Academic literature on the topic 'Kalkyl'

Create a spot-on reference in APA, MLA, Chicago, Harvard, and other styles

Select a source type:

Consult the lists of relevant articles, books, theses, conference reports, and other scholarly sources on the topic 'Kalkyl.'

Next to every source in the list of references, there is an 'Add to bibliography' button. Press on it, and we will generate automatically the bibliographic reference to the chosen work in the citation style you need: APA, MLA, Harvard, Chicago, Vancouver, etc.

You can also download the full text of the academic publication as pdf and read online its abstract whenever available in the metadata.

Journal articles on the topic "Kalkyl"

1

Weber, Horst. "Kalkül und Sinnbild." Die Musikforschung 46, no. 4 (2021): 355–70. http://dx.doi.org/10.52412/mf.1993.h4.1174.

Full text
Abstract:
Der Kanon markiert je nach satztechnischer Ausprägung entgegengesetzte Pole der Kunstmusik: entweder den Usus vervielfältigter Einstimmigkeit oder aber höchsten kontrapunktischen Kalkül. Diese Extreme des Kunstanspruchs verleihen dem Kanon in der Kunstmusik eine Aura des Besonderen. Die Erschwerung des kontrapunktischen Kalküls verknüpft sich für den Hörer mit einer Sinnvermutung. Das Verhältnis von Kalkül und Sinn wird anhand von Beispielen skizziert.
 bms online (Weil, Karola)
APA, Harvard, Vancouver, ISO, and other styles
2

Schneider, Johann Nikolaus. "KUHLMANNS KALKÜL." Daphnis 27, no. 1 (1998): 93–140. http://dx.doi.org/10.1163/18796583-90000620.

Full text
APA, Harvard, Vancouver, ISO, and other styles
3

Neu, Tim. "Koordination und Kalkül." Historische Anthropologie 23, no. 1 (2015): 129–47. http://dx.doi.org/10.7788/ha-2015-0109.

Full text
APA, Harvard, Vancouver, ISO, and other styles
4

Watanabe-O’Kelly, Helen. "„Angstapparat aus Kalkül“." Zeitschrift für Erziehungswissenschaft 15, S1 (2012): 115–24. http://dx.doi.org/10.1007/s11618-012-0296-6.

Full text
APA, Harvard, Vancouver, ISO, and other styles
5

Sautter, Hermann. "Moralisches Urteil und ökonomisches Kalkül." Zeitschrift für Evangelische Ethik 39, no. 1 (1995): 132–36. http://dx.doi.org/10.14315/zee-1995-0124.

Full text
APA, Harvard, Vancouver, ISO, and other styles
6

Koppo, Nico, and Hagen Schölzel. "Kooperative Politikberatung ohne machtpolitisches Kalkül?" Politische Vierteljahresschrift 50, no. 1 (2009): 86–104. http://dx.doi.org/10.1007/s11615-009-0128-3.

Full text
APA, Harvard, Vancouver, ISO, and other styles
7

Seelbach, Ulrich. "Gottes Kalkül und (k)ein Ereignis." Daphnis 47, no. 1-2 (2019): 285–312. http://dx.doi.org/10.1163/18796583-04701006.

Full text
Abstract:
In 1633 the armies of Wallenstein and the united armies of Saxony, Brandenburg and Sweden met in front of the city of Schweidnitz. Instead of fighting a battle, a truce was agreed on August 22. On this day, one of the Protestants’ hopes, Prince Ulrich of Denmark, fell victim to an attack. And in the enclosed city hunger and plague raged for weeks. How these two events were treated or even ignored in contemporary newsletters, and how poets interpreted the events, is presented here. Analyzed texts stem from Daniel Czepko and the Lutheran preacher Friedrich Scholtz, who wrote an epic poem in honor of Schweidnitz.
APA, Harvard, Vancouver, ISO, and other styles
8

Rein, Dieter. "Die Welt als Bild und Kalkül." Physik in unserer Zeit 19, no. 3 (1988): 92–93. http://dx.doi.org/10.1002/piuz.19880190305.

Full text
APA, Harvard, Vancouver, ISO, and other styles
9

Oktaviani, Riska, Hanggara Arifian, Agung Rahmadani, Nur Masyithah Zamruddin, and Rolan Rusli. "Kajian In Silico Senyawa Turunan Kalkon sebagai Antikanker." Proceeding of Mulawarman Pharmaceuticals Conferences 9 (April 30, 2019): 22–26. http://dx.doi.org/10.25026/mpc.v9i1.309.

Full text
Abstract:
Senyawa kalkon termasuk dalam famili flavonoid yang memiliki aktivitas seperti antimalarial, antioksidan, antimikroba, antikanker dan analgesik. Aktivitas antikanker senyawa kalkon berbasis 3,4-metilendioksi asetofenon di analisis melalui metode docking dengan adanya interaksi antara senyawa turunan kalkon dengan enzim topoisomerase II. Senyawa turunan kalkon berbasis 3,4-metilendioksi asetofenon dioptimasi dengan Hyperchem 8.0 dan di docking dengan MOE Chemical Computing Group. Interaksi antara senyawa turunan kalkon dengan enzim topoisomerase II berupa interaksi hidrogen dan arene hydrogen.
APA, Harvard, Vancouver, ISO, and other styles
10

Doleyeva, Aisa O. "Калмыцкие рукописи из фонда Российской национальной библиотеки". Бюллетень Калмыцкого научного центра Российской академии наук 15, № 3 (2020): 98–106. http://dx.doi.org/10.22162/2587-6503-2020-3-15-98-106.

Full text
Abstract:
The article introduces the texts of the Kalmyk (Oirat) manuscripts kept at the Russian National Library in Saint Petersburg in the Fund No. 918 (“Kalmyk manuscripts. New series. Meeting»). The collection of Oirat manuscripts includes “Vadzhrachkhedika Pradzhnya-paramita Sutra”, “The History of White Tara”, “Altn Gerl Nertya Nomin Khurangu Orshv”, prayer-repentance “Tsogt Zandn Orshv”, etc. The article gives the transliteration the manuscript of the letter of the Kalmyk Khan Ayuki to the Astrakhan Governor P. M. Apraksin, translated into the modern Kalmyk language and translated into Russian. The introduction of the transliteration and translation into modern Kalmyk of these manuscripts will contribute greatly to the research of the Kalmyk written culture.
APA, Harvard, Vancouver, ISO, and other styles
More sources

Dissertations / Theses on the topic "Kalkyl"

1

Khochaba, Silvia, and Vinos Koutcho. "BIM inom kalkyl." Thesis, Tekniska Högskolan, Högskolan i Jönköping, JTH, Byggnadsteknik, 2018. http://urn.kb.se/resolve?urn=urn:nbn:se:hj:diva-40799.

Full text
Abstract:
Sammanfattning Syfte: Det främsta problemet med implementering av BIM inom kalkyl är brister och felaktigheter i 3D-modeller (tredimensionell modell) som medför att de inte blir pålitliga. Målet med detta arbete är därför att klargöra hur informationskvalitén i en BIM-modell kan förbättras för att därmed öka användningen av BIM inom kalkyl hos byggföretag. Metod: Intervjuer, observationsstudier och litteraturstudier är de metoder som har valts för att besvara frågeställningarna i rapporten. Intervjuer utfördes med företag som har implementerat BIM inom kalkyl, med sådana som inte har infört och med företag som håller på att införa det. Observationsstudier genomfördes med handledarföretaget där kalkylprocessen redovisades tydligt. Litteraturstudier har pågått under hela arbetets gång för att ha en teoretisk grund i det hela. Informationen från dessa tre metoder har sedan jämförts för att därefter dra rimliga slutsatser. Resultat: En vägledning för branschen som lösning till kvalitetsproblem i modeller är att upprätta manualer. Dessa ska användas vid skapandet av modeller vilket troligtvis ska medföra reducering av felaktigheter. Dock krävs det även erfarenhet och kompetens inom personal samt investeringar på kostnad- och tid. Konsekvenser: Skulle implementering av BIM inom kalkyl lyckas medför det att säkrare kalkyler kan utföras vilket stärker företagets konkurrenskraft. Genom att implementera detta så tidigt som möjligt kan företagen utvecklas och undvika att hamna efter i branschen. Detta gynnar både företaget och den nya tekniken samtidigt som stora tids och kostnadsbesparingar erhålls. En implementering som denna kan lyckas vid upprättning av manualer med tydliga kravspecifikationer som tillämpas vid modellskapandet. Detta med hjälp av rätt erfarenheter och kompetenser bland involverad personal. Begränsningar: De begränsningar som finns i resultaten är bland annat att entreprenadformer och ansvarsförhållanden inte inkluderas. Dessutom är det avgränsat till att enbart behandla BIM i tidiga kalkylskeden vilket därmed medför att BIM inom planering, produktion, förvaltning och övriga skeden utesluts. Nyckelord: BIM, 5D, fördelar, kostnader, manualer.<br>Abstract Purpose: The main problem with implementation of BIM within calculation is the weaknesses and inaccuracies in 3D-models that makes them unreliable. The aim of this work is therefore to clarify how the information quality in a BIM model can be improved to thereby increase the use of BIM within calculation of construction companies. Method: Interviews, observation studies and literature studies are the chosen methods to answer the questions in the report. Interviews were conducted with companies that have implemented BIM within calculation, with those who have not introduced it yet, and with those who are about to implement it. Observation studies were conducted with the supervisor company where the calculation process was clearly reported. Literature studies have been done throughout the course to have a theoretical knowledge of the whole. The information from these three methods has then been compared to therefore make good conclusions. Findings: A guidance to the industry as a solution to quality problems in models is to set up manuals. These will be used during the creation of the models which will probably lead to a reduction of errors. However, it also requires experience and skills in staff as well as investments on cost and time. Implications: If the implementation of BIM within calculation succeeds, it will be possible to make safer calculations that strengthen the company's competitiveness. By implementing this as early as possible, companies can develop and avoid falling behind in the industry. This benefits both the company and the new technology while achieving great time and cost savings. An implementation like this can be successful in establishing manuals with clear requirement specifications which are applied during the creation of a model. This can be done with right experience and skills in the involved staff. Limitations: The limitations in the results are among other things, the fact that construction contracts and allocation of responsibilities are not included. In addition, it is limited to treat BIM in early calculation phases, which means that BIM in planning, production, management and other stages are excluded.  Keywords: BIM, 5D, benefits, costs, manuals.
APA, Harvard, Vancouver, ISO, and other styles
2

Mladenovic, Aleksandar, and Thomas Sjöström. "Kalkyl mot verkligt utfall : Analys av kalkyler och kalkylverktyg med avseende på ROT-projekt." Thesis, KTH, Byggteknik och design, 2014. http://urn.kb.se/resolve?urn=urn:nbn:se:kth:diva-148807.

Full text
Abstract:
När det handlar om ROT-projekt (renovering, om- och tillbyggnad) är det viktigt för entreprenören att uppnå långsiktig lönsamhet. För att säkerhetsställa detta är det av stor vikt att upprätta noggranna kalkyler som håller under hela byggprojektet. I dagsläget finns små marginaler för eventuella kostnadsökningar därmed ytterst lite utrymme för misstag. Eftersom förutsättningarna vid ROT-projekt ständigt varierar beroende på typ av badrum och skadeorsak är det därför väldigt svårt att uppskatta och beräkna kostnader utifrån rådande förutsättningar.  Utifrån detta finns det ett behov hos entreprenören att förstå varför kalkylerna avviker och hur man kan undvika detta i framtida projekt. Examensarbetet innehåller både en analys av kalkylerade kostnader och dess verkliga utfall samt en analys av kalkylverktyget Meps. Då ROT-sektorn är stor och omfattande har vi valt att avgränsa oss till badrumsrenoveringar som en följd utav vattenskador. Utifrån analys av kalkyler och kalkylverktyget samt intervjuer med parter både från entreprenör och från beställarsidan har vi kommit fram till en rad slutsatser om hur företaget kan ta fram noggrannare kalkyler i framtiden. Framförallt anser vi att företaget ska föra en tätare dialog med försäkringsbolagen för att vara en del i utvecklingen av kalkylverktyget. Vi anser även att man bör avsätta resurser för att utveckla erfarenhetsåterföringen inom företaget.<br>It is important for the contractor to have an accurate calculation throughout the whole project, especially when it comes to ”ROT”-projects (renovation and reconstruction).There is very little room for mistakes since the budget is very tight. Since the conditions always differ from one project to another it’s very important to take this into account. Due to this there is a great need for the contractor to understand why the calculations do not add up in the end so they can avoid income losses in the future. This report contains both an analysis of the calculated costs and the outcome for five different projects and also an analysis of the program used for calculating the costs, Meps. Since the ROT-sector is big and comprehensive we have decided only to analyse bathroom renovations due to water damages. From the analysis of the calculations and Meps together with interviews with contractors and clients we have come to the following conclusions: First of all we suggest that the entrepreneur should have a closer dialogue with the insurance company to be a part of the development of Meps. We also suggest that they should devote more resources for feedback in the company.
APA, Harvard, Vancouver, ISO, and other styles
3

Wixenius, Emmy, and Sara Olsson. "Kalkyl för logistikkostnader; från leverantör till förbrukningsplats." Thesis, Tekniska Högskolan, Högskolan i Jönköping, JTH, Industriell organisation och produktion, 2010. http://urn.kb.se/resolve?urn=urn:nbn:se:hj:diva-12467.

Full text
Abstract:
The globalization that has occurred during the last few years has made it more important for companies to have a well-functioning logistics system. Customers demand more options, which lead to an increased flow that creates greater demand regarding packaging and transports. Diverse logistics costs are nowadays a substantial cost for many companies. Therefore, more effort is aimed at optimizing transportation to lower these costs. The purpose of this project is to create a user-friendly calculation of logistics costs that illustrates how the costs vary, depending on how the flow is structured. This is done by examining which aspects that affect the total logistics costs and by mapping which aspects that should be included in a calculation of the logistics costs. Literature studies have been carried out parallel with empirical studies at Scania's production unit, MC, in Oskarshamn. A calculation of logistics costs is created for them with the purpose of making the materials supply system more efficient. Purchasing agreements are negotiated by Scania’s headquarters in Södertälje, whereas Scania Oskarshamn would like to evaluate the supplier suggestions from a logistics perspective. The company has declared that they are in need of a user-friendly calculation of logistics costs that can be used by many different employees. An analysis of the current situation is carried out in order to create a broad foundation of knowledge, regarding what aspects are most important to include in the calculation before creating it. The situation analysis is done through interviews and observations at the company. It shows that there are many different flows, both concerning internal material handling as well as transportation flows from suppliers to Scania Oskarshamn. As a consequence of this, a lot of effort is put into finding ways of simplifying the flows without decreasing the quality of the calculation, meaning its validity. The calculation includes five options: weight, volume, packaging, number of boxes on a EUR-pallet, and number of articles in a package. Further, it contains two different parts; one of them is a calculation of transportation costs and the other is a calculation of internal handling. The transportation calculation is founded on data from invoices, gathered and compiled during one year. The calculation of internal handling is founded on handling costs that occur depending on what packages the articles are delivered in, from the supplier. Many of the costs that occur cannot be ascribed to a certain category of packages. Therefore, the allocation of costs is done through allocation keys, according to Activity-Based Costing. The allocations of costs vary in the different areas, because it has not been possible to identify allocation keys to all of them. Finally a discussion takes place, concerning the aspects included in the current calculation against those mentioned in the literature. It is also discussed how other companies can make use of the result of this project, to create a calculation of logistics costs for their own business.<br>De senaste årens globalisering har lett till att det har blivit allt viktigare för företag att ha ett välskött logistiksystem för att kunna hävda sig på marknaden. Kunder kräver större valmöjligheter, vilket leder till ett ökat flöde som i sin tur ställer högre krav på emballage och transporter. Diverse logistiktjänster utgör numera en stor kostnad för företag och större fokus läggs därför på att optimera transporter för att kunna sänka dessa kostnader. Målet med detta projekt är att skapa en logistikkalkyl som enkelt illustrerar hur logistikkostnaden ändras beroende på hur logistikflödet ser ut. Detta genom att undersöka vilka faktorer som påverkar de totala logistikkostnaderna och kartlägga vilka faktorer som bör beaktas då en logistikkalkyl ska tas fram. För att nå målet har litteraturstudier gjorts parallellt med empiriska undersökningar på Scanias produktionsenhet MC i Oskarshamn. En logistikkalkyl skapas åt dem med syftet att effektivisera materialanskaffningen. Inköpsupphandlingar tas fram av Scanias huvudkontor i Södertälje varpå Scania Oskarshamn vill kunna utvärdera de leverantörsförslag som ges, ifrån ett logistikperspektiv. Företaget har uttryckt en önskan om en enkel logistikkalkyl som kan hanteras av många användare. En nulägesanalys har gjorts för att skapa en bred grund inför skapandet av kalkylen och för att få förståelse för vilka faktorer som är av störst vikt att ta med. Nulägesanalysen har tagits fram genom intervjuer och observationer på företaget. Den visar att det finns många olika flöden, både gällande intern materialhantering och gällande transportflödena från leverantörer till Scania Oskarshamn. Till följd av detta har mycket arbete lagts ner på att hitta sätt att förenkla flödena utan att göra avkall på kvaliteten i kalkylen, det vill säga dess validitet. I den kalkyl som har tagits fram görs fem val: vikt, volym, emballage, antal boxar per pallbotten och antal artiklar per emballage. Kalkylen består av två delar, dels en transportkalkyl som utgår ifrån tidigare statistik på företaget och dels en internhanteringskalkyl. Den sistnämnda grundar sig på hanteringskostnader som uppstår beroende på vilket emballage som artiklarna levereras i från leverantör. Eftersom många av de kostnader som har tagits fram inte går att härleda direkt till en kategori av emballage, har kostnadsfördelning gjorts med hjälp av fördelningsnycklar enligt ABC-kalkylering. Då det inte alltid gått att identifiera några särskiljande fördelningsnycklar har kostnadsfördelningen varierat mellan de olika huvudområdena. Avslutningsvis förs en diskussion gällande vilka aspekter som tagits med i den aktuella kalkylen gentemot vilka aspekter som nämns i litteraturen. En diskussion förs även om hur andra företag kan ta hjälp av resultatet av detta projekt då de vill skapa en logistikkalkyl i sin verksamhet.
APA, Harvard, Vancouver, ISO, and other styles
4

Hussein, Anwar, and Mahdi Husseini. "Tillämpning av ABC-kalkyl i ett hantverksföretag." Thesis, KTH, Tillämpad maskinteknik (KTH Södertälje), 2018. http://urn.kb.se/resolve?urn=urn:nbn:se:kth:diva-235173.

Full text
Abstract:
Detta examensarbete utfördes på Stolt Smide och Design i Skogås, där företaget tillverkar två olikatyper av glasväggar som kallas för Slim och Robust. Det nuvarande kostnadsberäkningssystemet iföretaget är inte tillräckligt funktionellt eftersom det inte tar hänsyn till ett antal relevanta faktorervid prissättningen av produkter. Detta gör att man har ett bristande beslutsunderlag när manförhandlar med kunder om priset på olika beställningar. I dagsläget prissätts produkterna enbartefter hur många kvadratmeter som beställts i kombination med en schablon som är gemensam förbåda produkterna. Syftet med detta examensarbete är att ge företaget en fördjupad kännedom över derastillverkningsprocess och hur företaget kan kostnadsberäkna sina produkter. Detta baserat pårespektive produkters resursanspråk. Eftersom vi skulle undersöka och se om det är aktiviteterna som påverka resursåtgången valdesaktivitetsbaserad kostnadskalkylen. Detta examensarbete bygger på sekundär- och primärdata som litteraturstudier, artikelsök,observationer av tillverkningsprocessen som helhet, sammanställning av interna material samttidsstudier. I vårt uppdrag ingick att kartlägga och värdera resursanspråken, Med hjälp avprocesskartläggning kunde vi skapa en analys som består av identifiering av aktiviteter, fördelning avresurser på varje aktivitet, val av kostnadsdrivarvolym, fastställning av en volym för kostnadsdrivaresamt kostnadsberäkning av kalkylobjekt. Resultaten för vår ABC-kalkylberäkningar blev inte samma tillverkningskostnad för bådeprodukterna där vi fick 4278 kr/kvm för Slim och en motsvarande Robust på 4884 kr.Vi har kommit fram en slutsats där vi kunde se att de direkta kostnaderna påverkade stort i bådeprodukterna, Skillnaden i direktlön och direktmaterial för produkterna blev 502 kr och påmotsvarande sätt blev skillnaden för den totala tillverkningskostnaden 606 kr. Detta motsvarar 83 % av mellan skillnaden är från direkta kostnaderna och resten som motsvarar 17 % är frånaktivitetskostnad.<br>This bachelor thesis was carried out at Stolt Smide and Design in Skogås, where the two differentglass walls called Slim and Robust are manufactured. The current cost calculation system in thecompany is not sufficiently functional because it doesn’t take into account a number of relevantfactors in the pricing of products. This means that employees have a difficulty with decision makingwhen they negotiate with the customers about the price of different product. Currently the productsare priced only according to the number of square meters ordered and the pricing is based on astandard sheet that is common for both products. The purpose of this thesis is to give the company a deeper knowledge of their manufacturingprocess and how the company can price their products. Based on the investigation that was needed to see if it is the activities that affect resourceconsumption, the activity-based costing was chosen. This thesis is based on secondary and primary data such as literature studies, article searches, observations of the manufacturing process as a whole, compilation of internal materials as well astime studies were conducted. With the help of mapping the manufacturing process, we were able tocreate an analysis consisting of identifies of activities, allocation of resources for each activity, choice of cost driver volume, setting of a volume for cost drivers, and cost calculation of each product. Based in our activity-based calculations we did not get the same manufacturing cost for theproducts. According to our calculations we got 4278 kr / sqm for Slim and 4884 kr/sqm for the Robust. In the end we have come to a conclusion that it’s the direct costs in term material cost and laborhours that affected the price of both products. The difference in direct cost and direct material forthe products was 502 kr and the difference for the total manufacturing cost was 606 kr. This corresponds to 83% of the difference between direct costs and only 17% is from activity cost.
APA, Harvard, Vancouver, ISO, and other styles
5

Borgenstam, Sebastian. "Livscykelanalys och ekonomisk kalkyl av två KL-bjälklag." Thesis, Umeå universitet, Institutionen för tillämpad fysik och elektronik, 2020. http://urn.kb.se/resolve?urn=urn:nbn:se:umu:diva-172272.

Full text
Abstract:
Sammanfattning Inom husbyggnad sker en ständig utveckling i form av nya material och innovativa tekniska lösningar. Viljan att minska vårt koldioxidavtryck är påtaglig i världen. Trä är ett miljövänligt råmaterial och skog är en stor resurstillgång vi har i Sverige. Korslimmat trä är ett massivträ med goda hållfasthetsegenskaper som har gjort det möjligt att bygga större än någonsin tidigare i trä. Syftet med detta projekt var att optimera utformningen av byggnadsstommar i bostadshus med avseende på ekonomisk kostnad och miljöpåverkan uttryckt i koldioxidutsläpp. I denna studie jämfördes två olika bjälklagsutformningar båda med en bärande stomme i korslimmat trä. Jämförelsen skedde utifrån livscykelanalyser och ekonomiska kalkyler. Studien omfattade delen av livscykeln som kallas ”vagga till grind”. Tjockleken för den bärande KL-skivan i denna studie var 230 mm. Bortsett från den skiljde sig bjälklagen både på under- och översidan av skivan. Ena bjälklaget var uppbyggt med ett regelsystem tillverkat av Granab AB. Det andra bjälklaget var uppbyggt med makadam och ett tjockt lager spackel. Det var den väsentliga skillnaden i uppbyggnad av bjälklagen. Konstruktionen skiljde sig även vid anslutningen mellan vägg och bjälklag. För att uppnå Boverkets ljudkraven med Granab-bjälklaget tvingades det placeras en ljudlist längs alla väggar där det ansluter mot bjälklaget. För det bjälklaget med makadam var detta inte nödvändigt för att uppnå ljudkraven vilket enkelt kan förklaras med tyngden av makadam och spackel. I studien användes Östra Station Kvarter A i Umeå som referensobjekt. Detta kvarter ska uppföras av Balticgruppen AB och var under studien fortfarande i projekteringsstadiet. Resultatet av jämförelsen blev att Makadam-bjälklaget hade 22,9 procent lägre ekonomisk kostnad än Granab-bjälklaget. Däremot hade Granab-bjälklaget 9 procent lägre miljöpåverkan.<br>Abstract In building construction, there is a constant development in new materials and innovative technical solutions. The desire to reduce our carbon footprint is evident in the world and wood is a sustainable raw material. Forests is one of the big resources we have in Sweden. Cross-laminated timber (CLT) is a massive wood with high load-bearing capacity and stiffness has made it possible to build larger than ever before in wood. The question now is how to optimize the use of this environmentally friendly material. In this study, two different floor slabs with a supporting frame in cross-laminated timber were compared. To be able to compare CO2 consumption, Life Cycle Assessment was used and for the costs, economic calculations was built. The study covered part of the life cycle known as "cradle-to-gate". The thickness of the CLT slab was 230 mm. Apart from the slab, the beams differed both above and beneath the slab. One of the floor slabs was constructed with a subfloor system manufactured by Granab AB. The other floor slab was constructed with macadam and a thick layer of putty. That was the significant difference in the construction of the floor slab. There was also a differed connection between the walls and floor slabs. To achieve Boverket sound requirements, an elastic interlayer had to be placed along all the walls where it connects to the floor slab with subfloor system. For the joists with macadam, this was not necessary to achieve the sound requirements, which can easily be explained by the weight of macadam and putty. In the study, Östra Station Kvarter A in Umeå was used as a reference object. These buildings are to be built by Balticgruppen AB and during the study were still in the design stage. As a result of the comparison, the Macadam joists had a 22.9 percent lower economic cost than Granab, while the subfloor system-joists had a 9 percent lower environmental impact.
APA, Harvard, Vancouver, ISO, and other styles
6

Rödén, Jonathan. "Kalkylmall i BidCon : En kalkylmall i BidCon som underlättar kalkylarbetet för inblandade yrkeskategorier på Selbergs Entreprenad AB." Thesis, Umeå universitet, Institutionen för tillämpad fysik och elektronik, 2016. http://urn.kb.se/resolve?urn=urn:nbn:se:umu:diva-119770.

Full text
Abstract:
Idag utförs de flesta byggprojekt med fast pris vilket kräver att entreprenören tidigt tar fram kostnader för att utföra projektet. Att ta fram alla kostnader för ett projekt kallas kalkylering och omfattar mycket arbete och stor kompetens av de inblandade. Att skapa en kalkyl kan göras på många olika sätt. I nuläget använder sig de flesta större entreprenörer av datorstödda kalkylprogram för att ta fram kostnaderna för ett projekt. Detta examensarbete är ett samarbete med Selbergs Entreprenad, som de använder sig av kalkylprogrammet BidCon.   Syftet med examensarbetet är att underlätta hela kalkylprocessen för alla inblandade yrkeskategorier på Selbergs Entreprenad. Detta genom att skapa en kalkylmall med lämplig struktur i netto- offert- och omkostnadskalkylarken samt lägesplacera de olika kategorierna för att underlätta vid planeringsarbetet. För att skapa denna kalkylmall intervjuades de inblandade yrkeskategorierna anbudsingenjör, inköpare och platschefer. I examensarbetet har även referensföretagets befintliga kalkylmall samt utförda projektkalkyler studerats och analyserats.   Kalkylmallen som skapats innehåller en struktur som lämpar sig för kalkylarbetet hos Selbergs entreprenad. Strukturen består av ett antal nivåer utifrån SBEF byggdelskoder samt fysiska lägen för projektet. I kalkylmallen har vanligt förekommande kalkylposter som identifierats implementerats. Detta för att effektivisera kalkylarbetet och undvika att kalkylposter glöms eller hanteras fel. Lägeshantering som används vid export från BidCon till planeringsverktyget fungerade inte som det skulle och uteslöts i kalkylmallen. Kalkylmallen som skapats har implementerats i Selbergs Entreprenads kalkylprogram för att kunna användas i det dagliga arbetet med anbuds- och produktionskalkyler.   Att använda sig av en kalkylmall bidrar till en gemensam kalkylstruktur för hela företaget vare sig det gäller inköp, anbudsingenjör, platschef eller någon annan inblandad. Generellt att tänka på vid skapande av kalkylmall är att anpassa mallen till efterföljande delar i processen, de så strukturen kan nyttjas i planeringsarbetet och vid kostnadsavstämning. För att kalkylmallen skall kunna användas i framtiden bör mallen uppdateras kontinuerligt i takt med införandet av nya byggmetoder och material.<br>Today is performed most construction projects with fixed price which requires that the contractor early access costs to carry out the project. To develop all the costs of a project called the costing and covers a lot of work and expertise of the people who are involved. Creating a calculation can be done in many different ways. At present uses most of the major contractors of the computer-aided calculation programs to develop the cost of a project. This thesis is a collaboration with Selbergs Construction and the use of the spreadsheet program BidCon.   The aim of the project is to facilitate the entire calculation process for all involved professionals on Selbergs Construction. This by creating a spreadsheet template with the appropriate structure. To create this spreadsheet template interviewed the involved professions tendering engineer, purchasers and managers. The thesis also reference the company's existing spreadsheet template and executed project estimates are studied and analyzed.   Calculation template created containing a structure suitable for calculi work of Selbergs construction. The structure consists of a number of levels based SBEF building component codes, and physical locations for the project. The spreadsheet template has identified common spreadsheet entries implemented. This is to streamline the process and avoid the miss of items when calculating. Location Management applied to exports from BidCon to the planning tool did not work as it should, which were excluded in the calculation template. Costing template created has been implemented in Selbergs Entreprenad spreadsheet to be used in the daily work with the tendering and production calculations.   Making use of a spreadsheet template contributes to a common spreadsheet structure for the entire company whether it be purchasing, tendering engineer, manager or anyone else involved. Generally to consider when creating a spreadsheet template is to customize the template for subsequent parts of the process. So the structure can be used in the planning and the cost reconciliation. For spreadsheet template to be used in the future should be the template is updated continuously as new construction methods and materials.
APA, Harvard, Vancouver, ISO, and other styles
7

Forell, Jonas. "Fastigheten Maskinbolaget SWECON : - programbaserade och egna energiberäkningar med ekonomisk kalkyl." Thesis, Mälardalen University, School of Sustainable Development of Society and Technology, 2008. http://urn.kb.se/resolve?urn=urn:nbn:se:mdh:diva-5355.

Full text
Abstract:
<p>Sammanfattning</p><p>I det följande examensarbetet har två alternativ av installationer jämförts beträffande ny­­bygg­nationen <em>Maskinbolaget Swecon</em>, en fastighet med en kontorsbyggnad och till­hör­­ande maskinhall i Uppsala. Alternativen har varit en fjärrvärmeinstallation med en separat kyl­mas­kin, och två bergvärmepumpar med en frikyleslinga. Jämförelser har gjorts mellan dator- och egenberäknade simu­leringar av energi­för­­brukningen [kWh­­/­(m<sup>2</sup>,år)], och då med olika ändringar i fastig­het­ens kon­struk­tion, där det ur­sprung­­­liga pro­jekt­­erings­un­der­laget har varit utgångspunkt (Inne­kli­mat­byrån, 2008).</p><p>    Därefter har en nu­vär­des­­kal­kylering med en kalkylhorisont på 30 år utförts, som visar på det mest eko­no­miska alternativet och simuleringen gällande drifts- och in­ves­­­t­eringskostnader.</p><p>    Energiberäkningarna har genomförts med datorprogrammen BV<sup>2</sup> och VIP+, och även med egna beräkningar i Excel. Nuvärdeskalkylen har också gjorts i Excel.</p><p> </p><p>                                     ♠    ♠    ♠</p><p> </p><p>Resultaten visar att kontorsbyggnaden och maskinhallen uppfyller riktlinjerna från Bo­verkets byggregler, BBR, avseende U-värde. Kontoret uppfyller även BBR:s di­rek­tiv angående energi­för­bruk­ning [kWh/(m<sup>2</sup>,år)], något som däremot inte gäller för mas­kinhallen.</p><p>    Alternativet med bergvärmepumparna är ekonomiskt fördel­ak­tig­ast i ett per­spek­tiv på 30 år. Jämförelserna mellan de olika simuleringarna ger vidare att störst för­tjänst erhålls då maskinhallen utrustas med vikportar som har ett lägre U-värde än de ur­sprung­­liga, och även att luftflödet till samma lokal sänks med tio procent. Med dessa förändringar uppfyller även maskinhallen BBR:s direktiv enligt ovan.</p><p>    De egna beräkningarna i Excel anses här ge ett lika tillförlitligt resultat på fastig­het­­ens energiförbrukning som med dator­programmen BV<sup>2</sup> och VIP+, förbehållet att vissa justeringar görs på in­­gå­ende ekvationer.    </p><p> </p><p> </p><p> </p><p> </p><p> </p><br><p> </p><p>Abstract</p><p>In this degree project a comparison between two alternatives of heating and cooling systems has been made, regarding not yet constructed buildings on the property <em>Maskinbolaget Swecon</em> in Uppsala, consisting of an office and a machine room. The al­ter­­­natives of choice have been a district heating installation with a separate refri­ge­ra­ting machine, and two heat pumps with the bedrock as a heat source, the latter equip­ped with a circuit of directly transferred cold water from the bedrock as a cool­ing sys­tem. A number of simulations of the buildings' en­­er­gy consumption [kWh /(m<sup>2</sup>,år)] have also been performed, and this with a variety of comparisons con­tain­ing of certain chang­es of the construction of the buildings vis-à-vis the original plan­ning data.</p><p>    After that a calculation of present value with a perspective of 30 years has been executed, a calculation which shows the most economical alternative and simulation concerning the costs of operation and investment.</p><p>    The simulations of the energy consumption have been computed with the pro­gram­mes BV<sup>2</sup> and VIP+, and also with a matrix in Excel by the writer's own design. The calculation of present value has been performed in Excel.  </p><p> </p><p>                                     ♠    ♠    ♠</p><p> </p><p>The results indicate that the office and the machine hall fulfil the guidelines of U-value from BBR. The office also comply with BBR regarding the energy consump­tion [kWh/(m<sup>2</sup>,år)]; this, however, is not the case with the machine hall.</p><p>    The alternative with the heat pumps is the economically most sound, viewed in the perspective of 30 years. Furthermore, the comparisons of the different simula­tions yield that the largest profit occur when the machine hall is equipped with ent­rance gates that have a lower U-value than the originally planned, and also that the air flow to the mentioned hall is decreased with ten per cent. With these changes, even the machine hall fulfil the requirements of energy consumption from BBR.</p><p>    The results from the computations with the matrix in Excel, is in this degree pro­ject consider­ed to be as accurate as those derived from the programmes BV<sup>2</sup> and VIP+, on con­di­tion that certain adjustements are made in the equations of the mat­rix.   </p>
APA, Harvard, Vancouver, ISO, and other styles
8

Gunnarsson, Michael. "Implementation av kalkyl- och planeringsverktyg hos byggentreprenör på ett planerat byggprojekt." Thesis, Umeå universitet, Institutionen för tillämpad fysik och elektronik, 2015. http://urn.kb.se/resolve?urn=urn:nbn:se:umu:diva-104939.

Full text
Abstract:
För byggprojekt som läggs ut på anbudsupphandling eller utförs inom en egen koncern är det viktigt att i ett tidigt skede kunna ta fram vilka kostnader projektet kommer att resultera i för byggentreprenören. Byggentreprenören AR Bygg AB som för tillfället enbart verkar inom den egna koncernen har trots att de inte jobbar med specifika kostnadskalkyler ändå lyckats väl med sina byggprojekt. Med en önskan om att få bättre kontroll över projektkostnader och tidsåtgång samt öppna upp möjligheten till att göra noggranna anbudskalkyler har de beslutat att testa att använda nya verktyg för kalkylering och tidsplanering i samband med framtida byggprojekt.   Syftet med examensarbetet är att för ett kommande på- och tillbyggnadsprojekt som AR Bygg AB kommer att utföra göra en kostnadskalkyl i kalkylverktyget Bidcon Bygg/anläggning utifrån befintliga projekteringshandlingar. Kostnadskalkylen ska fungera som ett underlag för att under och efter byggtiden kunna följa upp och utvärdera hur väl kalkylen stämmer överens med verkligheten samt även ligga till grund för framtida kalkyler.   Kalkylunderlaget har tagits fram genom mängdavtagning från projekteringsritningar vilket sedan legat till grund för tidplaner som visar förväntad byggtid av byggprojektet.   Kalkylen visar en total byggkostnad på cirka 16 miljoner kronor och att byggtiden blir cirka 9-10 månader om det kontinuerligt är fyra byggarbetare som utför arbetet. Arbetet har även resulterat i att ett antal byggdelstyper skapats speciellt för projektet i kalkyleringsskedet. För ett fortsatt kalkylarbete kommer det även att krävas en grundlig uppföljning på vissa områden för att uppdatera priser och tider för de delar som är av stor vikt för AR Bygg AB.<br>For a building contractor the normal procedure of securing a contract for a construction project is by tender. To be able to come up with a tender that covers all the costs of that particular construction and also generates a revenue there will probably be a need to use some kind of calculation tool. The building contractor AR Bygg AB do normally not calculate on this kind of tenders because they only work with project in the corporation group in which they are belonging to. They have a wish that they in the future years will have the ability to make this kind of tender calculations, and to get there they have decided to try a set of computer based tools for calculations and time management of construction projects.   The purpose with this thesis is to by use of the computer programs Bidcon Bygg/anläggning and Plancon Planner make a foundation for the company when it comes to calculating and planning of construction projects. The thesis will be based on an upcoming construction work on an office building in central Umeå where two floor levels will be added on top and a new segment with six floors adjacent to the existing building will be added as well. The outcome from the calculations and plans will later on be used to compare how well the calculations match the reality.   The calculations will be performed by quantifying all the building components by examine the engineering drawings that are available and then the quantity data will be transferred into the calculations program. This will also result in a time plan that tells the construction time based on the resources that AR Bygg AB has available.   In the end these calculations shows that the construction project will cost around 16 million Swedish kronor and that the time to build it will be around 9-10 months based on a work force of four people. The work has also resulted in a number of building component types created especially for the project in the stage of calculations. For continued use of this calculation tool, a thorough follow-up in some areas will be required to update prices and times for the parts that are of great importance for AR Bygg AB.
APA, Harvard, Vancouver, ISO, and other styles
9

Olovsdotter, Andersson Marie. "Erfarenhetsåterföring : Hur kan en verkningsfull återföring skapas mellan produktion och kalkyl?" Thesis, Högskolan i Halmstad, Sektionen för ekonomi och teknik (SET), 2014. http://urn.kb.se/resolve?urn=urn:nbn:se:hh:diva-26145.

Full text
APA, Harvard, Vancouver, ISO, and other styles
10

Cavanaugh, Hanna. "Studie till uppstartande av annonskatalog." Thesis, Högskolan Dalarna, Grafisk teknik, 2004. http://urn.kb.se/resolve?urn=urn:nbn:se:du-3570.

Full text
Abstract:
Sten Jonsson wants to start a production of an advertising catalogue for small companies in Sweden. Acatalogue where the advertisingcost is so low that most of the companies can afford to participate. Thecompanies who will advertise should be manufacturing companies in trades of carpentry, sheet metalworkshops, forging workshops and engineering workshops.The catalogue will facilitate for the manufacturer to reach the costumer without any middleman.Without a middleman creates a possibility for an opinion about the product at the same time as theprice can be held low. A catalogue of this type would benefit the marketing of the companies at the sametime as it would generate an occasion for innovations.The possible target groups are property companies, construct companies and farmers.A market research has been carried out contained a postal interview and a phone interview. Themarket research carried out to get an understanding in what the companies think about the idea butalso to see if the companies are in interest of advertise in the catalogue. Unfortunately the marketresearch became unusable when only three of thirty companies comment the idea and two of themwanted to meet for a further visit. In relation to the market research a deeper study in market research,in which essential parts for the project, was made.A dummie has been done to show the design of the catalogue.A calculation has also been done to get an understanding in what the project would cost to start.
APA, Harvard, Vancouver, ISO, and other styles
More sources

Books on the topic "Kalkyl"

1

Jöns-Anders, Gerrit. Intuition oder Kalkül? Deutscher Universitätsverlag, 2003. http://dx.doi.org/10.1007/978-3-322-81298-8.

Full text
APA, Harvard, Vancouver, ISO, and other styles
2

Gollnick, Gabriele. Geben ohne Kalkül. Springer Fachmedien Wiesbaden, 2013. http://dx.doi.org/10.1007/978-3-658-03511-2.

Full text
APA, Harvard, Vancouver, ISO, and other styles
3

Lembcke, Friedemann. Kalkül versus Katastrophe. VS Verlag für Sozialwissenschaften, 2012. http://dx.doi.org/10.1007/978-3-531-19629-9.

Full text
APA, Harvard, Vancouver, ISO, and other styles
4

Krishnaprasad, Bhatt. Kaljal. Adarsh Prakashan, 1988.

Find full text
APA, Harvard, Vancouver, ISO, and other styles
5

Sonavaṇī, Sañjaya. Kalkī. Pushpa Prakāśana, 1999.

Find full text
APA, Harvard, Vancouver, ISO, and other styles
6

Stiftung für Kunst und Kultur and Museum Küppersmühle, eds. Ulrich Erben: Lust und Kalkül. Stiftung Kunst und Kultur, 2011.

Find full text
APA, Harvard, Vancouver, ISO, and other styles
7

Sastry, B. V. K. Kaleya goñcalu. Karnāṭaka Sarakāra, Kannaḍa Pustaka Prādhikāra, 1994.

Find full text
APA, Harvard, Vancouver, ISO, and other styles
8

Uustulnd, Albert. Acheroni kaldal. Eesti Raamat, 1991.

Find full text
APA, Harvard, Vancouver, ISO, and other styles
9

Kaldal, Jón. Kaldal: Aldarminning. Jón Kaldal III, og Bókaútgáfan Bjartur, 1996.

Find full text
APA, Harvard, Vancouver, ISO, and other styles
10

Vasunandan, Rāvikaṇṭi. Kr̥ṣṇaṃ kalaya--. Jaggamāmba Pracuraṇalu, 2009.

Find full text
APA, Harvard, Vancouver, ISO, and other styles
More sources

Book chapters on the topic "Kalkyl"

1

Dreiseitl, Stephan. "Lambda-Kalkül." In Mathematik für Software Engineering. Springer Berlin Heidelberg, 2018. http://dx.doi.org/10.1007/978-3-662-56733-3_10.

Full text
APA, Harvard, Vancouver, ISO, and other styles
2

Lohnstein, Horst. "λ-Kalkül." In Formale Semantik und Natürliche Sprache. VS Verlag für Sozialwissenschaften, 1996. http://dx.doi.org/10.1007/978-3-663-10079-9_7.

Full text
APA, Harvard, Vancouver, ISO, and other styles
3

Lembcke, Friedemann. "Einleitung." In Kalkül versus Katastrophe. VS Verlag für Sozialwissenschaften, 2012. http://dx.doi.org/10.1007/978-3-531-19629-9_1.

Full text
APA, Harvard, Vancouver, ISO, and other styles
4

Lembcke, Friedemann. "Als Gesellschaft: Klimawandel und Kommunikation." In Kalkül versus Katastrophe. VS Verlag für Sozialwissenschaften, 2012. http://dx.doi.org/10.1007/978-3-531-19629-9_2.

Full text
APA, Harvard, Vancouver, ISO, and other styles
5

Lembcke, Friedemann. "Massenmedien als Katalysator: Die Wissenschaft des Klimawandels." In Kalkül versus Katastrophe. VS Verlag für Sozialwissenschaften, 2012. http://dx.doi.org/10.1007/978-3-531-19629-9_3.

Full text
APA, Harvard, Vancouver, ISO, and other styles
6

Lembcke, Friedemann. "Wissenschaft als Quelle: Klimawandel in den Massenmedien." In Kalkül versus Katastrophe. VS Verlag für Sozialwissenschaften, 2012. http://dx.doi.org/10.1007/978-3-531-19629-9_4.

Full text
APA, Harvard, Vancouver, ISO, and other styles
7

Lembcke, Friedemann. "Kalkül versus Katastrophe: Klimawandel im Verhältnis von Wissenschaft und Massenmedien." In Kalkül versus Katastrophe. VS Verlag für Sozialwissenschaften, 2012. http://dx.doi.org/10.1007/978-3-531-19629-9_5.

Full text
APA, Harvard, Vancouver, ISO, and other styles
8

Gollnick, Gabriele. "Einführung." In Geben ohne Kalkül. Springer Fachmedien Wiesbaden, 2013. http://dx.doi.org/10.1007/978-3-658-03511-2_1.

Full text
APA, Harvard, Vancouver, ISO, and other styles
9

Gollnick, Gabriele. "Die gesellschaftliche Rolle von Unternehmen." In Geben ohne Kalkül. Springer Fachmedien Wiesbaden, 2013. http://dx.doi.org/10.1007/978-3-658-03511-2_2.

Full text
APA, Harvard, Vancouver, ISO, and other styles
10

Gollnick, Gabriele. "Empirischer Zugang." In Geben ohne Kalkül. Springer Fachmedien Wiesbaden, 2013. http://dx.doi.org/10.1007/978-3-658-03511-2_3.

Full text
APA, Harvard, Vancouver, ISO, and other styles

Conference papers on the topic "Kalkyl"

1

Zaazaa, Khaled E., and A. L. Schwab. "Review of Joost Kalker’s Wheel-Rail Contact Theories and Their Implementation in Multibody Codes." In ASME 2009 International Design Engineering Technical Conferences and Computers and Information in Engineering Conference. ASMEDC, 2009. http://dx.doi.org/10.1115/detc2009-87655.

Full text
Abstract:
During the past decades Kalker developed a number of wheel-rail contact theories that can be used to determine the tangential forces and spin moment between the wheel and the rail [Kalker, 1990]. These theories are: Linear Theory, Strip Theory, Empirical Theory, Simplified Theory and Exact Three Dimensional Rolling Contact Theory. These theories assume that the contact between the two bodies is non-conformal. Recently, Li and Kalker [Li and Kalker 1998a, 1998b and Li, 2002] introduced an approach for numerical solution of the conformal contact between the wheel and the rail. In this paper, Kalker’s wheel-rail contact theories are presented. The paper provides an overview for each theory and its restriction or error as was reported by Kalker. In addition, a systematic procedure for implementing Kalkers’s wheel-rail contact theories in multibody codes is briefly presented.
APA, Harvard, Vancouver, ISO, and other styles
2

Esenova, Galina. "Gender-Based Upbringing In Kalmyk." In SCTCMG 2019 - Social and Cultural Transformations in the Context of Modern Globalism. Cognitive-Crcs, 2019. http://dx.doi.org/10.15405/epsbs.2019.12.04.122.

Full text
APA, Harvard, Vancouver, ISO, and other styles
3

Urgadulova, Aisa. "Kalmyk Food Discourse: Linguistic And Cultural Features." In International Scientific Conference «Social and Cultural Transformations in the Context of Modern Globalism» dedicated to the 80th anniversary of Turkayev Hassan Vakhitovich. European Publisher, 2020. http://dx.doi.org/10.15405/epsbs.2020.10.05.463.

Full text
APA, Harvard, Vancouver, ISO, and other styles
4

Seleeva, Ts B. "ORAL TALES ABOUT GESER IN KALMYK FOLKLORE." In The Epic of Geser — the spiritual heritage of the peoples of Central Asia. BSC SB RAS, 2020. http://dx.doi.org/10.31554/978-5-7925-0594-0-2020-68-71.

Full text
APA, Harvard, Vancouver, ISO, and other styles
5

Borlykova, Boskha. "Archaeographic Description Of Kalmyk Manuscripts On Folklore." In International Scientific Conference «Social and Cultural Transformations in the Context of Modern Globalism» dedicated to the 80th anniversary of Turkayev Hassan Vakhitovich. European Publisher, 2020. http://dx.doi.org/10.15405/epsbs.2020.10.05.197.

Full text
APA, Harvard, Vancouver, ISO, and other styles
6

Lidzhiev, Mingiyan. "Representation Of Folklore Traditions In Modern Kalmyk Literature." In SCTCMG 2019 - Social and Cultural Transformations in the Context of Modern Globalism. Cognitive-Crcs, 2019. http://dx.doi.org/10.15405/epsbs.2019.12.04.263.

Full text
APA, Harvard, Vancouver, ISO, and other styles
7

Schwab, A. L., and C. M. Kalker-Kalkman. "Joost J. Kalker (1933-2006): A Life in Rolling Contact." In ASME 2007 International Design Engineering Technical Conferences and Computers and Information in Engineering Conference. ASMEDC, 2007. http://dx.doi.org/10.1115/detc2007-34755.

Full text
Abstract:
Joost Kalker, famous for his mathematical description of the wheel-rail contact, died on April 24, 2006 of heart failure, at the age of 72. Apart from a heart condition, which he developed earlier in life, he suffered the last ten years from Parkinson’s disease.
APA, Harvard, Vancouver, ISO, and other styles
8

Ashtaev, Yuri Sergeevich. "Formation Of Identity In Young Community Of Kalmyk Society." In SCTCGM 2018 - Social and Cultural Transformations in the Context of Modern Globalism. Cognitive-Crcs, 2019. http://dx.doi.org/10.15405/epsbs.2019.03.02.263.

Full text
APA, Harvard, Vancouver, ISO, and other styles
9

Borlykova, Boskha Khalgaevna. "On Some Animal Names In The Sart-Kalmyk Language." In International Scientific Congress «KNOWLEDGE, MAN AND CIVILIZATION». European Publisher, 2021. http://dx.doi.org/10.15405/epsbs.2021.05.262.

Full text
APA, Harvard, Vancouver, ISO, and other styles
10

Echeverria, Sebastian, Grace Lewis, Craig Mazzotta, et al. "KalKi: A Software-Defined IoT Security Platform." In 2020 IEEE 6th World Forum on Internet of Things (WF-IoT). IEEE, 2020. http://dx.doi.org/10.1109/wf-iot48130.2020.9221050.

Full text
APA, Harvard, Vancouver, ISO, and other styles

Reports on the topic "Kalkyl"

1

Alekseeva, N. M., P. P. Borisova, V. V. Romanova, and S. I. Zarovniaev. Reproductive ability of Kalmyk cows in Yakutia. Издательский дом "Панорама", 2018. http://dx.doi.org/10.18411/29051967.

Full text
APA, Harvard, Vancouver, ISO, and other styles
2

Alekseeva, N. M., V. V. Romanova, P. P. Borisov, and S. I. Zaronnyaev. Features of growth and development of young of Hereford and Kalmyk breeds in the conditions of Yakutia. ООО «ВИВА-СТАР», 2018. http://dx.doi.org/10.18411/26101999.

Full text
APA, Harvard, Vancouver, ISO, and other styles
3

Punctuation in direct speech and quotations in different-system languages of the XX-XXI centuries (on the basis of English, Russian and Kalmyk scientific, publicistic and artistic texts). Ubushaeva, I. V. Убушаева, И. В., 2018. http://dx.doi.org/10.37494/2409-1030-2018-4-239-243.

Full text
APA, Harvard, Vancouver, ISO, and other styles
We offer discounts on all premium plans for authors whose works are included in thematic literature selections. Contact us to get a unique promo code!

To the bibliography