Academic literature on the topic 'Integruotas statybos projektų valdymas'

Create a spot-on reference in APA, MLA, Chicago, Harvard, and other styles

Select a source type:

Consult the lists of relevant articles, books, theses, conference reports, and other scholarly sources on the topic 'Integruotas statybos projektų valdymas.'

Next to every source in the list of references, there is an 'Add to bibliography' button. Press on it, and we will generate automatically the bibliographic reference to the chosen work in the citation style you need: APA, MLA, Harvard, Chicago, Vancouver, etc.

You can also download the full text of the academic publication as pdf and read online its abstract whenever available in the metadata.

Journal articles on the topic "Integruotas statybos projektų valdymas"

1

Turskis, Zenonas, Marcin Gajzler, and Agnieszka Dziadosz. "RELIABILITY, RISK MANAGEMENT, AND CONTINGENCY OF CONSTRUCTION PROCESSES AND PROJECTS / STATYBOS PROCESŲ IR PROJEKTŲ PATIKIMUMAS, RIZIKOS IR ATSITIKTINUMŲ VALDYMAS." Journal of Civil Engineering and Management 18, no. 2 (2012): 290–98. http://dx.doi.org/10.3846/13923730.2012.672931.

Full text
Abstract:
The paper presents the evolution of concepts, an overview of research and applications pertaining to reliability in construction production, the use of reserves, robust itineraries, and contingency of time and cost. It describes areas of management advisory systems in relation to the cycle of risk analysis. The article also presents the main trends in different approaches to risk management in construction and construction project processes, such as reliability of production, discount methods, methods of reporting, integrated management together with trends towards standardisation of the inves
APA, Harvard, Vancouver, ISO, and other styles
2

Rasciauskaite, Daiva, Arturas Kaklauskas, and Paulius Kazokaitis. "Integruoto statybos projektų valdymo žinių modelis." Business: Theory and Practice 12, no. (2) (2011): 162–74. https://doi.org/10.3846/btp.2011.17.

Full text
Abstract:
Straipsnio tikslas – pristatyti integruoto statybos projektų valdymo žinių modelį, atliekant kompleksinę jį veikiančių ekonominių, teisės / reguliavimo, techninių, technologinių, organizacinių, valdymo, socialinių, kultūrinių, politinių, etinių, psichologinių ir švietimo veiksnių analizę, pateikti rekomendacijų konkurencingumui didinti. Išsamus tyrimas pareikalavo skirtingų žinių valdymo modelių ir teorijų pritaikymo bei integravimo (bendrosios praktikos, socialinio tinklo analizės, intelektinio kapitalo, informacijos teorijos, kompleksinio mokslo, konstruktyvizmo).
APA, Harvard, Vancouver, ISO, and other styles
3

Melnikas, Borisas, Artūras Jakubavičius, and Rolandas Strazdas. "THE DEVELOPMENT OF INNOVATION ACTIVITIES IN BUILDING CONSTRUCTION BY SAVING HEATING RESOURCES/INOVACINĖS VEIKLOS STATYBOJE PLĖTOJIMAS TAUPANT ŠILUMOS IŠTEKLIUS." JOURNAL OF CIVIL ENGINEERING AND MANAGEMENT 4, no. 3 (1998): 235–42. http://dx.doi.org/10.3846/13921525.1998.10531410.

Full text
Abstract:
Statyba yra viena svarbiausių ūkio šakų, daugiausia lemiančių šalies ekonominį, socialinį, technologinį vystymą. Statyboje sukurtų produktų kiekis, kokybė bei jų ekonominiai parametrai smarkiai veikia galimybes pasiekti tarn tikrą socialinio gyvenimo kokybės bei materialinės gamybos ir paslaugų modernumo lygį: statybos produkcija reiškiasi kaip esminis veiksnys, darantis įtaką kaštų lygiui visose visuomenės ekonominio gyvenimo grandyse bei ribojantis ekonomines galimybes plėtoti socialinę sferą bei materialinę veiklą daugelyje visuomenės raidos sričių. Statybos raida yra tiesiogiai sietina su
APA, Harvard, Vancouver, ISO, and other styles
4

Banaitienė, Nerija, Audrius Banaitis, and Artūras Norkus. "RISK MANAGEMENT IN PROJECTS: PECULIARITIES OF LITHUANIAN CONSTRUCTION COMPANIES / RIZIKOS VALDYMAS PROJEKTUOSE: LIETUVOS STATYBOS ĮMONIŲ SAVITUMAI." International Journal of Strategic Property Management 15, no. 1 (2011): 60–73. http://dx.doi.org/10.3846/1648715x.2011.568675.

Full text
Abstract:
Risk analysis and management is nowadays a critical factor to successful construction project management, as construction projects tend to be more complex, dynamic, always unique, and competition increasingly tougher. risk management helps the project participants—client, contractor or developer, consultant, and supplier—to meet their commitments and minimize negative impacts on construction project scope, cost, schedule (and quality, as a Result). The benefits of the risk management process include identifying and analyzing risks, and improvement of construction project management processes a
APA, Harvard, Vancouver, ISO, and other styles
5

Baalousha, Yousef, and Tahir Çelik. "AN INTEGRATED WEB-BASED DATA WAREHOUSE AND ARTIFICIAL NEURAL NETWORKS SYSTEM FOR UNIT PRICE ANALYSIS WITH INFLATION ADJUSTMENT / INTEGRUOTA INTERNETINĖ DUOMENŲ SAUGYKLOS IR DIRBTINIŲ NEURONINIŲ TINKLŲ SISTEMA, SKIRTA VIENETO KAINAI ANALIZUOTI ATSIŽVELGIANT Į INFLIACIJĄ." Journal of Civil Engineering and Management 17, no. 2 (2011): 157–67. http://dx.doi.org/10.3846/13923730.2011.576806.

Full text
Abstract:
Estimating is a fundamental part of construction projects. Accurate cost estimate is the single most important element involved in the series of events that leads to a profitable completion of a contract in construction industry. The success or failure of a project depends on the accuracy of cost estimation. A cost estimate becomes more difficult and more complicated under inflationary medium. An unpredictable inflation rate and long progress payment delay during this period makes the budgeting function very difficult, if not impossible. The cost estimation process uses lots of data. The avail
APA, Harvard, Vancouver, ISO, and other styles
6

Zhu, Yimin, Mehmet Emre Bayraktar, and Shu-Ching Chen. "APPLICATION OF METADATA MODELING TO DISPUTE REVIEW REPORT MANAGEMENT." JOURNAL OF CIVIL ENGINEERING AND MANAGEMENT 16, no. 4 (2010): 491–98. http://dx.doi.org/10.3846/jcem.2010.55.

Full text
Abstract:
Disagreements in construction projects often result in litigation that is both time‐consuming and expensive. A dispute review board (DRB) provides a valuable and proven alternative method of dispute resolution. Currently, the Florida Department of Transportation (FDOT) stores DRB reports in portable document format (PDF) with limited search capability. Improving information retrieval of DRB documents and providing a certain level of integration of DRB reports with relevant but heterogeneous data and documents is the key to enhancing the current FDOT DRB system. This paper presents a web‐based
APA, Harvard, Vancouver, ISO, and other styles

Dissertations / Theses on the topic "Integruotas statybos projektų valdymas"

1

Lepiochinas, Kirilas. "Vadovo vaidmens, organizuojant efektyvų statybos projekto komandos darbą, tyrimas." Master's thesis, Lithuanian Academic Libraries Network (LABT), 2007. http://vddb.library.lt/obj/LT-eLABa-0001:E.02~2007~D_20070629.145010-78824.

Full text
Abstract:
Šiandieninė verslo plėtra, sparčiai kintančios technologijos, konkurencijos augimas lemia ne tik didėjantį aukštos kvalifikacijos specialistų, kvalifikuotų darbininkų poreikį, bet ir tinkamo personalo valdymo strategijos pasirinkimą. Šio baigiamojo magistro darbo tikslas - ištirti vadovo vaidmenį statybos projekto komandoje, pasiūlyti komandos valdymo modelį. Šiam tikslui pasiekti keliami trys uždaviniai: Pirmas – atlikti Lietuvos bei užsienio šalių mokslinės literatūros analizę tema „Vadovo vaidmens, organizuojant efektyvų statybos projekto komandos darbą, tyrimas“. Antras – išnagrinėti tokia
APA, Harvard, Vancouver, ISO, and other styles
We offer discounts on all premium plans for authors whose works are included in thematic literature selections. Contact us to get a unique promo code!