Academic literature on the topic 'IT/ITES projects'

Create a spot-on reference in APA, MLA, Chicago, Harvard, and other styles

Select a source type:

Consult the lists of relevant articles, books, theses, conference reports, and other scholarly sources on the topic 'IT/ITES projects.'

Next to every source in the list of references, there is an 'Add to bibliography' button. Press on it, and we will generate automatically the bibliographic reference to the chosen work in the citation style you need: APA, MLA, Harvard, Chicago, Vancouver, etc.

You can also download the full text of the academic publication as pdf and read online its abstract whenever available in the metadata.

Journal articles on the topic "IT/ITES projects"

1

Mayank, kathor, and moza Amit. "Risk Identification and Mitigation in Commercial Interior Projects for IT/ITES in India." Journal of Building Construction 7, no. 2 (2025): 25–50. https://doi.org/10.5281/zenodo.15549923.

Full text
Abstract:
<em>This paper explores risk assessment in commercial interior fit-out projects within India's IT and IT-enabled services (ITES) sector. The primary aim of the study is to identify various risks associated with interior fit-out projects in office environments, understand how to manage these risks effectively to manage the cost and time. The research focuses on both overall and delivery risks specific to interior fit outs. Key strategies such as delay management, resource allocation, and technology selection are examined. Based on a review of existing literature, a questionnaire with 15 targete
APA, Harvard, Vancouver, ISO, and other styles
2

Jigeesh, Nasina. "Workforce issues and their impact on projects: study on the Indian IT and ITeS industry." Journal of Project, Program & Portfolio Management 4, no. 1 (2013): 1. http://dx.doi.org/10.5130/pppm.v4i1.2810.

Full text
Abstract:
Today’s information technology (IT) industry is facing challenges from different corners because of globalization, technological changes, market and economic fluctuations and dynamic changes in customer requirements. A new stream of jobs has been emerging from time to time in the IT and IT enabled services (ITeS) industry. People management is gaining more concern when compared to technology management. Issues of recruiting right people with right and special skills, motivating them to improve their productivity continuously and retaining potential and productive people are becoming additional
APA, Harvard, Vancouver, ISO, and other styles
3

Chandrakant Manthanwar, Dhananjay, and Jagath Kumari Dungi. "Risk Assessment for Fast Tracked Commercial Interior Fit-Out IT/ITES Projects in India." Asian Review of Civil Engineering 12, no. 1 (2023): 24–28. http://dx.doi.org/10.51983/tarce-2023.12.1.3625.

Full text
Abstract:
This paper is about risk management in fast-track commercial interior fit out projects. The aim of the study is to identify risk in interior fit out projects such as in offices of IT/ITES, also to understand how to manage those risk and to propose a framework to mitigate risk in interior fit out projects. An effort has been made to study and identify the factors which includes overall risks and delivery risk in an interior fit out. Various Strategy such as delay management, Resource Management and technological choice has also been taken into consideration. Factors based on available literatur
APA, Harvard, Vancouver, ISO, and other styles
4

Srivastava, Vandana, A. Sharfuddin ., and Sanjeev Kishore . "Determinants of Service Quality in High-end IT Enabled Services: An Indian Perspective." Information Management and Business Review 4, no. 10 (2012): 523–31. http://dx.doi.org/10.22610/imbr.v4i10.1008.

Full text
Abstract:
IT enabled Services (ITeS) have charted tremendous growth in India over the last two decades. Over the years, the service domain has evolved to include high-end services as well as traditional services. Along with fresh opportunities, the evolving service landscape brings new challenges for the service providers, with quality being the prime challenge. As the nature of services change, new determinants of service quality emerge. Towards this aim, this research paper presents a fresh perspective of determinants of service quality in high-end ITeS by integrating elements from traditional service
APA, Harvard, Vancouver, ISO, and other styles
5

T, Kalidasan. "Project management – a modern management practice in it industry." Journal of Management and Science 6, no. 3 (2016): 226–30. http://dx.doi.org/10.26524/jms.2016.20.

Full text
Abstract:
Information Technology (IT) plays an imperative role in almost every aspect of our lives. The world today has become one global village due to the widespread use of Information Technology. The government and business have become so reliant on IT that it is hard to imagine how they would function without it. It has become an ever-increasing resource with which organizations have created and sustained their competitive advantages. The IT sector basically consists of software and services, Information Technology Enabled Services (ITES) and the hardware segments which is called as projects. All th
APA, Harvard, Vancouver, ISO, and other styles
6

Kalidasan, Mr T. "PROJECT MANAGEMENT–AN WAY TO OVERCOME THE FAILURE OFPROJECT IN IT INDUSTRY." EPH - International Journal of Business & Management Science 1, no. 2 (2015): 1–4. http://dx.doi.org/10.53555/eijbms.v3i1.21.

Full text
Abstract:
Information Technology (IT) plays an imperative role in almost every aspect of our lives. The world today has becomeone global village due to the widespread use of Information Technology. The government and business have become soreliant on IT that it ishard to imagine how they would function without it. It has become an ever-increasing resourcewith which organizations have created and sustained their competitive advantages. The IT sector basically consists ofsoftware and services, Information Technology Enabled Services (ITES) and the hardware segments which is called asprojects. All these th
APA, Harvard, Vancouver, ISO, and other styles
7

Nair, Remya, and J. Meenakumari. "Analyse, Enhance and Reiterate Risk management strategies, implemented in Information Technology Project Management, amidst COVID-19." Shanlax International Journal of Management 8, S1-Feb (2021): 49–57. http://dx.doi.org/10.34293/management.v8is1-feb.3757.

Full text
Abstract:
The global perspective of human life drastically changed after the spread of COVID-19. The world reduced itself, to a digital cocoon. Education, work, commerce, shopping, industry, sales - all walks of life, transformed mostly into a digital mode. The IT (Information Technology) and ITES (IT Enabled services) saw a tremendous transformation in the operational aspects. ‘WFH (Work from Home)’ enabled the resources to work from their preferred locations. These factors increased the risk of data management and data security. The security of the network and the personal devices used to handle the s
APA, Harvard, Vancouver, ISO, and other styles
8

Srinivasan, Vaishnavi, Manimegalai Rajkumar, Srivatsan Santhanam, and Arjit Garg. "PlatFab: A Platform Engineering Approach to Improve Developer Productivity." Journal of Information Systems Engineering and Business Intelligence 11, no. 1 (2025): 79–90. https://doi.org/10.20473/jisebi.11.1.79-90.

Full text
Abstract:
Background: Software developers are key players in IT/ITES business in order to drive software development by writing high-quality code quickly. Based on user needs, they must adapt evolving technologies and tools to produce efficient and successful software using Software Development Life Cycle (SDLC) principles. Platform Engineering comprises a set of activities to design, develop and maintain software code, making it a foundation for building software applications. Objective: This work focuses on reducing the time and effort needed to execute the above tasks that boosts software developer p
APA, Harvard, Vancouver, ISO, and other styles
9

Tahrir, Muhammad, Fajar Ramadhani, and Dewi Astuti Baco. "Critical Path Analysis Using Microsoft Project 2016 on the Implementation Schedule of Residential House Construction Projects." TEPIAN 4, no. 4 (2023): 196–206. http://dx.doi.org/10.51967/tepian.v4i4.2969.

Full text
Abstract:
A project requires good planning, careful execution and effective and efficient use of resources. The implementation of the development of a construction project consists of a series of activities that are interrelated with one another. This is where the importance of planning and scheduling projects properly to facilitate implementation in the field and development can be completed on time according to schedule. The existence of obstacles or obstacles that will occur in the process of implementing a construction project can be seen and predicted from the level of urgency of the work items to
APA, Harvard, Vancouver, ISO, and other styles
10

Subramaniam, Chitdrakantan, Syuhaida Ismail, Serdar Durdyev, Wan Nurul Mardiah Wan Mohd Rani, Nur Fatin Syazwani Abu Bakar, and Audrius Banaitis. "Overcoming the Project Communications Management Breakdown amongst Foreign Workers during the COVID-19 Pandemic in Biophilia Inveigled Construction Projects in Malaysia." Energies 14, no. 16 (2021): 4790. http://dx.doi.org/10.3390/en14164790.

Full text
Abstract:
The property sector is revitalised to incorporate sustainability, specifically the biophilic design, to encourage human interaction with nature. Thus, there is an urgent need to communicate the biophilic design elements amongst stakeholders, especially the foreign workers, to ensure the project meets the requirement. However, standard project communications management is no longer practical, as the construction industry worldwide has been severely impacted by the Coronavirus Disease 2019 (COVID-19) pandemic. Hence, this paper evaluates the biophilic design elements to be communicated and exami
APA, Harvard, Vancouver, ISO, and other styles
More sources

Dissertations / Theses on the topic "IT/ITES projects"

1

Silva, Valtemir de Alencar e. "Proposta de interface entre a WBS do projeto e a configuração do produto: uma contribuição para o acompanhamento de projetos." Universidade de São Paulo, 2006. http://www.teses.usp.br/teses/disponiveis/18/18140/tde-04012007-144836/.

Full text
Abstract:
Este trabalho investiga a integração entre a gestão de itens da WBS de projetos e os itens da configuração de produtos, visando um acompanhamento mais eficiente de projetos de desenvolvimento de produto. Trata-se de uma pesquisa-ação na qual se propôs um modelo de interface entre sistemas de gestão de projetos e sistemas de gestão de configuração e empreendeu-se uma análise de sua aplicação em uma empresa de desenvolvimento de software. A interface define um mecanismo para apurar o trabalho desenvolvido, a partir das alterações dos itens da configuração e, através do relacionamento entre estes
APA, Harvard, Vancouver, ISO, and other styles
2

Cheng, Chung-shan, and 鄭重山. "The project management stream (PMS) for public works projects: An analysis of its formulation andimplementation." Thesis, The University of Hong Kong (Pokfulam, Hong Kong), 1998. http://hub.hku.hk/bib/B31965568.

Full text
APA, Harvard, Vancouver, ISO, and other styles
3

Cheng, Chung-shan. "The project management stream (PMS) for public works projects : an analysis of its formulation and implementation /." Hong Kong : University of Hong Kong, 1998. http://sunzi.lib.hku.hk/hkuto/record.jsp?B19711372.

Full text
APA, Harvard, Vancouver, ISO, and other styles
4

Eizak, Shiri Farhad. "Planning intentionality and its implications for project planned time." Thesis, University of Manchester, 2015. https://www.research.manchester.ac.uk/portal/en/theses/planning-intentionality-and-its-implications-for-project-planned-time(db4669e5-68be-4426-9bc4-73f71f7361b4).html.

Full text
Abstract:
Within the construction industry, proximity of actual to scheduled completion time is a primary performance measure, and deviations from planned schedules remain a popular concern in the field of construction management. Prevailing research assumes that delays arise either from flawed execution of the plan or from failure to plan effectively. Thus, solutions suggested include improving execution and developing ever more sophisticated planning techniques. In spite of these efforts, accuracy in scheduling construction projects has shown little or no improvement, and clients continue to incur the
APA, Harvard, Vancouver, ISO, and other styles
5

Islam, Md Mainul. "Optimizing Concessionary Items' Values for Procuring Privately Financed Infrastructure Projects." Thesis, Griffith University, 2009. http://hdl.handle.net/10072/366981.

Full text
Abstract:
To provide reliable and cost-effective infrastructure services to the public, governments around the globe often seek participation from the private sector with an emphasis on their ability to provide private finance. As such, most countries exploit competitive tendering to award Privately Financed Infrastructure (PFI) projects to sponsors representing the private sector. Within the framework of competitive procurement, sponsors not only strive to maximize their potential of winning such ventures at the tendering stage, but they also aspire to achieve a certain level of profit reflecting the r
APA, Harvard, Vancouver, ISO, and other styles
6

Silva, Cleuton Martins da. "Projeto Aprender+: uma análise dos itens de Matemática nos cadernos dos 1º e 2º bimestres em relação ao desenvolvimento de competências e habilidades." Universidade Federal de Goiás, 2018. http://repositorio.bc.ufg.br/tede/handle/tede/8570.

Full text
Abstract:
Submitted by Luciana Ferreira (lucgeral@gmail.com) on 2018-06-12T11:33:47Z No. of bitstreams: 2 Dissertação - Cleuton Martins da Silva - 2018.pdf: 8653434 bytes, checksum: eff81a5e00e2f043d2a935846303dade (MD5) license_rdf: 0 bytes, checksum: d41d8cd98f00b204e9800998ecf8427e (MD5)<br>Approved for entry into archive by Luciana Ferreira (lucgeral@gmail.com) on 2018-06-12T12:22:47Z (GMT) No. of bitstreams: 2 Dissertação - Cleuton Martins da Silva - 2018.pdf: 8653434 bytes, checksum: eff81a5e00e2f043d2a935846303dade (MD5) license_rdf: 0 bytes, checksum: d41d8cd98f00b204e9800998ecf8427e (MD5)<br>Ma
APA, Harvard, Vancouver, ISO, and other styles
7

Kiskis, Susan. "Effects of test administrations on general, test, and computer anxiety, and efficacy measures." CSUSB ScholarWorks, 1991. https://scholarworks.lib.csusb.edu/etd-project/579.

Full text
APA, Harvard, Vancouver, ISO, and other styles
8

Franks, Tom R. "Goodbye to Projects? - A livelihoods-grounded audit of the Sustainable Management of the Usangu Wetland and its Catchment (SMUWC) project in Tanzania." Bradford Centre for International Development, 2003. http://hdl.handle.net/10454/3040.

Full text
Abstract:
No<br>Approaches to projects and development have undergone considerable change in the last decade with significant policy shifts on governance, gender, poverty eradication, and environmental issues. Most recently this has led to the adoption and promotion of the sustainable livelihood (SL) approach. The adoption of the SL approach presents challenges to development interventions including: the future of projects and programmes, and sector wide approaches (SWAPs) and direct budgetary support.This paper `A livelihoods-grounded audit of the Sustainable Management of the Usangu Wetland Catchment
APA, Harvard, Vancouver, ISO, and other styles
9

Bellotto, Marco <1995&gt. "Adidas and its reshoring project." Master's Degree Thesis, Università Ca' Foscari Venezia, 2020. http://hdl.handle.net/10579/17727.

Full text
Abstract:
L'elaborato analizza le dinamiche legate al progetto di reshoring di adidas, analizzandone potenizalità e criticità. Successivamente verranno discusse le cause che hanno portato al suo abbandono e a un ritorno in Cina. Infine si cercherà di contestualizzare queste dinamiche associandole a quelle legate all'impatto del coronavirus sul settore fashion.
APA, Harvard, Vancouver, ISO, and other styles
10

Miles, William. "The relationship between project manager and project engineer, and its impact on project performance." Thesis, University of Phoenix, 2014. http://pqdtopen.proquest.com/#viewpdf?dispub=3578050.

Full text
Abstract:
<p> Projects are becoming the ubiquitous mechanism for creating new products, services, and processes. However, based on deviation from schedule, budget, and requirements, projects are failing at an alarming rate. The purpose of this descriptive correlational study was to assess whether the relationship between the project manager and project engineer has a significant impact on project performance. A validated survey from Wu (2009) was used and administered to project managers who were members of the Project Management Institute Rio Grande Chapter, and project engineers identified by them. Th
APA, Harvard, Vancouver, ISO, and other styles
More sources

Books on the topic "IT/ITES projects"

1

Řípa, Milan. Historie výzkumu řízené termojaderné fúze. Akademie věd České republiky, 2014.

Find full text
APA, Harvard, Vancouver, ISO, and other styles
2

Speed, Chicks on. It's a project. Booth-Clibborn, 2004.

Find full text
APA, Harvard, Vancouver, ISO, and other styles
3

Gardner, Robert. It's About Time! Science Projects. Enslow Publishers, Inc., 2006.

Find full text
APA, Harvard, Vancouver, ISO, and other styles
4

Lynda, Cutting, ed. It's time: Celebrating maths with projects. Heinemann, 1993.

Find full text
APA, Harvard, Vancouver, ISO, and other styles
5

Philo, Maggie. Victorian decoupage: Source book with 10 projects. Aurum Press, 1994.

Find full text
APA, Harvard, Vancouver, ISO, and other styles
6

West, BBC North, and CLES, eds. It's my city project directory. BBC North West in association with the Centre for Local Economic Strategies, 1989.

Find full text
APA, Harvard, Vancouver, ISO, and other styles
7

American Association of State Highway and Transportation Officials., ed. Accelerating project delivery: It's about time. American Association of State Highway and Transportation Officials, 2007.

Find full text
APA, Harvard, Vancouver, ISO, and other styles
8

American Association of State Highway and Transportation Officials., ed. Accelerating project delivery: It's about time. American Association of State Highway and Transportation Officials, 2007.

Find full text
APA, Harvard, Vancouver, ISO, and other styles
9

American Association of State Highway and Transportation Officials., ed. Accelerating project delivery: It's about time. American Association of State Highway and Transportation Officials, 2007.

Find full text
APA, Harvard, Vancouver, ISO, and other styles
10

American Association of State Highway and Transportation Officials., ed. Accelerating project delivery: It's about time. American Association of State Highway and Transportation Officials, 2005.

Find full text
APA, Harvard, Vancouver, ISO, and other styles
More sources

Book chapters on the topic "IT/ITES projects"

1

West, Adrian W. "Dump Those Deprecated Items." In Practical HTML5 Projects. Apress, 2012. http://dx.doi.org/10.1007/978-1-4302-4276-5_15.

Full text
APA, Harvard, Vancouver, ISO, and other styles
2

Gładysz, Barbara, and Dorota Kuchta. "Uncertainty Occurrence in Projects and Its Consequences for Project Management." In Computational Science – ICCS 2022. Springer International Publishing, 2022. http://dx.doi.org/10.1007/978-3-031-08760-8_49.

Full text
APA, Harvard, Vancouver, ISO, and other styles
3

Dąbrowski, Marcin. "It’s Always Good to Be in the Game." In Managing IT Projects. Apress, 2023. http://dx.doi.org/10.1007/978-1-4842-9243-3_23.

Full text
APA, Harvard, Vancouver, ISO, and other styles
4

Jarke, Juliane. "Mobile Age: Co-creating Digital Public Services with and for Older Citizens." In Public Administration and Information Technology. Springer International Publishing, 2020. http://dx.doi.org/10.1007/978-3-030-52873-7_4.

Full text
Abstract:
Abstract This book describes and compares three co-creation projects that were conducted in two European cities as part of a larger EU-funded innovation project called Mobile Age. This chapter introduces Mobile Age and presents the project’s framework and methodology for co-creating digital public services. Part of the framework are seven streams of activity that need to be considered. These streams of activity are not sequential but run in parallel and inform each other: (1) governing and managing a co-creation process; (2) continuous recruitment and engagement of stakeholders; (3) co-creatin
APA, Harvard, Vancouver, ISO, and other styles
5

Höpel, Thomas. "French Cultural Policy and Its Global Ambitions." In French Globalization Projects. Vandenhoeck & Ruprecht, 2024. https://doi.org/10.13109/9783666302176.297.

Full text
APA, Harvard, Vancouver, ISO, and other styles
6

Cook, Ronald, Michael Harris, and Dennis Barber. "Developing the consulting team and its dynamics." In Management Consulting Projects, 6th ed. Routledge, 2021. http://dx.doi.org/10.4324/9781003174516-3.

Full text
APA, Harvard, Vancouver, ISO, and other styles
7

Bhunia, Asoke Kumar, Laxminarayan Sahoo, and Ali Akbar Shaikh. "Project Management." In Springer Optimization and Its Applications. Springer Singapore, 2019. http://dx.doi.org/10.1007/978-981-32-9967-2_14.

Full text
APA, Harvard, Vancouver, ISO, and other styles
8

Mackiewicz, Jo. "Developing Competences." In Learning Skilled Trades in the Workplace. Springer Nature Singapore, 2025. https://doi.org/10.1007/978-981-96-3396-8_11.

Full text
Abstract:
Abstract After over two years of work at Howe’s, I’ve developed competences in some knowledge domains, and with them, I’ve completed projects on my own, with little to no input from Jim or my coworkers. That is, I’ve developed sufficient competence in some domains to analyze a project, to plan its steps, and to carry out those steps. But as Dreyfus and Dreyfus wrote, “The competent performer judges by means of conscious deliberation.” In this chapter, I first discuss the sometimes-agonized conscious deliberation I go through as I move through a project’s steps. Discussing examples along the wa
APA, Harvard, Vancouver, ISO, and other styles
9

Zefferer, Thomas, Bernd Prünster, Roland Czerny, and Blaž Podgorelec. "Ensuring Security in Development-Oriented Collaborative Research Projects." In From Electronic to Mobile Government. Springer Nature Switzerland, 2024. http://dx.doi.org/10.1007/978-3-031-64471-9_9.

Full text
Abstract:
AbstractSecurity is of paramount importance in collaborative research projects, particularly those focusing on software development. The security of data processed by project-developed software relies on early consideration of security aspects during the software’s design and development process. Unfortunately, the unique characteristics of collaborative research projects often impede the seamless integration of security aspects, posing a risk of producing solutions with inadequate security properties. To tackle this challenge, this chapter introduces a generic method designed to seamlessly in
APA, Harvard, Vancouver, ISO, and other styles
10

MacPherson, Ronnie, Amy Jersild, Dennis Bours, and Caroline Holo. "Assessing the Evaluability of Adaptation-Focused Interventions: Lessons from the Adaptation Fund." In Transformational Change for People and the Planet. Springer International Publishing, 2022. http://dx.doi.org/10.1007/978-3-030-78853-7_12.

Full text
Abstract:
AbstractEvaluability assessments (EAs) have differing definitions, focus on various aspects of evaluation, and have been implemented inconsistently in the last several decades. Climate change adaptation (CCA) programming presents particular challenges for evaluation given shifting baselines, variable time horizons, adaptation as a moving target, and uncertainty inherent to climate change and its extreme and varied effects. The Adaptation Fund Technical Evaluation Reference Group (AF-TERG) developed a framework to assess the extent to which the Fund’s portfolio of projects has in place structur
APA, Harvard, Vancouver, ISO, and other styles

Conference papers on the topic "IT/ITES projects"

1

Brown, Russ. "Using Climate Control at the Job Site; It’s Just Good Business." In Paint and Coatings Expo (PACE) 2007. SSPC, 2007. https://doi.org/10.5006/s2007-00014.

Full text
Abstract:
The costs associated with the completion of steel tank projects continue to climb as schedules get tighter and the use of advanced technical materials, trained labor and specialized application methods become more frequently utilized. Additionally, costs related to warranty work that could not have been planned for at the estimation phase of the project are wreaking havoc on a companies profit and loss statements thus impacting other parts of their business. The unexpected costs incurred are not always subject to just the coatings contractor on the project either. In a way, all parties includi
APA, Harvard, Vancouver, ISO, and other styles
2

Saigh, Alawi Al, Fahad Al Mahashir, and Loai Al Owa. "Mechanized GMAW Root Profile Irregularities and Its Effects." In MPWT 2019. NACE International, 2019. https://doi.org/10.5006/mpwt19-15392.

Full text
Abstract:
Abstract This paper illustrates and discusses a failure that occurred during construction of a carbon steel pipeline, in which the root profile irregularities led to an unacceptable surface condition that affected the application of liquid epoxy coating. This irregularity was identified to be weld root protrusions having sharp edges due to poor implementation of Mechanized GMAW welding process and periodic maintenance of equipment which left a gap between copper backing shoes of the internal clamps. Therefore, the integrity and effectiveness of applying internal coating of carbon steel pipelin
APA, Harvard, Vancouver, ISO, and other styles
3

Dribusch, Christoph, Rodolphe Conan, Rodrigo Romano, Megan Shabram, and Henry Fitzpatrick. "GMT integrated FEM and its role in systems engineering." In Modeling, Systems Engineering, and Project Management for Astronomy XI, edited by Scott Roberts and Sébastien E. Egner. SPIE, 2024. http://dx.doi.org/10.1117/12.3019259.

Full text
APA, Harvard, Vancouver, ISO, and other styles
4

Katyayani, Jasti, and Veeramallu Pinaka Pani. "A niche technique to manage innovation projects in ITES." In 2015 SAI Intelligent Systems Conference (IntelliSys). IEEE, 2015. http://dx.doi.org/10.1109/intellisys.2015.7361088.

Full text
APA, Harvard, Vancouver, ISO, and other styles
5

Kusumo, P. T. "MPEP Scorecard: A New Quantitative Approach to Measure Project's Maturity in Medco EP Indonesia." In Indonesian Petroleum Association 44th Annual Convention and Exhibition. Indonesian Petroleum Association, 2021. http://dx.doi.org/10.29118/ipa21-f-214.

Full text
Abstract:
Oil &amp; gas companies in Indonesia continue to struggle in executing their projects due to highly volatile oil price, lower demand and marginal field developments. Consequently, these companies need to be as prudent as possible in investing their limited resources to the selected projects in their portfolio. In order to face this challenge, MedcoEnergi developed a tool called Medco Project Excellence Process (MPEP) Scorecard to effectively measure the maturity of all of its major projects using a quantitative approach. The application of this tool can greatly help MedcoEnergi in deciding whi
APA, Harvard, Vancouver, ISO, and other styles
6

Akinshipe, Olushola, Clinton Aigbavboa, Douglas Aghimien, and Ayodeji Oke. "Securing Project Goals: The Art of Guarding against Construction Project Failure." In 13th International Conference on Applied Human Factors and Ergonomics (AHFE 2022). AHFE International, 2022. http://dx.doi.org/10.54941/ahfe1002225.

Full text
Abstract:
Construction project failures are often attributed to the slackness of different project stakeholders. However, it is important to note that the success or failure of construction projects can span from characteristics that could either be internal or external to the project. Avoiding project failures that could lead to premature project closure is pertinent in all projects. Every project’s goal is to fulfil its objectives and ultimately reach a successful ending. Therefore, it is imperative to explore the measures that secure project goals and, by extension, lead to success in projects. Thus,
APA, Harvard, Vancouver, ISO, and other styles
7

Kececi, Baris, and Melis Colak. "Analyzing The Effects of Human Resource Allocation and Learning by Experience on Project Management in Defense Industry." In 14th International Conference on Applied Human Factors and Ergonomics (AHFE 2023). AHFE International, 2023. http://dx.doi.org/10.54941/ahfe1003055.

Full text
Abstract:
Activities that started using various resources and carried out to produce a product or service in a limited time are called projects. Process of delivering the project to an end with plans made to achieve project's goals in desired extent and time is called project management. Successful project management is becoming more important for competing companies. The project manager, who is responsible for execution of one or more projects, gains a lot of experience throughout the process and becomes more knowledgeable and skilled. The main purpose of this study is to reveal the effects of learning
APA, Harvard, Vancouver, ISO, and other styles
8

Kamel, Michael, and Hani Guirguis. "From Project Management to Project Design: A Research Proposal." In ASME 2005 International Mechanical Engineering Congress and Exposition. ASMEDC, 2005. http://dx.doi.org/10.1115/imece2005-79429.

Full text
Abstract:
Project Management has had an increasingly important role in industrial organization, new product development and innovation theories over the last few decades. The majority of the current project management research and literature are focused on the post contract award phase as well as the skills and know-how of the project manager. Empirical research shows that, despite strict adherence to the best management norms and best practices, many projects still fail to achieve their objectives while others are aborted before they are completed. The authors argue that this project failute is due to
APA, Harvard, Vancouver, ISO, and other styles
9

Olsina, Luis, Pablo Becker, and María Fernanda Papa. "The Project Management Ontology called ProjectCO: Architectural Aspects, Concepts, and Usefulness." In Congresso Ibero-Americano em Engenharia de Software. Sociedade Brasileira de Computação, 2024. http://dx.doi.org/10.5753/cibse.2024.28439.

Full text
Abstract:
This paper presents the concepts, relationships, constraints, and verification issues of the project management ontology called ProjectCO. Its concepts represent key concerns of the conceived world for project management, embracing particular things (or entities) and their relations, as well as assertions that deal with them. ProjectCO is placed at the core level in the context of a five-tier ontological architecture, which considers foundational, core, top-domain, low-domain, and instance layers. A given ontology is located in this architecture according to the level of generality/specificity
APA, Harvard, Vancouver, ISO, and other styles
10

S vescu, D. "Some Aspects Regarding Project Management." In 2015 International Conference on Industrial Technology and Management Science. Atlantis Press, 2015. http://dx.doi.org/10.2991/itms-15.2015.7.

Full text
APA, Harvard, Vancouver, ISO, and other styles

Reports on the topic "IT/ITES projects"

1

Allen, T., Q. Appert, and C. Davis. Materials identification and surveillance project item evaluation: Items, impure plutonium oxide (ATL27960) and pure plutonium oxide (PEOR3258). Office of Scientific and Technical Information (OSTI), 1997. http://dx.doi.org/10.2172/471405.

Full text
APA, Harvard, Vancouver, ISO, and other styles
2

Corral, Leonardo, Giulia Lotti, José Martínez Carrasco, and Camilo Pecha. Operational excellence: understanding project financial cancellations and its impact on the delivery of results. Inter-American Development Bank, 2022. http://dx.doi.org/10.18235/0003952.

Full text
Abstract:
The objectives of this analysis are twofold: (i) First, it aims to enhance our understanding of the role design and execution characteristics of IDB financed projects play in project success and effectiveness in delivering results. (ii) Second, it empirically explores which project characteristics are more likely to explain partial financial cancellations, which plays a key role on the delivery of results. Based on the knowledge gained, we identify specific measures that can be taken to enhance the likelihood of project success.
APA, Harvard, Vancouver, ISO, and other styles
3

Hernández, Juan. Open configuration options Selection Advantage of Corporate Venture Capitalists and Its Welfare Effects. Inter-American Development Bank, 2022. http://dx.doi.org/10.18235/0003983.

Full text
Abstract:
We develop a theoretical framework for corporate ventures where corporations' know-how gives them an advantage over regular financiers in identifying profitable projects. Corporations and venture capitalists compete to fund entrepreneurs in an environment featuring risk, adverse selection, and limited liability. The expected surplus of each project is independent of the financier and the efficient scale of each project differs among entrepreneurs. We characterize the optimal financial contracts arising in equilibrium and use this characterization to explore the effect corporations' knowledge h
APA, Harvard, Vancouver, ISO, and other styles
4

Deutsch, Ruthanne. Good Practices in Poverty Targeting in IDB Projects in 1997. Inter-American Development Bank, 1998. http://dx.doi.org/10.18235/0008939.

Full text
Abstract:
Good practices in targeting, as highlighted here, with an additional effort to go beyond the letter of the law in the identification of project beneficiaries. Effective and efficient targeting mechanisms attempt to better link the project's specific purposes with its intended group of beneficiaries. The IDB projects listed in this document all represent cases where the design of the operation made extra efforts to better target the poor that go beyond the PTI Classification Criteria. These design elements include a variety of instruments, such as the careful definition of beneficiary eligibili
APA, Harvard, Vancouver, ISO, and other styles
5

Pollan, Michael. Opportunities for GHG Mitigation in Latin America: Carbon Finance and the Clean Development Mechanism. Inter-American Development Bank, 2005. http://dx.doi.org/10.18235/0011159.

Full text
Abstract:
This report discusses the opportunities and challenges for Clean Development Mechanism (CDM) projects in Latin America. CDM is an important tool to improve the viability of many clean technology investments as it offers a number of important opportunities including increasing a project's internal rate of return (IRR) and its impact on project risk and overall credibility. The new and enlarged interest in GHG mitigation and carbon finance since the entry into force of the Kyoto Protocol and the full operation of the CDM provides the opportunity to revise programs and activities as needed to mee
APA, Harvard, Vancouver, ISO, and other styles
6

Gambrell, KP. Demonstration Project 111, ITS/CVO Technology Truck, Final Project Report. Office of Scientific and Technical Information (OSTI), 2002. http://dx.doi.org/10.2172/814533.

Full text
APA, Harvard, Vancouver, ISO, and other styles
7

VAN BEEK, J. E. Project Execution Plan for Project W-211 Initial Tank Retrieval Systems (ITRS). Office of Scientific and Technical Information (OSTI), 1999. http://dx.doi.org/10.2172/798001.

Full text
APA, Harvard, Vancouver, ISO, and other styles
8

VAN BEEK, J. E. Project Execution Plan for Project W-211 Initial Tank Retrieval Systems (ITRS). Office of Scientific and Technical Information (OSTI), 2000. http://dx.doi.org/10.2172/802980.

Full text
APA, Harvard, Vancouver, ISO, and other styles
9

Conroy, Hector, Li Tang, and Johanna Ramos. Approach Paper: Evaluation of Rural Land Titling and Regularization Projects. Inter-American Development Bank, 2012. http://dx.doi.org/10.18235/0010427.

Full text
Abstract:
The IDB has been working on land titling and regularization projects since its founding. A first set of projects was financed between 1960 and 1995. In 1995, a second set of projects began with the objective of regularizing land ownership and improving its administration. As of December 31, 2011, twenty five projects of this type have been approved throughout the region. This evaluation will analyze the implementation and results of the latter set of projects. The evaluation will assess the relevance, efficiency, effectiveness, and sustainability of project results. The in-depth analysis of a
APA, Harvard, Vancouver, ISO, and other styles
10

Haddad, Ibrahim. Recommended Practices for Hosting and Managing Open Source Projects on GitHub. The Linux Foundation, 2023. https://doi.org/10.70828/zfwq4969.

Full text
Abstract:
GitHub is a critical platform for the development and management of open source projects. When using the platform, there are important practices to consider so that a project maximizes its openness, collaboration, transparency, and community-oriented development. This report is a reflection on the power of GitHub to manage open source projects. It is based on a compilation of best practices to help developers enhance project engagement, understandability, and organization. Recommendations range from documentation and communication practices to embedding open source principles into the foundati
APA, Harvard, Vancouver, ISO, and other styles
We offer discounts on all premium plans for authors whose works are included in thematic literature selections. Contact us to get a unique promo code!