To see the other types of publications on this topic, follow the link: Lean slöseri.

Dissertations / Theses on the topic 'Lean slöseri'

Create a spot-on reference in APA, MLA, Chicago, Harvard, and other styles

Select a source type:

Consult the top 50 dissertations / theses for your research on the topic 'Lean slöseri.'

Next to every source in the list of references, there is an 'Add to bibliography' button. Press on it, and we will generate automatically the bibliographic reference to the chosen work in the citation style you need: APA, MLA, Harvard, Chicago, Vancouver, etc.

You can also download the full text of the academic publication as pdf and read online its abstract whenever available in the metadata.

Browse dissertations / theses on a wide variety of disciplines and organise your bibliography correctly.

1

Prelog, Josefin, and Sandra Huang. "Identifieringav slöseri inom NCC Folkboende." Thesis, Karlstads universitet, Fakulteten för hälsa, natur- och teknikvetenskap (from 2013), 2017. http://urn.kb.se/resolve?urn=urn:nbn:se:kau:diva-55415.

Full text
Abstract:
Idag är det högkonjunktur i byggindustrin och det byggs mer bostäder nu än vad det har gjorts förut. Produktionstider och kostnader för ett projekt pressas ner efter all konkurrens. Slöseri inom byggbranschen kan både bidra till en längre produktionstid och högre produktionskostnad. Tidigare studier visar att slöseri kan uppgå till 30-35 % utav ett projekts produktionskostnad. NCC bygger ett koncepthus, NCC Folkboende, vilket är ett platsgjutet koncept som genererar en effektiv byggprocess med lägre produktionskostnad. Konceptet har sitt ursprung från Umeå, och produktionstiden och produktionskostnaden grundar sig på Umeås kalkylerade timmar. Dessa timmar är svåra för andra distrikt att leva upp till vilket gör det intressant att följa aktuell studie för att finna möjliga orsaker. Lean Production är ett verktyg som härstammar från bilindustrin. Genom att fokusera på att minimera slöseri kan tid och material sparas in. Lean identifierar åtta typer av slöseri; överproduktion, väntan, omarbete, outnyttjad kreativitet, lager, överarbete, rörelse och transporter. För att identifiera slöseri i denna studie har metoden Activity Sampling använts. Metoden går ut på att göra många observationer för att mäta hur tiden utnyttjas i relation till arbetet. Med tillräckligt många observationer frambringas ett resultat som blir tillförlitligt under längre tid av arbetet. Resultatet visar i en jämförelse, mellan en grundkalkyl och verkligt utförda timmar, att det är en viss skillnad. Vidare har slöseri inte en så pass stor påverkan att det skulle utgöra en utav de större orsakerna under stomarbetet. Förbättringsåtgärder skulle kunna ske genom utbildning innan start med samtliga berörda. En erfarenhetsbank som registrerar vilka kompletteringsarbeten som görs för att få en bredare kunskap om dem.
The construction industry is a growing market and there is a huge demand for buildings today. The time for production and production costs for a project are being reduced because of the competitive market. Waste within the construction industry can both contribute to a longer production time and higher production costs. Previous studies confirm that waste can amount to 30-35% of the cost of production. NCC is building a concept house, NCC Folkboende, which is a site-based concept that generates an efficient construction process with lower production costs. NCC in Umeå developed the concept Folkboende. Production time and production costs are based on Umeå's estimated hours. The production time is difficult for other districts to maintain. This makes it interesting to follow the current study to find possible causes. Lean Production is a tool derived from the automotive industry. By focusing on eliminating waste, the time and materials can be saved. Lean identifies eight types of waste; Overproduction, waiting, reworking, untapped creativity, storage, overwork, movement and transportation. To identify waste in this study, the Activity Sampling method has been used. The method involves making many observations to measure how time is used in relation to the work. With enough observations, a result is obtained that becomes reliable for a long time of work. The result shows in a comparison, between the calculated hours and actual hours worked, that there is a difference. Furthermore, waste does not have such a big impact that it would be one of the major causes. To increase efficiency, education with all concerned before the production begins can be recommend based on the study. An experience bank that registers which supplementary work that has been done in the production will also be a recommendation.
APA, Harvard, Vancouver, ISO, and other styles
2

Johnsson, Tobias. "Arbetsberedningar : för att minska slöseri i byggproduktion." Thesis, Linköpings universitet, Institutionen för teknik och naturvetenskap, 2011. http://urn.kb.se/resolve?urn=urn:nbn:se:liu:diva-69273.

Full text
Abstract:
Med produktionsplanering menas att på ett effektivt sätt koordinera ett projekts aktiviteter och resurser. Genom god planering kan potentiella konflikter förutspås. Arbetsberedningar är ett verktyg som ser över arbetsmomenten, kartlägger arbetsflöden och kan hitta det mest effektiva sättet att genomföra arbetet på. Arbetsberedningar kan användas för att dela erfarenheter och standardisering av arbetsmoment inom företaget. Syftet med rapporten är att studera arbetsberedningar, samt vilka uppgifter produktionsledning och yrkesarbetare har vid framställning av arbetsberedningar. Undersökningen har genomförts som en fallstudie med två datainsamlingsmetoder; litteraturstudie och intervjuer. I undersökningen har produktionschefer, arbetsledare och yrkesarbetare intervjuats med syfte att kartlägga hur Skanska arbetar med arbetsberedningar i distriktet Kristianstad. Syftet är även att analysera nuläget och jämföra det med litteratur och med kunskap om detta påvisa förbättringsmöjligheter. I Skanskas verksamhetsledningssystem, Vårt sätt att arbeta, beskrivs arbetsberedningen som en detaljerad planering av ett arbetsmoment. Syftet är att ta tillvara allas kompetens, säkra arbetsmiljö, kvalitet och miljö samt öka förutsägbarheten avseende produktivitet. Risker som bedöms vara betydande för projektets tid, ekonomi, kvalitet, miljö eller arbetsmiljö ska arbetsberedas på en detaljerad nivå i produktionen. Från intervjuerna framgår hur anställda på Skanska arbetar med arbetsberedningar idag. Arbetssätten varierar mellan olika individer och arbetsplatser. Samtliga anser att arbetsberedningen är ett bra verktyg för planeringsarbetet i produktion och använder sig gärna av det, men att tidsbrist är en av orsakerna till att arbetsberedningar inte görs till fullo. Respondenterna inser också vikten av att nyttja alla medarbetares kompetens och kunskaper vid framställning av arbetsberedningen och ser gärna samarbete på arbetsplatsen. Medverkande i undersökningen har en positiv inställning till arbetsberedningar och tycker det är ett bra hjälpmedel i produktionen. Således behöver inte synsättet på arbetsberedningar ändras, däremot är inte samtliga införstådda med betydelsen av vad arbetsberedningar kan medföra för effekter. Förståelse för att denna typ av produktionsplanering är viktig måste öka. Ledningen bör förmedla syftet och målen med arbetsberedningar tydligare till alla medarbetare, på så vis kan förståelsen för arbetsberedningar förbättras och en reduktion av slöseri i byggproduktion kan ske. Arbetsberedningar tar tid att göra och därför prioriteras de ofta bort, men tid sparas snabbt in när aktiviteten börjar genom att frågor och osäkerheter elimineras samt att tid sparas in för åtgärder av de fel som uppstår. Brist på tid borde alltså inte vara en orsak till att göra mindre arbetsberedningar, tvärtom. För att arbetsberedningar ska bli en standardisering i produktionsledningens arbete krävs att de arbetar mer rutinmässigt med arbetsberedningar.
The meaning of production planning is to effectively coordinate a project's activities and resources in the most effective way possible. Through good planning, potential conflicts can be avoided. Work preparations is a tool that reviews the operations, mapping workflow and can find the most effective way to carry out work on. Work preparations can be used to share experiences and standardize operations within the company. The purpose of this report is to study work preparations and what tasks production management and skilled workers have when work preperations are done. The study was conducted as a case study with two methods of data collection, a literature review and interviews. In the study, production managers, supervisors and skilled workers were interviewed to identify how Skanska is working with work preparations in the district of Kristianstad. The study also aims to analyze the situation and compare it with literature and with established knowledge in order to highlight possible improvements. In Skanska’s business management system, Vårt sätt att arbeta, work preparations is described as a detailed planning of an operation. The aim is to take advantage of everyone’s skills, safe work environment, quality and environment, and to increase predictability regarding productivity. Risks that are deemed significant to the project's time, finances, quality, environmental or health should be prepared at a detailed level of  production. The interviews show how employees at Skanska are working with work preperations. Approaches vary between individuals and workplaces. All respondents believe work preperations is a good tool for planning in production and gladly uses it. But one of the reasons for not using it, is the lack of time. Respondents also recognize the importance of utilizing all coworkers’ skills and knowledge when producing work preperations, and encourages cooperation in the workplace. Respondents in the study has a positive attitude to work preperations and think it aids them in production. Thus, do not the opinion of work preperations have to change, however, not all respondents understand the importance of work preperations and what effects they can have. The understanding of how important this kind of planning is must increase. Skanska’s management should convey the purpose and objectives of work preperations to all employees, in that way the understanding of work preperations can improve and reduction of wastage in construction can take place. Work preperations takes time and therefor they are not always prioritized. There is however time to be saved when activities begin due to questions and uncertainties are eliminated. Time can also be saved by not having to take measures of produced errors. The lack of time shouldn’t be a reason for not doing work preperations, on the contrary work preperations saves time. To make work preperations a standardization in production, the management are required to work more routinely with work preperations.
APA, Harvard, Vancouver, ISO, and other styles
3

Lofjärd, Anna. "Implementering av Lean Construction inom byggbranschen : Ett slöseri eller ett verktyg?" Thesis, Högskolan i Borås, Akademin för textil, teknik och ekonomi, 2020. http://urn.kb.se/resolve?urn=urn:nbn:se:hb:diva-23562.

Full text
Abstract:
I Sverige har bostadsbristen lagt ytterligare fokus på att bygga billigare och snabbare. Byggbranschen har konstanta krav på sig att bygga effektivare och samtidigt upprätthålla sin kvalitet. Branschen utvecklas hela tiden och många företag har skapat egna verktyg och metoder för att förbättra sin effektivitet samt kvalité. Ursprungsidéerna kommer från Toyotas produktionsidéer från 1900-talet. Därifrån har teorier om kvalitetstänk och effektivitet blivit populärt att implementera och begreppet har t ex utvecklats att inom byggbranschen kallas för Lean Contruction. Då det finns mycket teori inom området ansåg författaren att ämnet skulle vara relevant att undersöka samt hur Lean Construction fungerar i verkligheten. Därför är syftet med denna studie att undersöka om byggföretag skulle kunna tillämpa vissa verktyg och metoder som finns inom Lean Construction. Skulle dessa verktyg och metoder kunna generera mer effektivitet i byggföretagens dagliga arbete. För att kunna genomföra denna studie har frågeformulär skickats ut till tre olika byggföretag. I frågeformuläret fick respondenterna rangordna de olika verktyg och metoder som de ansåg hade effektivitet samt de som inte hade någon effektivitet. Där fick de svara på vilka verktyg och metoder inom Lean Construction som de trodde skulle kunna förbättra sin effektivitet och om de redan själva arbetade efter någon metod som skulle höja deras effektivitet. De flesta av respondenterna visste vad Lean Construction är för något, men alla hade inte använt sig av det. Mellan de olika företagen skiljde det sig på vad de ansåg var effektivt arbete och ej. För att fastställa uppsatsens metod har en bred undersökningsstudie gällande metoder gjorts, de olika metoderna har avvägts mellan varandra för att undersöka vilken som skulle komplettera insamlad data. Genom att använda sig av frågeformulär och insamlad teori, valdes en kvalitativ metod. Fördelen med detta val av metod är att författaren kan jämföra insamlad data med teorin. Författaren valde att endast använda sig av tre olika byggföretag då studien inte skulle bli generaliserande utan få en mer öppen och tolkande bild av hur det ser ut i byggbranschen. För att kunna besvara syftet har författarens gjort begränsningar, detta genom att endast fokusera på de verktyg och metoder som finns inom Lean som skulle kunna bidra till en högre effektivitet hos byggföretag. Utifrån respondenternas svar framkom att metoder inom 5S kan tillämpas inom byggbranschen. Den insamlade teorin och den empiriska datan analyserades och ledde fram till slutsatsen. Studiens slutsats visar på att 5S metoden är den metod som lättast kan tillämpas inom byggbranschen. Respondenterna ansåg att några av de metoderna inom 5S redan arbetades efter dagligen.
In Sweden housing has been given further focus to build cheaper and faster. Construction have constant requirements to build more effective and at the same time maintain their quality. The industry evolves all the time and many businesses have created own tools and methods to keep improving the efficiency and quality of their work. The original ideas came from Toyotas production ideas from the early 1900. The theories about quality thinking and efficiency have been popular to implement and the concept has for example developed within construction and is called Lean Construction. Since there is a lot of theory within the field the writer felt that the subject should be relevant to examine and see how Lean Construction is working in reality. Therefore, the aim of this study is to investigate if the construction firm should be able to implement some tools and methods that you can find within Lean Construction. Would these tools and methods be able to generate more efficiency in the construction firm’s daily work. To be able to implement this study, a questionnaire has been sent out to 3 different construction firms. In the questionnaire the respondents rank the different tools and methods they thought had efficiency and the one’s that didn’t have any efficiency. Where they answered which tools and methods within Lean construction that they thought would improve the efficiency and if they already have worked by a method that should rise the efficiency. Most of the respondents have heard of the Lean Construction before but not everyone had used it. Between the different construction firm’s opinions about what kind of methods about efficiency varied. A wide study of different methods was made to determine what kind of methods should be used when writing this essay, the different methods have been balanced between each other to determine which should complete the collected data. By using the questionnaire and collected theory, a qualitative method was selected. The benefit with this method was that the writer could compare the collected data with the theory. The writer chose only 3 construction firms so that the study shouldn’t be generalized but instead be more open for interpretive picture of how the work within construction looks like. To be able to answer the purpose, the writer set some limitations, by only focusing on the tools and methods within Lean that should contribute to a higher efficiency at the construction firm. Through the respondents answer it emerged that methods within 5S can be applied within construction. The collected theory and the empirical data were analyzed and led to the conclusion. The study showed that the 5s method is the easiest method to implement at the construction firm. Respondents meant that some of the methods within 5S already is applied in their daily work.
APA, Harvard, Vancouver, ISO, and other styles
4

Fleismark, Linda. "Nulägesanalys och identifiering av slöseri." Thesis, Mälardalens högskola, Akademin för innovation, design och teknik, 2018. http://urn.kb.se/resolve?urn=urn:nbn:se:mdh:diva-40206.

Full text
Abstract:
ABSTRACT Purpose: The aim of the study is to provide a summary map of how a manufacturing company works with Lean tools to eliminate waste and create improvements. Initially the research questions were formulated, to which the study intends to answer and also goes in line with the purpose: How can companies in the manufacturing industry use Lean tools to work with improvements? How can Lean tools such as, elimination of 7+1 wastes and work with 5S contribute to improvements? Methodology and implementation: A case study has been carried out on a large company in the manufacturing industry, and to relate to what the literature says, also a comprehensive literature study on Lean methodology has been conducted. The study has been conducted through data collection, participatory observations and interviews. Documentation has taken place throughout the entire thesis. Result: The study shows that the company in which the case study was conducted at, uses several Lean tools in its continuous improvement work. Results from literature studies show a coherence that application of Lean tools is something that companies benefits from in their work with improvements. The result also shows a consensus when it comes to companies needing to see Lean as an overall system and a philosophy, not just as a set of effective tools. Results from literature studies also show that there is a lack of awareness about wasted improvements (the ninth waste). Key words: Lean, elimination of waste, 5S, improvements in vain, Kanban, standardised work
SAMMANFATTNING Syfte: Syftet med studien är att ta fram en nulägeskarta över hur ett företag inom tillverkningsindustrin arbetar med Lean-verktyg för att eliminera slöseri och skapa förbättringar. I ett tidigt stadie formulerades de forskningsfrågor som studien avser att besvara och som går i linje med syftet: Hur kan företag inom tillverkningsindustrin använda verktyg inom Lean för att arbeta med förbättringar? Hur kan Lean-verktyg som eliminering av 7+1 slöseri och arbete med 5S leda till förbättringar? Metod och genomförande: En fallstudie har genomförts på ett stort företag inom den tillverkande industrin och för att knyta an till det som litteraturen säger har även en omfattande litteraturstudie inom Lean-metodik genomförts. Studien har utförts genom insamling av data, deltagande observationer och intervjuer. Dokumentation har skett fortlöpande under hela examensarbetet. Resultat: Studien visar att företaget där fallstudien utfördes använder ett flertal Lean-verktyg i sitt kontinuerliga förbättringsarbete. Resultat från litteraturstudier visar en samstämmighet att tillämpning av Lean-verktyg är något som gynnar företag i deras arbete med förbättringar. Resultatet visar även en samsyn när det gäller att företag behöver se Lean som ett helhetssystem och en filosofi, inte endast som en uppsättning effektiva verktyg. Resultat från litteraturstudier visar även att det finns en avsaknad av medvetenhet om bortkastade förbättringar (det nionde slöseriet). Nyckelord: Lean, eliminering av slöseri, 5S, bortkastade förbättringar, Kanban, standardiserat arbetssätt
APA, Harvard, Vancouver, ISO, and other styles
5

Eklund, Malin, and Fanny Steenari. "En mixers väg genom produktionsflödet : En Value Stream Mapping på OPX Xylem Emmaboda." Thesis, Linnéuniversitetet, Institutionen för ekonomistyrning och logistik (ELO), 2014. http://urn.kb.se/resolve?urn=urn:nbn:se:lnu:diva-35705.

Full text
Abstract:
Bakgrund: Den svenska produktionsindustrin hotas utav så kallade låglöneländer som kanerbjuda samma tillverkning med en högre lönsamhet. Detta gör att verksamheten måste varaattraktiv för såväl investerare som kunder vilket gör att företaget måste genomföra ständigaförbättringar för att klara konkurrensen. Detta är något som även Xylem i Emmaboda kännerav. Xylem tillverkar ett brett utbud av dränkbara vattenpumpar men även annan utrustningsom krävs för att leverera vattenteknologi. Tidigare studier på en utav Xylems verkstäderOPX har visat att produktionen lägger mycket tid på aktiviteter som inte är värdeskapande såsom materialhantering och andra förflyttningar genom fabriken. Syfte: Syftet med uppsatsen är att identifiera var det kan finnas slöserier genom att utföra enValue stream mapping på en utav Xylems verkstäder i Emmaboda. Metod: Arbetet består av en fallstudie med explorativt syfte som utförs genom en Valuestream mapping. En kvalitativ forskningsmetod med insamling av såväl kvalitativa somkvantitativa data, genom observationer, intervjuer, litteraturstudier och tidsstudier hargenomförts. Resultat, slutsatser: Uppsatsen resulterade i en nutidskarta över bana 102 på OPX som i vilken en del mindre slöserier identifierades. Dock gav inte den valda metoden Value stream mapping önskat resultat då de upplevda slöserierna ifrån fallföretagets sida inte kunde identifieras. Utifrån detta drar författarna slutsatsen att en annan metod med utgångspunktifrån de upplevda problemen borde ha valts eller att de upplevda slöserierna inte grundar sig iden utvalda tillverkningsbanan.
APA, Harvard, Vancouver, ISO, and other styles
6

Lindblad, Caroline. "Praktisk tillämpning av Lean Production : En möjlig väg till minskat slöseri." Thesis, Uppsala universitet, Institutionen för teknikvetenskaper, 2014. http://urn.kb.se/resolve?urn=urn:nbn:se:uu:diva-236197.

Full text
Abstract:
Utländsk arbetskraft konkurrerar allt mer om arbetstillfällen i form av lägre löner och produktionskostnader. Detta gäller inte minst inom bygg- och anläggningsbranschen. Ett sätt att effektivt minska kostnader är att undersöka hur eventuellt slöseri kan undvikas. En filosofi som fokuserar på detta är Lean Production som allt fler företag i bygg- och anläggnings-branschen försöker arbeta enligt. Svensk Markentreprenad AB är ett ungt, växande företag som strävar efter att arbeta effektivare. De vill arbeta strukturerat och är nyfikna på Lean Production, då begreppet blivit allt vanligare. Därför studerades pro-blem hos företaget som skulle kunna förbättras med implementering av Lean i verksamheten samt de förutsättningar som fanns för detta. Genom en studie om Lean Production samt en mikro-etnografisk fältstudie hos årets (2012) Leanpris-vinnare Ytterbygg AB för dokumentation av hur de tillämpat Lean i företaget, samt hur de minskat sitt slöseri, drogs slutsatser kring hur Svensk Markentreprenad kan införa Lean Production på ett håll-bart sätt i sin verksamhet. Det visade sig att Ytterbygg AB var en god förebild då de arbetade ak-tivt med att reducera slöserier som även sågs hos Svensk markentrepre-nad. Genom att implementera Lean på rätt sätt i företaget finns goda för-utsättningar att lyckas strukturera verksamheten och bli effektivare. Det viktigaste är att ta till vara på och inspirera människor till kreativitet. Lean-filosofin bygger på enkla idéer med stort värde.
APA, Harvard, Vancouver, ISO, and other styles
7

Bergbom, Axel. "Slöseri i anläggningsbranschen : En fallstudie av produktionsprocessen för vägentreprenader." Thesis, Luleå tekniska universitet, Institutionen för samhällsbyggnad och naturresurser, 2020. http://urn.kb.se/resolve?urn=urn:nbn:se:ltu:diva-80161.

Full text
Abstract:
Det kommer ske stora investeringar inom den svenska infrastrukturen fram till år 2029. Detta leder till en stor möjlighet för entreprenadföretag inom branschen att växa på marknaden och få en ökad lönsamhet. För att generera en bra lönsamhet krävs det att tillgängliga resurser nyttjas på bästa sätt och slöseri minimeras så att en ökad effektivitet kan uppnås för processer. Ser man till hållbarhetsaspekten kan upp till 40% av de globala utsläppen av växthusgaser kopplas mot bygg- och anläggningsbranschen. För att anläggningsbranschen ska kunna bidra till en hållbar utveckling på sikt krävs det därför att slöseri minimeras och effektiva processer uppnås. Studien fokuserar på slöseri inom anläggningsbranschen då det idag är ett relativt outforskat område sett till antal publicerade arbeten inom problemområdet.   Studiens syfte har varit att undersöka slöseri för produktionsprocessen inom vägentreprenader. Detta har realiserats med hjälp av en fallstudie på ett anläggningsföretag. Genom att kartlägga slöseriet och dess orsaker har målet varit att ta fram ett effektiviseringsförslag för produktionsprocessen. Detta för att slöseriet ska reduceras och en effektivare produktionsprocess ska uppnås. Dessutom har målet varit att bidra till forskningen inom slöseri för anläggningsbranschen.   För att uppfylla studiens syfte har ett utforskande forskningssyfte tillämpats. Detta för att öka förståelsen inom problemområdet. Forskningsansatsen är av induktiv karaktär då studien utgår från observationer i verkligheten från intervjuer och fokusgrupp, till en generalisering av en teoretisk modell. En kvalitativ strategi har tillämpats för studien då fokus har legat på att skapa större förståelse för problemområdet och ge möjligheten att anpassa forskningen efter vad som uppkommit vid datainsamlingen. Datainsamlingsmetoderna som nyttjats för studien är litteraturstudie, intervjuer, fokusgrupp och kvalitativa sekundärdata. Triangulering och granskning från handledare har även nyttjats för att säkerställa studiens trovärdighet och kvalitet.   Studien visar att slöseri i form av väntan, onödiga transporter och felaktigt utförande återfinns i produktionsprocessen för vägentreprenader. Slöseriet uppstår primärt för aktiviteterna schaktning och avvattningsåtgärder, sprängning och transporter. Orsakerna till slöseriet kan delas in i två kategorier: externa och interna. Externa orsaker uppkommer från beställare, leverantör och geografiskt läge. Detta i form av långa körsträckor, resursbrist, tillhandahållande av beslut och bygghandlingar samt kompetens och rutin hos maskinförare. Interna orsaker uppkommer från entreprenören i form av begränsad styrning och kontroll över produktionen. Effektiviseringsförslaget togs fram genom programmet DynaRoad för att skapa massdisponeringsplaner för att minimera slöseriet onödiga transporter och få en bättre resurseffektivitet.   Den huvudsakliga rekommendationen till fallföretaget är att prioritera planeringen för sin entreprenadverksamhet. Detta ger fallföretaget bättre projektförutsättningar, vilket leder till att effektivare processer kan uppnås då slöseri minimeras.
The Swedish infrastructure will receive large investments until year 2029. This leads to big opportunities for construction companies within the industry to grow and increase their profitability. To generate good profit, it is important that the available resources are used in the best possible way so waste can be minimized, and efficient processes can be achieved. Taking the sustainability aspect in consideration, 40% of the global emissions can be linked to the construction sector. In order to reduce the environmental impact and contribute to sustainable development, the construction sector needs to minimize waste and achieve efficient processes. The focus of this thesis is regarding waste within construction industry and civil engineering projects, because of the limited research conducted within the field.   The aim of this thesis was to investigate waste for the production process regarding road projects. Further, their causes have also been investigated. This has been done by a case study on a construction company. By mapping the waste and their causes the aim has been to produce a recommendation to streamline the company´s operation. Further, the goal for this study has also been to contribute to the research on waste in the construction industry, with a focus towards road construction projects.   An exploratory researched been used for this thesis, to achieve the aim. This to increase the understanding for the field of study. The research approach is inductive hence, the study is based on observations from interviews and focus group, to a generalization of a theoretical model. A qualitative strategy has been applied for the thesis since the aim has been to create a deeper understanding for the field of study and give the possibility to adjust the research depending on what is found in the data collection. To collect data for this thesis a literature study, interviews, focus group and qualitative secondary data has been used. Further, triangulation and review by the supervisors has been used to ensure the credibility and quality for the thesis.   The study identifies waste in waiting, unnecessary transportation and improperly execution for the production process in road projects. The waste arises primarily for the activities excavation, blasting and transportation. The causes can be divided into two categories: external and internal. External causes emerge from clients, suppliers and geographical location. This in the form of long mass haul distances, resource shortage, provision of construction documents & decisions and competence & routine by the machine operators. Internal causes arise from guiding and control over the production. The proposal for the production process was developed through the software DynaRoad to be able to create a mass haul plan in order to reduce the unnecessary transports and increase the resource efficiency.   The recommendation for the company where this thesis has been conducted is to put a lot of effort into their planning process. This will result in better project basis, which leads to increased efficiency when the waste can be minimized.
APA, Harvard, Vancouver, ISO, and other styles
8

Gunnarsson, Marcus, and Viktor Svensson. "Implementering av Lean för små och medelstora byggentreprenadföretag för att reducera slöseri." Thesis, Tekniska Högskolan, Högskolan i Jönköping, JTH, Byggnadsteknik, 2016. http://urn.kb.se/resolve?urn=urn:nbn:se:hj:diva-31019.

Full text
Abstract:
Purpose: Waste and negligence in the construction industry is a way too big factor of the high costs occurring. To reduce those wastes, some companies in the manufacturing industry has started to apply Lean to get a more effectively work. Lean Construction is the construction industries counterpart and this investigation investigates what Lean Construction methods for waste management can do for small and medium-sized enterprises.The goal of this work is to analyze how small and medium-sized enterprises can work to get Lean in to the companies processes to reduce perceived wastageMethod: The methods that is used to achieve the goal and to answer the chosen questions is literature studies, interviews and participant observation.Findings: Based on the methods that is used has different factors to reduce waste been acquired. Better communication, awareness among employees, management commitment and keep the work to the time schedules is important factors for improvement.Implications: Better planning is basis for a more efficient construction process.The most important thing for small and medium-sized enterprises can think about is that expensive solutions do not need to be better than simple methods. The developed factors in this investigation can help companies that want to achieve a more efficient construction process. The reason that this investigation is theoretically based, the derived factors should be applied in real projects to see what impact they have.Limitations: The investigation is limited to small and medium-sized enterprises (SMEs) and is a case study at Brantås Bygg. The study include rework, waiting, movements and transports. The interviews are made with working managers, foremans and carpenters at Brantås Bygg. The participate observation is made at a project in the central parts of Vetlanda, Sweden.Keywords: Lean Construction, Wastes, SME, Implementation issues.
APA, Harvard, Vancouver, ISO, and other styles
9

Stenquist, Lars. "Skadereglering med fokus på kund : Försäkringsbolag arbetar med ständiga förbättringar." Thesis, Mittuniversitetet, Institutionen för informationsteknologi och medier, 2012. http://urn.kb.se/resolve?urn=urn:nbn:se:miun:diva-17291.

Full text
Abstract:
I en värld där organisationer fokuserar allt mer på att vårda kunden blir kundservice allt viktigare för organisationer. För att säkerställa att organisationen inte förbrukar onödiga resurser på aktiviteter som inte tillför värde för kunden är lean och kaizen värdefulla filosofier. Lean samt kaizen härstammar från den japanska bilproduktionen och har utvecklats till värdefulla verktyg för att effektivisera organisationer. Slöserier bland annat i form av väntan, onödiga förflyttningar, omarbete och transporter finns definierade som inte värdeadderande för kund. Syftet med examensarbetet har varit att studera ett försäkringsbolag arbete med att leverera mesta värde för kunden och hur slöseri kan identifieras och elimineras. Försäkringsbolaget erbjuder ett flertal olika privatförsäkringar och företagsförsäkringar. Examensarbetet har avgränsats till att inkludera sex avdelningar vid ett kontor och nio system. Den metod som har använts är en kvalitativ fallstudie med intervjuer och observationer men även en kvantitativ enkätundersökning har genomförts för att identifiera problemområden. Resultatet är i form av dokumenterade intervjuer, observationer och svar från enkätundersökningen men också i processbeskrivningar som visade på ett flertal områden för förbättring. Försäkringsbolaget arbetar redan med flera av dessa. Försäkringsbolaget har redan en klar plan för förbättringsarbetet och en samstämmig syn på vad som inte är värdeadderande för kund, definierat som tid skadereglerare lägger på att utföra onödigt arbete. Försäkringsbolaget har också en strategi för att standardisera till ett system. Slöserier som kan minimeras identifierades i form av onödigt arbete vid skapandet av brev, osynliga köer, avsaknad av statusuppdateringar, informationsutbyte med kunder. En allmän negativ attityd mot det nya skadestödssystemet uppdagades i examensarbetet. Slutsatser återges via förbättringar som kan komma till nytta för försäkringsbolaget i form av automatisering av inkommande kommunikation och bekräftelse- samt avböjandebrev, tydliggörande av osynliga köer och förslag på förbättringsåtgärder för kommunikationen mellan skadeavdelningen och IT-avdelningen.
APA, Harvard, Vancouver, ISO, and other styles
10

Olersbacken, Mattias. "Flödesanalys av plåtsammansättning : Strävan mot Just-In-Time och minskat slöseri." Thesis, Uppsala universitet, Industriell teknik, 2014. http://urn.kb.se/resolve?urn=urn:nbn:se:uu:diva-226451.

Full text
Abstract:
The Volvo Trucks plant in Umeå is a highy complex manufacturing facility where the same production line handles a variety of different models. This require flexible and agile processes with high quality standards. This thesis studies the flow of material through a production line and how Volvo can use their existing manufacturing monitoring system to optimize the flow of materials. The goal with the thesis is to identify eventual problems with the flow of materials and to deliver a few proposals on how the production line can improve its productivity. The theory of LEAN, Just-In-Time and Supply Chain Management serves as the scientific reference to this project. By analyzing the flow of material, performing interviews and observing the processes a few problems are identified. The problems are analyzed and some improvements are proposed along with recommendations for further investigation.
APA, Harvard, Vancouver, ISO, and other styles
11

Ahxner, Johan, and Samuel Axklo. "Införande av Lean Administration i utfallsprovsprocessen." Thesis, Tekniska Högskolan, Högskolan i Jönköping, JTH, Industriell organisation och produktion, 2013. http://urn.kb.se/resolve?urn=urn:nbn:se:hj:diva-23756.

Full text
Abstract:
Detta examensarbete handlar om införande av Lean Administration i administrativa stödprocesser. Examensarbetet undersöker hur Leanverktyg kan bidra till att standardisera dokument och dokumenthanteringen och därigenom eliminera slöserier. Parallellt erhålls kvalitetssäkring och effektivisering, samt att kapacitet frigörs till värdehöjande aktiviteter. Studiens fokus och tyngdpunkt beträffande empirin bygger på aktionsforskning bedriven hos ett tradingföretag där den stödjande dokumenthanteringen till arbetet med utfallsprover studerats närmare. Bakgrunden till studien kan härledas till den globala konkurrensen som medfört att fler företag i större omfattning arbetat med att förbättra och effektivisera sin verksamhet. Fler företag har även valt att fokusera på sin kärnkompetens och har därför outsourcat delar av sin verksamhet. I linje med denna utveckling har nya aktörer uppkommit som specialiserat sig på andra områden än produktion. För dessa företag som inte har någon produktion att effektivisera blir fokus istället riktat mot att förbättra andra områden, så som administrationen. Syftet med examensarbetet är att, baserat på Lean Administration, ge förslag på ny dokumenthantering för de administrativa stödprocesserna tillhörande utfallsprover. Resultatet av arbetet mynnar ut i ett förslag som presenteras i form av en mall skapad i Excel. Excelmallen har upprättats under examensarbetes gång och är byggd med stöd av principer och verktyg från Lean Administration. Mallen är tänkt att ersätta befintliga dokument i den administrativa stödprocessen och bidrar därmed till att standardisera och effektivisera arbetet med utfallsprover. Mallen bidrar även till valmöjligheter att bemöta kundernas olika krav samt höjer kvalitén genom inbyggd felsäkring. Mallen kan anses generell och möjlig att implementera på olika företag som arbetar med utfallsprover. Den grafiska layouten kan dock behöva förändras för att anpassa dokumenten till företagsspecifika behov. Under arbetets senare fas uppkom tankar om att vidareutveckla Excelmallen till ett totalkvalitetsdokument, vilket då skulle innehålla all information om en specifik artikel som härrör kvalité. Denna tankegång ger uppslag till vidare utvecklings och förbättringsarbete. Förslag ges till vidare forskning inom området Lean Administration då ämnet har mycket kvar att utforska. Arbetssättet som använts i detta examensarbete, att granska arbetsmomenten med Leanglasögon, kan generaliseras och tillämpas även inom andra områden än processen med utfallsprover.
This thesis concerns implementation of Lean Administration within administrative support-processes. The thesis examines how tools of Lean can contribute to the standardizing of documents and the handling of documents in order to eliminate waste. In addition, quality assurance and higher efficiency are obtained while it is possible to reach a higher capacity for value-adding activities. The empirical findings are based on action research conducted at a trading company where the supporting handling of documents concerning initial samples was studied closely. The background to this study can be traced to the increased global competition which has brought more companies to work with improvements to a larger extent. More companies have also decided to outsource parts of their operations to be able to focus on their core competencies. As an effect of this trend, different new actors have specialized in other areas than production. When there is no production to make more efficient, these companies have directed their work with improvements to other areas, such as the administration. The purpose with this thesis is to; based on Lean Administration, give suggestions for a new handling system of documents concerning the support processes for initial samples. The result of this work culminates into a proposal which is presented as a template created in Excel. The template has been created during the work with the thesis and it is built with support from principles and tools from Lean Administration. The Excel template is made to replace current documents in the specific administrative process and by doing that, contribute to standardization and increased efficiency to the work with initial samples. The template also creates options to treat customers’ different needs and it also increases quality through a built-in fail proofing feature. The template can be considered to be generalized and possible to implement at different companies working with initial samples. However, it may be required to change the graphical layout to company-specific needs. Towards the end of the writing process thoughts about developing the Excel template to a total quality document was raised. This document could contain all information concerning quality for a specific article. This idea gives opportunity for further work. Suggestions for further research within Lean Administration are given since there is still a lot to investigate within the field. The way the research was conducted, by viewing the work processes with Lean-glasses, can be generalized and applied to other areas than the processes concerning initial samples.
APA, Harvard, Vancouver, ISO, and other styles
12

Karlsson, Josefine. "Slöseri med innovationspotential : Ett medarbetarperspektiv på tillvaratagandet av innovationspotential i industriella Lean-kontexter." Thesis, Tekniska Högskolan, Högskolan i Jönköping, JTH, Industriell organisation och produktion, 2017. http://urn.kb.se/resolve?urn=urn:nbn:se:hj:diva-37831.

Full text
Abstract:
Syfte – Syftet med studien var att sträva efter att skapa förståelse för medarbetares perspektiv på hur innovationspotential kan tas tillvara genom relationen till ledaren och förutsättningarna i en industriell Lean-kontext. För att uppfylla syftet skapades tre frågeställningar: ➢ Vilka förutsättningar har medarbetaren i en industriell Leankontext för att bidra till innovationsarbetet i organisationen? ➢ På vilket sätt påverkar relationen till ledaren medarbetarens bidrag till innovationsarbetet i en industriell Leankontext? ➢ Vilka aspekter kan identifieras som avgörande för att ta till vara innovationspotentialen i en industriell Leankontext ur ett medarbetarperspektiv? Metod – För att besvara frågeställningarna utfördes en explorativ djupstudie med intervjuer och observationer. Data samlades in från tre olika industriföretag som arbetar med Lean där en observation samt tre intervjuer per företag utfördes. Data kodades i kategorier för den empiriska analysen som söker svar till de två första frågeställningarna. Den tredje frågeställningen belyser de aspekter som framkommit ur de två första frågeställningarna med teori och är den teoretiska analysen. Resultat – De viktigaste aspekterna som framkommit var att medarbetarna inte kände sig involverade, att det fanns grupperingar samt att dialog saknades i det dagliga arbetet. Feedback på förslag som lämnats in via blanketter var även bristfällig. Begränsningar – det framkommer att medarbetare upplever och ser många begränsningar, däribland att det inte finns tid, pengar, plats eller möjlighet till att själv testa eller fundera över innovationsförslag. Nyckelord – Medarbetarperspektiv, Innovation, Lean, Relationer, Förbättringsarbete.
APA, Harvard, Vancouver, ISO, and other styles
13

Almén, Christofer, and Olof Samzelius. "Effektivisering av en tjänsteleverantörs processer : Genomfört som en fallstudie på köksprojekt." Thesis, Tekniska Högskolan, Högskolan i Jönköping, JTH, Byggnadsteknik, 2015. http://urn.kb.se/resolve?urn=urn:nbn:se:hj:diva-29827.

Full text
Abstract:
Produktionskostnaderna i byggbranschen ökar ständigt och i en rapport utgiven av Sveriges byggindustrier kartläggs att uppemot 30-35 % av den totala produktionskostnaden i ett byggprojekt kan betraktas som slöseri. Slöseri kan beskrivas som de förbrukade resurser som inte skapar något värde för kunden, såsom förflyttning av material, väntan, avbrott, lagerhållning och överproduktion. Studien är genomförd på köksprojekt där Peab byggservice agerar tjänsteleverantör och bistår Ikea med monteringstjänster. Studien baseras på ett rikstäckande avtal som rör all typ av montering av Ikeas sortiment, dock har i denna studie endast monteringen av kök studerats. De förbättringsområden som har identifierats i rapporten har sedan analyserats och diskuterats med hjälp av verktyg från Lean. I rapporten benämns Peab byggservice som tjänsteleverantör och Ikea som leverantör. Syfte: Syftet med arbetet är att effektivisera en byggtjänsteleverantörs processer för att uppnå en ökad lönsamhet. Metod: För att uppnå målet och besvara frågeställningarna har arbetet utförts som en fallstudie av köksprojekt. Kvalitativa intervjuer och dokumentinsamling har använts som metoder och har varit en del av fallstudien. För att inhämta stöd i teorin och metoder som lämpar sig i det aktuella fallet har en litteraturstudie gjorts. För att identifiera slöseri i den befintliga processen har en värdeflödesanalys uppförts, det är ett verktyg från Lean med syfte att synliggöra köer, och andra icke värdeskapande aktiviteter. Resultat: I rapporten har: ● Processen gällande ett köksprojekt kartlagts. ● Olika former av slöseri identifierats. ● Verktyg från Lean analyserats för att minimera slöseri. Detta har lett till förslag på: ● Reducerade ledtider genom kombinerade aktiviteter. ● Kortare processtider genom effektivisering. ● Metoder för långsiktiga lösningar för att på sikt uppnå en effektivare process. Konsekvenser: Utifrån rapportens resultat konstateras möjlighet till förbättring. Slöseri har identifierats och förbättringsåtgärder med hjälp av framtagna teorier bedöms vara möjligt. Begränsningar: Resultatet är kopplat till generella problem och ger förslag på förbättringsarbete i de fall där en entreprenör agerar tjänsteleverantör åt en leverantör. Nyckelord: Processeffektivisering, Lean Production, Slöseri, Värdeflödesanalys.
APA, Harvard, Vancouver, ISO, and other styles
14

Kristoffersen, Annika. "Lean Administration : How can Lean be implemented in an administrative section?" Thesis, Södertörn University College, School of Business Studies, 2010. http://urn.kb.se/resolve?urn=urn:nbn:se:sh:diva-3651.

Full text
Abstract:

Den här uppsatsen behandlar Lean i en administrativ miljö, istället för produktion. Lean är inget nytt påfund, utan har sina rötter tillbaka till 1930-talet hos grundarna av Toyota. Lean handlar om att minska slöseri och att visualisera flöden inom företag. Lean används för att identifiera värden och värdeflöden, skapa flöden utan slöserier och implementera dessa flöden mer effektivt genom kontinuerliga förbättringar. 

Syftet med uppsatsen är att se hur Lean kan implementeras i en administrativ avdelning för att minska slöseri, ledtider och standardisera arbetsprocesserna. Vidare kommer en grund läggas till en modell för vidare implementering av Lean i andra administrativa avdelningar. 

Genom utförda intervjuer, följda ordrar och genom studerade dokument har det blivit klart att Lean går att använda sig av och implementera i en administrativ avdelning. Arbetsprocesserna blir mer synliga vilket gör att processerna kan standardiseras och på så sätt kan slöseri minskas och därmed ledtider minska. Standardisering av arbetet kan ske genom att skapa en prisdatabas, prismodell och synliggöras genom visuell planering. 

Modellen som skapats är en pyramid som är uppdelad i fem olika steg. Grunden i pyramiden är att de anställda måste ta ansvar för sitt eget arbete. Nästa nivå i pyramiden är att engagera de anställda. Tredje steget är att visualisera flödet, aktiviteterna och de problem som existerar. Nästa steg är att förenkla flödet, och toppen av pyramiden är att kontinuerligt förbättra flödet. 

Slutsatsen av denna studie är att Lean är ett sätt att arbeta som grundar sig i sunt och gemensamt förnuft. Lean kan implementeras i en avdelning genom att göra flödena synliga och identifiera problem, slöseri och förbättrings möjligheter. Vidare kan inte Lean implementeras i en avdelning om inte de anställda tar ansvar för sitt arbete eller om det inte finns ett tydligt ledarskap.


This Master thesis is concerning Lean in an administrative section, instead of production. Lean is nothing new, it has its roots back to the 1930s with the founders of Toyota. Lean is about reducing waste and visualizing flows in companies. Lean is used to find values and value streams in the business, creating flows without waste and to implement these flows more efficiently by continuously work with improvements. 

The purpose of this Master thesis is to study how Lean can be implemented in a section of a company where the processes are related to administration, not production, to reduce waste, lead time and structuralize the work process. Further a foundation will be created for a model to implement Lean in other administrative sections. 

Through interviews, following orders in the flow and by studying documents it has been established that Lean can be used and implemented in an administrative section. By using Lean work processes can be made more visual, which makes it possible to standardize the process and in that way reduce waste and lead time. This can be made by creating a price database, price model and by using visual planning. 

The model created is a pyramid divided into five steps. The foundation is to take responsibility for ones own work, and to inform the employees and give them meaning with changes. The next level is to engage the employees. Third step is to visualize the flow, activities and the problems. The next step is to simplify the flow, and the top of the pyramid is to continuously improve the flow. 

The conclusions of the Master thesis are that Lean is a way of working with good and common sense. Lean can be implemented in a section by making the flows visual and then identifying problems, waste and improvements. Further Lean cannot be implemented in a section if the employees do not take responsibility of their own work, or if there is not a visual leadership.

APA, Harvard, Vancouver, ISO, and other styles
15

Deldar, Sam, and Gabriella Cizmeli. "Analys och optimering av transportflöden i Eskilstuna kommun : Eliminering av slöseri och dess effekter ur ett ekonomiskt- och miljöperspektiv." Thesis, Mälardalens högskola, Akademin för innovation, design och teknik, 2017. http://urn.kb.se/resolve?urn=urn:nbn:se:mdh:diva-35677.

Full text
Abstract:
Syfte: Att undersöka de potentiella fördelarna vid implementering av Lean-baserade metoder för att möta prestanda, tillgänglighet och effektivitet i transportsystemet samt användningen av en varuflödesplan för att identifiera slöseri. Vidare, att observera hur fördelarna med en ruttoptimering kan minimera slöseri och reducera kostnader relaterade till transport samt minskningen av miljöutsläpp, stadsbuller och säkerhet. Metod och genomförande: För att uppnå syftet med denna studie och att besvara forskningsfrågorna har en fallstudie och en litteraturstudie kombinerats och genomförts. Fallstudien innehåller observationer och intervjuer som har genomförts för att samla in information om hur fallföretaget arbetar med transport dagligen, användningen av standardisering och effektivisering samt hantering av ruttplanering. Vidare har en implementering utförts av de föreslagna ruttoptimeringsmetoderna för att få större förståelse för de föreslagna metoderna och litteraturen. Slutligen har en analys och diskussion genomförts där de empiriska resultaten studerats och jämförts med litteraturstudien. Resultat: Genomförandet av Lean-baserade metoder för att identifiera och minska slöseri baserat på prestationsmätningsverktyg, såsom värdeflödekartläggning och användningen av ruttoptimering, har visat flera fördelar. De identifierade fördelarna var kortare körtider för chaufförerna, en minskad total kilometersträcka, en mer optimerad fyllnadsgrad i lastbilarna samt mer effektiv tid vid lastning och lossning av gods. Den sistnämna fördelen påverkar främst tillgängligheten och prestandan av den totala fordon- och chaufförseffektiviteten. En del av fördelarna var tolkbara i monetära termer för att ge insikt om hur de eventuella kostnadsbesparingarna. Rekommendationer: För att få bättre och mer djupgående resultat i framtida studier, föreslås att: fallföretaget kartlägger alla transporter som utförs för att bedöma lönsamheten i vissa körrutter samt för att undersöka hur all transport kan uppdelas geografiskt med hjälp av presenterat material i denna studie; noggrannare observationer av förare under andra veckodagar för att identifiera ytterligare problemområden och förbättringsmöjligheter; standardisera och implementera Lean metoder i närliggande processer i verksamheten för fortsatt strävan efter en lönsam verksamhet, till exempel genom att granska mottagandet av varor från leverantörer och utvärdera möjligheten med att ha lokala leverantörer; slutligen, all personal ska utbilda sig inom Lean och standardiserat arbete för att ytterligare eliminera och minska interna NIT-aktiviteter, såsom väntetid.
Purpose: To explore the possible benefits with the implementation of Lean methods to measure performance, availability and efficiency in transportation, including the use of a value stream map to identify waste. Furthermore, to observe how the benefits with a route optimization eventually can minimize waste and reduce costs related to transportation as well as the reduction of environmental emissions, urban noise and security. Methodology: To achieve the purpose of this study and to solve the research questions, a case study and a literature study has been combined and carried out. The case study contains observations and interviews which has been executed in order to gather information related to how the case-company work with transportation on a daily basis, the usage of standardization and the management of route planning. Moreover, an implementation of the proposed route optimizations has been executed with the purpose of gaining knowledge related to the outcome. Finally, an analysis and discussion has been performed where the empirical results are studied and compared with the literature findings. Findings: The implementation of Lean methods to identify and reduce waste based on performance measuring tools, such as value stream mapping and the use of route optimization, showed several advantages. The identified advantages were shorter driving schedules for the chauffeurs, a reduced overall mile distance, a more optimal degree of filling in the driver trucks and more efficient time spent while loading and unloading the trucks. The last advantage mainly affecting the availability and performance of the overall vehicle efficiency. Some of the advantages were interpretable into monetary terms in order to provide an insight into any cost savings. Recommendations: To gain better and more profound results in any further studies, it is suggested that: the case company map out all transports carried out in order to assess the profitability of certain driving routes, as well as to examine how all transport can be geographically divided using the presented material in this study; more thorough observations of drivers during other weekdays to further identify problem areas and improvement opportunities ought to be done; standardization and implementation of Lean methods in related processes in the company for continued pursuit of profitable operations. For example, by reviewing the receipt of goods from suppliers and reviewing the option of having local suppliers; lastly, all staff gets training and education of Lean methods and standardized work for additional elimination and reduction of internal NIT activities, such as waiting time.
APA, Harvard, Vancouver, ISO, and other styles
16

Nordekvist, Emma. "Identifiering av slöseri och undersökning av multipla takttider : En studie på ABB Robotics." Thesis, Luleå tekniska universitet, Institutionen för teknikvetenskap och matematik, 2019. http://urn.kb.se/resolve?urn=urn:nbn:se:ltu:diva-74247.

Full text
Abstract:
ABB Robotics är en av de största leverantörerna av industrirobotar på den globala marknaden. En av deras fabriker är belägna i Västerås där det här arbetet har utförts på slutmontaget av stora industrirobotar (SSIR). Slutmontaget är en taktad linje bestående av åtta stationer och en avsyning som slutstation. Robotarna som monteras på linjen har varierande cykeltider och alla modeller har inte arbete vid alla stationer. Linjen har en andon-resurs som används för att minska störningar och hantera avvikelser. Slutmontaget har nyligen genomgått en ombyggnation och ABB Robotics är nu intresserade av att identifiera slöserier i det nya flödet och undersöka möjligheten till att använda multipla takttider för att öka kapaciteten, vilket är fokus i det här arbetet. Arbetet genomfördes i två etapper där den första delen fokuserades till att identifiera slöseri och den andra delen tillägnades takttid och kapacitet. En kartläggning av nuläget genomfördes för att skapa förståelse för dagens flöde och problemet. Utifrån nulägesbeskrivningen skapades en värdeflödesanalys (VFA) baserat på en befintlig mall och cykeltider från tidigare tidsstudier. Slöserier identifierades utifrån de åtta slöserierna enligt lean med hjälp av VFA, spagettidiagram och störningsloggen. I dag uppstår slöseri på grund av att montören behöver gå och hämta material och verktyg. Cykeltiderna som användes för VFA användes även vid beräkning av kapacitet och takt. Olika takttider och mix av modeller jämfördes för att ta fram rekommendationer kring användandet av takttid. Lösningsförslag till hur identifierade slöserier togs fram och även förslag till hur de olika slöserierna kan mätas. Två av lösningsförslagen är att förändra layouten på station 1 och att införa ett nytt system för materialförsörjning. Om cykeltiderna för respektive modell och station förblir desamma eller om det sker en jämn förkortning rekommenderas ABB Robotics att enbart använda en takttid på SSIR. För att det ska bli aktuellt med att införa multipla takttider krävs en större skillnad i cykeltid mellan tunga och lätta modeller. Om de lätta modellerna ombalanseras till att ha arbetsmoment vid alla åtta stationer kan kapaciteten höjas med 4,5 % vid införande av multipla takttider.
ABB Robotics is one of the largest manufacturer of industrial robots on the global market. One of their factories is located in Västerås where this work was executed at the final assembly line for large industry robots (SSIR). The final assembly line have recently been converted to a takted one-piece flow. Now ABB Robotics want to identify waste in the new assembly line and investigate the possibility to use multiple takt times to increase their capacity. The project was divided into two parts where the first part was assigned to identify waste and the second part to analyze the use of takt time. A current state mapping was performed to increase the understanding for the flow and the issue. Value stream mapping (VSM) was executed in an existing template with the use of data from the current state mapping and cycle times from recent time studies. Waste was identified according to lean with the help of VSM, spaghetti diagram and the disruption log. Today waste arise from the worker having to move to collect tools and material. Cycle times used for the VSM were later on used for calculations regarding capacity and takt time. Different takt times and mix of models were compared to give recommendations regarding the use of multiple takt times. Solutions on how to decrease and measure waste was presented. Two of the solutions were to change layout of station 1 and to implement a new materials feed system. With todays cycle times ABB Robotics are recommended to only use one takt time. The same goes for the case when the cycle times are shortened evenly. If the gap between the average cycle time for heavy models respectively light models would increase, then it would become interesting to further investigate the use of multiple takt times. The gap would increase if the light models are rebalanced to include operations by station 2 and in this case the capacity would increase with 4,5 % with the use of multiple takt times instead of one takt time.
APA, Harvard, Vancouver, ISO, and other styles
17

Rost, Emma. "Förhöjt kundvärde i tjänsteprocesser : En studie av Scania Finans AB ur ett leanperspektiv." Thesis, Linköpings universitet, Kvalitetsteknik, 2012. http://urn.kb.se/resolve?urn=urn:nbn:se:liu:diva-78922.

Full text
Abstract:
Leanproduction börjar i allt större utsträckning appliceras inom olika verksamheter. Filosofins fokus på kundvärde samt dess skapade av effektiva och felförebyggande processer lockar mängder av aktörer inom olika sektorer av marknaden. Då kundvärde bör vara fokus för samtliga verksamheter och effektiva, kvalitetssäkra processer är något att eftersträva bör filosofin lämpa sig inom fler områden än just produktion. Tjänsteverksamhet är ett marknadssegment där kundvärde är särskilt viktigt. Då målet med tjänsteverksamhet vanligen är att skapa en bra service och på så sätt addera kundvärde bör leankonceptet framgångsrikt kunna appliceras inom verksamheten. Dock är leanfilosofin huvudsakligen utformad för produktionsverksamhet och få konkreta riktlinjer finns om hur den kan appliceras inom andra verksamheter. Scania Finans är ett företag som nyligen påbörjat ett initiativ att införa lean i sin organisation.Det här examensarbetet syftar till att analysera möjligheten att applicera lean inom tjänsteverksamhet genom att använda Scania Finans som fallföretag. Företagets kreditprocess har analyserats med hjälp av värdeflödesanalyser för att finna slöseri i processen. För att finna problem och slöseri i Scania Finans kreditprocess utfördes processkartläggningar i workshops med medarbetarna samt tidstudier för att mäta ledtid och processtid. Därefter kunde värdeflödesanalyser av processen utföras.En anpassning av värdeflödesanalyser för tjänsteprocesser har utformats i examensarbetet. Dessa är inte helt i enlighet med de traditionella värdeflödeskartorna som upprättats inom produktionsverksamhet men mer applicerbara för tjänsteföretag. Värdeflödesanalyserna pekade ut tydliga problem samt allokerade slöseri i processen och visade sig därav vara ett mycket användbart verktyg inom tjänsteverksamhet. En ny definition av slöseri, gällande inom tjänsteverksamhet, har framtagits i examensarbetet. Dåflera av de problemområden som identifierats hos Scania Finans är kännetecknande för tjänsteföretag är dessa mer representativa slöserier inom tjänsteverksamhet än de som tidigare definierats. Bland annat lider företaget av instabila processer med mycket defekter och bristfällig information.Företaget har också en mycket hög variation i ledtid. Just variation är ett svårt problem i tjänsteprocesser då det råder en variation i efterfrågan, som inte kan elimineras. Därför är det viktigare för tjänsteföretag att hantera den rådande variationen snarare än att eliminera den. En bidragande orsak till de varierande ledtiderna är frekventa avbrott av processen som leder till förlorad koncentration. Avbrotten beror i huvudsak på kundens närvarande i processen, vilket även det är karakteristiskt för tjänsteverksamhet. Då avbrotten i många fall kan vara värdeskapande för kunden går de inte att helt eliminera. Ett annat huvudsakligt problem är det abstrakta flödet som gör det svårt att arbeta flödesorienterat i en tjänsteprocess. På grund av medarbetarnas arbete i parallella processer, de frekventa avbrotten samt det abstrakta flödet är det svårt för tjänsteföretag att ha ett fokus på flödeseffektivitet. Flera åtgärder har föreslagits i examensarbetet med syfte att förbättra kreditprocessen ur ett leanperspektiv och reducera de identifierade problemen. Examensarbetet visar hur leankonceptet kan användas för att förbättra en tjänsteprocess genom att reducera slöseri och på så sätt öka det adderade värdet till kunden. Det belyser även den problematik som råder vid en introduktion av lean inom tjänsteverksamhet. En anpassad modell för värdeflödesanalyser inom tjänsteprocesser finns redovisad i examensarbetet vilken har visat sig vara framgångsrik. Arbetet definierar även slöseri inom tjänsteverksamhet och visar problemområden som är representativa för tjänsteföretag, vilka inte är helt i enlighet med de slöserityper som tidigare definierats för produktionsverksamhet.
Different business sectors are increasingly applying lean production. The philosophys focus on customer value and its establishment of efficient and defect preventing processes appeals multitude actors in different market sectors. Since customer value should be a general focus for all organizations and efficient, quality proofed processes are main objectives, the lean philosophy should be suitable for more areas than just production. In particular, customer value is vital in the market segment of service business. Since the objective of service business is to create good service and thereby add customer value, a successful application of the lean concept in this particular segment should be possible. However, the lean philosophy is mainly designed to suit manufacturing companies and there are few concrete guidelines on its applications in other areas. The company ScaniaFinans AB has recently introduced an initiative to apply lean in their organization. This master thesis aims to analyze the possibility of applying lean in service business with ScaniaFinans as model. The sales process of the company has been analyzed with the use of value stream mapping in order to identify waste. Process mapping was conducted at workshops held with employees, in order to identify obstacles and waste in the sales process. Subsequently, a time study, where waiting times and process times were measured, was conducted. The mapped processes along with the time studys result were converted to value stream maps to enable value stream analysis. These analyses pointed out legible obstacles and allocated waste in the processes. They therefore proved to be a useful tool in service business. Some adjustments of the most common metrics and symbols were necessary but the value stream analyses still fulfilled their purpose; identifying waste in the process. Several identified obstacles at ScaniaFinans are characteristic in service business. For instance, the company suffers from unstable processes with several defects and inadequate information. It is possible for service companies to make tremendous improvements by increasing their process focus, which also was illustrated at ScaniaFinans. High variation in total lead time is also a main obstacle at ScaniaFinans. Standardization is a common lean tool in order to eliminate variation, although not applicable in service companies. Since handling a fluctuating demand is vital to service companies the standardization application is not suitable in that area.ScaniaFinans is therefore recommended to handle the variation with use of process control in order to attain a stable process. A factor increasing lead times at ScaniaFinans is frequent disruptions causing loss of concentration. The disruptions are mainly due to the participation of the customer in the process, which also is characteristic in service business. To attend the disruptions, ScaniaFinans are recommended to change the distribution of employees and accordingly make one individual responsible for all disruptions every day. This allows the remaining employees to execute tasks undisturbed and waste consisting loss of concentration is reduced. This master thesis illustrates how the lean concept can improve a service process by reducing waste and therefore increase the added customer value. The report implies how application of lean enables allocation and elimination of waste using value stream mapping in service companies. Since the main identified obstacles are characteristic to service companies the problem is general and is of interest for several actors in the service business.
APA, Harvard, Vancouver, ISO, and other styles
18

Henningsson, Oliver. "Värdeflödesanalys hos beställare i planeringsfasen." Thesis, Luleå tekniska universitet, Institutionen för samhällsbyggnad och naturresurser, 2021. http://urn.kb.se/resolve?urn=urn:nbn:se:ltu:diva-86291.

Full text
Abstract:
The usage of value stream mapping has to a high degree been limited to entrepreneurs in the construction phase, but it might still be possible for the client to use the tool in the planning phase. If so, this opens up for a new efficiency tool to be used by clients, which could enable economical advantages. This study is thus directed towards the investigation of value stream mapping applications by the client, through a case study at the Swedish Transport Administration. The purpose of the study is to limit waste and increase efficiency in the process activity for quality control of time, costs, and content, from descriptions of new investments until they are approved. The study also intends to investigate the possibilities of applying the Lean tool value stream mapping within the planning phase in the role as client. The study is conducted based on a qualitative strategy. Which follows that gathered data is analyzed thoroughly through the stream mapping analysis. The research approach which is applied is based upon a deductive method, which follows out of that theory concerning value stream mapping and Lean makes up the base of the study. Empirical data for the study was gathered by interviews and documents. Interviews were conducted with both a representative from the section for planning and one from the investments section from all ten of the chosen projects. This was done to get two perspectives on how the process had been conducted.  Value stream mapping were conducted by the means of five stages. The first stage concerned the definition of the process. While the second stage was based around the conductions of a current situation mapping, to conduct this, a statistical analysis was required to get the necessary values. The third stage is made up by a future situation mapping, whereby previous mapping was analyzed through a qualitative strategy, whereby waste and Lean from theory were applied. At this stage, some suggestions for improvements that could be directly implemented were produced. The fourth stage was based upon an ideal situation mapping, which was based upon the expectations that the Swedish Transport Administration have for the process for quality control of time, costs, and content. In this stage improvements that are too complicated for immediate implementation were produced. The fifth stage were based upon creating an action plan for implementation of the suggestions for improvement.  The produced suggestions in the study are the following. ·       Strengthened communication. ·       A priority list. ·       Increased transparency. ·       Increased knowledge within the process for quality control of time, costs, and content. ·       Increased flexibility. The study also clearly indicates that value stream mapping can be applied by clients within the planning phase in repetitive processes with product families.
Användandet av värdeflödesanalys (VFA) har i hög grad begränsats till produktionsfasen inom byggsektorn, men möjligheten för applicering av beställare i planeringsfasen framstår ändå möjlig. Detta öppnar upp för ett nytt effektiviseringsverktyg för beställare, vilket kan medföra ekonomiska fördelar. Studien är riktad mot att undersöka VFA appliceringsmöjligheter genom en fallstudie hos Trafikverket. Syftet för studien utgörs av att begränsa slöseri och öka effektiviteten i TKI-säkringsprocessen, från framtagande av åtgärdsbeskrivning (ÅB) tills godkännande av ÅB. Studien syftar även till att utvärdera möjligheterna för att applicera Lean verktyget värdeflödesanalys inom planeringsfasen i rollen som beställare. Studien genomförs utifrån en kvalitativ strategi. Detta följer i att inhämtad data analyseras ingående i värdeflödesanalysen. Forskningsansatsen som appliceras bygger på en deduktiv metod, vilket följer ur att både tidigare teori gällande värdeflödesanalys och Lean utgör grunden för studien. Empiri inhämtades via intervjuer och dokument. Intervjuer har genomförts med en person från Trafikverkets VO Planering och en från VO Investering för respektive av de tio projekten som studien bygger på. Detta i syfte att få två perspektiv på hur processen utförts i respektive projekt.  Värdeflödesanalysen har genomförts utifrån fem steg. Varvid det initiala steget utgjordes av att definiera processen för studien. Det andra steget utgjordes av att en nulägeskartläggning utfördes, för denna kartläggning genomfördes en statistik analys för att få fram mätvärden utifrån insamlade data. Det tredje steget utgjordes av framtidskartläggning, där föregående kartläggning analyserades ur en kvalitativ strategi, varvid slöseri och Lean från litteraturstudien applicerades. Här framtogs förbättringsförslag som kan implementeras omgående. Det fjärde steget utgjordes av att genomföra en idealkartläggning baserad på de förhoppningar som finns inom Trafikverket för TKI-säkringsprocessen. Även framtagande av förbättringsförslag som är mer komplicerade att implementera. Det femte steget utgjordes av att skapa en handlingsplan, för att implementera förbättringsförslagen.  De framtagna slutsatserna i studien utgörs av fem förbättringsförslag för Trafikverket på processen: ·       Stärkt kommunikation ·       Prioriteringslista ·       Ökad transparens ·       Ökad kompetens i TKI-säkringen ·       Ökad flexibilitet Utöver detta visar studien att värdeflödesanalys kan appliceras av beställare inom planeringsfasen på repetitiva processer med produktfamiljer.
APA, Harvard, Vancouver, ISO, and other styles
19

Lindell, Thomas. "Ordning och reda, löning på fredag : Eliminering av slöseri som en positiv överlevnadsstrategi." Thesis, Linnéuniversitetet, Institutionen för ekonomistyrning och logistik (ELO), 2013. http://urn.kb.se/resolve?urn=urn:nbn:se:lnu:diva-26454.

Full text
Abstract:
Abstract   Examensarbete, Ekonomprogrammet online, Ekonomihögskolan vid Linnéuniversitetet Företagsekonomi, Ekonomistyrning, 2FE92E, VT 2013   Författare: Thomas Lindell Handledare: Elin Funck   Titel: Ordning och reda, löning på fredag: Eliminering av slöseri som en positiv överlevnadsstrategi Bakgrund: Undersökningen har sin bakgrund i den allt större spridning som lean som produktionssystem får, och i den viktiga roll som målkongruens spelar för en framgångsrik ekonomistyrning. Undersökningen, som tar sig an de anställdas mening, erhåller sin relevans genom den stora betydelse som byggandet av en kultur och aktiviteten elimineringen av slöseri har inom lean. Kunskapen har inte utforskats. Det finns en brist inom leanforskningen när det gäller detta betydelsefulla område, och det gör problemet intressant och viktigt att utforska. Frågeställning och syfte: Frågeställningen som styrt denna uppsats lyder: Inom tillverkande företag som arbetar med lean som produktionssystem: Vilken mening kopplar de anställda till elimineringen av slöseri? Syftet med denna uppsats är att försöka identifiera samband och mönster, som kan leda fram till en förståelse av den mening som de anställda kopplar till elimineringen av slöseri. Metod: Utifrån grundad teori har urval gjorts och data insamlats via semi-strukturerade intervjuer och dokument. Intervjuer har gjorts med 13 deltagare, fördelade på två företag. Data har analyserats så att begrepp, med deras egenskaper och dimensioner, har identifierats och samband och mönster mellan dem har kartlagts, och åskådliggjorts i en modell. Resultat, slutsatser: Svaret på frågeställningen blir att meningens kärna är överlevnad. Att få behålla jobben befinner sig i centrum av denna kärna. Utanför denna kärna handlar meningen i det vardagliga arbetet med att eliminera slöseri om att skapa ordning och reda. Starka positiva känslor är kopplade till elimineringen av slöseri genom den ordning och reda som skapas. Sammantaget sätter ovanstående mening in elimineringen av slöseri i ett förklarande sammanhang.
APA, Harvard, Vancouver, ISO, and other styles
20

Sawaya, Christopher, and Boris Vukman. "Analys och utveckling av godsterminal med hjälp av Lean." Thesis, Mälardalens högskola, Innovation och produktrealisering, 2021. http://urn.kb.se/resolve?urn=urn:nbn:se:mdh:diva-55618.

Full text
Abstract:
Syfte  Att undersöka en godsterminals logistikflöde med fokus på en automatiserad paketbana för att identifiera slöseri som kan leda till att outnyttjad arbetstid och flaskhalsar. Identifiera orsaker och vidare utveckla problemlösningar som leder till fullt utnyttjad arbetskapacitet genom implementering av Lean-verktyg. Syftet med arbetet har baserats på två forskningsfrågor:   • Hur kan slöseri identifieras och kostnadsoptimeras efter användning av Lean-verktyg inom en godsterminal?   • Hur kan rotorsaker till flaskhals vid automatiserade paketbanor identifieras och motverkas genom användning av Lean-verktyg?   Metod och genomförande  Syftet med arbetet och dess forskningsfrågor har besvarats genom en fallstudie och en litteraturstudie. Fallstudien som utförts bestod av intervjuer och observationer på fallföretaget för att ta reda på hur de arbetar samt hur arbetsprocesserna är utformade för att kunna identifiera slöseri och felprioritering inom terminalens layout kring paketbanan. I litteraturstudien har teori som stödjer logistikkostnader, slöseri och Lean samlats för att kunna besvara rapportens forskningsfrågor.   Resultat  Genom användning av Lean har slöseri vid fallföretagets automatiserade paketbana kunnat identifieras. Väntan var ett av de slöseri som funnits där fokus lagts på att finna en metod för att motverka väntan och på så sätt effektivisera arbetsflödet. Onödiga transporter var också ett problem som blev tydligt vid fallstudien som genomfördes där studien kunnat resultera i avsevärd minskning av avstånd för onödiga transporter där operatörer vid paketbanan istället kan lägga tiden på värdeskapande arbete. Studien har även resulterat i att onödiga arbetsmoment reducerats genom att de identifierats vid paketbanans defektplock. Resultatet av det har frambringat tidsbesparing och en strukturerad arbetsmetod för arbetsmomentet. Samtliga identifieringar av slöseri har resulterat i att flaskhalsar kan motarbetas för att hindra produktionstopp på paketbanan.   Rekommendationer  För att företaget ska motverka flaskhalsar och identifiera slöseri på godsterminalen bör en kartläggning av alla arbetsmoment göras. Fokus bör läggas på varje arbetsmoments lönsamhet samt att personalstyrkan bör utbildas inom Lean om möjligt för att all berörd personalstyrka tillsammans ska kunna sträva mot standardisering och implementering av Lean.
APA, Harvard, Vancouver, ISO, and other styles
21

Håkansson, Andrea, and Petra Andersson. "En studie över effektiviseringsmöjligheter av fjärrvärmeinstallationer i småhus." Thesis, Tekniska Högskolan, Högskolan i Jönköping, JTH, Industriell organisation och produktion, 2014. http://urn.kb.se/resolve?urn=urn:nbn:se:hj:diva-24003.

Full text
Abstract:
Syfte: Syftet med examensarbetet är att undersöka möjligheter till effektivisering av fjärrvärmeinstallationer i småhus med hjälp Lean. Detta har gjorts genom att besvara de tre följande frågeställningarna: Hur ser en fjärrvärmeinstallation i småhus ut i dagsläget? Vilka slöserier går att identifiera i processen för fjärrvärmeinstallation i småhus? Hur kan slöserier i processen för fjärrvärmeinstallation i småhus minskas? Metod: För att uppfylla examensarbetets syfte har en fallstudie genomförts på Jönköping Energi som är en leverantör av fjärrvärme. Där har intervjuer och dokumentationsstudier använts som datainsamlingsmetoder. Litteraturstudier har gjorts för att samla in information kring teorier som sedan använts för att utvärdera och analysera empirin. Resultat: Genom studien har slöserier identifierats i processen för fjärrvärmeinstallation i småhus. Det största slöseriet som identifierats är väntan som uppstår mellan delprocesserna, vilken uppgår till 20 % av den totala ledtiden för installationen. Genom att införa ett informationssystem som täcker glappet mellan entreprenörerna och fallstudieföretaget, förändrad tidsplanering samt arbete med parallella processer anses denna väntan kunna minskas. Implikationer: Denna studie visar att med hjälp av Lean kan processen för fjärrvärmeinstallation i småhus effektiviseras och att ledtiden för processen kan förkortas genom eliminering av slöserier. Studien visar också att genom att använda periodlös planering kan ledtiden förkortas ytterligare då tidsplaneringen anpassas efter verksamheten. Begränsningar: Studien som genomförts baseras på empiri som samlats in på ett fallstudieföretag, genom att öka antalet fallstudier samt genomföra dessa på fler en ett företag ökar generaliserbarheten i resultaten.
Purpose: The purpose of this study is to investigate the possibilities for improving the efficiency of district heating installations in houses by using Lean. This is done by answering the following three questions: How is a district heating installation implemented? What types of wastes can be identified in the process of district heating installations in houses? How can wastes in the process of district heating installations in houses be reduced? Method: In order to fulfill the purpose of the study a case study has been conducted at Jönköping Energi, a supplier of district heating. Interviews and documentation studies have been used as data collection methods. Literature studies have been made to collect information on theories that were used to evaluate and analyze empirical data. Results: Wastes in the process of district heating in houses has been identified in the study. The biggest identified waste is the wait that occurs between the sub-processes, where wait reach up to 20 % of the total lead time of the installation. By implementing an information system, introducing changes in scheduling and start working in with parallel processes this wait can be reduced. Implications: This study shows that by using Lean the process of district heating installations in houses can be more efficient and that the lead time for the process can be shortened by eliminating wastes. The study also shows that by using bucketless planning, lead time can be shortened further when scheduling adapts to the process. Limitations: The study was carried out based on only one case study. By increasing the number of case studies and by carry those out in more than one company the generalizability of the results will be increased.
APA, Harvard, Vancouver, ISO, and other styles
22

Pettersson, Martina, and Elin Wästerlund. "Identifiering av slöserier på Lundbergs Plåt AB." Thesis, Jönköping University, JTH, Industrial Engineering and Management, 2010. http://urn.kb.se/resolve?urn=urn:nbn:se:hj:diva-12677.

Full text
Abstract:

Lundbergs Plåt AB is a small company situated in Jönköping. Their main task is to process different kinds of steel such as stainless steel. Lately, they have shown an interest in Lean production.

On the basis of the situation mentioned above, we developed the purpose to find and decrease the non value-added wastes in the production at Lundbergs Plåt AB. Out of this, we also developed and answered two questions:

 

  • Which wastes can be found with help from a value stream mapping (VSM)?
  • In what way can these wastes be reduced and how can these reductions contribute to an improved production?

 

VSM is the method used to find the non value-added wastes. In the context of Lean production this is a reliable method because it shows in a good way the wastes in a manufacturing process. The VSM was performed on the family of food bin, which is one of the company’s more recurring products.

 

During the analysis of the value stream we found several wastes in the manufacturing process. All categories of non value-added wastes are represented. Examples of identified wastes are unnecessary transportation and working movement. The limited access to operators who have the right competence and who are allowed to process the food bins, is in our opinion one of the factors that generate most of the non value-added wastes.

 

Several action proposals were worked out and a conclusion is that one action proposal can generate a reduction of different kind of wastes. The action proposals that can reduce the most of the non value-added wastes are a change of the layout and competence building. This means that one action proposal can reduce or eliminate several wastes at the same time.


Lundbergs Plåt AB är ett mindre företag i Jönköping vars huvudsysselsättning är plåtbearbetning. På senare tid har ett intresse väckts för att undersöka vad Lean skulle kunna ge deras företag.

Utifrån ovanstående formulerades syftet att finna och minska de så kallade ”sju slöserierna + ett” som finns beskrivna inom Lean. Utifrån detta preciserades två frågeställningar:

  • Vilka slöserier går att urskilja med hjälp av en värdeflödesanalys?
  • På vilket sätt kan dessa slöserier minskas och bidra till en förbättrad produktion?

Metoden som användes i sökandet efter slöserierna är en värdeflödesanalys,som är en väl beprövad metod i Lean-sammanhang. Detta för att den på ett bra sätt för upp slöserierna i ett tillverkningsflöde till ytan.

Värdeflödesanalysen utfördes på produktfamiljen livsmedelsbehållare som är en av företagets mer frekventa produkter.

Under analysen av värdeflödet fann vi ett flertal slöserier i tillverkningsflödet. Samtliga kategorier av de ”sju slöserierna + ett” finns representerade. De största slöserierna är enligt vår bedömning de som uppkommer till följd av företagets begränsade tillgång på operatörer som kan och tillåts bearbeta behållarna. Andra identifierade slöserier är onödiga transporter och arbetsmoment som sker i tillverkningen.

Förbättringsförslagen arbetades fram utifrån syftet att minska och eliminera funna slöserier. De åtgärder som kan minska flest antal slöserier är layoutändring av produktion och flöde samt kompetensutveckling av personalen. Detta innebär att ett och samma åtgärdsförslag kan generera flera minskade eller eliminerade slöserier.

APA, Harvard, Vancouver, ISO, and other styles
23

Wolfram, Joakim, and Jonas Lundin. "Förbättringsmöjligheter inom prefabproduktion : En undersökning av BoKlok-fabriken i Gullringen." Thesis, Örebro universitet, Akademin för naturvetenskap och teknik, 2011. http://urn.kb.se/resolve?urn=urn:nbn:se:oru:diva-16612.

Full text
APA, Harvard, Vancouver, ISO, and other styles
24

Nählstedt, Kristoffer, Martin Norén, and Oscar Weberg. "En fallstudie om e-handel : Identifierade slöserier i returflödet." Thesis, Linnéuniversitetet, Institutionen för ekonomistyrning och logistik (ELO), 2016. http://urn.kb.se/resolve?urn=urn:nbn:se:lnu:diva-53375.

Full text
Abstract:
Kurs: Ämnesfördjupande kurs i logistik, 2FE02E, VT 2015 Författare: Martin Norén Kristoffer Nählstedt och Oscar Weberg Handledare: Petra Andersson Examinator: Åsa Gustafsson Titel: En fallstudie om e-handel – Identifierade slöserier i returflödet Bakgrund: I en bransch med mycket returer krävs en effektiv hantering av returer för att inte kostnaderna ska skena iväg. Hela returflödet behöver vara smidigt för att snabbt få ut returnerade varor på marknaden igen. Hur ser ett returflöde ut i nuläget på ett företag i e-handelsbranschen? Returflödet kommer undersökas genom en fallstudie på ett företag. Genom att identifiera slöserier enligt Lean Production förväntas denna uppsats eliminera eller åtminstone reducera identifierade slöserier. Syfte: Syftet med uppsatsen är att identifiera slöserier i returflödet och presentera förbättringsförslag som reducerar nämnda slöserier. Metod: Studien har utförts som en kvalitativ fallstudie med ett deduktivt angreppssätt och ett postpositivistisk synsätt.  Primärdatan har samlats in genom semi-strukturerade intervjuer och observationer. Slutsats: Efter en genomförd Value Stream Mapping analyserar författarna returflödes nuvarande tillstånd. Därefter identifieras slöserier och orsakerna till varför slöserierna uppstår. I slutsatsen presenteras förslag på förbättringar såsom att öka andelen webbreturer och minska avstånden inom lagret.
APA, Harvard, Vancouver, ISO, and other styles
25

Bawaqneh, Mahdi. "Effektivisering av ventilationsprojekt : Bravida Filial Uppsala." Thesis, Uppsala universitet, Industriell teknik, 2013. http://urn.kb.se/resolve?urn=urn:nbn:se:uu:diva-217938.

Full text
Abstract:
In recent years the construction industry has been exposed to increased time pressure which has resulted in a higher amount of wastage. Today 35 % of all construction projects in Sweden is "wasted". Time pressure has risen due to increased competition on the market, with more actors entering the construction business, therefore profit margins decreased which has led to a more pressing need for decreasing the amount of wastage. Bravida is Scandinavia's largest supplier of installations and provides specialist services in electrical installations (heating and sanitation), and ventilation. Mahdi Bawaqneh's task was to investigate where, how and why wastage occurs in the company's projects and how to prevent such wastage. The thesis covers the subjects of lean production, communication in projects and planning of projects. Mahdi Bawaqneh has chosen to use interviews and participant observations to understand Bravida's organization. For the best purposes of the thesis, Mahdi decided to focus on examining two projects in detail, namely Brf in Märsta and Skandionkliniken in Uppsala. The conclusion of the thesis presents that problems may always arise, however it is possible to prevent them. The main difficulties discovered in the thesis are the lack of information in some parts of the process, drawing and communication problems, and finally the lack of cohesion and thematic sense among employees. In order for Bravida to develop and remain competitive on the marketplace a higher level of commitment and willingness to improve is required from the entire company, as well as patience, when it comes to the implementation of the proposed solutions. The thesis project resulted in a number of improvement proposals for the identified problems. These suggestions for development are intended to prevent future wastage in prospective and upcoming projects.
APA, Harvard, Vancouver, ISO, and other styles
26

Abrahamsson, Catrin, and Elizabeth Blixt. "Lean - effektivitet och minskning av slöseri till priset av stress? : En kvalitativ studie av teamworks och kommunikationens påverkan på anställdas upplevda stress." Thesis, Örebro universitet, Handelshögskolan vid Örebro Universitet, 2016. http://urn.kb.se/resolve?urn=urn:nbn:se:oru:diva-52015.

Full text
APA, Harvard, Vancouver, ISO, and other styles
27

Ahrengart, Emelie, and Elsa Häggström. "Exploring Lean in construction projects : How can the workflow be improved by observing value streams?" Thesis, KTH, Ledning och organisering i byggande och förvaltning, 2020. http://urn.kb.se/resolve?urn=urn:nbn:se:kth:diva-277006.

Full text
Abstract:
Research reveal that the construction industry does not have the same level of growth and development in performance compared to the manufacturing industry, and that Lean could be one solution to improve performance. Most research about Lean in the construction industry that exist today focus on simulating future scenarios. Hence miss analysing the impact Lean has on the current situation of construction projects, and its usability and possibility to set the framework for how to improve performances in construction projects. Thus, there is a gap in research concerning the evaluation on current process flows. This research explores Lean as a management method to understand how it has been used in the construction industry and how it could be used in construction projects to improve process flows. This will be done by using the method Value Stream Mapping, a method within Lean that is used to identify Non-Value-Adding activities in the process flow to point out what activities can be improved. The case study in this research explores two different value streams within two construction projects; deliveries and mounting one side of the framework of interior walls. Thus, the research will explore if and how the value stream differentiates between the two projects, with the aim to understand the reason for the results to understand how future construction projects could improve their process flows within a value stream. Data will be collected and analysed qualitative by combining observations and interviews. The value stream for deliveries differentiated between the projects. Project A had 73% Non-Value-Adding activities with a cycle time of 3,1 m2/min whilst Project B had 65% with a cycle time of 2,7 m2/min. In both projects Non-Value-Adding activities were categorized as Waiting, Movement, Transport and Overproduction. The value stream for mounting in Project A had 31% Non-Value-Adding activities with a cycle time of 2,9 m2/hour whilst Project B had 41% Non-Value-Adding activities with a cycle time of 1,7 m2/hour. In both project activities were categorized as Waiting, Transport, Incorrect processing and Movement. However, in Project B Overproduction was also identified as a Non-Value-Adding activity. Findings from the study shows that even though construction projects are complex and consist of variabilities, it is possible to observe value streams to identify Non-Value-Adding activities. Nevertheless, it is crucial to adjust the method to the construction industry since the theory of Value Stream Mapping originate from the manufacturing industry. This research recommends excluding number of resources as a category from the method and instead evaluate resources based on the total time, and to categorize inspections and reading drawing as Value-Adding activities instead of Non-Value-Adding. The study reveals that construction projects that work with Lean and its method Value Stream Mapping are given new opportunities to improve process flows. Thus, construction projects could be able to improve processes without needing to invest in more resources, material and tools. Not only could projects lower construction costs but also improve production time as Non-Value-Adding activities are reduced. Thus, the research believes Lean and its method Value Stream Mapping could improve performances within the construction industry.
Tidigare forskning menar att Lean skulle kunna vara en lösning på det faktum att byggindustrin inte har haft lika stor tillväxt och utveckling som bilindustrin. Den forskning som finns idag gällande Lean i byggindustrin fokuserar på att simulera framtida scenarier av den effekt Lean skulle kunna ge. Därav försummas analysering av den faktiska effekten Lean har i pågående situationer samt användbarheten och möjligheten att fastställa ramverk för hur man kan förbättra prestationer och tillväxt i byggprojekt. Denna studie utforskar Lean som en ledarskapsmetod. Studien fördjupar sig i Lean för att förstå hur det tidigare har använts i byggindustrin och förstå dess användbarhet och möjlighet att förbättra processflöden i byggprojekt. Value Stream Mapping, en metod inom Lean kommer att användas för att identifiera icke-värdeskapande aktiviteter i process flöden samt för att se vilka aktiviteter som kan förbättras eller elimineras. Fallstudien i denna forskning undersöker två olika värdeflöden inom två byggprojekt; ta emot leveranser och enkling av innerväggarna. Studien kommer att undersöka om och hur värdeflödena skiljer sig mellan de två projekten, med syfte att förstå orsaken till resultaten och förstå hur framtida byggprojekt kan förbättra processer inom värdeflödena. Data samlas in och analyseras kvalitativt genom att kombinera observationer och intervjuer. I värdeflödet för leveranser hade Projekt A 73% icke-värdeskapande aktiviteter med en produktionstid på 3,1 m2/min medan Projekt B hade 65% icke-värdeskapande aktiviteter med en produktionstid på 2,7 m2/min. Aktiviteterna i projekten kategoriserades som slöseri i form av, väntande, rörelse, transport och överproduktion. I värdeflödet för monteringen hade Projekt A 31% icke-värdeskapande aktiviteter med en produktionstid på 2,9 m2/h medan Projekt B hade 41% icke-värdeskapande aktiviteter med en produktionstid på 1,7 m2/h. I. I båda projekten kategoriserades icke-värdeskapande aktiviteter som slöseri i form av, väntande, rörelse, transport och fel bearbetning. Projekt B hade även slöseri i form av överproduktion. Studien visar att trots att byggprojekt är komplexa och varierande, är det möjligt att observera värdeströmmar för att identifiera aktiviteter som inte tillför värde. Det är däremot nödvändigt att anpassa metoden till byggindustrin då Value Stream Mapping grundar sin teori från bilindustrin. Studien rekommenderar att utesluta antalet resurser som en slöserikategori och istället utvärdera resurser genom att se på den totala tiden samt att kategorisera inspektioner och läsa ritning som värdeskapande aktiviteter i stället för icke-värdeskapande. Studien visar att byggprojekt som arbetar med Lean och dess metod Value Stream Mapping ges möjligheter att förbättra sina processflöden. Således skulle byggprojekt kunna förbättra processer utan att behöva investera i mer resurser, material och verktyg och därmed kunna sänka byggkostnaderna. Slutligen skulle byggprojekt kunna förbättra sina produktionstider då icke-värdeskapande aktiviteter reduceras. Studien visar därmed att Lean och dess metod Value Stream Mapping skulle kunna förbättra tillväxten inom byggindustrin.
APA, Harvard, Vancouver, ISO, and other styles
28

Forsberg, Veronica. "VSM for a car dealer." Thesis, Linköpings universitet, Kommunikations- och transportsystem, 2016. http://urn.kb.se/resolve?urn=urn:nbn:se:liu:diva-133209.

Full text
Abstract:
På Söderbergs Personbilar i Norrköping AB bedrivs en serviceprocess för begagnade bilar, en tjänsteverksamhet som idag är präglad av en stor ineffektivitet med avseende på tid. I detta examensarbete utförs en fallstudie på företaget där problemet analyseras i syfte att identifiera det tidssvinn som förekommer i processen, utreda dess uppkomst, samt formulera passande åtgärdsförslag till företaget som vid ett genomförande skulle minska genomloppstiden för bilarna i processen. Intervjuer och observationer har skapat en övergripande förståelse för processen, där förklaringar har erhållits om hur processen är tänkt att fungera, hur den fungerar i praktiken, och varför den fungerar som den gör. Som komplement till detta har värdeflödeskartläggning av två bilar genomförts, där bilarnas färd genom processen studerades i praktiken. De två bilarna studerades från dess inkommande till företaget tills det att de var klara till försäljning. Genom detta erhölls ytterligare information om processen. I värdeflödeskartläggningen framkom det att tidssvinnet var stort för bägge bilar, och att andelen tid för värdehöjande aktiviteter var mycket liten för bilarna. Allt material om processen analyseras och ett antal olika åtgärdsförslag för processen är framarbetade till företaget. Tre huvudåtgärder presenteras som vid ett införande troligen skulle underlätta avsevärt för företaget vid ett genomförande av övriga åtgärdsförslag. Den första av dessa tre huvudåtgärder är att tillsätta en ledare för processen, något som saknas idag. Ledaren ska ha befogenheter att genomföra förändringar i processen, och ska arbeta för en ständig förbättring av processen. Den andra huvudåtgärden är att utveckla nedskrivna standarder för personalen som beskriver hur alla aktiviteter inom processen ska utföras. Standarderna ska vara utformade så att aktiviteterna utförs på ett optimalt sätt. Den tredje huvudåtgärden är att göra fler resurser dedikerade inom processen. Dessa tre åtgärder, och övriga åtgärdsförslag skulle med största sannolikhet generera en avsevärt kortare genomloppstid för bilarna, det vill säga precis det resultat som eftersöks i processen.
APA, Harvard, Vancouver, ISO, and other styles
29

Karlsson, Martin, and Fredrik Landegren. "Identifiering och uppföljning av dagliga fel och brister på byggarbetsplatsen : Samt hur dessa kan hanteras enligt Lean-koncepttänkande." Thesis, Mälardalen University, School of Sustainable Development of Society and Technology, 2008. http://urn.kb.se/resolve?urn=urn:nbn:se:mdh:diva-4296.

Full text
Abstract:

Byggbranschen brottas idag med en hel del fel och brister i byggprocessen. Exempel på problem är bl.a. höga byggkostnader, kvalitetsbrister samt att det förekommer slarv och okunskap. Produktiviteten i byggbranschen har inte utvecklats lika mycket som i tillverkningsindustrin som använder sin ledningsfilosofi Lean Production.

Syftet med detta examensarbete är att få insikt i vilka vanliga fel och brister som förekommer i byggbranschen, samt att kunna ge förslag till förbättringar i enlighet med lean-tänkande. När man talar om Lean i byggsammanhang benämns det Lean Construction. Lean Construction har sin teoretiska bakgrund i verkstadsindustrins Lean Production och Lean Thinking.

Lean Production är en industriell produktionsmetod vars syfte är att öka produktionseffektiviteten och har sin bakgrund i japanska bilindustrin. Lean Thinking är en vidareutveckling av Lean Production och är ett begrepp som används för att omfatta fler branscher utöver tillverkningsindustrin. Att arbeta enligt Lean innebär att hela tiden arbeta med ständiga förbättringar samt att identifiera och eliminera allt slöseri. Slöseri kan ses som en aktivitet som inte skapar något värde för kunden men som ändå förbrukar resurser.

När man tillämpar Lean i sin organisation så analyserar man hur en effektivisering kan ske utifrån sin egen produktionsprocess. Några av grundelementen inom Lean är Kaizen som betyder ständiga förbättringar samt Just In Time.

Det har utförts vissa studier kring slöseri i byggbranschen, delar av dessa presenteras i denna rapport. Det som kartlagts som slöseri är bl.a. omarbete, materialspill, överproduktion och väntan hos personal. Det är utifrån dessa kartlagda slöserier som vi har utformat enkäterna i vår undersökningsstudie.

Studien visar inte på några större skillnader mellan platschefer/arbetsledare och yrkesarbetare vad det gäller deras uppfattning om vilka fel och brister som är vanligt förekommande. Båda yrkeskategorierna är överens om att slöseri kan minskas, t ex genom effektivare materialhantering på byggarbetsplatserna och bättre kommunikation och planering på alla plan.


The Construction industry struggles with quality deviances and defects in the building process. Various kinds of problem are for example expensive costs for production, defects in quality and negligence and ignorance in the industry in general. The development of productivity in building process has not progressed at the same rate as companies within manufacturing industry who are using the Lean Production philosophy.

The purpose whit this degree project is to bring knowledge about what kind of deviances and defects that exist in the industry, and to recommend suggestions for improvements in accordance with Lean Thinking. When you speak about Lean in the construction business it is called Lean Construction. Lean Construction has its theoretical background in the engineering industries Lean Production and Lean Thinking.

Lean Production is an industrial production method which purpose is to increase the effectiveness of production. It originates from the car-industry in Japan. The concept of Lean Thinking is a further development of Lean Production and it includes all industries, not just the manufacturing industry. To work according to Lean means that you all the time tries to achieve constant improvements and to identify and eliminate all kinds of waste in time and materials. Waste can be seen as an activity that do not create any added value for the customer but still however consume resources.

While implementing and using Lean in your business corporation you have to analyze how a potentiate can be achieved outgoing from the existing production process. Some main elements within Lean are Kaizen, which means constant improvements, and Just In Time.

There have been many studies about waste in production in the construction industry. Some are introduced in this report. Activities that have been identified as waste are among others reworking, waste of material, overproduction and misplanning causing waiting times among employees. Based on these ascertained wastages we have formulated the questionnaire study.

The study does not show large differences between local managers/team leaders and construction workers when it comes to their opinion about what kinds of deviances and defects they find as frequent. The both professions agree that waste can be reduced, by the way of for example efficacious material handling on the building sites and better communication and planning on several levels.

Keywords: Building process, Lean Construction, Wasting, Kaizen and Just In Time

APA, Harvard, Vancouver, ISO, and other styles
30

Berggren, Olof, and Linus Kjellberg. "Icke värdeskapande aktiviteter inom byggproduktion." Thesis, Uppsala universitet, Byggteknik, 2019. http://urn.kb.se/resolve?urn=urn:nbn:se:uu:diva-391389.

Full text
Abstract:
The purpose of this thesis is to enlighten Boetten Bygg ABconcerning Lean Construction and its methods, which can benefittheir work towards reduction of non-valuable activities during theproduction phase. The examination took place at two projects thatBoetten is working with in Sigtuna and Sollentuna. Both projectswere in the same phase. The method used were to visit the projectsand get an overview of how they’re working today. This was done byattending weekly meetings between the leading parties from Boettenas well as the leading persons from each of the contractors, wealso handed out a survey where the participants evaluate theproblems that can occur. The literature study lifts the basic principles of LeanConstruction, where we have chosen to focus on three differentLean methods that may help Boetten to decrease the wastingactivities in their future projects. We adressed the procurementof a project to lift the pros and cons that this contributes. Byusing this theory, we have discussed the subject round thequestion formulation: •Where in the production process is the biggest potential fordecreasing wasting activities? •Which Lean methods would generate the most valuable improvementadjusted to their organization? •How can Boetten go through with a change in the productionprocess? The gathered result shows the three dominating problem areas werewaiting, the arrangement on the construction site and thecommunication between involved parties. Based on the result wediscussed Boettens way of working to narrate, with grounds fromthe literature study, how an improvement may be carried out. Thestudy shows that an implementation of Lean Construction has thepossibility to minimize the wastage. The methods which wereconsidered to make the biggest change concerning wastingactivities were 5S, Just-In-Time and Last Planner. In order forthis to be possible, a strategy decision is required at amanagement level
APA, Harvard, Vancouver, ISO, and other styles
31

Smith, Filip, and Maja Eriksson. "Kvalitetssäkring och ledtidsreducering av produktionsprocess – brandsågen." Thesis, Örebro universitet, Institutionen för naturvetenskap och teknik, 2020. http://urn.kb.se/resolve?urn=urn:nbn:se:oru:diva-86099.

Full text
Abstract:
Detta arbete har utförts på avdelningen för produktion av brandglas hos en av Sveriges främsta glasleverantörer, Martin G Anderson. Företaget upplever i dagsläget låg lönsamhet för deras brandglasprodukter. Anledningen till detta beror på problem i form av långa ledtider, stökiga arbetsutrymmen och allmän oreda på avdelningen. Målet med arbetet har således fokuserat på att kartlägga slöserier i tillverkningsprocessen för brandglas som ger upphov till dessa problem, samt reducera ledtiden och samtidigt kvalitetssäkra processen. Arbetets metodgång är av en analyserande karaktär, där en stor del av tiden ägnats åt insamling av data i form av observationer, intervjuer samt litteraturstudier.  Arbetet initierades med att undersöka nuläget och utföra en nulägesanalys. Manuella tidtagningar utfördes under fyra veckor i syfte att få en bild över hur ledtiden ser ut i dagsläget. Därefter användes verktyg inom Lean för att analysera den information som sammanställts i nulägesbeskrivningen. Exempel på verktyg som tillämpats är styrdiagram, 7+1 leanslöserier samt rotorsaksverktyget 5 varför.  När nuläget var känt och insamlad data analyserad, tillämpades Lean verktyget 5S för att reducera de slöseri som identifierats i processen. En ny manuell tidtagning utfördes där resultatet visar en 19% reducering av ledtiden. Slutligen presenteras förslag till fortsatt arbete. Dessa förslag består bland annat av fortsatt tillämpning av verktyget 5S, men även hur en mer hållbar process kan åstadkommas utifrån social hållbarhet.
This project has been carried out in the department for the production of fire-resistant glass products at one of Sweden's leading glass suppliers, Martin G Anderson. The company currently experiences low profitability for their fire-glass products. The reason for this is due to problems in the form of long lead times, messy areas and general disorder in the department. The goal of the project has thus been focused on locating wastes in the production process for fire-resistant glass that causes these problems, as well as reducing lead time and at the same time assuring a high process quality. The methodology of the work is of an analytical nature, where a large part of the time has been devoted to the collection of data in the form of observations, interviews and literature studies. The project was initiated by investigating the current situation and performing a current situation analysis. Manual timings were carried out during four weeks in order to get a picture of what the lead time looks like today. Subsequently, tools within Lean were used to analyze the information compiled in the current description. Examples of tools used are control diagrams, 7 + 1 lean waste and the root cause analysis 5 why. Once the known state and collected data were analyzed, the Lean tool 5S was applied to reduce the waste identified in the process. A new manual timing was performed where the result shows a 19% reduction in lead time. Finally, proposals for further work are presented. These proposals include, among other things, continued application of the 5S tool, but also how a more sustainable process can be achieved based on social sustainability.
APA, Harvard, Vancouver, ISO, and other styles
32

Quincoses, Annette, and Malin Andersson. "Tidseffektivisering av inköpsprocessen på Mape Sweden AB." Thesis, Högskolan Väst, Avdelningen för maskinteknik och naturvetenskap, 2015. http://urn.kb.se/resolve?urn=urn:nbn:se:hv:diva-7757.

Full text
Abstract:
Detta examensarbete har genomförts på Mape Sweden AB med syfte att eliminera eller minska icke värdeskapande aktiviteter inom inköpsprocessen. Genom att undersöka hur fö-retaget arbetar med inköp och dess inköpsaktiviteter för verktyg och reservdelar är målet att hitta lösningar som innebär en tidseffektivisering av inköpsprocessen. Arbetet är av kvalitativ karaktär. Denna ansats valdes då gruppen ville få en förståelse över nuläget genom kvalitativa metoder. Metoderna som använts för att samla in data till arbetet var observationer och intervjuer, en litteraturstudie samt benchmarking på ett annat tillver-kande företag. För att ta fram förbättringsförslag till företaget utfördes ett spagettidiagram över förflyttningar. En tidsstudie genomfördes för att kunna jämföra tiderna innan och efter implementering av förbättringsförslagen. Vid analysen av nuläget framkom att olika typer av inköp görs av olika personer på företaget, vilket resulterar i att det inte finns ett standardiserat arbetssätt. Spagettidiagrammet över för-flyttningar vid godsuttag och godsmottagning visade att många förflyttningar görs och att ett stort antal av dem är onödiga. Genom denna information samt den information som erhållits från benchmarkingen tog gruppen fram förbättringsförslag. Förbättringsförslaget innebär för godsuttag att operatörerna själva skriver in sina uttag i affärssystemet SAP. För godsmottag-ningen var förbättringsförslagen att endast göra godsmottagning en gång per dag, att placera en hylla för ej lagerlagda verktyg och en hylla för förnödenheter i verktygsboden samt att ställa krav på leverantörerna att alltid ha med artikelnummer och lagerplats på följesedeln som medföljer alla leveranser. Vid införande av förbättringsförslagen kommer den totala tiden som läggs på godsuttag och godsmottagning minska från 6 timmar, 40 minuter och 23 sekunder till 1 timma och 58 mi-nuter, vilket motsvarar en minskning av tiden på 70 %. I framtiden rekommenderas att förbättringsförslagen även implementeras på andra typer av inköp inom företaget samt att företaget vidare undersöker fördelarna med verktygsskåp och skanningssystem.
This Bachelor's Thesis has been performed at Mape Sweden AB with the purpose of elimi-nate or reduce the non-value adding activities within the purchasing process. By examining the company's purchasing process for tools and spare parts, the goal is to find solutions that will entail time-efficiency in the purchasing process. The work in this thesis is of qualitative nature. This approach was chosen to obtain an un-derstanding of the current situation with qualitative methods. To collect data the group per-formed several observations and interviews, literature reviews and a benchmarking at a dif-ferent manufacturing company. To develop proposals for improvements to the company, a spaghetti diagram was conducted tracking all movements at goods-withdrawal and goods-receipt. A time study was conducted to compare the times before and after implementation of improvement proposals. The current situation analysis showed that purchases are made by different people resulting in that there is not a standardized approach. Spaghetti diagram of movements in goods-withdrawal and goods-receipt showed that there is numerous movements and some of them are unnecessary. Proposals for improvements was conducted based on the information from current situation analysis together with information obtained from benchmarking. The pro-posal for goods-withdrawal was that the workers themselves enter goods-withdrawal in the SAP-system. The proposals for goods-reception was to receive the goods once a day, place a shelf for non-stocked tools and a shelf for supplies in the tool shed as well as making demands on suppliers to always have the part number and stock location on the packing slip included with all deliveries. .When implementing the groups proposed improvements, the total time spent on goods-receiving and goods-withdrawal was reduced from 6 hours, 40 minutes and 23 seconds to 1 hour and 58 minutes, which represents a decrease of 70%. For future work the group recommend that the improvement proposals also be implemented on other types of purchases within the company and that the company further investigate the benefits of tool cabinet and scan-ning systems.
APA, Harvard, Vancouver, ISO, and other styles
33

Shadrooh, Benjamin. "Logistikens betydelse inom byggsektorn Logistikkvot i Byggkostnad." Thesis, Högskolan i Borås, Institutionen Ingenjörshögskolan, 2011. http://urn.kb.se/resolve?urn=urn:nbn:se:hb:diva-20783.

Full text
Abstract:
Detta examensarbete är en studie som syftar till att undersöka och belysa vikten av logistikens betydelse inom byggsektorn och dess nödvändiga tillämpning för byggbranschen. Ett annat syfte är att undersöka logistikkvoten i byggnadskostnad inom byggföretaget wäst-Bygg och jämföra de med att par andra byggföretag inom byggbranschen.Det finns studier som visar att det finns stora kostnader i byggsektorn som är dold i form av slöseri. I byggbranschen kan detta slöseri vara så högt som 30 % av produktionskostnaden, vilket skulle innebära att så mycket som 50 % av byggkostnaden kan vara rent slöseri. Studien (Josephson, Saukkorripi, 2005) visar att dessa kostnader kan sänkas betydligt mycket genom att fokusera på att minimera andelen slöseriet.Ett viktigt område där det finns en stor besparingspotential och förbättringsmöjligheter för den väl behövande byggsektorn är logistik och materialhantering.Byggföretag kan ha stor nytta av att veta sin logistikkvot i byggkostnad för att lättare kunna bedöma graden av slöseri och de kan även förbättra sin lönsamhet och effektivisera byggproduktionen genom logistiska rutiner.Om man hårdrar begreppet slöseri i byggprocessen, så är det ju egentligen lika med allt som inte tillför ett värde till slutprodukten ur användarens perspektiv. Men det gäller att se begreppet ur en positiv synvinkel och försöka hitta de förbättringar som kan ge störst effektivitetsvinst (Josephson, Saukkorripi, 2005).
APA, Harvard, Vancouver, ISO, and other styles
34

Svensson, Ivan, and Elin Berglund. "At the heart of it all : A value stream mapping of the heart emergency at Danderyds Sjukhus AB." Thesis, KTH, Industriell ekonomi och organisation (Inst.), 2015. http://urn.kb.se/resolve?urn=urn:nbn:se:kth:diva-170535.

Full text
Abstract:
Dagens situation med en åldrande befolkning som leder till en större förekomst av allvarliga kroniska sjukdomar gör att sjukvården står inför nya utmaningar. Då de flesta vårdinrättningar har en mycket hög beläggning och begränsade resurser har man börjat använda sig av produktionsstrategier som traditionellt använts i mer industrinära miljöer, exempelvis Lean production. I denna studie har värdeflödet kartlagts och analyserats för besök vid hjärtakuten på Danderyds Sjukhus AB. Detta har genomförts med hjälp av fältstudieobservationer och intervjuer, för att undersöka verksamheten på en vårdinstitution som arbetar enligt Lean healthcare. Studien har genomförts för att identifiera potentiella förbättringsområden och förändringar inom dessa, som kan leda till effektivare patientflöde. Resultaten av vår fallstudie tyder på att det förekommer icke-värdeskapande inslag relaterade till Transport, Motion, Waiting, Overproduction & Over processing, Defects, Confusion och People på hjärtakuten. Den vanligaste orsaken till slöseri har upptäckts vara kopplad till arbetsrutiner och hur väl dessa rutiner följs, även om problem relaterade till kommunikation och arbetsplatskultur också har upptäckts. Vår främsta rekommendation för att effektivisera verksamheten på akuten är att skapa standardiserade rutiner som är lätta för personalen att följa. Studien och dess resultat kan ses som ett bidrag till den generella diskursen på områdena Lean healthcare, kartläggning samt analys av värdeflöden. Den kan även användas av vårdinrättningar liknande fallkliniken som är i stånd att genomföra en värdeflödesanalys.
The aging population and higher occurrence of chronic diseases today has healthcare facing a very high occupancy and limited resources. To meet rising demands, many healthcare institutions have adapted operational strategies traditionally used in more industrial settings such as Lean production. In this study, the value flow during emergency visits to the heart emergency at Danderyds hospital (Danderyds Sjukhus AB) was mapped and analysed through observations and interviews. The aim was to identify potential changes that might render a more efficient patient flow and improve the operations at a healthcare institution working in accordance with Lean healthcare. The findings from the study show that waste related to Transport, Motion, Waiting, Overproduction & Over processing, Defects, Confusion and People exists at the heart emergency. The most common source of waste is related to routines and compliance to them among the staff, all though some issues related to communication and workplace culture were also discovered. Our main suggestion is therefore to establish standardised routines that are easy to follow for the staff at the clinic, to make emergency visits and patient flow more efficient. The study and its findings can be seen as a general contribution to the discourse regarding Lean healthcare, value stream mapping and analysing. It can also be used by healthcare institutions similar to the case clinic, about to perform an analysis of the value stream.
APA, Harvard, Vancouver, ISO, and other styles
35

Jonsson, Mattias, and Moa Kolvereid. "Effektivisering av automatlager och formatsåg : En fallstudie vid AB Edsbyverken." Thesis, Högskolan i Gävle, Industriell ekonomi, 2021. http://urn.kb.se/resolve?urn=urn:nbn:se:hig:diva-36870.

Full text
Abstract:
In today’s industry, efficient production is important for manufacturing companies to pursue. By improving efficiency, the companies can use less time and fewer resources to achieve the same performance, or even surpass the previous one. According to the concept of lean production, the performance efficiency can be increased by identifying waste within the business and counteract them.  The purpose of this thesis was to study the flow of material between an automation storage system and an angular saw unit. In addition, suggestions for efficiency improvements were made on the interaction between the storage system and the angular saw unit. The focus was on waste, tied up capital, inventory, time reduction and production planning. The methods used were observations and interviews. The suggestions presented were: invest in an IT-system to gather data and allow inter-machine communication, define needed levels of material to storage to reduce capital tied up, standardize the concept of pre-stacking, use production planning, use a manual standard procedure when deviations occur, balance the flow between the storage system and the saw in pull fashion. The conclusion shows that the material flow between the storage system and the angular saw unit can be improved and become more efficient if the company implement our suggestions.
APA, Harvard, Vancouver, ISO, and other styles
36

Karlsson, Jonas. "Icke värdeskapande aktiviteter - En undersökning av slöserier på byggprojektet "Trädgårdarna"." Thesis, Örebro universitet, Institutionen för naturvetenskap och teknik, 2015. http://urn.kb.se/resolve?urn=urn:nbn:se:oru:diva-45684.

Full text
Abstract:
Inom byggbranschen är det av vikt att hitta arbetssätt som på lång sikt sänker byggkostnaderna för att på så sätt kunna producera en vara som kräver mindre förbrukning av resurser men som även fortsätter vara konkurrenskraftig. Syftet med detta examensarbete är att undersöka hur medarbetarna vid Skanskas byggprojekt "Trädgårdarna" i Boglundsängen, Örebro kommun, arbetar för att minimera slöserier (icke värdeskapande aktiviteter). Syftet är även att identifiera vanliga slöserier som förekommer, både generellt på byggarbetsplatser men i synnerhet på byggprojektet "Trädgårdarna", samt att slutligen komma med förslag på åtgärder för att mini-mera dessa slöserier. Arbetet grundar sig på en kvalitativ metod i form av intervjuer och obser-vationer. När detta arbete skrevs var produktionen i ett tidigt stadie. Arbetets resultat påvisar att det finns både styrkor och brister gällande hur arbetet på "Trädgårdarna" fortskrider. Även fast produktionen i skrivandets stund inte har kommit så långt på projektet framkommer det av resultatet att personalen värdesätter ordning och reda och försöker upprätthålla detta genom olika tillvägagångssätt. Överlag arbetar personalen bra med att minska slöserier på arbets-platsen. De slöserier som har uppstått beror främst på brister i projekteringen och/eller produktionsplaneringen. För att minska slöserierna och upprätthålla ett effektivt arbetssätt är det av stor vikt att ha en genomarbetad projektering, genomföra arbetsberedningar på så många moment som möjligt, ha god ordning och reda på arbetsplatsen, ta tillvara på personalens kunskap och engagemang samt att utnyttja någon form av samordnad leverans för att minimera lagerhållningen och väntetiderna.
In the construction industry it is important to find ways of working that in the long term lowers construction costs so as to produce a product that requires less consumption of resources, but which also continues to be competitive. The purpose of this thesis is to investigate how employees at Skanska's construction project "Trädgårdarna" in Boglundsängen, Örebro, work to minimize wastes (non value-adding activities). It also seeks to identify common wastes that occur, both generally on construction sites but in particular on the building project "Trädgårdarna", and finally to come up with suggestions on measures to minimize these wastes. This thesis is based on a qualitative method in the form of interviews and observations. When this thesis was written production was at an early stage. The results of this thesis demonstrate that there are both strengths and weaknesses regarding how work on "Trädgårdarna" is pro-gressing. Although the production was in an early stage, during the time of writing this thesis, the results show that the staff appreciates orderliness at their workplace and try to maintain this through different means. Overall, the staff work well to reduce wastage in the workplace. The wastes which have arisen primarily did so due to deficiencies in the design and/or production planning. To reduce the wastage rate and maintain an effective work it is of great importance to have a well-planned design, to implement work preparations as frequently as possible, to have an orderly workplace, to take advantage of the staff's knowledge and commitment and to use some form of coordinated delivery system to minimize inventory and waiting times.
APA, Harvard, Vancouver, ISO, and other styles
37

Forsström, Ludvig, Tobias Lundin, and Anton Thorin. "Intern och vertikal logistik inom projektet Björnflokan." Thesis, Högskolan i Borås, Akademin för textil, teknik och ekonomi, 2021. http://urn.kb.se/resolve?urn=urn:nbn:se:hb:diva-25496.

Full text
Abstract:
Byggbranschen har under senare år utvecklat logistiken, detta för att konkurrensen på marknaden blivit hårdare och därmed har marginalerna minskat. Denna rapport granskar internlogistisken på projekt Björnflokan i Borås. Bygget består av tre flerbostadshus, ett parkeringshus, en förskola samt lokaler på en begränsad yta vilket medför logistiska utmaningar. Syftet med studien är att undersöka hur den interna logistiken fungerar i praktiken och om det går att genom bättre planering och kommunikation effektivisera byggproduktionen inom projekt Björnflokan. Studien har granskat interna logistiken vid byggnation av flerbostadshusen. Undersökningen förhåller sig till kvalitativa metoder. Studien innehåller intervjuer av semistrukturerad karaktär samt kompletterande fältstudier. Intervjuer genomförs med anställda tjänstemän på Serneke som ingår i projektledningen på projekt Björnflokan. En litteraturundersökning genomförs för att kunna härleda till teorier i resultatet. I resultatet presenteras observationer och sammanställningar från intervjuer samt fältstudier. Det framkommer av den insamlade datan att Serneke har en väl genomarbetad logistikplan och att den grundar sig teorier som Location based system (LBS) och Location based management system (LBMS). Teorierna används till stor del för att minimera slöserier ochöka effektiviteten av det materiella flödet. Analysen väver samman resultat och teori och kopplar delarna till frågeställningen. En kvalitativ forskningsmetod förutsätter analysen grundar sig i tolkningar av resultat och teori. I analysen framgår det att vidare effektivisering är möjlig, men det finns också risker som uppenbarar sig vid optimering. Det är inte alltid optimalt att effektivisera produktionen genomatt eliminera slöserier i form av icke nödvändiga materialförflyttningar, detta eftersom produktionen även innehåller kritiska moment.
Over the past few years, the construction industry has focused on the development of logistics. This is to a large extent because the competition within the industry has become tougher and thus the margins have diminished. This essay will therefore examine the internal logistics ofthe Björnflokan project in Borås. The construction will include three apartment buildings, one parking garage, one preschool and premises. The construction area is highly exploited and therefore limited, which entails logistical challenges. The purpose of this study is to investigate how the internal logistics work in practice, and whether or not it is possible to streamline the production within the Björnflokan project through better planning and communication. The study has only examined the internal logistics regarding the production of the apartment buildings. The survey relates to the qualitative methods, thus the study contains interviews of a semistructured nature together with supplementary field of studies. The interviews were held with officials at Serneke, who all are a part of the management at the Björnflokan project. The study also contains a literature review in order to deduce the theories in the result. Within the results of the study observations and summaries from both the interviews and the field studies are presented. From the collected data it becomes apparent that Serneke has a verywell-developed logistics plan and that it is founded on the theories Location-based system(LBS) and Location-based management system (LBMS). The theories are largely applied to minimize waste and increase the efficiency of the material flow. The analysis on the other hand, weaves together the results and the theory, and by doing so connects each of these parts to the issue. A qualitative research method presupposes that the analysis is based on interpretations of both the results and the theory. The analysis shows that further streamlining is possible, but it also indicates the risks that manifest themselves when only looking at optimization. It suggests that it may not be optimal to streamline the production to the extent that it eliminates waste in the form of unnecessary material transfers. This is due to the containment of critical elements that can be found within the production.
APA, Harvard, Vancouver, ISO, and other styles
38

Ekström, Johan, Joakim Nielsen, and Jonas Petri. "Bygg smartare, inte fortare! : En fallstudie av Lean Thinking inom prefabricerat byggande." Thesis, Högskolan i Halmstad, Sektionen för ekonomi och teknik (SET), 2011. http://urn.kb.se/resolve?urn=urn:nbn:se:hh:diva-15707.

Full text
Abstract:
Kostnaden för nyproduktion av hus i Sverige har ökat markant under de senaste åren. Byggföretag har svårt att hålla både projektens löptid och kostnader nere, vilket resulterat i ett ökat marknadspris och ett växande missnöje bland slutkunder. De ökade kostnaderna beror enligt forskning på vanligt förekommande slöseri i form av såväl material som arbetskraft. I försöken att eliminera slöseri har många företag anpassat sin verksamhet efter Lean Thinking, ett system som härstammar från den japanska bilindustrin, bestående av verktyg och metoder med huvudsyfte att identifiera och eliminera slöseri. Ur detta har även nya former av byggnation fångat marknadens intresse. Industrialiserat byggande är en metod som förflyttat stora delar av verksamheten från byggarbetsplats till prefabricering i fabrik och på så sätt eliminerat många av de slöseri och riskmoment som förknippas med det traditionella synsättet på byggnation. Studien lägger fokus på hur arbete med Lean Thinking och prefabricerat byggande kan avhjälpa de kostnadsproblem som branschen ställs inför på dagens marknad. Genom en fallstudie har vi beretts möjlighet att på nära håll studera för- respektive nackdelar med ett prefabricerat byggande, samt fått möjlighet att studera en organisation där verksamheten utgår från Lean Thinking. Studien visar att det genom Lean Thinking och prefabricerat byggande går att minimera vanligt förekommande slöseri inom byggbranschen. Utförandetiden för prefabricerat byggande är också mycket kortare än vid traditionellt byggande och på så vis hålls kostnaderna nere. Genom att ytterliga utveckla prefabricerat byggande enligt Lean Thinking skulle det vara möjligt att i större utsträckning minimera slöseri och möjliggöra ett ännu smartare byggande.
The costs of house construction in Sweden have increased conspicuously over the last years. Construction companies have a hard time maintaining low project lead-times as well as keeping costs within the financial plan, which in turn has affected market price and created a growing discontent amongst buyers. Research indicates that the increased production costs are in many ways caused by the large amount of waste, in form of materials and labor, which is common within today’s construction projects. Efforts to eliminate waste has led many companies to adapt Lean Thinking, a system with roots in Japanese car manufacturing industry, containing tools and methods designed to identify and eliminate all kinds of waste. From all this, new ways of construction has been introduced on to todays market. Industrialized housing is a relatively new concept, which has eliminated a lot of waste and risks by moving construction away from an on-site project into prefabrication within factories. This study focuses on how Lean Thinking adaptation and industrialized construction can help lowering construction costs. A case study has given us the opportunity to follow an industrialized construction project up close, as well as the opportunity to study an organization that has implemented Lean Thinking. The study shows that it is possible to reduce common waste within construction industry through Lean Thinking and industrialized housing. The project lead-time for industrialized housing is also much shorter compared to traditional construction methods and therefore the costs are kept low. By continuing to evolve industrialized housing through Lean Thinking it would be possible to further reduce waste and consequently enabling an even smarter way of construction.
APA, Harvard, Vancouver, ISO, and other styles
39

Wihlborg, Ida, and Maja Jonsson. "Öka monteringsproduktiviteten med avseende på materialförsörjningsmetod och dess påverkan på anläggningsplanering." Thesis, Linnéuniversitetet, Institutionen för maskinteknik (MT), 2020. http://urn.kb.se/resolve?urn=urn:nbn:se:lnu:diva-96093.

Full text
Abstract:
Sambandet mellan materialförsörjningen och monteringsprocessen är väsentlig för hela processen och det är viktigt att de är utvecklade tillsammans. Att dessa system är framtagna utan hänsyn tillvarandra är ett generellt problem som många verksamheter har. Studiens syfte är därför att undersöka materialförsörjningen för en montering och dess samband med monteringsprocessen. Målet är att hitta vilken materialförsörjningmetod som är mest produktiv med avseende på tid per monterad produkt. Undersökningen utfördes som en fallstudie på monteringen hos LVI Low Vision International i Växjö. Genomförandet av studien innehåller en pilotstudie som testar materialförsörjningsmetoden kittning. Pilotstudien resulterade i en reducering av materialanskaffning från 37% till 9,7% i en specifik monteringsstation. Ett framtida läge för LVI presenteras i slutet av rapporten där fokus ligger på fortsatt utvecklingsarbete med kittning, ny utformning av anläggningslayout i monteringen och ett standardiserat arbetssätt.
APA, Harvard, Vancouver, ISO, and other styles
40

Aldebe, Wesam, and Yacine Tararbit. "Tids- och kostnadseffektivisera byggproduktionen : Slöserier och störningar." Thesis, KTH, Byggteknik och design, 2018. http://urn.kb.se/resolve?urn=urn:nbn:se:kth:diva-231564.

Full text
Abstract:
Största utmaningen byggindustrierna har i dagens läge är att reducera onödiga kostnader och onödigt arbete samt att effektivisera arbetet i form av tid och pengar. Detta är en fråga och en undersökning som gjorts ett flertal gånger under de senaste åren eftersom att det är ett stort problem inom de flesta byggbranscher. Denna rapport är skriven i uppdrag av Peab i syfte att identifiera slöserierna och kritiska störningar, för att sedan ta fram åtgärdsförslag för att reducera slöseriet av tiden och kostnaderna för framtida projekt Fyra olika, slutförda anläggningsprojekt har undersökts i uppdrag av Peab belägna i Stockholm. Dessa projekt omfattar ombyggnad av en vägkorsning samt nybyggnad av gång- och cykelbanor. Dessa fyra projekt varierar i omfattning och ger en mer varierad resultat i jämförelse med fyra stycken liknande projekt. Faktainsamlingen för detta arbete har mestadels omfattat lean construction med de olika sorters slöseri som finns i byggbranschen samt de olika principerna och metoderna lean construction omfattar, så som Just-In-Time. Andra studier gällande byggprocessen har även gjorts, mer specifikt produktions skedet. Skillnaden mellan värdeskapande och icke värdeskapande tid har behandlats, samt angående riskhanteringen och hur en riskhantering genomförs. Intervjuer har även genomförts i syfte att identifiera de mest kritiska slöserierna och störningar. Fakta framtagen från intervjuerna har redovisats i resultatet. Där framkom det att de fyra mest kritiska slöserierna var fel- och omarbeten, väntetider, onödiga transporter och onödiga arbeten. Sammanfattningsvis har åtgärdsförslag med hjälp av lean construction, intervjuer samt kunskap från denna rapport framtagits för att minska på dessa störningar och slöseri med hjälp av t.ex. Jidoka och PDCA för att öka tids- och kostnadseffektiviteten i produktionen. Kortfattat kan begreppet slöseri och störning definieras på olika sätt. Där slöseri är en aktivitet som inte bidrar med något till verksamheten, och en störning är ett moment som stör arbetet.
The biggest challenge construction companies are facing at the moment is reducing the unnecessary costs and labor as well as to streamline the work. This is a matter and an investigation that has been done multiple times in recent years because this is a major problem in most construction companies. This report is commissioned by Peab for the purpose of identifying wastes and critical disorders, then drafting action proposals to reduce waste of time and costs. Four different, completed construction projects have been investigated, commissioned by Peab, and are located in Stockholm. These projects include the reconstruction of a roadway intersection and new construction of pedestrian and cycle tracks. These four projects vary in scale, giving a more varied result compared to four very similar projects The gathering of information for this work has mostly included lean construction with the various waste in the work industry, as well as the different principles and methods of lean construction, such as Just-In-Time. Other studies on the construction process have also been made, more specifically the production phase, the planning of the work. The difference between value creation time and non-value creation time has been dealt with, as well as risk management and how to conduct a risk analysis. Interviews have also been conducted with the aim of identifying the most critical wastes and interferences. The gathering of facts from the interviews has been reported in the results. It emerged that the four most critical wastes were defects/rework, waiting, transportation and extra processing. In summary, action proposals using lean construction, interviews and the knowledge from this report have been developed to reduce these disturbances and wastages with help of for example Jidoka and PDCA to increase time and cost efficiency in the production process. In short, the concept of waste and disturbance can be defined differently. Waste is an activity that does not contribute anything to the business, and a disturbance is a matter of disturbing the work.
APA, Harvard, Vancouver, ISO, and other styles
41

Azad, Namu. "Bygglogistik för skyskrapor : Logistikplanering för bygget av Karlatornet i Göteborg." Thesis, Mälardalens högskola, Akademin för ekonomi, samhälle och teknik, 2020. http://urn.kb.se/resolve?urn=urn:nbn:se:mdh:diva-49901.

Full text
Abstract:
The handling of construction logistics around building materials has long been a major problem that has been noticed since 1960. The handling of construction logistics is important as they have a major impact on costs and customer service. There is a lot of work on a small area of ​​building a skyscraper that includes many risky elements and factors that affect production speed and schedule.   In Gothenburg, a skyscraper will emerge from the city, with its 245m and 73 floors, which will be a building like no other in the country. A complex comprehensive construction project which leads to a complex logistics solution with good planning of the logistics flow.   The purpose of this degree project is to map the management of the construction logistics and to review how the planning of the factors that will guide the logistics of the construction project will look.   In order to respond to the purpose of the study, a case study has been made based on interviews of three key people within the Karlatornet project. Site visits have been made to get a real picture of the Karlatornet project. During the visit, documents and pictures were received regarding the logistics of the project.   The result shows that careful and early planning of the construction logistics reduces waste and increases the flow efficiency for a construction project like Karlatornet. Gathering enough knowledge from similar projects around the world has led Serneke to produce a logistics appendix that serves as a functional description for how logistics should be handled at Karlatornet. This logistics appendix acts as a contract document where all parties involved in the project must work according to the logistics appendix, which is a standardized working method for logistics management.   Through various tools such as Myloc, BIM and LEAN's production management philosophy, the project has been able to achieve an efficient logistic solution that fits Karlatornet.
APA, Harvard, Vancouver, ISO, and other styles
42

Ulriksson, Johan, Mesud Mustafic, and Johan Rydell. "Effektivisering av intern resurs­hantering på ett tillverkande trähusföretag : En fallstudie utförd på Smålandsvillan." Thesis, Linnéuniversitetet, Institutionen för maskinteknik (MT), 2014. http://urn.kb.se/resolve?urn=urn:nbn:se:lnu:diva-36426.

Full text
Abstract:
Syftet med studien är att öka kunskapen och förståelsen inom effektivisering av interna resurser på ett tillverkande företag, för att sedan kunna ge förslag på förbättringar inom verksamheten. Studien utfördes på Smålandsvillan AB som ligger i Vrigstad och tillverkar modulhus i trä. En materialkartläggning låg till grund för arbetet och ett antal slöserier och brister kunde identifie­ras. Genom att analysera det empiriska materialet tillsammans med studiens framtagna teorier kunde en identifiering av företagets slöserier genereras. Dessa slöserier orsakades till stor del av bristande struktur på företaget. Genom observationer på företaget framkom också ett antal brister i arbetsmiljön längs med produkt­ionslinan. I resultatdelen togs förslag fram som eliminerar dessa slöserier och brister, och genom detta bidra till en effektivare resurshantering. I slutet av arbetet besvaras forskningsfrågan, även rekommendationer presenteras och det förklaras hur de kommer hjälpa företaget om de skulle implementeras.
APA, Harvard, Vancouver, ISO, and other styles
43

Svenningsson, Johan. "Förhindra långvariga trafikstopp i spårväxlar med rörlig korsning." Thesis, Mälardalens högskola, Akademin för innovation, design och teknik, 2017. http://urn.kb.se/resolve?urn=urn:nbn:se:mdh:diva-36256.

Full text
Abstract:
Purpose:The purpose of this study as a part of Trafikverkets continues improvement work is to create ahigher society value with less delayed train traffic. This study will analyze if it’stechnical/administrative possible to eliminate or reduce the delays which accrue when switcheswith swing nose crossing is not in control. The issue has been segmented in three sub issues:1. How does a switch with swing nose crossing work and which factors leads to a stop intraffic?2. What knowledge does train engineer have and how do they work today?3. Is it possible to change the current regulation without decrease the safety?Methodology:Literature study, interview and observation has been performed to see which issues switcheshas and what underlying effects that causes them. A workshop has been held with teacher andstudents in a school for train engineer. Collected data has been analyzed for compilation of thestudies result.Findings:As the regulation is written today it creates a complete stop in traffic when a switch with swingnose crossing goes in control. The studies result shows that train engineers has anunderstanding of the how switches with swing nose crossing works and therefore could it bepossible to alter the regulation. A change in this regulation could mean less delayed traintraffic. But also a greater risk for more collision between train and switches which could lead tothat more switches have to be repaired. A standardized approach in how to control a switchcould decrease this risk.Implications:The purpose of this study through the problem definition is deemed answered. Theunderstanding on the train engineer awareness of switches with swing nose crossing and theirdemands has been a great significance for the development work. More interviews andworkshops would have enhanced the scientific result.Recommendation:I advocate for a change in the regulation so that train engineer are allowed to pass a switch with swingnose crossing even if it’s not in control. There is also of great weight to study the back laying reasonsfor why train engineer misjudge switches position and why the switches doesn’t go in control.
APA, Harvard, Vancouver, ISO, and other styles
44

Olsson, Andreas, and Erik Nykvist. "Förbättringsarbete inom leveranskvalité i ett tillverkande företag : En utforskande studie angående emballeringens och interna transporters inverkan på leveranskvalité." Thesis, Tekniska Högskolan, Jönköping University, JTH, Logistik och verksamhetsledning, 2020. http://urn.kb.se/resolve?urn=urn:nbn:se:hj:diva-50006.

Full text
Abstract:
Syfte – Syftet med denna studie är att studera emballeringsaktiviteters och interna transporters inverkan på leveranskvalité i en tillverkande verksamhet. För att besvara syftet har tre frågeställningar formulerats: -          Hur kan emballeringsaktiviteter och interna transporter kopplas till leveranskvalité? -          Vilka slöseri och brister finns inom emballeringsaktiviteter och interna transporter? -          Hur kan hantering av emballeringsaktiviteter och interna transporter bidra till en förbättrad leveranskvalité?   Metod – Den valda metoden för denna studie är fallstudie med en kvalitativ inriktning kring hantering av empiriska data. Datainsamlingen bestod av intervjuer, observationer och dokumentstudier för att sträva efter en triangulering vilket höjer trovärdigheten. Litteraturstudier pågick parallellt under hela studien för att kopplas mot insamlad empiri och ge klarhet i existerande kunskap inom forskningsområdet. Utifrån empiri och teoretiskt ramverk kunde frågeställningarna besvaras.   Resultat – Genom besvarandet av första frågeställningen kunde emballeringsaktiviteter och interna transporter kopplas till leveranskvalité. Utifrån den lagda grunden kunde sedan slöseri och brister identifieras i de olika aktiviteterna på fallföretaget utifrån insamlad empiri. Nyttjandet av aktuella teorier inom förbättringar som Jidoka, 5S och TQM ligger som förbättringsförslag kring hur företag kan hantera aktuella slöserier och brister inom värdekedjan. Implikationer – Studien är formad efter tillhandahållandet av ett problemområde från fallföretaget. Därför har studien haft problemlösande karaktär kring specifika problem inom fallföretagets verksamhet. Alla framlagda förbättringsförslag är inte genomförda och därför bör en analys ske efter framtida införande för att kontrollera effekten av resultatet.   Begränsningar – Upplevda problem är specifika för fallföretaget och det kan diskuteras kring om rådande förhållanden är liknande inom andra verksamheter. Generaliserbarhet kan vara utmanande att uppnå för att vara applicerbart inom fler tillverkningsindustrier.
Purpose – The purpose of this study is to study packing activities and internal transports and its impact on delivery quality in a manufacturing setting. To answer the purpose three research questions were formed: -          How can packing activities and internal transports be connected to deliver quality? -          Which wastage and deficits can be found within packing activities and internal transports? -          How can the management of packing activities and internal transports contribute to an improved delivery quality?   Method – The chosen method for this study was a case study with a qualitative alignment on the handling of data. The empirical data collection consisted of interviews, observations, and document studies to strive for triangulation which increases the credibility of the overall study. Literature reviews was conducted as a parallel process throughout the study, to establish a connection with the collected empirics.  This gave the study substance and clarity within existing knowledge in the science field. By analysing empirics and the theoretical framework, the research questions could be answered.   Findings – Packing activities and internal transports was found to have a strong connection to deliver quality. Through this set foundation and with additional empirics it was possible to identify wastage and deficits within the different activities at the case company. Utilizing common theories such as, Jidoka, 5S and TQM lies as improvement propositions on how a company could handle wastage and deficits within their value chain.   Implications – The study was formed after being provided a problem area by the case company. Therefore, the study followed a problem-solving characteristic regarding the specific problem within the case company’s operations. All improvement propositions have not been conducted and therefore the future adoption should be analyzed regarding the results.   Limitations – Experienced problems are specific for the case company and it can be discussed regarding if the problems are similar with other businesses. Generalizability and the goal to apply the results in different manufacturing industries has been a challenge to reach.
APA, Harvard, Vancouver, ISO, and other styles
45

Skum, Skum. "LEAN i ankomst och kontroll : Processkartläggning av ankomst och kontroll av material på Sanmina i Örnsköldsvik. Syftet är att genom analys identifiera slöseri i processen och genomföra förbättringar som eliminerar eller minskar störningar." Thesis, Umeå universitet, Institutionen för tillämpad fysik och elektronik, 2015. http://urn.kb.se/resolve?urn=urn:nbn:se:umu:diva-104916.

Full text
Abstract:
This report is the result of a thesis at the company Sanmina in Örnsköldsvik. The thesis is the final work at the mechanical engineering program at Umeå University. Sanmina has in 2015 launched an initiative to ensure that all sites are using LEAN principles and tools to enhance their business. As part of the plan for the LEAN-work, an LSS (Lean Six Sigma)-project has started to study the company's receivehall and inspection. The problem is that receive and inspection for a long time had difficulties to achieve the goal that all deliveries should be in stock within 24 hours after arrival. The aim of the project is to define the problems affecting the time negative and find solutions using process mapping, time studies and statistics available. At present, around 30% of the time goes to other things than efficient work at the inspection. Over a 25 week period (2014-2015) has an average of 41% of the deliveries passed the goal to be in stock within 24 hours, the remaining 59% have taken more than 24 hours, before the articles is in stock. The proposal that has been developed on the new process flow is based on the staff's views, time-study of the effective time of the inspection, the problems that were defined at process mapping and the new warehouse management system to be introduced in the fall.
APA, Harvard, Vancouver, ISO, and other styles
46

Larsson, Hanna, and Selma Tica. "A study of the order picking process at PostNord Logistic - improving the picking process by identifying factors that inhibit the prodctivity." Thesis, Linköpings universitet, Kommunikations- och transportsystem, 2017. http://urn.kb.se/resolve?urn=urn:nbn:se:liu:diva-138687.

Full text
Abstract:
The goal of this study was to find factors affecting the pickers’ productivity negatively, in the order picking process, and to suggest a change that can increase the pickers’ productivity. By a qualitative approach the initial situation at PostNord was studied. The obtained results, after analyzing the initial situation, showed various factors that affect the pickers’ productivity negatively. All these contributed to waste, meaning that the picker did not use its time correctly according to Lean theory. These factors were analyzed and categorized into four problem areas, which are quality of tools, standardization of routines and leadership, article placement and jam in the corridors. Possible suggestions to improve the situation can be done with smaller or bigger changes. One solution is to improve the work procedures by standardizing the methods, which could be done by cooperating more with PEMA and using the pickers’ knowledge. Some suggestions and adjacent activities must be investigated further to find the best solutions.
APA, Harvard, Vancouver, ISO, and other styles
47

Hanna, Rodan. "Kostnadsdrivet förbättringsarbete inom miljö : En fallstudie på AstraZeneca." Thesis, KTH, Industriell produktion, 2018. http://urn.kb.se/resolve?urn=urn:nbn:se:kth:diva-232523.

Full text
Abstract:
Miljömässig hållbarhet är en förutsättning för en fortsatt hållbar ekonomisk utveckling ochför en fortsatt konkurrenskraft, genom olika verktyg kan så väl miljö- som hållbarhetsarbeteatt utvecklas. Syftet med den här studien har varit att identifiera miljöaspekter för att sedanåstadkomma praktiska åtgärder med målet att öka tempot i miljöförbättringsarbetet.Arbetet är utfört vid produktionsenheten AstraZeneca Sweden Operations i Södertälje, påenheten tillverkas aktiv läkemedelsubstans och enheten står för tillverkning, formulering,fyllning och förpackning av slutprodukter. Enheten Sweden Operations, som är AstraZenecasstörsta högteknologiska produktionsenhet, är indelad i sju olika fabriker som kallas för PET.Detta arbete är utfört vid PET Turbuhaler, vid en av de produktionslinjer som producerarinhalatorn Turbuhaler Symbicort.Att utsläppen måste minska är idag de flesta överens om, de finns olika tillvägagångssätt attgöra det på. I det här arbetet har fokus varit på att använda metoden Green PerformanceMap (GPM), det är en metod som integrerar lean och miljöarbete och kan användas som ettverktyg för miljöförbättringsarbete. I detta arbete har GPM-metoden använts för attidentifiera de miljöaspekter som finns på produktionslinjen på PET Turbuhaler i AstraZeneca.Vidare har ett flertal av dessa identifierade miljöaspekter analyserats djupare ur ettekonomiskt- och miljöperspektiv, under arbetet har medarbetare från operatörsnivå tillledningsnivå involverats. Genom att sätta fokus på kostnadsdrivna förbättringar inom miljönoch involvera fler medarbetare kan drivkraften för det gröna förbättringsarbetet i enverksamhet ökas.Med identifiering som grund har en karta tagits fram över de miljöaspekter som finns iproduktionsprocessen, både i form av material och energi. Vidare har dessa miljöaspekterdiskuterats och kunnat värderas i miljö- och kostnadsbesparingar.
Environmental sustainability is a prerequisite for a sustainable economic development andfor competitiveness, the environmental as well as the sustainability work, can through varioustools, be developed. The purpose of this study has been to identify environmental aspectsand then to provide practical measures aimed to improve the environmental improvementactivities.The thesis work was carried out at AstraZeneca Sweden Operations in Södertälje, the siteproduces active pharmaceuticals ingredients and is responsible for the manufacture,formulation, filling and packaging of end products. Sweden Operations site is AstraZeneca'slargest high-tech facility, the facility is divided into seven different sections called PET. Thiswork has been performed at PET Turbuhaler, at one of the production lines that produces theTurbuhaler Symbicort Inhaler.In this work, the focus has been on studying the environmental aspects by using the GreenPerformance Map (GPM), it is a method of continuous improvement tools in the “lean andgreen” area and can be used as a tool for improving the environmental performance. In thiswork the GPM method has been used to identify the environmental aspects of the PETTurbuhaler production line in AstraZeneca. Furthermore, a number of these identifiedenvironmental aspects have been analysed deeper from an economic and environmentalperspective. By focusing on cost-driven improvements in the environment and by involvingmore employees, the ‘step-up the pace’ of improvement can be increased.Based on the identified aspects, a map of environmental aspects was drawn up, representingmaterials and energy. Furthermore, these environmental aspects have been discussed toassess the environmental and cost savings.
APA, Harvard, Vancouver, ISO, and other styles
48

Huldin, Jessica. "Effektivisering av interna processer : En tillämpning av offensiv kvalitetsutveckling på Astrid Lindgrens Värld." Thesis, Uppsala universitet, Institutionen för samhällsbyggnad och industriell teknik, 2020. http://urn.kb.se/resolve?urn=urn:nbn:se:uu:diva-413828.

Full text
Abstract:
Studien har genomförts på Astrid Lindgrens Värld som är en nöjespark som vill göra sagor till verklighet och är ett turistmål för människor världen över. Organisationen består av cirka 60 helårsanställda och cirka 500 anställda under sommarsäsong. Fokus för arbetet har varit den interna lagerprocessen på organisationen som innebär det arbete som sker från att beställingsbehov upptäckts tills varor är mottagna. Den interna lagerprocessen har sin utgångspunkt i det centrallager som finns på organisationen och har sedan koppling till sex olika avdelningar inom organisationen. Inom den interna lagerprocessen prioriterades avdelningen butik för att studera hur den interna lagerprocessen kan förbättras i relation till butik. Den interna lagerprocessen kopplat till området butik skapar svårigheter i att veta hur mycket och vad som behöver beställas samt att varor missas i beställningarna. Processen upplevs också vara ineffektiv och tidskrävande. Syftet med studien är att identifiera ett förbättringsförslag som kan skapa en effektivisering och förenkling av arbetet utifrån butiksperspektiv kopplat till den interna lagerprocessen. Studien tar sin utgångspunkt i frågeställningarna (1) Hur ser den interna lagerprocessen ut idag? (2) Vad upplevs problematiskt inom processen? (3) Hur kan den interna lagerprocessen förbättras med hjälp av offensiv kvalitetsutveckling? Det teoretiska ramverket för arbetet tar sin grund i offensiv kvalitetsutveckling med tillhörande värderingar, verktyg och arbetssätt med fokus på Lean. Ramverket presenterar också teorier om organisationsförändring, ansvar samt kommunikation. För att besvara uppställda frågeställningar utgör studien en kvalitativ ansats där datainsamlingsmetoden baseras på intervjuer, fokusgrupper, möten och dokumentstudier. För att analysera, systematisera och skapa mening av insamlade data har verktyg inom offensiv kvalitetsutveckling använts. Resultatet visar på (1) det finns ett gemensamt arbetssätt för den interna lagerprocessen, däremot finns det tre olika sätt att arbeta med processen beroende på om det är en planerad beställning eller akutbeställning. Akutbeställningarna anses som onödiga arbetsmoment som helst önskas minimeras. (2) Problematiken som identifierats grundar sig på medarbetare och chefers upplevelser, där följande grupperad problematik identifierades; tidskrävande arbete, ostrukturerat arbete, högt lagersaldo, förbättringsförslag missas, bristande kommunikation samt att nya rutiner inte efterlevs. (3) Förbättringar som har identifierats är; implementering av 5S, processägare, dragande system, ”Lean-tavla” samt kommunikationsplan. Det förbättringsförslag som bäst svarar upp mot studiens syfte är att implementera 5S och valdes därför vidare för en implementeringsplan. Däremot är det viktigt vid en eventuell implementering av 5S att den integreras med förbättringsförslaget kommunikationsplan för att säkerställa att den nya rutinen kommuniceras ut korrekt och efterlevs.
The present study was conducted at Astrid Lindgren’s Värld (ALV), an amusement park and popular tourist attraction in southern Sweden. This study focuses on the park’s internal warehousing processes. The present study focuses on the warehousing process in one of 6 branches, namely that which serves the shops in the park. The aim of this paper was to investigate how the internal warehousing processes can be made more efficient and design a plan of action to remedy the identified issues. The current practices create problems regarding orders, more specifically what needs to be ordered, how much, and items missing from deliveries. Employees also perceive the process to be inefficient and time consuming. The study is based on three questions: (1) what is the current internal warehousing process? (2) What issues can be identified with the current process? (3) How could the internal warehousing process be improved using the theory of total quality management? The study uses total quality management strategies, mainly Lean manufacturing as a theoretical framework together with data collected from interviews and focus groups. The results reveal that (1) there is a common work process in the warehouse at large, however, 3 different approaches are employed depending on whether the order is planned or urgent. Unplanned, urgent orders are seen as unnecessary and should be reduced. (2) Employees and managers identify the process’ main issues to be: time consuming work, unstructured work, an excessive amount of items in the warehouse, suggestions for improvements go unheard, communication issues, and new routine non-conformity. (3) In conclusion, the study recommends five different improvement strategies for the efficiency of the internal processes: implementation of 5S, process owner, pull system, Lean board and a communication-plan. 5S best corresponds to the identified issues at ALV and was therefore chosen for implementation. However, it is key to implement it in tandem with a communications plan in order to ensure proper distribution of information and conformity with new routines.
APA, Harvard, Vancouver, ISO, and other styles
49

Borgvall, Albin, and Robin Rodestrand. "Utvecklad value stream mapping för en varierande produktion mot kundorder : En fallstudie vid Karl Hedin Emballage AB." Thesis, Högskolan i Gävle, Avdelningen för Industriell utveckling, IT och Samhällsbyggnad, 2017. http://urn.kb.se/resolve?urn=urn:nbn:se:hig:diva-24246.

Full text
Abstract:
Introdukton: Dagens hårda krav på specialanpassade produkter har bidragit till fler och fler företag som tillämpar en kundorderanpassad strategi. Eftersom dessa företag konkurrerar genom att hålla så låga ledtider som möjligt och erbjuder unika produkter med tilltalande priser har det blivit allt mer attraktivt att använda sig av lean-baserade verktyg för att reducera slöseri, skapa en effektivare produktion och således bli mer konkurrenskraftig. Problemet är att lean-verktyg inte är utvecklade för denna typ av organisation. Syfte: Syftet är att utforma en modell för en utvecklad value stream mapping som visar hur företag med en kundorderstyrd strategi som kännetecknas av hög produktvariation i låga volymer kan använda value stream mapping för att effektivisera produktionen.                                                    Metod: Studien är utförd genom en fallstudie vid ett tillverkande företag som producerar specialanpassade produkter efter kundönskemål. För att kartläggningen genom value stream mapping skulle vara genomförbar samlades relevant litteratur in. Därefter genomfördes intervjuer och observationer som underlag för det empiriska materialet. Avslutningsvis har teorin tillsammans med det empiriska materialet utgjort innehållet för analyser och slutsatser inom denna studie.                                                                                                                      Resultat: Fallföretaget kännetecknas av en komplex produktion av unika produkter med korsande material- och informationsflöden vilket försvårar value stream mapping. Fallföretagets tillverkningsprocesser inom produktionen är manuell kapning, manuell plywoodkapning, kedjekapning, inredning och montering. Processer med liknande operationer var utspridda i fabriken och monteringsprocessen identifierades som flaskhals.                                                                                                                                  Slutsats: En modell för hur företag med en kundorderstyrd strategi med hög produktvariation och låga volymer kan använda value stream mapping har sammanställts. Vidare har ytterligare aspekter fastställts som är betydande vid genomförandet av value stream mapping inom denna produktionsform.
Introduction: Today’s high demand on customer specific products has led to an upstream of organizations that are adapting an make-to-order production strategy. Seeing that these organizations compete by obtaining low lead-times and the ability to present unique and affordable products, a need has been created to use lean-based methods in attempt to reduce waste, create an efficient production, thus to gain competitive advantage. The issue is that lean-methods are not developed for these types of organizations.  Purpose: The purpose of this study is to compile a model that describes how an organization that is characterized by make-to-order strategy and with a high variety in products manufactured in low volumes can implement value stream mapping to create an efficient production and thus gain competitive advantage. Methodology: The study is carried out through a case-study on a company that manufacture based on the specification of customer-orders. To perform a value stream mapping, relevant literature was collected and studied. Consequently, interviews and observations were conducted and constitute the empirical data. Subsequently the literature review along with the empirical data constitutes the conclusions and findings.    Results: The case company is characterized by a complex manufacturing of unique products with crossing information- and material flows which complicates value stream mapping. The processes consist of manual cutting, semi-manual cutting, plywood cutting, component manufacturing, and assembling. Processes with similar operations were spread throughout the manufacturing plant and the assembly points were identified as bottle-necks.   Conclusion: A model that describes how an organization that is characterized by make-to-order strategy and with a high variety in products manufactured in low volumes can implement value stream mapping has been compiled. Furthermore, additional aspects have been identified that are significant in the implementation of value stream mapping within this form of production.
APA, Harvard, Vancouver, ISO, and other styles
50

Juliusson, Axel, Viktor Hultgren, and Amar Sabic. "Produktionseffektivisering i prefabriceringsindustrin : – En fallstudie på Finja." Thesis, Linnéuniversitetet, Institutionen för maskinteknik (MT), 2017. http://urn.kb.se/resolve?urn=urn:nbn:se:lnu:diva-65179.

Full text
Abstract:
Syftet med studien är att öka förståelsen kring hur produktionen utav betongväggar i prefabriceringsbranschen kan effektiviseras. Genom insamlande av teori, framförallt inom LEAN, och empiriskt material har information kunnat analyseras och förbättringsförslag inom ramen för förbättringsarbete, 5S och visuell styrning har belysts. Tidmätningar har gjorts för att se hur mycket tid som i dagsläget är värdeskapande och hur tid som inte är det ska hanteras.
APA, Harvard, Vancouver, ISO, and other styles
We offer discounts on all premium plans for authors whose works are included in thematic literature selections. Contact us to get a unique promo code!

To the bibliography