Dissertations / Theses on the topic 'Kalkyl'
Create a spot-on reference in APA, MLA, Chicago, Harvard, and other styles
Consult the top 50 dissertations / theses for your research on the topic 'Kalkyl.'
Next to every source in the list of references, there is an 'Add to bibliography' button. Press on it, and we will generate automatically the bibliographic reference to the chosen work in the citation style you need: APA, MLA, Harvard, Chicago, Vancouver, etc.
You can also download the full text of the academic publication as pdf and read online its abstract whenever available in the metadata.
Browse dissertations / theses on a wide variety of disciplines and organise your bibliography correctly.
Khochaba, Silvia, and Vinos Koutcho. "BIM inom kalkyl." Thesis, Tekniska Högskolan, Högskolan i Jönköping, JTH, Byggnadsteknik, 2018. http://urn.kb.se/resolve?urn=urn:nbn:se:hj:diva-40799.
Full textAbstract Purpose: The main problem with implementation of BIM within calculation is the weaknesses and inaccuracies in 3D-models that makes them unreliable. The aim of this work is therefore to clarify how the information quality in a BIM model can be improved to thereby increase the use of BIM within calculation of construction companies. Method: Interviews, observation studies and literature studies are the chosen methods to answer the questions in the report. Interviews were conducted with companies that have implemented BIM within calculation, with those who have not introduced it yet, and with those who are about to implement it. Observation studies were conducted with the supervisor company where the calculation process was clearly reported. Literature studies have been done throughout the course to have a theoretical knowledge of the whole. The information from these three methods has then been compared to therefore make good conclusions. Findings: A guidance to the industry as a solution to quality problems in models is to set up manuals. These will be used during the creation of the models which will probably lead to a reduction of errors. However, it also requires experience and skills in staff as well as investments on cost and time. Implications: If the implementation of BIM within calculation succeeds, it will be possible to make safer calculations that strengthen the company's competitiveness. By implementing this as early as possible, companies can develop and avoid falling behind in the industry. This benefits both the company and the new technology while achieving great time and cost savings. An implementation like this can be successful in establishing manuals with clear requirement specifications which are applied during the creation of a model. This can be done with right experience and skills in the involved staff. Limitations: The limitations in the results are among other things, the fact that construction contracts and allocation of responsibilities are not included. In addition, it is limited to treat BIM in early calculation phases, which means that BIM in planning, production, management and other stages are excluded. Keywords: BIM, 5D, benefits, costs, manuals.
Mladenovic, Aleksandar, and Thomas Sjöström. "Kalkyl mot verkligt utfall : Analys av kalkyler och kalkylverktyg med avseende på ROT-projekt." Thesis, KTH, Byggteknik och design, 2014. http://urn.kb.se/resolve?urn=urn:nbn:se:kth:diva-148807.
Full textIt is important for the contractor to have an accurate calculation throughout the whole project, especially when it comes to ”ROT”-projects (renovation and reconstruction).There is very little room for mistakes since the budget is very tight. Since the conditions always differ from one project to another it’s very important to take this into account. Due to this there is a great need for the contractor to understand why the calculations do not add up in the end so they can avoid income losses in the future. This report contains both an analysis of the calculated costs and the outcome for five different projects and also an analysis of the program used for calculating the costs, Meps. Since the ROT-sector is big and comprehensive we have decided only to analyse bathroom renovations due to water damages. From the analysis of the calculations and Meps together with interviews with contractors and clients we have come to the following conclusions: First of all we suggest that the entrepreneur should have a closer dialogue with the insurance company to be a part of the development of Meps. We also suggest that they should devote more resources for feedback in the company.
Wixenius, Emmy, and Sara Olsson. "Kalkyl för logistikkostnader; från leverantör till förbrukningsplats." Thesis, Tekniska Högskolan, Högskolan i Jönköping, JTH, Industriell organisation och produktion, 2010. http://urn.kb.se/resolve?urn=urn:nbn:se:hj:diva-12467.
Full textDe senaste årens globalisering har lett till att det har blivit allt viktigare för företag att ha ett välskött logistiksystem för att kunna hävda sig på marknaden. Kunder kräver större valmöjligheter, vilket leder till ett ökat flöde som i sin tur ställer högre krav på emballage och transporter. Diverse logistiktjänster utgör numera en stor kostnad för företag och större fokus läggs därför på att optimera transporter för att kunna sänka dessa kostnader. Målet med detta projekt är att skapa en logistikkalkyl som enkelt illustrerar hur logistikkostnaden ändras beroende på hur logistikflödet ser ut. Detta genom att undersöka vilka faktorer som påverkar de totala logistikkostnaderna och kartlägga vilka faktorer som bör beaktas då en logistikkalkyl ska tas fram. För att nå målet har litteraturstudier gjorts parallellt med empiriska undersökningar på Scanias produktionsenhet MC i Oskarshamn. En logistikkalkyl skapas åt dem med syftet att effektivisera materialanskaffningen. Inköpsupphandlingar tas fram av Scanias huvudkontor i Södertälje varpå Scania Oskarshamn vill kunna utvärdera de leverantörsförslag som ges, ifrån ett logistikperspektiv. Företaget har uttryckt en önskan om en enkel logistikkalkyl som kan hanteras av många användare. En nulägesanalys har gjorts för att skapa en bred grund inför skapandet av kalkylen och för att få förståelse för vilka faktorer som är av störst vikt att ta med. Nulägesanalysen har tagits fram genom intervjuer och observationer på företaget. Den visar att det finns många olika flöden, både gällande intern materialhantering och gällande transportflödena från leverantörer till Scania Oskarshamn. Till följd av detta har mycket arbete lagts ner på att hitta sätt att förenkla flödena utan att göra avkall på kvaliteten i kalkylen, det vill säga dess validitet. I den kalkyl som har tagits fram görs fem val: vikt, volym, emballage, antal boxar per pallbotten och antal artiklar per emballage. Kalkylen består av två delar, dels en transportkalkyl som utgår ifrån tidigare statistik på företaget och dels en internhanteringskalkyl. Den sistnämnda grundar sig på hanteringskostnader som uppstår beroende på vilket emballage som artiklarna levereras i från leverantör. Eftersom många av de kostnader som har tagits fram inte går att härleda direkt till en kategori av emballage, har kostnadsfördelning gjorts med hjälp av fördelningsnycklar enligt ABC-kalkylering. Då det inte alltid gått att identifiera några särskiljande fördelningsnycklar har kostnadsfördelningen varierat mellan de olika huvudområdena. Avslutningsvis förs en diskussion gällande vilka aspekter som tagits med i den aktuella kalkylen gentemot vilka aspekter som nämns i litteraturen. En diskussion förs även om hur andra företag kan ta hjälp av resultatet av detta projekt då de vill skapa en logistikkalkyl i sin verksamhet.
Hussein, Anwar, and Mahdi Husseini. "Tillämpning av ABC-kalkyl i ett hantverksföretag." Thesis, KTH, Tillämpad maskinteknik (KTH Södertälje), 2018. http://urn.kb.se/resolve?urn=urn:nbn:se:kth:diva-235173.
Full textThis bachelor thesis was carried out at Stolt Smide and Design in Skogås, where the two differentglass walls called Slim and Robust are manufactured. The current cost calculation system in thecompany is not sufficiently functional because it doesn’t take into account a number of relevantfactors in the pricing of products. This means that employees have a difficulty with decision makingwhen they negotiate with the customers about the price of different product. Currently the productsare priced only according to the number of square meters ordered and the pricing is based on astandard sheet that is common for both products. The purpose of this thesis is to give the company a deeper knowledge of their manufacturingprocess and how the company can price their products. Based on the investigation that was needed to see if it is the activities that affect resourceconsumption, the activity-based costing was chosen. This thesis is based on secondary and primary data such as literature studies, article searches, observations of the manufacturing process as a whole, compilation of internal materials as well astime studies were conducted. With the help of mapping the manufacturing process, we were able tocreate an analysis consisting of identifies of activities, allocation of resources for each activity, choice of cost driver volume, setting of a volume for cost drivers, and cost calculation of each product. Based in our activity-based calculations we did not get the same manufacturing cost for theproducts. According to our calculations we got 4278 kr / sqm for Slim and 4884 kr/sqm for the Robust. In the end we have come to a conclusion that it’s the direct costs in term material cost and laborhours that affected the price of both products. The difference in direct cost and direct material forthe products was 502 kr and the difference for the total manufacturing cost was 606 kr. This corresponds to 83% of the difference between direct costs and only 17% is from activity cost.
Borgenstam, Sebastian. "Livscykelanalys och ekonomisk kalkyl av två KL-bjälklag." Thesis, Umeå universitet, Institutionen för tillämpad fysik och elektronik, 2020. http://urn.kb.se/resolve?urn=urn:nbn:se:umu:diva-172272.
Full textAbstract In building construction, there is a constant development in new materials and innovative technical solutions. The desire to reduce our carbon footprint is evident in the world and wood is a sustainable raw material. Forests is one of the big resources we have in Sweden. Cross-laminated timber (CLT) is a massive wood with high load-bearing capacity and stiffness has made it possible to build larger than ever before in wood. The question now is how to optimize the use of this environmentally friendly material. In this study, two different floor slabs with a supporting frame in cross-laminated timber were compared. To be able to compare CO2 consumption, Life Cycle Assessment was used and for the costs, economic calculations was built. The study covered part of the life cycle known as "cradle-to-gate". The thickness of the CLT slab was 230 mm. Apart from the slab, the beams differed both above and beneath the slab. One of the floor slabs was constructed with a subfloor system manufactured by Granab AB. The other floor slab was constructed with macadam and a thick layer of putty. That was the significant difference in the construction of the floor slab. There was also a differed connection between the walls and floor slabs. To achieve Boverket sound requirements, an elastic interlayer had to be placed along all the walls where it connects to the floor slab with subfloor system. For the joists with macadam, this was not necessary to achieve the sound requirements, which can easily be explained by the weight of macadam and putty. In the study, Östra Station Kvarter A in Umeå was used as a reference object. These buildings are to be built by Balticgruppen AB and during the study were still in the design stage. As a result of the comparison, the Macadam joists had a 22.9 percent lower economic cost than Granab, while the subfloor system-joists had a 9 percent lower environmental impact.
Rödén, Jonathan. "Kalkylmall i BidCon : En kalkylmall i BidCon som underlättar kalkylarbetet för inblandade yrkeskategorier på Selbergs Entreprenad AB." Thesis, Umeå universitet, Institutionen för tillämpad fysik och elektronik, 2016. http://urn.kb.se/resolve?urn=urn:nbn:se:umu:diva-119770.
Full textToday is performed most construction projects with fixed price which requires that the contractor early access costs to carry out the project. To develop all the costs of a project called the costing and covers a lot of work and expertise of the people who are involved. Creating a calculation can be done in many different ways. At present uses most of the major contractors of the computer-aided calculation programs to develop the cost of a project. This thesis is a collaboration with Selbergs Construction and the use of the spreadsheet program BidCon. The aim of the project is to facilitate the entire calculation process for all involved professionals on Selbergs Construction. This by creating a spreadsheet template with the appropriate structure. To create this spreadsheet template interviewed the involved professions tendering engineer, purchasers and managers. The thesis also reference the company's existing spreadsheet template and executed project estimates are studied and analyzed. Calculation template created containing a structure suitable for calculi work of Selbergs construction. The structure consists of a number of levels based SBEF building component codes, and physical locations for the project. The spreadsheet template has identified common spreadsheet entries implemented. This is to streamline the process and avoid the miss of items when calculating. Location Management applied to exports from BidCon to the planning tool did not work as it should, which were excluded in the calculation template. Costing template created has been implemented in Selbergs Entreprenad spreadsheet to be used in the daily work with the tendering and production calculations. Making use of a spreadsheet template contributes to a common spreadsheet structure for the entire company whether it be purchasing, tendering engineer, manager or anyone else involved. Generally to consider when creating a spreadsheet template is to customize the template for subsequent parts of the process. So the structure can be used in the planning and the cost reconciliation. For spreadsheet template to be used in the future should be the template is updated continuously as new construction methods and materials.
Forell, Jonas. "Fastigheten Maskinbolaget SWECON : - programbaserade och egna energiberäkningar med ekonomisk kalkyl." Thesis, Mälardalen University, School of Sustainable Development of Society and Technology, 2008. http://urn.kb.se/resolve?urn=urn:nbn:se:mdh:diva-5355.
Full textSammanfattning
I det följande examensarbetet har två alternativ av installationer jämförts beträffande nybyggnationen Maskinbolaget Swecon, en fastighet med en kontorsbyggnad och tillhörande maskinhall i Uppsala. Alternativen har varit en fjärrvärmeinstallation med en separat kylmaskin, och två bergvärmepumpar med en frikyleslinga. Jämförelser har gjorts mellan dator- och egenberäknade simuleringar av energiförbrukningen [kWh/(m2,år)], och då med olika ändringar i fastighetens konstruktion, där det ursprungliga projekteringsunderlaget har varit utgångspunkt (Inneklimatbyrån, 2008).
Därefter har en nuvärdeskalkylering med en kalkylhorisont på 30 år utförts, som visar på det mest ekonomiska alternativet och simuleringen gällande drifts- och investeringskostnader.
Energiberäkningarna har genomförts med datorprogrammen BV2 och VIP+, och även med egna beräkningar i Excel. Nuvärdeskalkylen har också gjorts i Excel.
♠ ♠ ♠
Resultaten visar att kontorsbyggnaden och maskinhallen uppfyller riktlinjerna från Boverkets byggregler, BBR, avseende U-värde. Kontoret uppfyller även BBR:s direktiv angående energiförbrukning [kWh/(m2,år)], något som däremot inte gäller för maskinhallen.
Alternativet med bergvärmepumparna är ekonomiskt fördelaktigast i ett perspektiv på 30 år. Jämförelserna mellan de olika simuleringarna ger vidare att störst förtjänst erhålls då maskinhallen utrustas med vikportar som har ett lägre U-värde än de ursprungliga, och även att luftflödet till samma lokal sänks med tio procent. Med dessa förändringar uppfyller även maskinhallen BBR:s direktiv enligt ovan.
De egna beräkningarna i Excel anses här ge ett lika tillförlitligt resultat på fastighetens energiförbrukning som med datorprogrammen BV2 och VIP+, förbehållet att vissa justeringar görs på ingående ekvationer.
Abstract
In this degree project a comparison between two alternatives of heating and cooling systems has been made, regarding not yet constructed buildings on the property Maskinbolaget Swecon in Uppsala, consisting of an office and a machine room. The alternatives of choice have been a district heating installation with a separate refrigerating machine, and two heat pumps with the bedrock as a heat source, the latter equipped with a circuit of directly transferred cold water from the bedrock as a cooling system. A number of simulations of the buildings' energy consumption [kWh /(m2,år)] have also been performed, and this with a variety of comparisons containing of certain changes of the construction of the buildings vis-à-vis the original planning data.
After that a calculation of present value with a perspective of 30 years has been executed, a calculation which shows the most economical alternative and simulation concerning the costs of operation and investment.
The simulations of the energy consumption have been computed with the programmes BV2 and VIP+, and also with a matrix in Excel by the writer's own design. The calculation of present value has been performed in Excel.
♠ ♠ ♠
The results indicate that the office and the machine hall fulfil the guidelines of U-value from BBR. The office also comply with BBR regarding the energy consumption [kWh/(m2,år)]; this, however, is not the case with the machine hall.
The alternative with the heat pumps is the economically most sound, viewed in the perspective of 30 years. Furthermore, the comparisons of the different simulations yield that the largest profit occur when the machine hall is equipped with entrance gates that have a lower U-value than the originally planned, and also that the air flow to the mentioned hall is decreased with ten per cent. With these changes, even the machine hall fulfil the requirements of energy consumption from BBR.
The results from the computations with the matrix in Excel, is in this degree project considered to be as accurate as those derived from the programmes BV2 and VIP+, on condition that certain adjustements are made in the equations of the matrix.
Gunnarsson, Michael. "Implementation av kalkyl- och planeringsverktyg hos byggentreprenör på ett planerat byggprojekt." Thesis, Umeå universitet, Institutionen för tillämpad fysik och elektronik, 2015. http://urn.kb.se/resolve?urn=urn:nbn:se:umu:diva-104939.
Full textFor a building contractor the normal procedure of securing a contract for a construction project is by tender. To be able to come up with a tender that covers all the costs of that particular construction and also generates a revenue there will probably be a need to use some kind of calculation tool. The building contractor AR Bygg AB do normally not calculate on this kind of tenders because they only work with project in the corporation group in which they are belonging to. They have a wish that they in the future years will have the ability to make this kind of tender calculations, and to get there they have decided to try a set of computer based tools for calculations and time management of construction projects. The purpose with this thesis is to by use of the computer programs Bidcon Bygg/anläggning and Plancon Planner make a foundation for the company when it comes to calculating and planning of construction projects. The thesis will be based on an upcoming construction work on an office building in central Umeå where two floor levels will be added on top and a new segment with six floors adjacent to the existing building will be added as well. The outcome from the calculations and plans will later on be used to compare how well the calculations match the reality. The calculations will be performed by quantifying all the building components by examine the engineering drawings that are available and then the quantity data will be transferred into the calculations program. This will also result in a time plan that tells the construction time based on the resources that AR Bygg AB has available. In the end these calculations shows that the construction project will cost around 16 million Swedish kronor and that the time to build it will be around 9-10 months based on a work force of four people. The work has also resulted in a number of building component types created especially for the project in the stage of calculations. For continued use of this calculation tool, a thorough follow-up in some areas will be required to update prices and times for the parts that are of great importance for AR Bygg AB.
Olovsdotter, Andersson Marie. "Erfarenhetsåterföring : Hur kan en verkningsfull återföring skapas mellan produktion och kalkyl?" Thesis, Högskolan i Halmstad, Sektionen för ekonomi och teknik (SET), 2014. http://urn.kb.se/resolve?urn=urn:nbn:se:hh:diva-26145.
Full textCavanaugh, Hanna. "Studie till uppstartande av annonskatalog." Thesis, Högskolan Dalarna, Grafisk teknik, 2004. http://urn.kb.se/resolve?urn=urn:nbn:se:du-3570.
Full textGill, Tobias, and Philip Troedsson. "Kartläggning, kostnadsberäkningar och förbättringsåtgärder för kundorderprocessen för beställningsartiklar – En fallstudie på Fredells VVS-, El- & Kakelavdelning." Thesis, Linnéuniversitetet, Ekonomihögskolan, ELNU, 2012. http://urn.kb.se/resolve?urn=urn:nbn:se:lnu:diva-19652.
Full textAndersson, Mats B. "Hantering av osäkerhet i samband med investeringsbeslut – några metodansatser och exempel." Licentiate thesis, KTH, Infrastructure, 2004. http://urn.kb.se/resolve?urn=urn:nbn:se:kth:diva-1798.
Full textBefore you take a decision you can normally choose amongmany different alternatives. The alternatives can be rankeddepending on what net benefits they produce. The alternativewith the best net benefit is chosen. Within economicscost-benefit analysis may be used to decide which alternativeis likely to offer the best net benefit.
Some time after the decision it may be found that theselected alternative turned out not to be as favourable asexpected. The reason is often that there are uncertainties inthe decision process. Sometimes this is not a major problemsince it is possible to change the decision or the costconsequences may be small.
When the National Traffic Administrations make investmentslarge volumes of capital are involved. It is often difficult orvery expensive to change an investment when started. It istherefore essential to get an early knowledge about potentialuncertainties, which can affect the decision. Uncertainties canaccrue from incorrect input data. A reason for spreading ofuncertainties is the presence of dependencies among thevariables. The uncertainties are also usually dependent upontime.
This thesis describes some methods to take uncertaintiesinto account in cost-benefit analysis before a decision istaken. The aim is both to identify the uncertainties and tooutline methods for coping with uncertainties.
The methods rely on results in reliability theory and riskanalyses among others. Some statistical methods and discretedata models are also applied. The aim is to increase theprobability of selecting an alternative with high and stablenet benefits over a long time period.
The cost-benefit estimates are divided into smaller parts tomake it possible to locate uncertainties. Descriptive andanalytical models are recommended for handling the cost-benefitstructure and the uncertainties found in its components.Dependencies among variables and, in particular, timedependencies are analysed.
Throughout the thesis the various methods are applied to anexample referring to a road investment.
Högdahl, Emma, and Anniina Lantela. "Datacenter - en ny svensk basindustri? : En samhällsekonomisk kalkyl av Facebooks etablering i Luleå." Thesis, Linköpings universitet, Nationalekonomi, 2021. http://urn.kb.se/resolve?urn=urn:nbn:se:liu:diva-176912.
Full textGummesson, Louise, and Emma Sturesson. "Provision - Den framtida prissättningsmetoden för fastighetsmäklare?" Thesis, Halmstad University, School of Business and Engineering (SET), 2009. http://urn.kb.se/resolve?urn=urn:nbn:se:hh:diva-3067.
Full textBostadsaffären är för de allra flesta den största affären i livet. Varje år säljs ett stort antal fastigheter i Sverige. En stor del av dessa fastigheter säljs med hjälp av en traditionell fastighetsmäklare och de mäklarförmedlade fastigheterna säljs i de allra flesta fall med prissättningsmetoden provision. Provision är ett omtalat ämne som ofta möter motstånd. Syftet med vår uppsats var att ta reda på hur hem- och villaintresserade personer samt traditionella fastighetsmäklare ställer sig till provision. Syftet var även att ta reda på om provision verkligen är den ultimata prissättningsmetoden eller om det skulle kunna vara aktuellt att istället ta betalt per aktivitet. För att besvara våra frågor har vi vävt samman teori med vår empiri. Empirin har vi kommit fram till genom metodtriangulering. Slutsatsen av vår uppsats är att hem- och villaintresserade har en ganska negativ inställning till provision men att fastighetsmäklarna ser denna metod som den mest ultimata. Vi har kommit fram till att betalning per aktivitet inte skulle vara möjligt att använda med dagens arbetssätt men att fastighetsmäklarna snart måste förändra antingen hem- och villaintresserades bild av provision eller själva prissättningsmetoden provision.
Lidberg, Tobias, and Olausson Daniel. "Investeringsmodell för lastpallstillverkning vid Södra timber i Långasjö : Investment model for pallet manufacturing at Södra timber in Långasjö." Thesis, Linnéuniversitetet, Institutionen för teknik, TEK, 2012. http://urn.kb.se/resolve?urn=urn:nbn:se:lnu:diva-20834.
Full textDilan, Khazan, and Susanna Elewi. "Kalkylarbete för byggnadsprojekt med Vico Office : För- och nackdelar med 5D BIM." Thesis, Högskolan i Gävle, Avdelningen för bygg- energi- och miljöteknik, 2015. http://urn.kb.se/resolve?urn=urn:nbn:se:hig:diva-19781.
Full textHolmsten, Felicia. "Etableringsbodar - köpa kontra hyra : Studie för NCC Construction Karlsta." Thesis, Karlstads universitet, Institutionen för ingenjörs- och kemivetenskaper, 2014. http://urn.kb.se/resolve?urn=urn:nbn:se:kau:diva-32263.
Full textThe work is done for NCC Construction AB in Karlstad and all input is based on NCC's previous projects in Värmland. Most entrepreneurs rent their establishment sheds with the knowledge that it costs more than investing in sheds, but without studies that it is more profitable to buy the sheds. This study is based on energy efficient sheds from Cramo. The energy consumption for the production of a building is 15% of the building's life cycle, which leads to high costs. A large part of the energy in the production stage goes to the establishment sheds, studies has been made on sheds to produce energy efficient shed and therefore, expenditure on establishments has decreased. There is another way to save money regarding the establishment, and that is to own their own establishment sheds. The purpose is to show what is most profitable, renting or buying establishment sheds. In view of the assembly, disassembly, storage and maintenance a calculation was set up that shows input costs and conditions. If you have utilization on the sheds over 50%, it is more profitable for NCC Construction to buy their establishment sheds than renting them. What makes the biggest difference is the number of movements of the sheds. The price per build day can be halved if you have a high occupancy rate. Between 50% - 90% of the rental price will it cost to own their own sheds, based on occupancy days.
Gräns, Elin, and Maria Falk. "Investeringsbedömning av Glaspanneprojektet : - en framtidsvision." Thesis, Växjö University, School of Management and Economics, 2008. http://urn.kb.se/resolve?urn=urn:nbn:se:vxu:diva-1859.
Full textBakgrund: Projektet vi har valt att arbeta med är kallat Glaspanneprojektet och är ett EU-projekt vars ekonomiska del ligger på Ekonomihögskolan vid Växjö Universitet. Det vi främst fann intressant var miljöaspekten inom projektet då man vill försöka göra glastillverkning koldioxidneutral samtidigt som ett miljövänligt energialternativ för slutkonsumenter. Att göra en investeringsbedömning i Glaspanneprojektet kände vi skulle vara både intressant och väldigt givande.
Syfte: Det övergripande syftet med denna uppsats är att se huruvida en investering i Glaspanneprojektet kan genomföras eller ej sett ur ett ekonomiskt perspektiv och sedermera om själva projektet i sig skulle vara lönsamt. Detta uppfylls genom att följande moment genomförs:
Investerings- samt kapitalbehovet skattas
En ekonomisk analysmodell utvecklas
Slutligen utformas investeringskalkyl med hänsyn till ett antal nödvändiga antaganden och därefter ska en känslighetsanalys genomföras
Metod: Information har samlats in genom såväl litteratur- som empiriska studier. De empiriska studierna har i huvudsak bestått av samtal och möten med inblandade i projektet samt sakkunniga. Även om en kvalitativ undersökning används kommer en kvantitativ analys, i form av en investeringskalkyl, att tillämpas.
Teori, utformning av kalkylmodellen: För att kunna utforma en investeringskalkyl i vilken vi sedan vill analysera olika variablers påverkan har relevant teori behandlats. För att identifiera vad för aktiviteter som bör vara med i kalkylmodellen har Porters värdekedja tillämpats. Därefter har variabler motiveras baserat på empiriskt material från sakkunniga samt inblandade i projektet och efter detta har skattningar för dessa variabler gjorts. För att undvika en alltför komplex kalkyl har en del generaliseringar och förenklingar gjorts. Variablerna har sedan sammanställts i en kalkylmodell i vilken variablernas storlekar ska kunna analyseras.
Analys, resultat, slutsatser: Men grund i kalkylmodellen som utformats har känslighetsanalyser genomförts och break-even punkter beräknats. Genom detta har kritiska variabler för investeringens lönsamhet tagits fram och dessa har sedan analyserats. De två variabler som visade sig vara mest kritiska var kapacitetsutnyttjandet samt inbetalningsöverskottet baserat på försäljningspris och för dessa föreslås åtgärder. Med justeringar i kalkylmodellen anses det vara högst troligt att investeringen kan komma att bli lönsam.
Framtida undersökningar: Till framtida undersökningsområden framförs en marknadsundersökning såväl som en undersökning av kapitalbehov för att ge uppsatsen ytterligare relevans samt en bättre bild av investeringsklimatet.
Neguse, Josef, and Manuel Fernandez. "Hur påverkar olika faktorer prissättningen på produkten Komplett Media Center a20?" Thesis, Uppsala University, Department of Business Studies, 2005. http://urn.kb.se/resolve?urn=urn:nbn:se:uu:diva-9094.
Full textPrissättningen för ett företag kan påverkas av flera olika faktorer. Dessa faktorer är antingen
interna eller externa. När ett företag ska prissätta en ny produkt är det svårt att bedöma vilka
faktorer som är väsentliga. Utgångsläget är kostnaderna för produkten och därefter tas hänsyn till
hur de externa faktorerna påverkar prissättningen. Syftet med denna undersökning är att bedöma
hur marknaden, interna beräkningar och valutasvängningar påverkar prissättningen på produkten
Komplett Media Center a20.
För att bedöma hur de olika faktorerna påverkar prissättningen på produkten har vi utfört en
gruppintervju med företaget Komplett Data Sverige AB. Informationen vi tog del av under mötet
med företaget och kopplingarna till teorin visade att Komplett Data Sverige AB tillämpar en form
av bidragskalkylering på produkten. Företaget använder sig av en marginal som blir påverkad av
både interna och externa faktorer. Studien visar att kostnaderna för produkten är den del av
prissättningen som har störst betydelse för Komplett Media Center a20 och att kunder och
konkurrenter påverkar genom marginalen på produkten. Studien visar även att de olika faktorerna
påverkar prissättningen under olika tidpunkter i produktlivscykeln.
Freidh, Martin, and Sebastian Winberg. "Anläggningsarbeten för ett vindkraftverk i Karryd." Thesis, Växjö University, School of Technology and Design, 2009. http://urn.kb.se/resolve?urn=urn:nbn:se:vxu:diva-5227.
Full text
Vindkraftsindustrin är en starkt växande marknad både Sverige och övriga världen och utbyggnaden ökar hela tiden. Detta ger inte bara arbete åt de företag som tillverkar själva vind-kraftverken utan även för företag inom anläggningsbranschen.
Skanska väg och anläggning i Växjö har fått en offertförfrågan på uppförande av vägar och fundament för ett vindkraftverk i Karryd. I detta arbete har vi utrett metoder och kostnader för projektet i Karryd. Vi har även undersökt vilka olika typer av fundament som idag används vid uppförandet av vindkraftverk.
Grunden till detta arbete är att Skanska mer exakt ska kunna uppskatta kostnader för anläggning av vindkraftverk men också få en inblick i vilka fundamentstyper som finns. Vårt resultat är en kalkyl och en tidplan som vi hoppas Skanska ska kunna ha nytta av vid kommande vindkraftprojekt.
Cederqvist, Fredrik. "Simulation & integration av robot med stiftmaskin : En förstudie om robotisering av stiftmaskin." Thesis, Karlstads universitet, Fakulteten för hälsa, natur- och teknikvetenskap (from 2013), 2017. http://urn.kb.se/resolve?urn=urn:nbn:se:kau:diva-62517.
Full textThis pilot study investigated the robotization of a process that connects two pined conductors to a plastic contact and thereby forming a cabling. The pilot study examined if the process is technically possible and economically feasible to robotize. Today the pined conductors are attached to the cabling manually. Introduction of robotization is done so that a robot seizes one pined conductor at a time in the pin machine (Schleuniger 67) with a gripper and inserts same into the plastic contact. To determine if the process is technical possible to robotize two experiments were conducted with a gripper that was designed for this purpose. The purpose of the first was to investigate how the gripper could engage the pined conductor without damaging same or change its position or orientation. The experiment was carried out as a “try and fail” type. The experiment resulted in guidelines regarding the design of the gripper and which working pressure was recommendable for the process. A too high pressure could damage the pined conductor and a too low would cause the friction force between the conductor and the gripper to be too low to insert the pined conductor into the plastic contact. The goal of second experiment was to find an approximate value for the quality yield of the process (that is the number of approved cablings in %). In this experiment 65 attempts to form a cabling was performed and the number of approved cablings was checked and documented. The result from the experiment – using the present conductors and plastic components – was a quality approval rate of 51%. The company requires that the quality yield is higher than 95% in order to robotize the process. A thorough analysis of the result of the experiment and discussion with company representatives indicates that the required quality yield can be reached with some further development of the involved components and the gripper making the designs more “automation friendly”. A financial analysis was made using a pay-back calculation in order to determine when and if robotization is financially justified and resulted in an approximate value regarding how much of the value –added in the operation that is to be automated. This value-added that will be performed by the robot is defined as the degree of automation. The conclusion is that robotization (automation) is technically feasible with a degree of automation of 22% and a quality yield of 95%. This is based upon: the pay-back analysis, the present design of the used components and the result from the experiments.
Tideman, Simon, and Emma Oscarsson. "Vad kostar duschen? : En fallstudie i ABC-kalkylering & Processkartläggning hos Macro AB." Thesis, Linnéuniversitetet, Ekonomihögskolan, ELNU, 2011. http://urn.kb.se/resolve?urn=urn:nbn:se:lnu:diva-11964.
Full textElHarthy, Kamal. "Alternativ för kreosotimpregnerade stolpar för Skellefteå Kraft AB : Med energiteknisk kalkyl för utsläpp vid impregnering och transport av kreosotstolpar." Thesis, Luleå tekniska universitet, Institutionen för teknikvetenskap och matematik, 2017. http://urn.kb.se/resolve?urn=urn:nbn:se:ltu:diva-66487.
Full textAbdulkhalik, Lauko, and Paula Samuelsson. "Ekonomiska konsekvenser vid stambyten som berör skyddsrum : -en förtydligande studie av fyra typfall." Thesis, KTH, Byggteknik och design, 2018. http://urn.kb.se/resolve?urn=urn:nbn:se:kth:diva-230909.
Full textArping, Christopher, and Karl Bergman. "The difference between the calculated cost and the actual cost with focus on concrete slab." Thesis, Linköpings universitet, Kommunikations- och transportsystem, 2017. http://urn.kb.se/resolve?urn=urn:nbn:se:liu:diva-142879.
Full textMattila, Mika, and Sofia Nyström. "UPPSALA KONSERT OCH KONGRESS : En undersökning av investeringskalkylen." Thesis, Uppsala universitet, Företagsekonomiska institutionen, 2009. http://urn.kb.se/resolve?urn=urn:nbn:se:uu:diva-132241.
Full textSaxbo, André. "Underlag för mest fördelaktiga upphandling av stomkomplettering i mindre bostadshus :." Thesis, Linnéuniversitetet, Institutionen för teknik, TEK, 2012. http://urn.kb.se/resolve?urn=urn:nbn:se:lnu:diva-19712.
Full textWaluszewski, Daniel. "Värdet av en krona : en samhällsekonomisk analys av ett högre bensinpris." Thesis, Linköping University, Department of Management and Economics, 2006. http://urn.kb.se/resolve?urn=urn:nbn:se:liu:diva-5737.
Full textBensinpriset i Sverige har den senaste tiden stigit kraftigt och åsikterna går isär om huruvida detta ska uppfattas som positivt eller negativt för samhället.
Denna studie kartlägger de samhällsekonomiska effekterna av ett högre bensinpris och studerar skillnaden i resultat mellan en oljeprisbaserad bensinprisökning och en bensinprisökning som grundar sig på en högre bensinskatt.
I en cost-benefit kalkyl har effekter av ett högre bensinpris identifierats och värderats. Resultatet visar att en oljeprisbaserad bensinprishöjning är att uppfatta som negativ för samhället. Även en skattebaserad bensinprishöjning är dock negativ för samhället. En oljeprisbaserad bensinprishöjning åsamkar emellertid samhället en betydligt större nettoförlust än en skattebaserad bensinprishöjning.
En marginalkostnadsberäkning har utförts som ett alternativt beräkningssätt av det samhällsekonomiska resultatet av de två olika bensinprishöjningarna. Marginalkostnadsberäkningen uppskattar den samhälleliga marginalkostnaden av en liter bensin till cirka 9,31 kr och att marginalkostnaden ligger under prisnivån bekräftar slutsatsen att ett högre bensinpris är negativt för samhället, då det, vid en bensinskattehöjning, leder till en situation där bensinpriset hamnar längre från det pris som är optimalt för samhället. Vid en oljeprishöjning stiger både pris och marginalkostnad för samhället och att detta scenario är att uppfatta som negativt för samhället beror på att den ökade kostnaden för bensin som betalas av svenska bilister går till utländska oljeproducenter.
Slutligen har centrala faktorer i beräkningarna analyserats och diskuterats. Denna diskussion mynnar ut i en rekommendation till vidare forskning mot beräkningsfaktorer som baserar sig på fordonskilometer.
Recently the Swedish gasoline price has risen considerable and the opinions are divided however this should be perceived as positive or negative for society.
In this study, the influences of a higher gasoline price on society and the differences between a scenario with a higher oil price and a higher gasoline tax as ground for the rise of prices are studied.
Within the frames of a cost-benefit analysis the effects of a higher gasoline price have been identified and valued. The results show that a higher gasoline price based on a higher oil price is negative for a society. A higher gasoline tax causing a higher gasoline price also has negative effects. The latter type of price increase however, causes far less damage than the former.
An estimation of marginal cost has been conducted as an alternative calculation of the results. The marginal cost has been estimated to 9,31 SEK and the fact that the marginal cost is below the price level confirms the conclusion that a higher gasoline price, disregarded the cause, is negative for society, since a tax increase will bring a situation where the gasoline price now is situated further from its optimum price. In the case of an increase in oil price, both the marginal cost and the gasoline price increase and that this scenario is negative for society is due to the increasing payments of the Swedish motorists to foreign oil producers.
Finally, central factors in the calculations have been discussed and analysed. The discussion has ended in a recommendation of further research with vehicle kilometers as basis of calculation.
Skålberg, Johan, and Markus Höijer. "Optimering av modelleringsteknik i BIM : I samarbete med Peab Sverige AB." Thesis, Karlstads universitet, Fakulteten för hälsa, natur- och teknikvetenskap (from 2013), 2015. http://urn.kb.se/resolve?urn=urn:nbn:se:kau:diva-36706.
Full textBuilding Information Modeling, or more known as BIM, is one of the most up-to-date working process within the construction industry. This advanced digital high end model brings projection to a whole new level. By the exchange of information which is stored within the model, every involved participant has easy access to relevant information needed for the project. To get an accurate BIM-model, or an object-based model which it also could be called, every participant has to strive against a common goal for a successful result. The BIM-method has, according to a lot of different studies, a very positive impact on the whole project such as being able to minimize errors as a result of miscommunication, early identification of potential clashes and detection of collisions. To receive these benefits the requirements from the requested model has to be clearly presented. Peab Sweden AB, one of the biggest companies in the construction industry in Sweden, has a huge interest in this method and uses BIM to manage some of their projects. The office in Karlstad, Sweden, has the desire to be able to use BIM-models in their calculation work. Today’s modeling by the consultants is not filling the desired function Peab aspire because the models aren’t adapted to production. The purpose of this study is to facilitate the cooperation between the contractor Peab and its external consultants in the development of a BIM-model to avoid additional work in the calculation stage. In order to close the gap this study will create an illustration of how the consultants should model. The study will also provide the basis to create a compendium which the external consultants can use where object classification is adapted to production and will satisfy Peab’s calculators. With the help of a built theoretical foundation, interviews with relevant partners and understanding of Peab's BIM-programs, an object classification according to SBEF's building component table became the best option. Thoughts and opinions were taken from BIM-Coordinator and calculators from Peab and three external consulting firms Tengbom, Mondo Architects and Integra to understand different modeling techniques and getting knowledge of what’s possible to model by different CAD-programs. The result of the study ended up in a compendium to give the consultant a visual aid how Peab wants their models. This guideline will help close the existing gap between the drawing consultants and contractor. The compendium will be used as an attachment to Peab’s current BIM-manual which is sent out to every participant when BIM-project is appropriate. The meetings with the consultants verified that a modeling based on the compendium was possible, but it would take longer to build such a model, which also means an increased cost. In order to standardized this model-based method Peab has to see the benefits in putting down more money on project planners, which will be difficult to justify when it may be difficult to measure the profits.
Eriksson, John, and Oskar Gustafsson. "Köpa eller tillverka : Beslut inom industrin." Thesis, Linnéuniversitetet, Institutionen för maskinteknik (MT), 2016. http://urn.kb.se/resolve?urn=urn:nbn:se:lnu:diva-54703.
Full textDanielsson, Anders. "Produktionsuppföljning : För att underlätta styrning i projekt samt ge återkoppling i form av produktionsdata till kalkylator." Thesis, Luleå tekniska universitet, Institutionen för samhällsbyggnad och naturresurser, 2018. http://urn.kb.se/resolve?urn=urn:nbn:se:ltu:diva-70542.
Full textHenriksson, Pontus, and Karl Pålsson. "ABC-kalkylering i gemensamma och komplexa monteringsprocesser : En fallstudie på Scania i Södertälje." Thesis, Högskolan i Gävle, Industriell ekonomi, 2020. http://urn.kb.se/resolve?urn=urn:nbn:se:hig:diva-32841.
Full textPurpose - The purpose of the study is to analyze the challenges of distributing costs in an assembly process where several different product categories are assembled together, and present a better way to make this distribution. Method - The study initiated with a literature review about calculation models. This was done to get a better understanding of different calculation models and how they are constructed. The study is based on a theory called activity-based costing (ABC), which aims to locate activities that create the costs. The chosen theory was carried out at Scania Södertälje, which is a manufacturing company within the automotive industry. The data collection has been done with the help of interviews with expert staff, observations at the assembly line and an analysis of documents received from Scania. Empiricism has been compared to the theoretical frame of reference, which has generated the study’s results. Findings – The results of the study show that the ABC-model helps the case company distribute costs fairly between different product categories, which use common processes. The current cost model of the company does no contribute to a fair distribution of resources and instead gives a misleading product costs. Implications - The study contains knowledge on how an ABC model can be implemented in different businesses. It also identifies which factors are important for the success of the implementation. The company must locate which activities create costs for a calculus object and find a cost driver that has a strong causal connection between resource consumption and its cause. Research limitations - Due to Covid-19, the company has had its production closed during most of the thesis project. A short opportunity for observations was allowed by the management team, by the end of the thesis period. Time studies were excluded because there was no time left to make such an observation. Keywords - product cost, cost allocation, cost accounting, automotive industry, distribution key, financial management, flexible manufacturing system (FMS), ABC Model.
von, Sydow Susanna. "Miljöaspekter i samhällsekonomiska kalkyler : exemplet Botniabanan." Thesis, Uppsala universitet, Nationalekonomiska institutionen, 2011. http://urn.kb.se/resolve?urn=urn:nbn:se:uu:diva-183027.
Full textUnoson, Alexander. "A study of the tendering stage process when introducing new quality systems." Thesis, Linköpings universitet, Medie- och Informationsteknik, 2013. http://urn.kb.se/resolve?urn=urn:nbn:se:liu:diva-95242.
Full textLöfgren, Kim, and Virving Lisa Hannula. "Avstämningsmetod för installatörer kopplat till slutkostnadsprognos." Thesis, KTH, Byggteknik och design, 2019. http://urn.kb.se/resolve?urn=urn:nbn:se:kth:diva-256227.
Full textDetta examensarbete har mestadels byggts av intervjuer med berörda parter hos Arcona samt installatören Nymans Elektriska då avgränsning gjorts till att endast omfatta projekt Glömstaskolan. Syftet med studien är att Arcona ska kunna redovisa en träffsäkrare slutkostnadsprognos gentemot kunden/beställaren gällande installatören samt att underlätta för både byggföretaget och installatören kring avstämningen. Bakgrunden ligger i att installatörerna ej kalkylerar på byggdelar och aktiviteter som övrig byggproduktion, vilket då gör det svårt att stämma av om en aktivitet har genomförts i enlighet med budget. Båda parter är överens om att det är arbetstimmar som önskas följas upp, då det är där svårigheten till kontroll ligger. För att kunna följa upp verkliga timmar behövs kunskap om planerade antal timmar. Tidplanen är ett viktigt verktyg i projekt och bör involveras i avstämningen. Arcona och Nymans Elektriska rekommenderas att nyttja befintliga styrdokument med visst tillägg för mätning av framdrift.
Holgersson, Lisa, and Yonatan Tekle. "Jämförelse av CAV- och VAV-ventilationssystem för Björkhöjdskolan." Thesis, Högskolan i Borås, Akademin för textil, teknik och ekonomi, 2020. http://urn.kb.se/resolve?urn=urn:nbn:se:hb:diva-23427.
Full textIn order to reach the climate goals in Sweden that the EU has set, energy efficient solutions in buildings are required all around the country. The purpose of this report has therefore been to compere two different ventilations systems, VAV-system (variable air velocity) and CAV(constant air velocity) in a reconstruction of an a school buiding that is located in Borås. The comparison has involved both an energy- and economic analysis of the two different ventilation systems. The method to complete this report has been through gathering information from the project participants and calculations using Microsoft Excel and Google calculation. The result of this study makes it clear that a VAV-system is the best energy efficient choice of ventilation system. The yearly energy use of the VAV-system is 7984 kWh/school year while CAV-system uses 22087 kWh/school year. The economic analysis shows that the VAV-system has a higher LCC-cost due to the high investment sum. The total LCC-cost for VAV-system is 2128 045 SEK and 2 027 494 SEK for the CAV-system, however the present value for the VAVsystemis lower than the CAV-system. If the school could secure an occupancy the total air flow of the air handling unit (AHU) could be reduced. This could potentially lead to a change to a lower sized AHU that gives a lower cost of the AHU and further energy savings. A suggestion is to evaluate this further in a later stage of the project in order to optimize the AHU when the occupancy is given and more certain. In addition this could motivate to choice of the more energy efficient VAV-system.
Sjöström, Jenny, and Marie Wilhelmsson. "Säkrare utveckling och användning av kalkylark inom mindre och medelstora företag : en metod." Thesis, Högskolan i Borås, Institutionen Handels- och IT-högskolan, 2007. http://urn.kb.se/resolve?urn=urn:nbn:se:hb:diva-18612.
Full textUppsatsnivå: D
Granqvist, Andreas, and Jonas Hall. "Utfackningsväggar och trafikbuller - En förtätning av Albyberget." Thesis, KTH, Byggteknik och design, 2017. http://urn.kb.se/resolve?urn=urn:nbn:se:kth:diva-223326.
Full textAUCTORITAS Projektstyrning AB is working on obtaining contract documents for two new apartment buildings in an environment that is exposed to noise. One problem that has arisen is to find an infill wall that meets the requirements for noise and U-value, which at the same time is economically justifiable. The authors, on behalf of AUCTORITAS Projektstyrning AB, have examined 10 different infill walls with regard to noise reduction, U-value and price. The purpose of the work was to investigate the technical properties of the infill walls. The question that was addressed was the following: How does different materials affect the sound attenuation? Which infill walls can handle the noise requirements of a new construction on Albyberget? Can the problem be solved solely with the walls or does it require further action? Is it economically justifiable to choose a thicker wall with regard to u value instead of maximizing the living space? In order to answer these questions, the authors have carried out laboratory work, literature studies and also taken part in a reference object, acoustics reports, energy calculation reports and costing books/offers. An interview with a person with knowledge in the area of noise/acoustics have been completed and used as a complementary basis. The results led to a recommendation of a standard timber frame wall with a thickness of 395 mm, that met all of the project requirements and with a cost of 1 391 kr/m2 to be used in the buildings at Albyberget.
Kelemit, Ellinor, and Sara Schön. "Alternativ rumsbeskrivning med hänsyn till miljö och ekonomi." Thesis, Linnéuniversitetet, Institutionen för byggteknik (BY), 2016. http://urn.kb.se/resolve?urn=urn:nbn:se:lnu:diva-53839.
Full textUpper, Martin, and Johan Wilson. "Beredningsarbete av landsbygdsnät för områdena Fän, Suttene och Hermanseröd." Thesis, Högskolan Väst, Avdelningen för data-, elektro- och lantmäteriteknik, 2015. http://urn.kb.se/resolve?urn=urn:nbn:se:hv:diva-8226.
Full textThis thesis is about the approach how the preparation work is done at TROLK El & Tele AB. The preparation work includes three areas, Hermanseröd, Fän and Suttene in Munkedal municipality. This preparation is the basis for the implementation of the project from Fortum Distribution AB. The project has come when Fortum decided to invest to ensure power quality and weather secure the network in the areas that was earlier mentioned. The preparation includes landowner contact, field work, permits and contract applications. Laying of cables and placement of the substations will also be established for the network owner. The voltage level of the network that is affected is up to 12kV to be transformed down to 0.4kV for subscribers. The project includes three substations, about 2.7 kilometers medium voltage cable, approximately 0.5 kilometers low voltage cable, 1 pc, cable box and about 1.7 kilometers demolition of the overhead line. The summary of the field work carried out is that the planner proposals of cable will be pursued for the most part, except for certain problematic locations where the cable placement will be changed.
Bjerhag, Linnéa, Malin Elofsson, and Jane Nygren. "Kan en investering i stålprofiler eliminera slöserier i en ställagegodsprocess? : En fallstudie på Företag Xs wellpapp-pallsorienterade distributionslager." Thesis, Linnéuniversitetet, Institutionen för ekonomistyrning och logistik (ELO), 2018. http://urn.kb.se/resolve?urn=urn:nbn:se:lnu:diva-76589.
Full textKlang, Rasmus. "KARTLÄGGNING OCH ANALYS AV MÄNGDNINGSARBETET HOS EN BYGGENTREPRENÖR : ANVÄNDNING AV 3D-MODELLER FÖR MÄNGDAVTAGNING." Thesis, Luleå tekniska universitet, Institutionen för samhällsbyggnad och naturresurser, 2018. http://urn.kb.se/resolve?urn=urn:nbn:se:ltu:diva-70087.
Full textPihlvang, Alexander, and Pierre Svorono. "Automatiserad process för mängdavtagning och kalkylering : En jämförelse mellan traditionell mängdavtagning och kalkylering mot BIM för BTH Bygg AB." Thesis, KTH, Byggteknik och design, 2019. http://urn.kb.se/resolve?urn=urn:nbn:se:kth:diva-260051.
Full textReplacing an already functioning but old process can be time consuming and unprofitable. This has been demonstrated especially in the construction industry, where digitization is progressing slowly. This study examines what aspects of the traditional process of quantity takeoff as well as calculation process at the company BTH Bygg AB will be affected when changing to a process based on modeling and BIM, Building Information Modeling. The purpose of the study is to compare the traditional quantity takeoff and calculation with the aid of Bluebeam and MAP against a process that is carried out with modeling in the software ArchiCAD with a connection to Vico Office for quantity takeoff and calculation. The difference from the traditional process will be to move from 2D manual quantity takeoff to using 3D models, BIM models, and performing automatic calculations via Vico Office. The study is a qualitative study with elements of a quantitative survey where the focus on getting the most work-efficient and profitable solution for BTH Bygg. Comparisons between two different construction projects has been made. The projects comprises similar size and conditions as well as limited to calculations of floors, interior walls and ceilings. The basis for the study has been personal interviews with people from the calculation section at BTH Bygg to gather knowledge about their process for quantity takeoff and calculation. Interviews with employees of the companies for the software Bluebeam, ArchiCAD and Vico Office have also been carried out to obtain an objective picture of all the software. The conclusion is that implementing information-rich BIM models in the quantity takeoff and calculation has proved to be profitable when it comes to quality through reduced manual work when connecting between software. In addition, there are great opportunities for saving time in other stages by working in an integrated process where all parts of the con- struction process are linked to each other.
Blixberg, Caldana Andreas, and Filip Kroon. "Kartläggning och förbättring av processer." Thesis, Jönköping University, JTH, Logistik och verksamhetsledning, 2021. http://urn.kb.se/resolve?urn=urn:nbn:se:hj:diva-54018.
Full textDahlström, Anton, and Anton Schytzer. "En undersökning av omkostnader för tillfällig form : Utveckling av kalkylering." Thesis, Uppsala universitet, Byggteknik och byggd miljö, 2021. http://urn.kb.se/resolve?urn=urn:nbn:se:uu:diva-451280.
Full textLundgren, Marcus, and Nilsson Tobias. "Produktkalkylering i mindre hantverksföretag : En fallstudie på Gemla Fabrikers AB." Thesis, Linnéuniversitetet, Institutionen för ekonomistyrning och logistik (ELO), 2016. http://urn.kb.se/resolve?urn=urn:nbn:se:lnu:diva-53356.
Full textKurs: Examensarbete i logistik för Civilekonomprogrammet, 4FE19E, VT16 Författare: Marcus Lundgren och Tobias Nilsson Handledare: Peter Berling Examinator: Helena Forslund Titel: Produktkalkylering i mindre hantverksföretag – En fallstudie på Gemla Fabrikers AB Bakgrund: Ett konkurrenskraftigt pris är i dagsläget inte tillräckligt då även en noggrann kostnadskontroll som tar hänsyn till arbetskraftsinsatsen och produktrelaterade avvägningar krävs för att säkerställa konkurrensförmågan. Ett användbart verktyg för detta är upprättandet av produktkalkyler som grund för lönsamhetsanalyser, prissättningsstrategi och beslutsunderlag. Svårigheten ligger dock i att finna rätt kalkyleringsmetod gällande detaljeringsnivån som fördelar en verksamhets direkta och indirekta kostnader på ett rättvisande sätt. Syfte: Syftet med studien är att genom en kartläggning av tillverkningsprocessen anpassa en produktkalkyl för prissättning och beslutsfattande av produktsortimentet på Gemla Fabrikers AB, samt teoretiskt lyfta diskussionen om anpassad modells lämplighet i en kontext för mindre tillverkande företag som karaktäriseras av en hantverksmässig produktion. Metod: Studien utförs enligt en fallstudie på Gemla Fabrikers AB med en flerfaldig forskningsstrategi av kvalitativ art med kvantitativa inslag. Datainsamlingen bygger främst på ostrukturerade intervjuer, direkta observationer och tidsstudier. En processkartläggning genomfördes till en början för att utgöra ett underlag för resterande delar. Vidare anpassades en produktkalkyl utifrån företaget och tillverkningens karaktär vilket slutligen utgjorde ett underlag för modellens lämplighet i en hantverksmässig tillverkningskontext. Slutsatser: Efter genomförd kartläggning av tillverkningsprocessen på fallföretaget framgick det att tillverkningen karaktäriseras av en tidskrävande process med ett stort antal ingående aktiviteter. Detta resulterade i att anpassad produktkalkyl utformades enligt en ABC-modell då slutsatsen blev att fördelningen av kostnaderna skulle göras iii mer rättvisande om dessa fördelades till respektive aktivitet baserat på det faktiska tidsutnyttjandet. Anpassad modell utformades genom en tydlig aktivitetsfördelning utifrån produktnivå där varje aktivitets kostnad fastställs vid en given produktionsvolym vilket möjliggör underlag för en ökad kostnadskontroll, prissättningsstrategi och beslutsunderlag. Baserat på studerat fallföretag drogs slutsatsen att anpassad modell görs lämplig för andra företag i en liknande hantverksmässig kontext utifrån att i högre grad göra sammanslagningar av aktiviteter med ett större fokus på de värdeadderande aktiviteterna. Kostnadsfördelningen sker via ett orsak-verkan samband utifrån det faktiska tidsutnyttjandet där ett mindre antal tidsrelaterade kostnadsdrivare används. Modellen blir då lämplig för ökad kostnadskontroll samt underlag för prissättning och beslutsfattande.
Enfeldt, Viktor. "Real-Time Ray Tracing With Polarization Parameters." Thesis, Blekinge Tekniska Högskola, Institutionen för datavetenskap, 2020. http://urn.kb.se/resolve?urn=urn:nbn:se:bth-19667.
Full textBakgrund. Realtidsrenderarna som används i videospel och liknande grafikapplikationer simulerar inte ljusets polarisering. Polariseringsinformation har tidigare implementerats i vissa stålföljningsbaserade (ray-traced) offline-renderare för att simulera polariseringsfilter och diverse optiska effekter. Eftersom strålföljning har blivit allt vanligare i realtidsrenderare så kan dessa polariseringstekniker potentiellt också användas för att simulera polarisering och dess optiska effekter i sådana program. Syfte. Syftet med denna rapport är att avgöra om en befintlig polariseringsteknik från offline-renderare, från en prestandasynpunkt, är lämplig att använda för att simulera polariseringsfilter i stålföljningsbaserade realtidsapplikationer, eller om ytterligare optimeringar och förenklingar behövs. Metod. DirectX RayTracing API:et har använts för att implementera tre stålföljningsbaserade realtidsrenderare: en polarisationsfri Baseline-version; en Polarization-version med en befintlig polariseringsteknik; och en optimerad Hybrid-version, som är en kombination av de andra två. Deras prestanda mättes och jämfördes med avseende på frametime och VRAM-användning i tre olika scener och med fem olika antal strålar per pixel. Resultat. Polarization-versionen är ca 30% långsammare än Baseline-versionen i de två mest komplexa scenerna, och Hybrid-versionen är ca 5–15% långsammare än Baseline-versionen i alla testade scener. Polarization-versionens VRAM-användningen var högre än Baseline-versions i testerna med högre strålantal, men endast med försumbara mängder. Slutsatser. Hybrid-versionen har potential att användas i realtidsapplikationer där höga bildhastigheter är viktiga, men inte absolut nödvändiga (exempelvis de vanligt förekommande fotolägena i videospel). Polarization-versionens implementation hade sämre prestanda, men även den skulle potentiellt kunna användas i sådana applikationer. På grund av mätprocessens begränsningar och testapplikationens omfattning så kunde inga slutsatser dras gällande implementeringarnas påverkan på VRAM-användning.
Tillman, Johan. "En energistudie över Fengerfors bruk : Kartläggning och förslag till effektiviseringsåtgärder hos byggnader av industrikaraktär." Thesis, Karlstads universitet, Fakulteten för teknik- och naturvetenskap, 2011. http://urn.kb.se/resolve?urn=urn:nbn:se:kau:diva-7898.
Full textIn the late 1900s society began to realize the consequences of relying on non-renewable energy sources for heating. Prices were increasing heavily and because of that people often chose to replace their oil boiler with electricity which at the time was a viable option. With the rise in prices that has occurred over the past decade the importance of energy efficient measures seemed increasingly clear. With that said many older buildings often have poor thermal properties since both energy prices and construction standards were considerably lower back then. The client Not Quite is a nonprofit association based in Fengerfors mill, Åmål. They have expressed dissatisfaction over increasing heating costs combined with problems getting the desired thermal comfort related to their premises. The objects described are of industrial nature and has previously been used to a paper mill which closed in 1979. The buildings are now classified as part of a cultural monument. The intention of this dissertation has been to map the energy use and to evaluate appropriate efficiency measures related to the specific objects. This includes getting the demanded thermal comfort in combination with possibly reducing the energy consumption. The cost-effectiveness of proposed efficiency measures will also be evaluated. The objective of this dissertation has been to through the use of simulation identify the energy consumption, required thermal input and potential energy efficiency measures. The efficiency measures consisted mainly of adding insulation, air sealing, intermittent heating, heat recovery and window replacements. Cost-effectiveness was evaluated through a life cycle cost analysis with the different heat sources of wood, pellets and air source heat pumps. The conclusion has been that the proposed efficiency options related to each object reduces energy consumption to a considerable extent, while an adequate heating is achieved. The objects have through these measures obtained just as good energy consumption rates as standard considered buildings in Sweden. The life cycle cost analysis shows us that the present value of the proposed efficiency measures in all economic case scenarios results in great cost savings. It has also been shown that a satisfactory discretization of building elements is very important in this type of simulation.
Ahmic, Edvin, and Dosmat Akbarov. "Klassifikationssystemens påverkan på kalkylarbete : En jämförelse mellan CoClass och BSAB-systemen." Thesis, KTH, Byggteknik och design, 2018. http://urn.kb.se/resolve?urn=urn:nbn:se:kth:diva-231101.
Full textAs the construction industry shifts to digital information modeling of its projects, the need to coordinate and improve the efficiency of the management of this information increases. A common language in the form of an industry-wide classification system could lead to billions in savings annually. In the calculation, it is important that the correct information management is included in order to provide the most accurate calculation possible. The aim of this study is to examine how the three different systems, BSAB 83, BSAB 96 and CoClass, differ and stand in contrast to each other to highlight and demonstrate such differences. The purpose of the study is that it should be used as a basis for how ÅF can create classified calculations with CoClass. To achieve the aim of the report and answer the research questions, the examination consisted of literature studies, interviews, a comparative study and a case study. These methods contributed to the following result: ÅF could effectively transfer to the CoClass system. When comparing the systems, it has been shown that CoClass is a more extensive and comprehensive system structured in a different way as opposed to the previous classification systems. Based on the results of the study, a calculation structure according to CoClass can be implemented in ÅF's current working methods, where ready-made recipe for building components can still be used. The recommendation is to consider the component table as equivalent to the production result in the calculation work with CoClass structure in the MAP. In the long run, this would have been an efficient strategy, both economically and primarily less time-consuming.
Prokopová, Dagmar. "Vizualizace výrazů procesní algebry pi-kalkul." Master's thesis, Vysoké učení technické v Brně. Fakulta informačních technologií, 2017. http://www.nusl.cz/ntk/nusl-363857.
Full text