To see the other types of publications on this topic, follow the link: Just – in- time and Project Evaluation Planning.

Journal articles on the topic 'Just – in- time and Project Evaluation Planning'

Create a spot-on reference in APA, MLA, Chicago, Harvard, and other styles

Select a source type:

Consult the top 50 journal articles for your research on the topic 'Just – in- time and Project Evaluation Planning.'

Next to every source in the list of references, there is an 'Add to bibliography' button. Press on it, and we will generate automatically the bibliographic reference to the chosen work in the citation style you need: APA, MLA, Harvard, Chicago, Vancouver, etc.

You can also download the full text of the academic publication as pdf and read online its abstract whenever available in the metadata.

Browse journal articles on a wide variety of disciplines and organise your bibliography correctly.

1

Simion, Marius, Gabriela Vasile, Cristina Dinu, and Roxana Scutariu. "CPM and PERT techniques for small-scale R&D projects." SIMI 2019, SIMI 2019 (September 20, 2019): 166–74. http://dx.doi.org/10.21698/simi.2019.fp22.

Full text
Abstract:
Contemporary Project Management has conceived tools based on mathematical models for planning, scheduling and controlling the projects, the costs and resources. Critical Path Method (CPM) and Program Evaluation and Review Technique (PERT) are two network-based methods which were independently developed to assist the project managers in order to schedule complex real-life projects. A scheduling of a small-scale R&D project using these optimization time-oriented methods was accomplished. In many models of project network some activities are closely related to each other such as procurement a
APA, Harvard, Vancouver, ISO, and other styles
2

Whittier, David, and Sonia Lara. "Preparing Tomorrow’s Teachers to Use Technology (PT3) at Boston University through Faculty Development." Estudios sobre Educación 5 (May 22, 2018): 47–60. http://dx.doi.org/10.15581/004.5.25614.

Full text
Abstract:
Boston University School of Education received a grant for Preparing Tomorrow’s Teachers to use Technology from U.S. Department of Education. The project focused on faculty development in learning the Web and digital tools and reflecting on technology’s value for teacher preparation. Qualitative data showed gains in understanding and using technology but little radically new pedagogy. Trained educational technologists facilitated faculty learning and production. Recommendations include: learn by doing; provide “just in time” expert help; focus on the pedagogical advantages of technology, not o
APA, Harvard, Vancouver, ISO, and other styles
3

Schwartz, Marcy, Miley (Lee) Merkhofer, and Richard Upton. "Innovative Approach to Multiple-Criteria Evaluation of Multimodal Alternatives: Newberg-Dundee Transportation Improvement Project Case Study." Transportation Research Record: Journal of the Transportation Research Board 1617, no. 1 (1998): 139–48. http://dx.doi.org/10.3141/1617-20.

Full text
Abstract:
Dissatisfied with the time and resources required to conduct a number of high-profile, controversial major investment studies, the Oregon Department of Transportation (ODOT) decided to use the Newberg-Dundee transportation improvement project to explore methods for streamlining the alternatives analysis process and better controlling the time frames and expenditures for these efforts. The Newberg-Dundee project concerned a highly congested segment of highway just outside the Portland metropolitan area. Over 95 percent of all trips in the corridor are made by automobile; public transportation i
APA, Harvard, Vancouver, ISO, and other styles
4

Buchmann, Oliver, Maik Siegmund, Robert Kaden, and Frank Iden. "CITYTWIN – AI-based Decision Support System for Semantic Search and Analysis of Location-based Information for Urban and Site Planning." ISPRS Annals of the Photogrammetry, Remote Sensing and Spatial Information Sciences X-4/W5-2024 (June 27, 2024): 63–69. http://dx.doi.org/10.5194/isprs-annals-x-4-w5-2024-63-2024.

Full text
Abstract:
Abstract. The development of a knowledge-based decision support system for the evaluation and planning of location and urban development concepts was implemented. In order to achieve this goal, cross-domain ontologies were developed for interdisciplinary databases, which are then mapped in semantic networks. The exponential growth in computing power in the hardware sector alone can no longer solve this problem, but at the same time enables the application of new methods for storing and evaluating data. Essentially, it is no longer just about the digital recording of object properties in conven
APA, Harvard, Vancouver, ISO, and other styles
5

Trad, Antoine. "Enterprise transformation project-AI based manager’s profile’s selection." Human Resources Management and Services 7, no. 2 (2025): 3588. https://doi.org/10.18282/hrms3588.

Full text
Abstract:
The artificial intelligence (AI)-based architect’s profile’s selection (simply iSelection) uses a polymathic mathematical model and AI-subdomains’ integration for enabling automated and optimized human resources (HR) processes and activities. HR-related processes and activities in the selection, support, problem-solving, and just-in-time evaluation of a transformation manager’s or key team members’ polymathic profile (TPProfile). Where a TPProfile can be a classical business manager, transformation manager, project manager, or an enterprise architect. iSelection-related selection processes use
APA, Harvard, Vancouver, ISO, and other styles
6

Manzoli, Federica, Matteo Al Kalak, and Maria Chiara Rioli. "Qualitative-archival research on migration is not just preservation." Open Research Europe 4 (July 16, 2024): 149. http://dx.doi.org/10.12688/openreseurope.17804.1.

Full text
Abstract:
Qualitative-archival research is needed to support effective policies and the work of practitioners working in the field of migration. This Open Letter helps readers to understand how this happens in different contexts, as more than 150 stakeholders among researchers, policymakers, practitioners, migrant associations, governments, civil society/non-governmental organisations and migrants in seven countries around the Mediterranean contributed to discuss this topic, during the H2020 project ITHACA - Interconnected Histories and Archives for Migrant Agency. Three main key findings emerge. Qualit
APA, Harvard, Vancouver, ISO, and other styles
7

Upadhye, Dr Vaishali, Dr Swati Madhe, and Dr Atul Joshi. "Project Based Learning as an Active Learning Strategy in Engineering Education." Journal of Engineering Education Transformations 36, S1 (2022): 18–24. http://dx.doi.org/10.16920/jeet/2022/v36is1/22169.

Full text
Abstract:
Things done are better remembered than things that are just heard or seen. In Project based learning pedagogy, the course content is delivered by assigning problem statements pertaining to real life situations to a group of students. For the assessment and evaluation of the course, the students have to give a presentation and a demo of the solution for the given problem at the end of course. So the students get sufficient time to work on the solution for the given problem. However, the work of the students is regularly monitored which helps in refining the proposed solution, looking for altern
APA, Harvard, Vancouver, ISO, and other styles
8

Hanson, Sandra H. "The Perceived Value of Manager Participation in the Cpm Program." Public Administration Quarterly 28, no. 3 (2004): 363–87. http://dx.doi.org/10.1177/073491490402800306.

Full text
Abstract:
Is the Certified Public Manager (CPM) program just “feel good” release time from the demands of the job or is there actual change in behavior that results from the program? This paper proposes to test the belief that education and training result in better management and administration by measuring the results of the Arkansas' Certified Public Manager training/education program. In a mail survey with a 30 percent response rate, approximately 80 percent of program graduates endorsed the overall program and indicated they commanded increased knowledge and skills in leadership, management develop
APA, Harvard, Vancouver, ISO, and other styles
9

Hei, Shanggang, Hong Zhang, Shen Luo, et al. "Implementing BIM and Lean Construction Methods for the Improved Performance of a Construction Project at the Disassembly and Reuse Stage: A Case Study in Dezhou, China." Sustainability 16, no. 2 (2024): 656. http://dx.doi.org/10.3390/su16020656.

Full text
Abstract:
The construction industry is adopting a collaborative paradigm by combining Lean construction (LC) principles and BIM capabilities. Existing studies lack sufficient case studies and performance evaluations, especially for the disassembly and reconstruction stage, creating a gap in the practical application of BIM and Lean construction (BIM-LC) in China. To bridge this gap, this study quantitatively assessed the BIM-LC methodology in a relocation project in Dezhou, China. The project employed BIM-LC practices such as the Last-Planner System (LPS), Just-In-Time (JIT), Kanban, Value-Stream Mappin
APA, Harvard, Vancouver, ISO, and other styles
10

Anshi, Verma*1 Dr. Shailesh Ahgalekar2 Prof. Manish Khandare3. "APPLICATION OF LEAN CONSTRUCTION TOOL (L.P.S) TO IMPROVE LABOUR PRODUCTIVITY AT CONSTRUCTION SITE." INTERNATIONAL JOURNAL OF ENGINEERING SCIENCES & RESEARCH TECHNOLOGY 6, no. 6 (2017): 287–301. https://doi.org/10.5281/zenodo.809172.

Full text
Abstract:
Indian construction industry still follows the primitive work pattern, which generates poor management in resources, waste management, over budgeting and schedule lagging. To eliminate all the above mentioned issues, construction industries are now adopting sophisticated tools and techniques like lean construction tool (L.P.S). This paper includes the implementation of last planner system at site. After the implementation we observed the improvising effect in the area of labor productivity therefore, we can conclude that the L.P.S technique is better than the primitive project management appro
APA, Harvard, Vancouver, ISO, and other styles
11

Daryono, Yunanto Ary, Suryahani Irma, Bambang, and Mayasari Viviana. "Career Path Progression Model and Work Competency: A Design for Entrepreneurship Engagement University." INTERNATIONAL JOURNAL OF MULTIDISCIPLINARY RESEARCH AND ANALYSIS 05, no. 10 (2022): 2613–20. https://doi.org/10.5281/zenodo.7146959.

Full text
Abstract:
Entrepreneur Engagement University (EEU) complete model with learning tools needed by teaching staff to provide problem based learning teaching patterns that can touch the entrepreneurial side. It is time for lecturers to direct creativity and dedicate to students that educated entrepreneurs will provide enormous benefits. Not just teaching, but has penetrated to create new job opportunities for graduates in the future. The role of the lecturer is as an inspiration, motivator, and facilitator to produce graduates who are able to make a major contribution to themselves and others. Therefore, ev
APA, Harvard, Vancouver, ISO, and other styles
12

Wang, Xiaobing, Xiaozhou Xia, Renjie Teng, Xin Gu, and Qing Zhang. "Risk Assessment of Dike Based on Risk Chain Model and Fuzzy Influence Diagram." Water 15, no. 1 (2022): 108. http://dx.doi.org/10.3390/w15010108.

Full text
Abstract:
For the risk assessment of flood defense, a comprehensive understanding of risk factors affecting dike failure is essential. Traditional risk assessment methods are mostly based on experts’ experience and focus on just one type of failure mode of flood defensive structures. The risk resources, including the analytical factors and non-analytical factors, were summarized firstly according to the general experience of dikes. The uncertainty of the resources that affect dike safety can be quantified by membership degree. Hence, a fuzzy influence diagram based on fuzzy mathematics was proposed to a
APA, Harvard, Vancouver, ISO, and other styles
13

Owens, Oghogho Collins, and Patrick Adeel. "Predictive Analytics in Public Sector Project Management: A Real-Time Decision Support Framework." International Journal of Management Technology 12, no. 4 (2025): 44–57. https://doi.org/10.37745/ijmt.2013/vol12n44457.

Full text
Abstract:
In the era of data-driven governance, predictive analytics has emerged as a transformative force in public sector project management. As governments strive to address increasingly complex societal challenges—ranging from aging populations and public health crises to crime prevention and fiscal constraint—there is growing recognition that traditional project management tools and reactive decision-making models are insufficient for today’s dynamic public administration environment. This paper introduces a real-time decision support framework specifically tailored to the public sector, integratin
APA, Harvard, Vancouver, ISO, and other styles
14

Grushina, Olga V. "Main Advantages of Using Standard Documentation: A Case of State Construction Programs in the Irkutsk Region." Public Administration. E-journal (Russia), no. 110 (June 7, 2025): 34–45. https://doi.org/10.55959/msu2070-1381-110-2025-34-45.

Full text
Abstract:
The paper deals with a further research into the theory and practice of standardization of housing construction projects. The most problematic and relevant area of such projects application is the process of resettlement of citizens from dilapidated housing. Currently, just over 40% of the existing emergency housing stock is settled in the Irkutsk region. The paper is focused on the increasing the efficiency of construction projects implementation within the framework of state programs in the Irkutsk region. It is hypothesized that the standardization of the budget-funded housing construction
APA, Harvard, Vancouver, ISO, and other styles
15

Zhang, Kehe, Jocelyn V. Hunyadi, Marcia C. de Oliveira Otto, et al. "Increasing COVID-19 Testing and Vaccination Uptake in the Take Care Texas Community-Based Randomized Trial: Adaptive Geospatial Analysis." JMIR Formative Research 9 (February 11, 2025): e62802-e62802. https://doi.org/10.2196/62802.

Full text
Abstract:
Abstract Background Geospatial data science can be a powerful tool to aid the design, reach, efficiency, and impact of community-based intervention trials. The project titled Take Care Texas aims to develop and test an adaptive, multilevel, community-based intervention to increase COVID-19 testing and vaccination uptake among vulnerable populations in 3 Texas regions: Harris County, Cameron County, and Northeast Texas. Objective We aimed to develop a novel procedure for adaptive selections of census block groups (CBGs) to include in the community-based randomized trial for the Take Care Texas
APA, Harvard, Vancouver, ISO, and other styles
16

Pribyl, Barbara, and Greg Horton. "Technology Focus: Reserves Management (December 2022)." Journal of Petroleum Technology 74, no. 12 (2022): 42–43. http://dx.doi.org/10.2118/1222-0042-jpt.

Full text
Abstract:
We continue to live in volatile times. While there has been an easing of the global pandemic, geopolitical issues and conflicts have been increasing. There is also ever-increasing pressure to sanction and maintain oil and gas projects in a socially and environmentally sustainable manner. These projects can no longer be considered part of an isolated or independent petroleum sector but as part of the whole resource base of an area, country, or region. There needs to be visibility of the linkages among company vision; national, regional, and global targets; and the project attributes in meeting
APA, Harvard, Vancouver, ISO, and other styles
17

Atika, Tuti, and Fatimah Zahara. "Merealisasikan Gerakan Semangat Belajar Bahasa Inggris Anak-anak Panti Asuhan." ABDISOSHUM: Jurnal Pengabdian Masyarakat Bidang Sosial dan Humaniora 1, no. 2 (2022): 271–75. http://dx.doi.org/10.55123/abdisoshum.v1i2.567.

Full text
Abstract:
Technological advances have made the ability to speak English very important. This is because the use of English is no longer just for greeting, but also for other needs to support activities. Even if you don't have plans to travel or study abroad, English is still a priority to learn. Because, now the world has entered a digital era filled with advances in information technology. The digital era makes the world seem borderless because of the distance and time that seem to be connected via the internet. Not a bit of information in cyberspace is presented in English, this is what makes the abil
APA, Harvard, Vancouver, ISO, and other styles
18

Tosic, Lazar, Marco Thoma, Stefanos Voglis, et al. "Evaluation of patient STress level caused by radiological Investigations in early Postoperative phase After CRANIOtomy (IPAST-CRANIO): protocol of a Swiss prospective cohort study." BMJ Open 12, no. 9 (2022): e061452. http://dx.doi.org/10.1136/bmjopen-2022-061452.

Full text
Abstract:
IntroductionPostoperative imaging after neurosurgical interventions is usually performed in the first 72 hours after surgery to provide an accurate assessment of postoperative resection status. Patient frequently report that early postoperative examination after craniotomy for tumour and vascular procedures is associated with distress, exertion, nausea and pain. Delayed postoperative imaging (between 36 and 72 hours postoperatively) may have an advantage regarding psychological and physical stress compared with early imaging. The goal of this study is to evaluate and determine the optimal time
APA, Harvard, Vancouver, ISO, and other styles
19

SAMMY, KIMAGUT. "The Effectiveness of Seed Certification and Variety Protection Management Systems on Seed Maize Quality and Market Integrity: A Project Management Perspective." International Journal of Recent Research in Commerce Economics and Management (IJRRCEM) 12, no. 1 (2025): 58–68. https://doi.org/10.5281/zenodo.15088963.

Full text
Abstract:
<strong>Abstract:</strong> Agriculture is more than just farming&mdash;it is the backbone of food security and economic stability. At the heart of any successful agricultural venture is the use of high-quality seed. However, counterfeit seed remains a major challenge, often due to weak regulatory frameworks or a lack of proper seed certification processes. This not only affects farmers but also undermines the Seed and Plant Varieties Act (Cap 326), which is designed to ensure seed quality and protect genetic purity. Seed certification plays a vital role in guaranteeing seed quality, giving far
APA, Harvard, Vancouver, ISO, and other styles
20

VA, R. HARITHA. "A Study of Financial Planning and Forecasting With Reference to Indian Oil Corporation Limited." INTERANTIONAL JOURNAL OF SCIENTIFIC RESEARCH IN ENGINEERING AND MANAGEMENT 08, no. 04 (2024): 1–5. http://dx.doi.org/10.55041/ijsrem31376.

Full text
Abstract:
Financial planning is a ceaseless procedure of guiding and designating financial assets to meet strategic goals and targets. The yield from financial planning appears as budgets. The most generally utilized type of budgets is Pro Forma or Budgeted Financial Statements. The establishment for Budgeted Financial Statements is Detail Budgets. Detail Budgets incorporate sales conjectures, production figures, and different gauges in help of the Financial Plan. On the whole, these budgets are alluded to as the Master Budget. We can likewise separate financial planning into planning for tasks and plan
APA, Harvard, Vancouver, ISO, and other styles
21

Mazza, A., M. Paneroni, M. Marconi, A. Maestri, and A. Giardini. "INNOVATION AND DIGITAL TRANSFORMATION IN HEALTHCARE. PROCESS OPTIMIZATION OF REHABILITATION ACTIVITIES IN IN REHABILITATION CARDIOLOGY IN SUPPORT OF PATIENT AND TEAM." European Heart Journal Supplements 26, Supplement_2 (2024): ii138. http://dx.doi.org/10.1093/eurheartjsupp/suae036.346.

Full text
Abstract:
Abstract Physical activity is a treatment for preventing and treating a wide range of diseases; its prescription must be precise and accurate in order to optimize the effects avoiding at the same time clinical risks due to frequent patients’ frailty.To deploy a “comprehensive digital rehabilitation” means to digitalize the whole process: from clinical and instrumental evaluations to the subsequent coherent prescriptions of the rehabilitation and care–related activities, from the case management planning – described in the individual rehabilitative project – to the individual rehabilitative pro
APA, Harvard, Vancouver, ISO, and other styles
22

Wales, Brad, and Jennifer D. Roberts. "Highway Removal vs. Highway Redesign." Journal of Healthy Eating and Active Living 4, no. 2 (2024): 47–59. http://dx.doi.org/10.51250/jheal.v4i2.99.

Full text
Abstract:
Reconnecting The Best Planned City This is a moment in time, a crossroads even, when public planning processes will either continue to capitulate to the unilateral assumption of retaining existing highways, expressways and transportation corridors, or to insist on a common sense case-by-case approach whereby a clean slate evaluation is started for every transportation project. In Buffalo, New York, where thousands of lives and billions of dollars in future urban developments are at stake, an unbiased approach to evaluating crumbling transportation infrastructures has become an urgent and criti
APA, Harvard, Vancouver, ISO, and other styles
23

Chen, William Chun-Ying, Jason Daniel Nosrati, Daniel Ma, et al. "Understanding radiation treatment terminations as an element of quality." JCO Oncology Practice 19, no. 11_suppl (2023): 408. http://dx.doi.org/10.1200/op.2023.19.11_suppl.408.

Full text
Abstract:
408 Background: Disruptions in cancer care adversely affect clinical outcomes. The effect is magnified when treatments are not just protracted, but discontinued prematurely. The incidence of such treatment termination (TT) during radiation therapy has not been well studied. We herein present a single-institution cohort of TT at a large multi-center radiation oncology department over 10 years. Methods: As part of our ongoing departmental quality and safety monitoring program, TTs were prospectively tracked and assessed. A TT was defined as the premature discontinuation of therapy at any point f
APA, Harvard, Vancouver, ISO, and other styles
24

Kuchhal, Utsav, Aditya Bhardwaj, Shivangi Goel, and Ajay Tiwari. "PLANNING POKER." International journal of multidisciplinary advanced scientific research and innovation 1, no. 10 (2021): 374–82. http://dx.doi.org/10.53633/ijmasri.2021.1.10.020.

Full text
Abstract:
Estimating and Planning is very important for the success of any project, it is the key factor to its successful conclusion. In software project management there has been a shift from traditional plan management to agile project management. Agile project management has been viewed as the new big change in the software industry. The Project Management Institute (PMI) was founded in 1969 and offers industry-leading certifications for project management professionals. PMI, which was traditionally best known for its traditional project management certifications, has just recently started offering
APA, Harvard, Vancouver, ISO, and other styles
25

Dai, Li Xin, and Zong Li. "Study on Application of Critical Path to Project Time Management." Advanced Materials Research 328-330 (September 2011): 368–71. http://dx.doi.org/10.4028/www.scientific.net/amr.328-330.368.

Full text
Abstract:
Most resources used in a project will have an easily determined cost. We need to know which staff members can work on which parts of a project and what needs to be done, and when. Project time management should be broken down, step by step, just as other parts of the project are broken down in the planning phase. This will help make sure that everything is done when it needs to be, and to keep the project from going over its budget because it went well past the time scheduled for it. A project manager often need to control the whole time of the project and grasp the key process in those tasks
APA, Harvard, Vancouver, ISO, and other styles
26

Abdelraheem, Abubkr. "Mediating influence of total quality management between just-in-time techniques and projects performance evaluatio." Journal of Project Management 10, no. 2 (2025): 301–12. https://doi.org/10.5267/j.jpm.2025.1.008.

Full text
Abstract:
The main objective of the present research is to evaluate the influence between just-in-time technique (JIT) and total quality management TQM in project performance evaluation (PPE) in the paint industry; and to identify the important factors that should be considered for the successful application of JIT in project management in the paint industry ar Riyadh Governorate. A questionnaire was distributed to administrators, economists and accountants in the paint industry. The study used the partial least squares program for analysis purposes. The results indicated that the just-in-time technique
APA, Harvard, Vancouver, ISO, and other styles
27

Nur Salsabila, Malsya Debrina, Ika Arum Puspita, and Sandhy Widyasthana. "The Project Performance Evaluation of PLBN Project Using Earned Value Management Method." International Journal of Innovation in Enterprise System 6, no. 01 (2021): 61–73. http://dx.doi.org/10.25124/ijies.v6i01.139.

Full text
Abstract:
Process of monitoring and controlling projects requires data evaluation activities in the order to find out whether the project is in accordance with the plan to avoid an incompatibility between the planning and the actual time. The failure of construction project almost reached the figure of 20% - 40% which occurred in the project monitoring and controlling process. The purpose of this research is analysis project performance with earned value management method at PLBN Project. This research was carried out by several stages: data collection, data processing and analysis. From the results of
APA, Harvard, Vancouver, ISO, and other styles
28

Baranwal, Tushar, Samar Tyagi, Suravi Chaudhary, and Shubham Singh. "Construction Management of a Multi-Storey Building." International Journal for Research in Applied Science and Engineering Technology 10, no. 5 (2022): 2960–68. http://dx.doi.org/10.22214/ijraset.2022.43004.

Full text
Abstract:
Abstract: For construction projects to reduce and control delays, proper planning and scheduling are critical. Each year, the construction sector wastes a significant amount of time, money, and resources owing to ineffective project management. Building projects have grown in size and complexity as a result of globalization. By decreasing the amount of paperwork you have to undertake, project planning software may help you save time and money. A project cannot accomplish the target outcome just by providing adequate planning, proper organization, and a sufficient flow of resources. A warning s
APA, Harvard, Vancouver, ISO, and other styles
29

Nuciferani, Felicia, Diah Listyaningsih, M. Ferdaus Noor Aulady, and M. Irsadul Ibad Adde Santoso. "Just in Time on Mechanical and Electrical Implementation in Leedon Hotel Surabaya." Journal of Applied Sciences, Management and Engineering Technology 3, no. 2 (2022): 51–59. http://dx.doi.org/10.31284/j.jasmet.2022.v3i2.3045.

Full text
Abstract:
Mechanical electrical and plumbing (MEP) job is a job in construction project and the implementation is conducted after the workers conduct structural work. The use of materials has an important part from project total cost because waste will be happened if it is used uncontrollable. The aim of this study was identifying JIT application to electrical work in Leedon Hotel Surabaya. The condition before the researcher implemented JIT in Leedon Hotel project, it was identified waste caused by design change, lack of coordination between project and Head Office, and materials availability with exce
APA, Harvard, Vancouver, ISO, and other styles
30

Brassey, J. "Just in time information for clinicians: a questionnaire evaluation of the ATTRACT project." BMJ 322, no. 7285 (2001): 529–30. http://dx.doi.org/10.1136/bmj.322.7285.529.

Full text
APA, Harvard, Vancouver, ISO, and other styles
31

Tang, Yan Qun, and Wei Zeng. "The Application of Physical Planning Theory in Objective Management." Applied Mechanics and Materials 94-96 (September 2011): 2238–42. http://dx.doi.org/10.4028/www.scientific.net/amm.94-96.2238.

Full text
Abstract:
Basing on the analysis of problems existing in the comprehensive decision-making and balanced optimizing of project programs, the writer has introduced the method of physical planning to solve the problems of comprehensive decision-making and optimizing in the quality of the project management – time limit for a project - cost, and established the quality - time limit for a project- cost comprehensive evaluation and decision model as well as the quality - time limit for a project - cost optimization model. The proposed method has been proved effective through the cases of highway engineering p
APA, Harvard, Vancouver, ISO, and other styles
32

Ramadhan, Wahyu, Sutrisna Sitorus, and Rizky Maulana. "Evaluasi Perencanaan Proyek Pembangunan SDS X Menggunakan Network Diagram dan Crashing Project Guna Mengoptimalkan Waktu Dan Biaya Proyek." Jurnal Teknik Industri Terintegrasi 6, no. 4 (2023): 1118–28. http://dx.doi.org/10.31004/jutin.v6i4.17709.

Full text
Abstract:
The research focuses on evaluating the project time planning to know exactly when the project will be completed, the estimated budget to be spent, using the CPM and PERT methods to carry out an analysis of the SDS X Development Project Planning Evaluation. The results are with the CPM and PERT methods, the project's critical path is found in activities A – D – E – F – G – H – I – L – M – N with a project completion time using the CPM method is 52 days, while for the PERT method the project completion time is 54 days with a great chance of completing project work of 99, 94%. As for the results
APA, Harvard, Vancouver, ISO, and other styles
33

Han, Lu, Quanli Gao, Keshu Zhou, et al. "Development and Evaluation of CART Targeting Bcma with Humanized Alpaca-Derived Single-Domain Antibody As Antigen Recognition Domain." Blood 132, Supplement 1 (2018): 1976. http://dx.doi.org/10.1182/blood-2018-99-114980.

Full text
Abstract:
Abstract Chimeric antigen receptor T cells (CART) targeting CD19 have shown substantial activity against leukemia and lymphoma, which motivated developing CART cell therapy for Multiple myeloma (MM). B cell maturation antigen (BCMA) is the target molecule in MM. Several kinds of CART targeting BCMA have been created from 2016. Among these, the Bluebird Bio uses the humanized murine BCMA scFv to make CART, the Nanjing Legend company uses the single-domain antibody targeting BCMA to make CART. The single-domain antibody refers to the heavy chain antibody naturally present in camel species, which
APA, Harvard, Vancouver, ISO, and other styles
34

Hossein, Seyed Amir, Adil Al Tamimi, and Ghanim Kashwani. "Application of JIT on Materials and Labor Management of Construction Site." Emirati Journal of Civil Engineering and Applications 2, no. 1 (2024): 50–57. http://dx.doi.org/10.54878/6q4v5p60.

Full text
Abstract:
In the Just In Time (JIT) management process, planning should be carried out in a way that provides an optimum fit between the tools, the workers and technical laborers, and the management. Planning should enable all the parties involved to coordinate themselves with the design and production system, based on the understanding that the service and production systems require knowledge to facilitate the implementation of the Just In Time production system. Just In Time production systems are implemented for the purpose of optimizing the production process and creating efficiencies through waste
APA, Harvard, Vancouver, ISO, and other styles
35

Hana, Heningtyas Rofi, and Hanie Teki Tjendani. "Analysis of Project Acceleration Implementation Using the CPM and PERT at Lettu Imam Building." EXTRAPOLASI 19, no. 02 (2022): 121–33. http://dx.doi.org/10.30996/ep.v19i02.7656.

Full text
Abstract:
The implementation of construction projects generally has a predetermined time limit. To achieve the time limit, planning and controlling are necessary. Planning can determine what work needs to be done and when it is done, what resources are needed, and what risks may arise. Clear activity targets can be identified for each activity. The case study in this research is Lettu Imam Building Construction Project in the OPD Office Complex of Pasuruan Regency. This study uses the Critical Path Method (CPM) to determine the work items passed through the critical path and the Project Evaluation and R
APA, Harvard, Vancouver, ISO, and other styles
36

Joshi, Abhishek, and Ashok M. Mehendale. "Project Pre-mortem using Prospective Hindsight: An Unexplored Tool to address Healthcare Projects Implementation barriers." Indian Journal of Community Health 33, no. 2 (2021): 415–16. http://dx.doi.org/10.47203/ijch.2021.v33i02.039.

Full text
Abstract:
Many Healthcare initiatives &amp; Projects are planned in Healthcare sector and usually after the initial sensitization sessions and Brainstorming among stakeholders the Projects are implemented. Monitoring and Review/Evaluation is done at the end of Project duration or during some specifically decided time interval as per standard practices. Strength, weakness, opportunities &amp; threat (SWOT) analysis or critical evaluation/analysis is done. If the Project Objectives are not achieved as expected the insights gained by these methods are used as lessons learnt which are to be kept in Mind whi
APA, Harvard, Vancouver, ISO, and other styles
37

Joshi, Abhishek, and Ashok M. Mehendale. "Project Pre-mortem using Prospective Hindsight: An Unexplored Tool to address Healthcare Projects Implementation barriers." Indian Journal of Community Health 33, no. 2 (2021): 415–16. http://dx.doi.org/10.47203/ijch.2021.v33i02.039.

Full text
Abstract:
Many Healthcare initiatives &amp; Projects are planned in Healthcare sector and usually after the initial sensitization sessions and Brainstorming among stakeholders the Projects are implemented. Monitoring and Review/Evaluation is done at the end of Project duration or during some specifically decided time interval as per standard practices. Strength, weakness, opportunities &amp; threat (SWOT) analysis or critical evaluation/analysis is done. If the Project Objectives are not achieved as expected the insights gained by these methods are used as lessons learnt which are to be kept in Mind whi
APA, Harvard, Vancouver, ISO, and other styles
38

Kamandang, Zetta Rasullia. "The Project Performance Evaluation of Road Construction Project Using Earned Value Method." CI-TECH 3, no. 01 (2022): 30–34. http://dx.doi.org/10.33005/ci-tech.v3i01.53.

Full text
Abstract:
&#x0D; &#x0D; &#x0D; &#x0D; The fundamental goal of project management is to finish a facility building project on schedule and within budget while adhering to defined standards and specifications. No matter how great the construction project plan is, if frequent and timely reviews are not done throughout project execution, neither the project progress nor the plan's efficacy can be evaluated. The Earned Value Method (EVM) is one of the tools used in project management that integrates scope, cost and time or schedule measures and provide an accurate picture of current project state at the time
APA, Harvard, Vancouver, ISO, and other styles
39

Novikova, Tatyana, Svetlana Evdokimova, and A. Novikov. "R&D of the PERT basic model for project planning." Modeling of systems and processes 14, no. 4 (2022): 75–81. http://dx.doi.org/10.12737/2219-0767-2021-14-4-75-81.

Full text
Abstract:
The guiding principles of project implementation are planning. The discrepancy in time, cost, and quality between the plan and the actual implementation of the project requires management decisions supported by an analysis of the optimization of the duration of the project and the search for reserves to reduce the implementation time. For this purpose, a basic PERT model for a specific project was developed, early and late deadlines for work, time reserves, and a critical path were calculated. This work is aimed at applying methods of evaluation and analysis of projects to find optimal solutio
APA, Harvard, Vancouver, ISO, and other styles
40

Chen, Xinyan. "Exploring Just Spaces: How to Achieve the Fair Distribution of Urban Social Spaces through Participatory Urban Planning." International Journal of Education and Social Development 1, no. 3 (2024): 12–16. https://doi.org/10.54097/fj089r57.

Full text
Abstract:
This paper reviews the theories and practices of achieving the fair distribution of urban social spaces through participatory planning, emphasizing the important role of participatory planning in promoting urban justice and spatial equity. By analyzing successful cases such as the Tempelhofer Feld public space project in Berlin and the community participatory green space planning in Chengdu, this paper demonstrates how participatory planning can enhance community participation, improve the transparency and accountability of the planning process, and promote spatial equity and social inclusion.
APA, Harvard, Vancouver, ISO, and other styles
41

Mali, P. A* Lokhande A.Y Kadam S.K Shirole S.B More P.N Velhal A.J. "TIME AND COST OPTIMIZATION BY MSP SOFTWARE." INTERNATIONAL JOURNAL OF ENGINEERING SCIENCES & RESEARCH TECHNOLOGY 6, no. 3 (2017): 400–407. https://doi.org/10.5281/zenodo.438096.

Full text
Abstract:
In the construction project, time and cost are the most important factors to be considered in the planning of every project. The aim of project is to finish the projects on time, within budget and to achieve other project objectives. It is a difficult task undertaken by project managers in practice, which include constantly measuring progress, evaluation of plans, and corrective actions should be taken whenever required. Optimization is a systematic effort made to improve profit margins and obtain the best results under given circumstances. There is a Systematic planning and programming with e
APA, Harvard, Vancouver, ISO, and other styles
42

Dhevy, Retno Ajeng Paramitha, and Yusuf Latief. "Evaluation of the planning and control process of offshore oil and gas platform projects at the engineering stage with the Project Management Body of Knowledge (PMBOK) approach, 6th and 7th editions to improve time performance." International research journal of engineering, IT and scientific research 11, no. 1 (2024): 1–13. https://doi.org/10.21744/irjeis.v11n1.2493.

Full text
Abstract:
The oil and gas exploration process continues to be carried out in order to achieve the oil and gas production target. However, offshore oil and gas platform projects are often found to experience delays in completion. Therefore, a comprehensive evaluation of the project planning and control process is needed to improve project time performance, so that it can be completed according to target effectively and efficiently. This study focuses on the evaluation of offshore oil and gas platform project planning and control at the engineering stage using the approach in PMBOK Editions 6 and 7. This
APA, Harvard, Vancouver, ISO, and other styles
43

Raghunath, Reddy Koilakonda. "Driving Value Through Strategic Planning and Resource Allocation." European Journal of Advances in Engineering and Technology 6, no. 10 (2019): 67–70. https://doi.org/10.5281/zenodo.13325385.

Full text
Abstract:
Strategic planning and resource allocation is important to understand the capacities and competencies in terms of plans or operations as well as how much they weigh on task or project difficulty levels when it comes to overseeing intricate tasks. Without definite starting estimates, administrators will never find out how much of what type of resources should go to whom in an organization. A system for distributing them efficiently prevents excessiveness over a long duration in using resources with strategic planning at the same time as leading to increased productivity through supplying just e
APA, Harvard, Vancouver, ISO, and other styles
44

DeVries, Richard L. "Computer-Aided Process Planning: A Path to Just-in-Time Manufacturing for Shipyards." Journal of Ship Production 4, no. 03 (1988): 197–215. http://dx.doi.org/10.5957/jsp.1988.4.3.197.

Full text
Abstract:
The use of computers to improve the productivity of U.S. shipyards has never been as successful as hoped for by the designers. Many applications were simply the conversion of an existing process to a computerized process. The manufacturing database required for the successful application of computer-aided process planning (CAPP) to the shipyard environment requires a "back-to-basics" approach, one that can lead to control of the processes occurring in the fabrication and assembly shops of a shipyard. The manufacturing database will not provide management feedback designed for the financial seg
APA, Harvard, Vancouver, ISO, and other styles
45

Dong, Yuan, ShiLun Zhang, and YuanLin Huang. "Construction of Educational Quality Evaluation Index System Based on Project Management." International Journal of Information Systems in the Service Sector 12, no. 2 (2020): 65–75. http://dx.doi.org/10.4018/ijisss.2020040105.

Full text
Abstract:
Project management is a sub-discipline of management. Using specialized knowledge, skills, tools, and methods in project activities enables the project to meet or exceed set requirements and desired processes under limited resource constraints. Project management is the overall monitoring and control of activities that are successful in achieving a range of goals. This includes planning, scheduling, and maintaining the progress of the activities that make up the project. A project is a one-time task that needs to be completed within a defined resource and within a limited time. Specifically, i
APA, Harvard, Vancouver, ISO, and other styles
46

Romanov, Anton, Nadezhda Yarushkina, Alexey Filippov, Pavel Sergeev, Ilya Andreev, and Sergey Kiselev. "Time Series Forecasting during Software Project State Analysis." Mathematics 12, no. 1 (2023): 47. http://dx.doi.org/10.3390/math12010047.

Full text
Abstract:
Repositories of source code and their hosting platforms are important data sources for software project development and management processes. These sources allow for the extraction of historical data points for the product development process evaluation. Extracted data points reflect the previous development experience and allow future planning and active development tracking. The aim of this research is to create a predictive approach to control software development based on a time series extracted from repositories and hosting platforms. This article describes the method of extracting parame
APA, Harvard, Vancouver, ISO, and other styles
47

Oka, Junafuji, and Dwi Kartikasari. "EVALUASI MANAJEMEN WAKTU PROYEK MENGGUNAKAN METODE PERT DAN CPM PADA PENGERJAAN “PROYEK REPARASI CRANE LAMPSON” DI PT MCDERMOTT INDONESIA." JOURNAL OF APPLIED BUSINESS ADMINISTRATION 1, no. 1 (2019): 28–36. http://dx.doi.org/10.30871/jaba.v1i1.1257.

Full text
Abstract:
Project scheduling is one of the elements of planning outcomes, which can provide information about project schedules and project progress in terms of resource performance in terms of cost, labor, equipment and materials and project duration plan with time efficiency for project completion. Critical Path Method (CPM) and Project Evaluation Review Technic (PERT) are two project scheduling methods that use different approaches in the process. In making a project, the researcher assumes that the initial success of a project should begin with the planning and preparation of the correct phase and t
APA, Harvard, Vancouver, ISO, and other styles
48

Triska Bayu Wedananta, Komang Gede, Hanie Teki Tjendani, and Budi Witjaksana. "Evaluation of Cost and Time Estimates Using The Earned Value Method: A Case Study of The Construction of RU Guest House and Main House." Journal of Social Research 4, no. 4 (2025): 648–59. https://doi.org/10.55324/josr.v4i4.2488.

Full text
Abstract:
This study evaluates the performance of the RU Guest House and Main House construction project in Bali, focusing on time and cost estimates using the Earned Value Method (EVM). By analyzing the Actual Cost of Work Performed (ACWP), Budgeted Cost of Work Performed (BCWP), and Budgeted Cost of Work Scheduled (BCWS), the study identifies significant delays and cost overruns. The project, initially scheduled for 34 weeks, experienced a 27.99% delay by week 21, with an estimated cost increase of IDR 1,079,046,375. The findings reveal that poor initial planning and logistical constraints, such as na
APA, Harvard, Vancouver, ISO, and other styles
49

Barna, Zsolt. "New Times in Performance Evaluation." INTERNATIONAL JOURNAL OF MANAGEMENT SCIENCE AND BUSINESS ADMINISTRATION 9, no. 4 (2023): 21–34. http://dx.doi.org/10.18775/ijmsba.1849-5664-5419.2014.94.1002.

Full text
Abstract:
The research topic focuses on performance evaluation in business organizations with varying ownership structures. Fundamentally changed planning cycles, epidemics, war, raw material shortages, and energy crises have rewritten the everyday life and planning cycles of controlling and HR. The unified labor market and companies’ preparedness for the new situation, the constraints of project-based short planning periods, have led to exciting results in performance assessment. The questionnaire research aimed to shed light on the need for performance appraisal, the demand for it on the part of emplo
APA, Harvard, Vancouver, ISO, and other styles
50

Bein, Peter, and Mike Kawczynski. "Environmental Accounting in Greater Vancouver Transportation System Planning." Transportation Research Record: Journal of the Transportation Research Board 1601, no. 1 (1997): 13–20. http://dx.doi.org/10.3141/1601-03.

Full text
Abstract:
Transportation facility and system options for the greater Vancouver region are evaluated using the provincial guidelines for full-cost accounting. The impact of the monetized environmental accounts on the overall evaluation is presented, using facility, system option, and pricing examples from the regional plan. Within project options that are homogeneous with respect to travel demand management or modal split, environmental account values do not differ much, just as in the user cost accounts. Monetized environmental account values are two to three times smaller than the user cost in project-
APA, Harvard, Vancouver, ISO, and other styles
We offer discounts on all premium plans for authors whose works are included in thematic literature selections. Contact us to get a unique promo code!