Academic literature on the topic 'Inventory of calculations with contractors'

Create a spot-on reference in APA, MLA, Chicago, Harvard, and other styles

Select a source type:

Consult the lists of relevant articles, books, theses, conference reports, and other scholarly sources on the topic 'Inventory of calculations with contractors.'

Next to every source in the list of references, there is an 'Add to bibliography' button. Press on it, and we will generate automatically the bibliographic reference to the chosen work in the citation style you need: APA, MLA, Harvard, Chicago, Vancouver, etc.

You can also download the full text of the academic publication as pdf and read online its abstract whenever available in the metadata.

Journal articles on the topic "Inventory of calculations with contractors"

1

Angraeni, Rahmah Nur, Bayu Priyatna, Agustia Hananto, and Shofa Shofiah Hilabi. "Application of the K-Nearest Neighbor Method to Predict Demand for Goods from Customers at PT Sinergi Prima Enjineering." Instal : Jurnal Komputer 16, no. 02 (2024): 99–109. http://dx.doi.org/10.54209/jurnalinstall.v16i02.200.

Full text
Abstract:
PT Sinergi Prima Enjineering, which is engaged in services, has been trusted as a contractor in several companies facing challenges in handling the large number of requests for goods and stock inventory management. This research aims to improve the prediction of demand for goods and inventory management using the calculation of the K-Nearest Neighbor (KNN) method and RapidMiner tools. With the comparison of calculations between KNN and RapidMiner using ten test data, the results are appropriate where the categorical grouping is often ordered totaling five data, moderately ordered totaling two
APA, Harvard, Vancouver, ISO, and other styles
2

Zou, Ai Juan. "Optimization Research of Construction Inventory Management on Site Based on Inventory Theory." Applied Mechanics and Materials 209-211 (October 2012): 1321–25. http://dx.doi.org/10.4028/www.scientific.net/amm.209-211.1321.

Full text
Abstract:
Inventory management is to improve economic benefit of project procurement management by means of dominating order cycle and order quantity to minimize the stocks and total cost under the circumstance of normal construction.Firstly,inventory management involves material order,and contractors need to calculate parameters such as order cycle,order fee,order quantity,stocks fee,order lead time and safe stocks in order to make the total inventory fee minimized during construction.This article applies one branch of operations research--"inventory" to optimize the inventory management.
APA, Harvard, Vancouver, ISO, and other styles
3

Ortiz, José I., Eugenio Pellicer, and Keith R. Molenaar. "Determining Contingencies in the Management of Construction Projects." Project Management Journal 50, no. 2 (2019): 226–42. http://dx.doi.org/10.1177/8756972819827389.

Full text
Abstract:
This research describes the managerial approaches that contractors follow to determine different types of contingencies in construction project management. Two large Spanish general contractors were selected for an in-depth analysis. Interviews and surveys were conducted with six additional companies to explore the external validity of the findings. Managers constrain time and cost buffers through project objectives, applying heuristics to determine inventory buffers. The management of capacity buffers is entrusted to subcontractors. The contractors take advantage of scope and quality buffers
APA, Harvard, Vancouver, ISO, and other styles
4

RathinaKumar, V., K. Lalitha Priya, Prasanna Kumar.I, and C. Ravekumar. "Construction Material Management through Inventory Control Techniques." International Journal of Engineering & Technology 7, no. 3.12 (2018): 899. http://dx.doi.org/10.14419/ijet.v7i3.12.16558.

Full text
Abstract:
Objectives: A research has shown that the construction materials account for more than 55%-60% of the total expenditure of a project. Efficient material planning plays a major role in the successful handing over of a project within the estimated cost and schedule. Methods: This paper mainly focuses on materials planning and inventory control as these are the major aspects of material management. S-curve analysis is performed to measure the fluctuation between estimated materials cost and market materials cost. The major reasons for this are identified by interviewing engineers and contractors.
APA, Harvard, Vancouver, ISO, and other styles
5

Chen, Xiang, Xue Feng Zhou, and Wei Hou. "Application of Improved Safety Inventory Quantity in Building Construction." Applied Mechanics and Materials 99-100 (September 2011): 250–53. http://dx.doi.org/10.4028/www.scientific.net/amm.99-100.250.

Full text
Abstract:
Safety inventory quantity computation based on Collaborative Planning Forecasting & Replenishment (CPFR) can avoid uncertainty of material supply in building construction, which can also coordinate relationship between supplier and construction side to reduce inventory cost and to ensure the progress of construction. The paper analyzed systematically on relationship between lead time and safety inventory. Combining with application of CPFR and based on establishing good relation between material supplier and construction contractors, safety inventory level was reduced with management of le
APA, Harvard, Vancouver, ISO, and other styles
6

Kohar, Sulistyadi, I. Nyoman Dana, Wardana Agung, and Anna Nurasyiah. "ANALYSIS OF MATERIAL INVENTORY CONTROL THE METROSTATER CONSTRUCTION PROJECT IN DEPOK." Sustainable Environmental and Optimizing Industry Journal 4, no. 2 (2022): 131–41. http://dx.doi.org/10.36441/seoi.v4i2.1189.

Full text
Abstract:
In the last 10 years the construction sector boom has increased rapidly. The Government's Long-Term Plan and the leniency of government policies on investors wishing to invest in Indonesia have stimulated the growth of the construction sector in Indonesia. Increasingly adequate infrastructure encourages entrepreneurs or contractors to invest in public and private projects. One of the private construction projects being handled is the Depok Metrostater Project. This project is located in the city of Depok which has a Transit Oriented Development (TOD) concept. Currently the project is still in
APA, Harvard, Vancouver, ISO, and other styles
7

Ochilov, Farkhodjon Shavkatjonovich, and Bekhzod Mukhtarovich Reimbaev. "PROBLEMS OF SETTLEMENTS WITH SUPPLIERS AND CONTRACTORS." SCHOLAR 1, no. 1 (2023): 33–41. https://doi.org/10.5281/zenodo.7548650.

Full text
Abstract:
<em>In this article, the main problems of business entities in accounting with suppliers and contractors and ways to improve them, which will help to minimize errors in financial statements of business entities. The organization is not the last place in the accounting process in terms of volume and the importance of accounting procedures is occupied by accounting for settlements with suppliers and contractors for raw materials, materials, goods and other material values. This is due to the fact that the constantly occurring circuit household funds causes continuous renewal various calculations
APA, Harvard, Vancouver, ISO, and other styles
8

Rahmawati, Suci. "Analisis Penyimpanan Dan Pengeluaran Bahan Curah Pt Semen Padang." Jurnal Optimasi Sistem Industri 9, no. 2 (2010): 75. http://dx.doi.org/10.25077/josi.v9.n2.p75-80.2010.

Full text
Abstract:
Inventory are assets of a company. If the inventory control of a company is not good then the company will incur a loss, if a company's inventory control both the Performance Management will benefit. Inventory control is one of them can be done by looking at inventory turnover (ITO). Since inventory is a very important thing to do design a model that can be used as an alternative to using the approach Economic Production Quantity (EPQ). Inventory control can be done in a way determine the number of requests a year to do the calculations for the current conditions in the ITO. then performed 12
APA, Harvard, Vancouver, ISO, and other styles
9

Findlay, D. J. S., G. P. Škoro, G. J. Burns, and S. Ansell. "Experimental verification of spallation inventory calculations." Applied Radiation and Isotopes 125 (July 2017): 1–3. http://dx.doi.org/10.1016/j.apradiso.2017.03.023.

Full text
APA, Harvard, Vancouver, ISO, and other styles
10

Rahmawati, Suchi. "Analisis Penyimpanan dan Pengeluaran Bahan Curah PT. Semen Padang." Jurnal Optimasi Sistem Industri 10, no. 1 (2011): 127. http://dx.doi.org/10.25077/josi.v10.n1.p127-133.2011.

Full text
Abstract:
AbstractInventory are assets of a company. If the inventory control of a company is not good then the company will incur a loss, if a company's inventory control both the Performance Management will benefit. Inventory control is one of them can be done by looking at inventory turnover (ITO). Since inventory is a very important thing to do design a model that can be used as an alternative to using the approach Economic Production Quantity (EPQ). Inventory control can be done in a way determine the number of requests a year to do the calculations for the current conditions in the ITO. then perfo
APA, Harvard, Vancouver, ISO, and other styles
More sources

Dissertations / Theses on the topic "Inventory of calculations with contractors"

1

Савельєва, К. О. "Обліково-аналітичне забезпечення та контроль розрахунків з дебіторами і кредиторами (на прикладі ТОВ «Українські напої південь»)". Thesis, Одеський національний економічний університет, 2021. http://local.lib/diploma/Savelyeva.pdf.

Full text
Abstract:
Доступ до роботи тільки на території бібліотеки ОНЕУ, для переходу натисніть на посилання нижче<br>Результати аналізу свідчать, що організація діючої системи обліку та контролю на підприємстві не позбавлена недоліків. Так, на підприємстві відсутній наказ про облікову політику, відсутні розроблені графіки документообігу у розрізі окремих об’єктів обліку. Протягом досліджуваного періоду товариство досягло беззбитковості діяльності, проте його платоспроможність все ще залишається на низькому рівні. Запропоновано комплекс рекомендацій щодо удосконалення системи обліку та внутрішнього контролю роз
APA, Harvard, Vancouver, ISO, and other styles
2

Єгоров, Г. Г. "Облік, аналіз та контроль розрахунків з контрагентами у системі управління підприємством (на прикладі ТОВ «Геліос-1»)". Thesis, 2018. http://dspace.oneu.edu.ua/jspui/handle/123456789/9586.

Full text
Abstract:
У роботі розглядаються теоретичні і практичні аспекти обліку та контролю розрахунків з контрагентами, а також розробка шляхів удосконалення діючої системи управління дебіторською і кредиторською заборгованістю на досліджуваному підприємстві. Проаналізовано основні економічні показники діяльності досліджуваного підприємства, а також порядок ведення первинного, аналітичного та синтетичного обліку розрахунків з контрагентами, особливості системи внутрішнього контролю на досліджуваному підприємстві. Запропоновано: рекомендації щодо вдосконалення обліково-аналітичного забезпечення та контролю р
APA, Harvard, Vancouver, ISO, and other styles
3

Гузенко, Анна Миколаївна. "Особливості обліку і аналіз дебіторської заборгованості на ТОВ «Рассвет ЛТД»". Магістерська робота, 2019. https://dspace.znu.edu.ua/jspui/handle/12345/2728.

Full text
Abstract:
Гузенко А. М. Особливості обліку і аналіз дебіторської заборгованості на ТОВ «Рассвет ЛТД» : кваліфікаційна робота магістра спеціальності 071 "Облік і оподаткування" / наук. керівник В. В. Сьомченко. Запоріжжя : ЗНУ, 2020. 107 с.<br>UA : Кваліфікаційнаробота: 107с., 4 рис., 28 табл., 4 додатки, 60 літературних джерел. Метою кваліфікаційної poбoти є виявлення передумов, теоретичне та практичне дослідження організації і методики обліку та аналізу розрахунків з дебіторами на сільськогосподарському підприємстві в сучасних умовах господарювання.Об’єктомдocлiджeнняє opгaнiзaцiя бухгaлтepcькoгo
APA, Harvard, Vancouver, ISO, and other styles
4

Брайловський, Є. М. "Розрахунки підприємства як об’єкт обліку і аудиту: нормативне забезпечення та діюча практика". Thesis, 2018. http://dspace.oneu.edu.ua/jspui/handle/123456789/7490.

Full text
Abstract:
У роботі розглядаються теоретичні аспекти обліку та аудиту розрахунків з дебіторами і кредиторами в Україні, визначено дискусійні питання обліку розрахунків у системі управління підприємствами. Проаналізовано діючу практику обліку розрахунків на об’єкті дослідження, основні фінансово-економічні показники діяльності та фінансовий стан ТОВ «Вовківське». Запропоновано Шляхи удосконалення обліку і аудиту розрахункових операцій у сучасних умовах, проведено економіко-математичне моделювання ефективності розрахунків підприємств.<br>В работе рассматриваются теоретические аспекты учета и аудита рас
APA, Harvard, Vancouver, ISO, and other styles

Books on the topic "Inventory of calculations with contractors"

1

Domel, August W. Basic engineering calculations for contractors. McGraw-Hill, 1997.

Find full text
APA, Harvard, Vancouver, ISO, and other styles
2

United States. Government Accountability Office. Defense inventory: Army needs to strengthen internal controls for items shipped to repair contractors : report to congressional requesters. U.S. Government Accountability Office, 2005.

Find full text
APA, Harvard, Vancouver, ISO, and other styles
3

United States. Government Accountability Office. Defense inventory: Navy needs to improve the management over government-furnished material shipped to its repair contractors : report to congressional requesters. U.S. Government Accountability Office, 2004.

Find full text
APA, Harvard, Vancouver, ISO, and other styles
4

Buell, Gary R. Data compilation, synthesis, and calculations used for organic-carbon storage and inventory estimates for mineral soils of the Mississippi River Basin. U.S. Geological Survey, 2003.

Find full text
APA, Harvard, Vancouver, ISO, and other styles
5

Office, General Accounting. Industrial base: Contractors have ability to meet requirements for rations during wartime : report to congressional requesters. The Office, 1994.

Find full text
APA, Harvard, Vancouver, ISO, and other styles
6

United States. Congress. Senate. Committee on Governmental Affairs. Government furnished property provided to DOD contractors: Hearing before the Committee on Governmental Affairs, United States Senate, One Hundreth Congress, second session, March 21, 1988. U.S. G.P.O., 1988.

Find full text
APA, Harvard, Vancouver, ISO, and other styles
7

United States. Congress. House. Committee on Government Operations. Legislation and National Security Subcommittee. Government property furnished to DOD contractors: Hearing before a subcommittee of the Committee on Government Operations, House of Representatives, Ninety-ninth Congress, first session, March 6, 1985. U.S. G.P.O., 1985.

Find full text
APA, Harvard, Vancouver, ISO, and other styles
8

United States. Congress. House. Committee on Government Operations. Legislation and National Security Subcommittee. Government property furnished to DOD contractors: Hearing before a subcommittee of the Committee on Government Operations, House of Representatives, Ninety-ninth Congress, first session, March 6, 1985. U.S. G.P.O., 1985.

Find full text
APA, Harvard, Vancouver, ISO, and other styles
9

United States. Congress. House. Committee on Government Operations. Legislation and National Security Subcommittee. Government property furnished to DOD contractors: Hearing before a subcommittee of the Committee on Government Operations, House of Representatives, Ninety-ninth Congress, first session, March 6, 1985. U.S. G.P.O., 1985.

Find full text
APA, Harvard, Vancouver, ISO, and other styles
10

Office, General Accounting. Department of Energy: National security controls over contractors traveling to foreign countries need strengthening : report to Congressional requesters. U.S. General Accounting Office, 2000.

Find full text
APA, Harvard, Vancouver, ISO, and other styles
More sources

Book chapters on the topic "Inventory of calculations with contractors"

1

Atescan-Yuksek, Yagmur, Sanjooram Paddea, Sharon Jackson, Mark Jolly, and Konstantinos Salonitis. "Quantifying the Carbon Footprint of Events: A Life Cycle Assessment-Based Framework for Evaluating Impact of Location and Timing." In Lecture Notes in Mechanical Engineering. Springer Nature Switzerland, 2025. https://doi.org/10.1007/978-3-031-77429-4_31.

Full text
Abstract:
AbstractThis research proposes a Life Cycle Assessment-based framework to quantify the carbon footprint of events, considering the event's location and timing. The framework aims to standardise environmental impact calculations through inventory analysis. To validate it, a comparative analysis on conducting an event in different locations and time periods, while maintaining similar scale and nature is conducted. The assessment includes emissions from attendee transport, accommodation, food and drink, and venue. Additionally, it considers emission reductions resulting from attendees not using t
APA, Harvard, Vancouver, ISO, and other styles
2

Wen, Xingjian, Zian Zhai, Songqian Tang, Chao Tian, and Zhouyu Liu. "Development and Verification of a New Depletion, Activation and Radiation Source Term Calculation Code." In Springer Proceedings in Physics. Springer Nature Singapore, 2023. http://dx.doi.org/10.1007/978-981-99-1023-6_46.

Full text
Abstract:
AbstractExisting depletion and source term calculation codes lack flexible interfaces, which is difficult to meet the actual engineering design needs. Based on the Chebyshev rational approximation method, a new depletion, activation and source term calculation code TIST is developed and verified. Full-fidelity depletion library based on ENDF-VII.0 and EAF2010 contains 3837 isotopes is generated. Flexible interfaces are built-in to support cross sections from different sources for depletion and activation calculations. The EAF2010 library and the cross sections from the high-fidelity code NECP-
APA, Harvard, Vancouver, ISO, and other styles
3

Fufa, Selamawit Mamo, Marianne Kjendseth Wiik, and Inger Andressen. "Estimated and Actual Construction Inventory Data in Embodied Greenhouse Gas Emission Calculations for a Norwegian Zero Emission Building (ZEB) Construction Site." In Sustainability in Energy and Buildings 2018. Springer International Publishing, 2018. http://dx.doi.org/10.1007/978-3-030-04293-6_14.

Full text
APA, Harvard, Vancouver, ISO, and other styles
4

"Inventory Control." In Operations Research Calculations Handbook. CRC Press, 2001. http://dx.doi.org/10.1201/9781420039221-13.

Full text
APA, Harvard, Vancouver, ISO, and other styles
5

"Inventory Control." In Operations Research Calculations Handbook. CRC Press, 2001. http://dx.doi.org/10.1201/9781420039221.ch9.

Full text
APA, Harvard, Vancouver, ISO, and other styles
6

"Inventory Control." In Operations Research Calculations Handbook. CRC Press, 2009. http://dx.doi.org/10.1201/ebk1420052404-14.

Full text
APA, Harvard, Vancouver, ISO, and other styles
7

"Oil Transportation With Weather Disruptions." In Advances in Business Strategy and Competitive Advantage. IGI Global, 2025. https://doi.org/10.4018/979-8-3373-0959-0.ch008.

Full text
Abstract:
An oil rig in the middle of the Gulf of Mexico serves as an inventory stocking point for several other platforms. Crude oil is generated daily. Some of it is shipped to the coast, some is sent through a pipeline, and the rest is stored at the rig. The potential crude output generated daily is Pert distributed. This output is constrained because of storage capacity. If the inventory after shipping and pipeline amounts are greater than the storage capacity, the crude output is decreased and the final inventory that day is equal to the storage capacity, implemented in the Inventory Calculations.
APA, Harvard, Vancouver, ISO, and other styles
8

Kasemsap, Kijpokin. "The Roles of Logistics Service Providers and Supply Chain Integration in Global Supply Chain." In Global Intermediation and Logistics Service Providers. IGI Global, 2017. http://dx.doi.org/10.4018/978-1-5225-2133-4.ch014.

Full text
Abstract:
This chapter explains the overview of logistics service providers (LSPs); LSPs' competitive advantage and logistics performance; LSPs, city logistics, and freight distribution in megacities; LSPs and cloud computing utilization; LSPs, green supply chain, and environmental sustainability; the prospect of supply chain integration (SCI); and the important aspects of SCI in global supply chain. LSPs can share responsibility for managing global supply chain, keeping stores properly stocked, and delivering the perfect order every time. Carriers and logistics intermediary perform more roles than what
APA, Harvard, Vancouver, ISO, and other styles
9

Ramasamy, Sivasamy, and Wilford B. Molefe. "Markov models related to inventory systems, control charts and forecasting methods." In Markov Model [Working Title]. IntechOpen, 2023. http://dx.doi.org/10.5772/intechopen.1001362.

Full text
Abstract:
A Markov model describes a randomly varying system that satisfies the Markov property. This means that future and past states at any time are independent of the current state. The most commonly used Markov models are Markov chains and higher-order Markov chains. Therefore, three types of Markov models are proposed in this chapter of the book: (i) Supply chain management, (ii) Markov queue waiting time monitoring, and (iii) Markov fuzzy time series forecasting. The introduction introduces the Markov chain (MC) and summarizes the most important aspects of Markov chain analysis. Using the classic
APA, Harvard, Vancouver, ISO, and other styles
10

Haigh, Thomas, Mark Priestley, and Crispin Rope. "Converting ENIAC." In Eniac in Action. The MIT Press, 2016. http://dx.doi.org/10.7551/mitpress/9780262033985.003.0008.

Full text
Abstract:
In spring 1947 a project was launched to convert ENIAC to run code written in the new from introduced with the 1945 “First Draft of a Report on the EDVAC.” This was intertwined with the planning of Monte Carlo calculations for Los Alamos. Adele Goldstine worked with a team of contractors led by Jean Bartik and a group of Aberdeen employees under Richard Clippinger to develop a succession of planned “set-ups” to implement a new control mechanism and vocabulary of general purpose instructions for ENIAC. Our analysis focuses particularly on the relationship of this work on concurrent efforts by v
APA, Harvard, Vancouver, ISO, and other styles

Conference papers on the topic "Inventory of calculations with contractors"

1

Baliunas, Ralph, and Louis G. Lyras. "Factors Determining the Size of Projects." In Paint and Coatings Expo (PACE) 2007. SSPC, 2007. https://doi.org/10.5006/s2007-00007.

Full text
Abstract:
Abstract This paper identifies the problems with large multi-year painting projects and discusses the benefit to Facility Owners and Contractors for breaking a large bridge project into smaller phases. It will also discuss factors that determine the optimum size, large or small, of a painting project and their impacts. The size of a project will be analyzed from the standpoint of money, time, insurance, bonding, manpower, inspection, management, bridge inventory and job quality. All of these factors are important and must be addressed during the design of any project. When both the Facility Ow
APA, Harvard, Vancouver, ISO, and other styles
2

Sherar, Brent W. A., and Peter F. Ellis. "Optimizing Sour Qualification Testing – Verification of H2S Solubility from H2S/N2 Gas Mixtures up to 20,000 Psig at 70 °F." In CORROSION 2021. AMPP, 2021. https://doi.org/10.5006/c2021-16317.

Full text
Abstract:
Abstract Traditionally, the H2S partial pressure (PH2S) of the gas phase has been used as the primary sour severity metric for material qualification and selection under ANSI/NACE MR0175/ISO 15156 guidelines. While the PH2S is appropriate for characterizing low total pressure systems, the strict, or ideal, Henry's Law approach leads to over estimation of the dissolved H2S concentration (CH2S) for high-pressure, high-temperature (HPHT) wells by up to ~20 times at 70 °F. Alternatively, the Ensemble Henry's Law equation corrects for the non-ideal phase behavior of H2S at HPHT conditions and avoid
APA, Harvard, Vancouver, ISO, and other styles
3

Chinniah, Kevin. "Blockchain-ing of Supplier's Management Process." In Construction Blockchain Conference 2021. Design Computation, 2021. http://dx.doi.org/10.47330/cbc.2021.qnaq7017.

Full text
Abstract:
Disconnected workflow or fragmentation is a challenge in the construction industry. Supply chains have been a complicated issue since the beginning of time, in all types of situations, from the battlefield to the project site. Now builders, developers, manufacturers, architects, and contractors are dealing with that reality “In technology, over decades of management, there is a great deal of information and stakeholders have learned to use data to make decisions on supply chain visibility and inventory, which means it can be managed better”.
APA, Harvard, Vancouver, ISO, and other styles
4

Gürel, S. Kaan, İ. Ahmet Yüksel, and T. Oytun Kılınç. "Uncertainty calculations and calibration of metal hardness testing equipment." In 19th International Congress of Metrology (CIM2019), edited by Sandrine Gazal. EDP Sciences, 2019. http://dx.doi.org/10.1051/metrology/201912002.

Full text
Abstract:
Hardness tests have vital role for industries such as aerospace, ground vehicles and energy. In these industries, companies do not have only their internal processes but also sub-contractors. Therefore, for acceptance tests, hardness testing becomes so convenient way in order to confirm conformance of incoming materials to the facility. Additionally, there are also critical test limits that comes from technology transfer projects. In these type of projects, specification limits can be very narrow and design of parts may not be changed and quality (non-conformance) decisions may not be taken as
APA, Harvard, Vancouver, ISO, and other styles
5

Daher, Elie, and Sameh Schoeib. "Revolutionizing Tool Management in Oil and Gas Facilities." In SPE International Health, Safety, Environment and Sustainability Conference and Exhibition. SPE, 2024. http://dx.doi.org/10.2118/220468-ms.

Full text
Abstract:
Abstract One of the key challenges to worker productivity is increasing tool time. One way to increase worker productivity is to ensure that workers have easy access to the equipment they need and ensure that the equipment can be effectively tracked, maintained and is ready for use. The Automated In-Plant Equipment Center (AIPEC) is an automated warehouse with all the required equipment set up on the worksite itself. The AIPEC is a groundbreaking innovation in safety tool management within oil and gas facilities and refineries. Acting as the central point of onsite distribution, the AIPEC stre
APA, Harvard, Vancouver, ISO, and other styles
6

Asai, Shiho, Yukiko Hanzawa, Keisuke Okumura, et al. "Comparison of Post-Irradiation Experimental Data and Theoretical Calculations for Inventory Estimation of Long-Lived Fission Products in Spent Nuclear Fuel." In ASME 2010 13th International Conference on Environmental Remediation and Radioactive Waste Management. ASMEDC, 2010. http://dx.doi.org/10.1115/icem2010-40101.

Full text
Abstract:
The inventory estimation of long-lived fission products (LLFP) is essential for the long-term safety assessment of a geological disposal of high-level radioactive waste (HLW). 79Se and 135Cs are a main contributor to the total dose from the geological repository of HLW, owing to their solubility in the strata. In this study, the post-irradiation experimental data of LLFPs, such as 79Se, 99Tc, 126Sn and 135Cs, were compared with ORIGEN2 calculation using the data library of JENDL-3.3. A fragment of the UO2 fuel pellet irradiated in a commercial Japanese PWR was dissolved with nitric acid in a h
APA, Harvard, Vancouver, ISO, and other styles
7

Jaecky, Jaecky, and Hajan Hidayat. "Inventory Management Calculations Using the Economic Order Quantity (EOQ) Method in Determining Optimal Quantity and Costs at CV Standard Entertainment Music." In Proceedings of the 5th International Conference on Applied Economics and Social Science, ICAESS 2023, 7 November 2023, Batam, Riau islands, Indonesia. EAI, 2023. http://dx.doi.org/10.4108/eai.7-11-2023.2342298.

Full text
APA, Harvard, Vancouver, ISO, and other styles
8

Young, Raymond, and Manou Kashani. "Carbon Footprint Minimization for Deepwater Pipelay Construction." In Offshore Technology Conference. OTC, 2021. http://dx.doi.org/10.4043/31105-ms.

Full text
Abstract:
Abstract With recent oil and gas discoveries in deepwater offshore, these regions have become the hotspots for oil and gas exploration. It is for this reason that major pipelay contractors are developing more advanced construction vessels with high lay tension capacity, payload and high specification dynamic positioning (DP) systems to operate at even deeper water depths. It is shown that at water depths of greater than 1000 m, one of the major construction costs is fuel consumption, which is directly related to the level of thrust and hold back tension the laybarge is required to maintain dur
APA, Harvard, Vancouver, ISO, and other styles
9

Miśkiewicz, Mikołaj, Andrzej Kozakiewicz, Lukasz Pyrzowski, and Bartosz Sobczyk. "Sustainable development requires risky decisions - problematic 300 ton overweight transport passing a bridge." In IABSE Congress, New Delhi 2023: Engineering for Sustainable Development. International Association for Bridge and Structural Engineering (IABSE), 2023. http://dx.doi.org/10.2749/newdelhi.2023.0674.

Full text
Abstract:
&lt;p&gt;Oversize load passages over bridges are one of the research issues related to sustainable development that engineering and scientific teams around the world have to deal with . The article presents the scope of activities that enabled the passage of an oversized vehicle with a total weight of over 300 tons over a reinforced concrete slab. The bridge load capacity is 30 tons. In order to assess the capacity of the bridge, detailed visual inspection, inventory, tests during a load test, field and laboratory tests of concrete, location and inventory of reinforcement, static and strength
APA, Harvard, Vancouver, ISO, and other styles
10

APLOCINA, Elita, Aivars ABOLTINS, and Juris PRIEKULIS. "MANURE MANAGEMENT SYSTEMS AND NITROGEN EMISSIONS IN LATVIA." In Rural Development 2015. Aleksandras Stulginskis University, 2015. http://dx.doi.org/10.15544/rd.2015.047.

Full text
Abstract:
The information for the present overview on manure management in different countries was primarily gathered through a survey using Greenhouse Gas (GHG) Inventory reports. In Latvia, N2O emissions from manure management account for only 5 % of total N2O emissions. Dividing the N2O emissions by all livestock species, 75.9 % are produced by cattle, 12.67 % – by poultry, and 4.96 % – by pigs. In GHG Inventory reports, there are great differences in manure output calculations for all livestock species in different countries (V, % ≥ 20), because all livestock is included in the same group, without s
APA, Harvard, Vancouver, ISO, and other styles

Reports on the topic "Inventory of calculations with contractors"

1

Schnitzler, B. G., and J. B. Briggs. TMI-2 isotopic inventory calculations. Office of Scientific and Technical Information (OSTI), 1985. http://dx.doi.org/10.2172/6332535.

Full text
APA, Harvard, Vancouver, ISO, and other styles
2

Ahle, L. E., and J. L. Boles. Scoping Inventory Calculations for the Rare Isotope Accelerator. Office of Scientific and Technical Information (OSTI), 2003. http://dx.doi.org/10.2172/15004552.

Full text
APA, Harvard, Vancouver, ISO, and other styles
3

Goldberg, H. J. ,. Westinghouse Hanford. Calculational note in support of inventory assessment of three tank trailers using radiological attentuation calculations. Office of Scientific and Technical Information (OSTI), 1996. http://dx.doi.org/10.2172/325649.

Full text
APA, Harvard, Vancouver, ISO, and other styles
4

Liscum-Powell, J. Automation of ORIGEN2 calculations for the transuranic waste baseline inventory database using a pre-processor and a post-processor. Office of Scientific and Technical Information (OSTI), 1997. http://dx.doi.org/10.2172/495727.

Full text
APA, Harvard, Vancouver, ISO, and other styles
5

Voegeli, Sam. PR317-17700-R01 Accuracy of Temperature Logging for Calculating Gas Inventory in Storage Caverns. Pipeline Research Council International, Inc. (PRCI), 2019. http://dx.doi.org/10.55274/r0011589.

Full text
Abstract:
Fundamentally, measurements of the temperature and pressure within a cavern are required to estimate the gas inventory. To obtain these measurements, downhole wireline logging has been the conventional industry standard, and several calculation methods have been developed to esti-mate the gas inventory based on wireline measurements. However, wireline logs only measure the temperature at the centerline of the cavern, which requires an assumption that the temperature at the cavern centerline represents the entire gas temperature at that particular depth. If horizontal variations in temperature
APA, Harvard, Vancouver, ISO, and other styles
6

Voegeli, Sam. PR-317-17700-WEB Accuracy of Temperature Logging for Calculating Gas Inventory in Storage Caverns. Pipeline Research Council International, Inc. (PRCI), 2019. http://dx.doi.org/10.55274/r0011606.

Full text
Abstract:
Tuesday, August 8, 2019 PRESENTER: Sam Voegeli, M.Sc., RESPEC HOST: John Jackson, Enbridge MODERATOR: Laurie Perry, PRCI CLICK BUY/DOWNLOAD TO ACCESS WEBINAR REGISTRATION LINK The PRCI Underground Storage Technical Committee invites you to join them as they present the results from a research project that evaluated the accuracy of downhole wireline temperature logging, and the related calculation methods, to estimate gas inventory in storage caverns. Expected Benefits/Learning Outcomes: � Gain an understanding of how inaccurate wireline temperature logging impacts the estimated gas inventory i
APA, Harvard, Vancouver, ISO, and other styles
7

Young, Craig. Problematic plant monitoring in George Washington Carver National Monument: 2006–2020. Edited by Tani Hubbard. National Park Service, 2022. http://dx.doi.org/10.36967/nrr-2293655.

Full text
Abstract:
Managers are challenged with the impact of problematic plants, including exotic, invasive, and pest plant species. Information on the cover and frequency of these plant species is essential for developing risk-based approaches to managing them. Based on surveys conducted in 2006, 2013, 2016, and 2020, Heartland Inventory and Monitoring Network staff and contractors identified a cumulative total of 50 potentially problematic plant species in George Washington Carver National Monument. Of the 35 species found in 2020 , we characterized 8 as very low frequency, 9 as low frequency, 10 as medium fr
APA, Harvard, Vancouver, ISO, and other styles
8

Young, Craig. Problematic plant monitoring in Wilson's Creek National Battlefield: 2006–2020. Edited by Tani Hubbard. National Park Service, 2022. http://dx.doi.org/10.36967/nrr-2293658.

Full text
Abstract:
Managers are challenged with the impact of problematic plants, including exotic, invasive, and pest plant species. Information on the cover and frequency of these plant species is essential for developing risk-based approaches to managing them. Based on surveys conducted in 2006, 2013, 2016, and 2020, Heartland Inventory and Monitoring Network staff and contractors identified a cumulative total of 53 potentially problematic plant species in Wilson’s Creek National Battlefield. Of the 40 species found in 2020, we characterized 9 as very low frequency, 13 as low frequency, 9 as medium frequency,
APA, Harvard, Vancouver, ISO, and other styles
9

Young, Craig. Problematic plant monitoring in Pea Ridge National Military Park: 2006–2021. Edited by Tani Hubbard. National Park Service, 2022. http://dx.doi.org/10.36967/nrr-2293656.

Full text
Abstract:
Managers are challenged with the impact of problematic plants, including exotic, invasive, and pest plant species. Information on the cover and frequency of these plant species is essential for developing risk-based approaches to managing them. Based on surveys conducted in 2006, 2013, 2018, and 2021, Heartland Inventory and Monitoring Network staff and contractors identified a cumulative total of 38 potentially problematic plant species in Pea Ridge National Military Park. Of the 35 species found in 2021, we characterized 13 as very low frequency, 9 as low frequency, 9 as medium frequency, an
APA, Harvard, Vancouver, ISO, and other styles
10

Cleary, Summers, and Summers Cleary. Land cover summary statistics for Pacific Island Network park units. National Park Service, 2024. http://dx.doi.org/10.36967/2303772.

Full text
Abstract:
This report documents the acquisition of source data and calculation of land cover summary statistics datasets for 12 National Park Service Pacific Island Network park units: Ala Kahakai National Historic Trail, American Memorial Park, Haleakal? National Park, Hawai?i Volcanoes National Park, Honouliuli National Monument, Kalaupapa National Historical Park, Kaloko-Honok?hau National Historical Park, National Park of American Samoa, Pu?uhonua o H?naunau National Historical Park, Pu?ukohol? Heiau National Historic Site, War in the Pacific National Historical Park, and Pearl Harbor National Memor
APA, Harvard, Vancouver, ISO, and other styles
We offer discounts on all premium plans for authors whose works are included in thematic literature selections. Contact us to get a unique promo code!