Academic literature on the topic 'Medium and large projects'

Create a spot-on reference in APA, MLA, Chicago, Harvard, and other styles

Select a source type:

Consult the lists of relevant articles, books, theses, conference reports, and other scholarly sources on the topic 'Medium and large projects.'

Next to every source in the list of references, there is an 'Add to bibliography' button. Press on it, and we will generate automatically the bibliographic reference to the chosen work in the citation style you need: APA, MLA, Harvard, Chicago, Vancouver, etc.

You can also download the full text of the academic publication as pdf and read online its abstract whenever available in the metadata.

Journal articles on the topic "Medium and large projects"

1

Olmedo, Diego Contreras. "Medium- and large-size cogeneration projects in Spain." Energy Policy 21, no. 2 (1993): 191–97. http://dx.doi.org/10.1016/0301-4215(93)90140-b.

Full text
APA, Harvard, Vancouver, ISO, and other styles
2

Koru, A. G., and J. Tian. "Defect handling in medium and large open source projects." IEEE Software 21, no. 4 (2004): 54–61. http://dx.doi.org/10.1109/ms.2004.12.

Full text
APA, Harvard, Vancouver, ISO, and other styles
3

Qureshi, M. Rizwan Jameel. "Agile software development methodology for medium and large projects." IET Software 6, no. 4 (2012): 358. http://dx.doi.org/10.1049/iet-sen.2011.0110.

Full text
APA, Harvard, Vancouver, ISO, and other styles
4

Sun, Yu Feng, and Xun He. "Research on Professionalized Operation and Management Model for Large and Medium Biogas Projects." Advanced Materials Research 472-475 (February 2012): 3258–63. http://dx.doi.org/10.4028/www.scientific.net/amr.472-475.3258.

Full text
Abstract:
On the basis of analysis of domestic and inland management models for biogas projects, this article has learned experience from foreign experiences on operation and management of biogas projects. The key factor for medium and large biogas projects is professionalized operation and Specialized company who is an agency by agreement of the project investor. The new professionalized model manages biogas projects in comprehensive and systematic manner as per market demand, and provides efficient compressive services so that biogas projects could produce maximum social, economic, environmental and b
APA, Harvard, Vancouver, ISO, and other styles
5

He, Huiyu, Xiwei Gan, Lin Liu, and Xing Zhang. "Adaptability Analysis of Integrated Project Delivery Method in Large- and Medium-Sized Engineering Projects: A FAHP-Based Modeling Solution." Buildings 14, no. 7 (2024): 1999. http://dx.doi.org/10.3390/buildings14071999.

Full text
Abstract:
With the emerging large- and medium-sized engineering projects, prominent project delivery methods make sense in terms of cost, risk, management, and schedule. Among these, the Integrated Project Delivery (IPD) method stands out due to its adaptability for growing scale and complexity projects. This study compares the IPD method with other methods, emphasizing its benefits in large- and medium-sized projects and introducing the Fuzzy Analytic Hierarchy Process (FAHP) model to analyze IPD’s adaptability quantitatively. By conducting a matrix calculation of eighteen second-level indicators, this
APA, Harvard, Vancouver, ISO, and other styles
6

Bakhsh, Sheikh Tahir, Basit Shahzad, Sabeen Tahir, and Rayed A. Alghamdi. "Determining Large Scale Healthcare Projects by Resource Attribution." Journal of Medical Imaging and Health Informatics 10, no. 10 (2020): 2389–92. http://dx.doi.org/10.1166/jmihi.2020.3268.

Full text
Abstract:
Software development activity deals with the development of the healthcare software by using given resources. The allocation of the resources needs to be consistent with the scale of the project for which the resources are being allocated. The allocation of resources depends on the scale of healthcare projects. As far as resource planning for healthcare projects is concerned, healthcare projects are similar to software development in other areas. In this research, the effort is made to quantify the scale of healthcare projects. The scale can be small, medium, or large. Each scale has a differe
APA, Harvard, Vancouver, ISO, and other styles
7

Bakhsh, Sheikh Tahir, Basit Shahzad, Sabeen Tahir, and Rayed A. Alghamdi. "Determining Large Scale Healthcare Projects by Resource Attribution." Journal of Medical Imaging and Health Informatics 10, no. 10 (2020): 2389–92. http://dx.doi.org/10.1166/jmihi.2020.32682389.

Full text
Abstract:
Software development activity deals with the development of the healthcare software by using given resources. The allocation of the resources needs to be consistent with the scale of the project for which the resources are being allocated. The allocation of resources depends on the scale of healthcare projects. As far as resource planning for healthcare projects is concerned, healthcare projects are similar to software development in other areas. In this research, the effort is made to quantify the scale of healthcare projects. The scale can be small, medium, or large. Each scale has a differe
APA, Harvard, Vancouver, ISO, and other styles
8

Ab Hakim, Nurul Atiqah, Abdelrahman M. Farouk, Saffuan Wan Ahmad, and Rahimi A. Rahman. "Effect of Mega Railway Projects on Small and Medium Construction Companies: Impact and Problems." CONSTRUCTION 4, no. 1 (2024): 21–27. http://dx.doi.org/10.15282/construction.v4i1.9891.

Full text
Abstract:
Railway mega-projects are typically enormous large-scale investment projects that require a long time to develop and build. However, compared to other types of transportation, the railway is a safe mode of land transportation. Therefore, development such as railway mega-projects positively impacts small and medium construction companies. This study aims to study the impact of railway mega-projects on small and medium construction companies and investigate the problems that small and medium construction companies experience involving railway mega-projects. This study used a qualitative method o
APA, Harvard, Vancouver, ISO, and other styles
9

Nasid Masrom, Md Asrul, Garba Hamza, Norpadzlihatun Manap, and Noor Shahifah Syahrom. "Factors Affecting the Performance of Medium and Large Local Contractors in the Jigawa State Nigerian Construction Industry." MATEC Web of Conferences 266 (2019): 03017. http://dx.doi.org/10.1051/matecconf/201926603017.

Full text
Abstract:
Medium and large local contractors in the Nigerian construction industry suffer from numerous problems and complex issues in regards to their performance in executing projects, particularly cost, time and quality. This paper is to identify the factors affecting the performance of medium and large local contractors in the Jigawa state Nigerian construction industry. Literature about medium and large local contractors, their performance was reviewed to identify the factors believed to affect their performance in executing construction projects. One hundred thirty-six questionnaires distributed t
APA, Harvard, Vancouver, ISO, and other styles
10

Park, Daehyeon, Jinhyeong Jo, and Doojin Ryu. "Incentive Contracts for Sustainable Growth of Small or Medium-Sized Enterprise." Sustainability 13, no. 9 (2021): 4964. http://dx.doi.org/10.3390/su13094964.

Full text
Abstract:
This study analyzes incentive contracts in public procurement supply chains using a game-theoretic approach. Specifically, we compare a structure in which the host company is a large enterprise and the partner company is a small or medium-sized enterprise (SME) to a structure in which the host is an SME and the partner is a large enterprise. For each structure, we examine whether an incentive contract improves supply chain performance and confirm that the performance improvement effect is greater when the host company is an SME. Our analysis has several policy implications. SMEs are less likel
APA, Harvard, Vancouver, ISO, and other styles
More sources

Dissertations / Theses on the topic "Medium and large projects"

1

Kiani, Mavi Neda. "Forecasting project success in the construction industry using multi-criteria decision-making tools and adaptive neuro fuzzy inference system." Thesis, Edith Cowan University, Research Online, Perth, Western Australia, 2024. https://ro.ecu.edu.au/theses/2791.

Full text
Abstract:
The construction industry plays a significant role in the development of economies. This industry in Australia contributed around 20% Australian Trade and Investment Commission (2023) to its gross domestic product (GDP) of over US$1.80 trillion (approximately AUD 2.85 trillion) (OECD, 2023).The federal budget for 2022–23 allocates AUD 17.9 billion over a decade towards major infrastructure projects, encompassing substantial funding for nationwide road and rail projects. The overall investment in major public infrastructure is anticipated to surpass AU$218 billion from 2021 to 2025. Approximate
APA, Harvard, Vancouver, ISO, and other styles
2

Olsson, Nils. "Project Flexibility in Large Engineering Projects." Doctoral thesis, Norwegian University of Science and Technology, Department of Civil and Transport Engineering, 2006. http://urn.kb.se/resolve?urn=urn:nbn:no:ntnu:diva-1932.

Full text
Abstract:
<p>Traditionally, projects tend to strive for increased predictability by managing details and attempting to bring all variables under control. However, experience shows that the chance of realising a plan without major amendments decreases with an increasing time horizon, which points to a need for flexible projects. A number of scholars argue that flexibility is necessary to face changes and uncertainty in the business environment. On the other hand, flexible projects are generally not described as desirable in project management literature. These conflicting approaches to flexibility have j
APA, Harvard, Vancouver, ISO, and other styles
3

Frazier, David E. "Requirement elicitation of large web projects." [Johnson City, Tenn. : East Tennessee State University], 2004. http://etd-submit.etsu.edu/etd/theses/available/etd-1109104-113450/unrestricted/FrazierD112304f.pdf.

Full text
Abstract:
Thesis (M.S.)--East Tennessee State University, 2004.<br>Title from electronic submission form. ETSU ETD database URN: etd-1109104-113450 Includes bibliographical references. Also available via Internet at the UMI web site.
APA, Harvard, Vancouver, ISO, and other styles
4

SANTOS, PAULO IVSON NETTO. "INFORMATION VISUALIZATION FOR MANAGING LARGE-SCALE ENGINEERING PROJECTS." PONTIFÍCIA UNIVERSIDADE CATÓLICA DO RIO DE JANEIRO, 2018. http://www.maxwell.vrac.puc-rio.br/Busca_etds.php?strSecao=resultado&nrSeq=34199@1.

Full text
Abstract:
PONTIFÍCIA UNIVERSIDADE CATÓLICA DO RIO DE JANEIRO<br>CONSELHO NACIONAL DE DESENVOLVIMENTO CIENTÍFICO E TECNOLÓGICO<br>Grandes projetos de engenharia como prédios e infraestrutura urbana demandam milhões em investimentos e estreita colaboração entre equipes de especialistas ao longo de vários anos de projeto, construção e operação. Para vencer estes desafios, a indústria de Arquitetura, Engenharia e Construção (AEC) está ativamente desenvolvimento métodos e ferramentas baseadas na Modelagem da Informação da Construção (BIM). BIM promove o uso de modelos CAD 3D como uma base de dados centraliza
APA, Harvard, Vancouver, ISO, and other styles
5

Karasu, T. (Taha). "Integration mechanisms in large Turkish and Finnish projects." Master's thesis, University of Oulu, 2018. http://urn.fi/URN:NBN:fi:oulu-201805301955.

Full text
Abstract:
Large construction projects are conducted in complex and uncertain climate by multiple stakeholders with varied expertise which increased the popularity of integration management particularly in 21st century. The main objective of the thesis is to find ways to improve integration capability in case projects. The study is pursued by both theoretical and empirical analysis. Literature was reviewed in order to provide solid theoretical background. Furthermore, questionnaire was formulated based on literature, and semi-structured interviews were conducted for the sake of data collection. Then, col
APA, Harvard, Vancouver, ISO, and other styles
6

Mohd, Yunus Mohd Zulkifli. "Geospatial data management throughout large area civil engineering projects." Thesis, University of Newcastle Upon Tyne, 1997. http://ethos.bl.uk/OrderDetails.do?uin=uk.bl.ethos.360241.

Full text
APA, Harvard, Vancouver, ISO, and other styles
7

Fineman, Milijana. "Improved risk analysis for large projects : Bayesian networks approach." Thesis, Queen Mary, University of London, 2010. http://qmro.qmul.ac.uk/xmlui/handle/123456789/1300.

Full text
Abstract:
Generally risk is seen as an abstract concept which is difficult to measure. In this thesis, we consider quantification in the broader sense by measuring risk in the context of large projects. By improved risk measurement, it may be possible to identify and control risks in such a way that the project is completed successfully in spite of the risks. This thesis considers the trade-offs that may be made in project risk management, specifically time, cost and quality. The main objective is to provide a model which addresses the real problems and questions that project managers encounter, such as
APA, Harvard, Vancouver, ISO, and other styles
8

Kang, Jihun 1971. "Valuing flexibilities in large-scale real estate development projects." Thesis, Massachusetts Institute of Technology, 2004. http://hdl.handle.net/1721.1/26739.

Full text
Abstract:
Thesis (S.M.)--Massachusetts Institute of Technology, Dept. of Urban Studies and Planning, 2004.<br>This electronic version was submitted by the student author. The certified thesis is available in the Institute Archives and Special Collections.<br>Includes bibliographical references (leaves 147-150).<br>This thesis aims to develop a set of strategic tools for real estate development projects. The conventional tools such as the Discounted Cash Flow (DCF) method fail to incorporate dynamics of real estate development processes. As a result, their application to real world situation is quite li
APA, Harvard, Vancouver, ISO, and other styles
9

Staudenmayer, Nancy A. (Nancy Ann). "Managing multiple interdependencies in large scale software development projects." Thesis, Massachusetts Institute of Technology, 1997. http://hdl.handle.net/1721.1/10357.

Full text
APA, Harvard, Vancouver, ISO, and other styles
10

Magnusson, Evelina, and Moa Westlund. "Measuring Performance in Large Scale Agile Software Development Projects." Thesis, KTH, Skolan för industriell teknik och management (ITM), 2021. http://urn.kb.se/resolve?urn=urn:nbn:se:kth:diva-300388.

Full text
Abstract:
The increased usage and need for software as part of products has challenged traditional project management, nevertheless for hardware heavy organisations that are used to rely on the linear prediction and tracking of project outcomes. The developments in projects with embedded systems have countless dependencies and almost impossible to predict. Literature shows that software development projects have problems meeting the initial goals of budget, time, and scope. This is discovered too late due to insufficient methods of tracking progress. The purpose of this thesis was to investigate how lar
APA, Harvard, Vancouver, ISO, and other styles
More sources

Books on the topic "Medium and large projects"

1

Occardi, Valerio D. A computer capacity planning model for medium to large scale software development projects. Portsmouth Polytechnic, School of Information Sciences, 1990.

Find full text
APA, Harvard, Vancouver, ISO, and other styles
2

Royal Institution of Chartered Surveyors. The development of medium to large industrial development projects: Current trends, issues and policies : a memorandum. The Institution, 1985.

Find full text
APA, Harvard, Vancouver, ISO, and other styles
3

Facility, Global Environment, and United Nations Environment Programme. GEF Coordination Office., eds. UNEP's GEF medium-sized projects. United Nations Environment Programme, GEF Coordination Office, 2000.

Find full text
APA, Harvard, Vancouver, ISO, and other styles
4

ill, Bogacki Tomasz, ed. Small, medium, large. Star Bright Books, 2011.

Find full text
APA, Harvard, Vancouver, ISO, and other styles
5

Rem, Koolhaas, Mau Bruce, Sigler Jennifer, Werlemann Hans, and Office for Metropolitan Architecture, eds. Small, medium, large, extra-large. 010 Publishers, 1995.

Find full text
APA, Harvard, Vancouver, ISO, and other styles
6

Betsy, Kruger, and Association of Research Libraries. Office of Leadership and Management Services., eds. Managing large projects. Association of Research Libraries, Office of Leadership and Management Services, 2005.

Find full text
APA, Harvard, Vancouver, ISO, and other styles
7

Oldenburg, Claes. Large-scale projects. Thames and Hudson, 1995.

Find full text
APA, Harvard, Vancouver, ISO, and other styles
8

Martra, Pere. Large Language Models Projects. Apress, 2024. http://dx.doi.org/10.1007/979-8-8688-0515-8.

Full text
APA, Harvard, Vancouver, ISO, and other styles
9

Rakos, John J. Software projectmanagement: For small to medium sized projects. Prentice Hall, 1990.

Find full text
APA, Harvard, Vancouver, ISO, and other styles
10

Kostka, Genia, and Jobst Fiedler, eds. Large Infrastructure Projects in Germany. Springer International Publishing, 2016. http://dx.doi.org/10.1007/978-3-319-29233-5.

Full text
APA, Harvard, Vancouver, ISO, and other styles
More sources

Book chapters on the topic "Medium and large projects"

1

Shi, Jintao, and Zhijiang Chen. "Research on Existing Bridges Rapid Load-Lifting Technology with UHPC in Highways Reconstruction and Expansion Projects." In Novel Technology and Whole-Process Management in Prefabricated Building. Springer Nature Singapore, 2024. http://dx.doi.org/10.1007/978-981-97-5108-2_3.

Full text
Abstract:
AbstractThere are a large number of small and medium-span bridges in the highway reconstruction and expansion projects. These bridges have been used for at least 20 years. Due to the design according to the old code the ultimate bearing capacity is generally insufficient after the reconstruction and expansion. This paper selects hollow-core slab bridges that account for more than 80% of the reconstruction and expansion projects as the research object, carefully evaluates the specific reasons for the insufficient bearing capacity of small and medium-span bridges, designs a plan for rapid loadin
APA, Harvard, Vancouver, ISO, and other styles
2

Mao, Huaidong, Mingwen Hu, and Ying Li. "Preliminary Study on the Cost Control in Medium and Large-Sized Construction Project." In Lecture Notes in Electrical Engineering. Springer Berlin Heidelberg, 2011. http://dx.doi.org/10.1007/978-3-642-24820-7_65.

Full text
APA, Harvard, Vancouver, ISO, and other styles
3

Tembo, C. K., A. Kanyembo, F. Muleya, and K. Kajimo-Shakantu. "Investigation of cost management factors influencing poor cost performance on large to medium sized projects in the construction industry." In Smart and Resilient Infrastructure For Emerging Economies: Perspectives on Building Better. CRC Press, 2023. http://dx.doi.org/10.1201/9781003435648-24.

Full text
APA, Harvard, Vancouver, ISO, and other styles
4

Haas, Gabriel, Adnan Alhomssi, and Viktor Leis. "Managing Very Large Datasets on Directly Attached NVMe Arrays." In Scalable Data Management for Future Hardware. Springer Nature Switzerland, 2025. https://doi.org/10.1007/978-3-031-74097-8_9.

Full text
Abstract:
Abstract High-performance solid-state drives based on flash memory have replaced hard disks as the primary storage medium. Modern servers can host ten or more NVMe SSDs, and the aggregate bandwidth is approaching main memory bandwidth. In response to this evolution, this project evaluates the performance trade-offs posed by the abstraction layers and interfaces involved in I/O management. We experimentally slice through the software stack, exploring the limits of how efficient I/O can be done, and provide a discussion about durability. Finally, we discuss the implications of fast storage devic
APA, Harvard, Vancouver, ISO, and other styles
5

Layton, Peter. "Evolution Not Revolution: Defence AI in Australia." In Contributions to Security and Defence Studies. Springer Nature Switzerland, 2024. http://dx.doi.org/10.1007/978-3-031-58649-1_26.

Full text
Abstract:
AbstractMiddle power Australia has an active defence Artificial Intelligence (AI) program underway with a well-defined innovation pathway and numerous experimentation projects. The Australian Defence Force sees AI mainly being used in human–machine teams to improve efficiency, increase combat power, achieve decision superiority, and lower risks to combat personnel. The major equipment acquisition plan for the next two decades sets out six AI-relevant projects: one navy, one army, three air force and one in the information and cyber domain. Associated with this investment is a high expectation
APA, Harvard, Vancouver, ISO, and other styles
6

Gbode, Imoleayo E., Vincent O. Ajayi, Kehinde O. Ogunjobi, Jimy Dudhia, and Changhai Liu. "Impacts of Global Warming on West African Monsoon Rainfall." In African Handbook of Climate Change Adaptation. Springer International Publishing, 2021. http://dx.doi.org/10.1007/978-3-030-45106-6_93.

Full text
Abstract:
AbstractThe impacts of global warming on rainfall in West Africa were examined using a numerical framework for 5 monsoon years (2001, 2007, 2008, 2010, and 2011). Rainfall characteristics over the three climatic zones, Guinea coast, Savannah, and Sahel, were analyzed. The potential changes associated with global warming were assessed by the pseudo-global warming (PGW) downscaling method. Multiple PGW runs were conducted using climate perturbation from the 40-member ensemble of the Community Earth System Model version 1 (CESM1) coupled with Community Atmospheric Model version 5.2 (CAM5.2) compo
APA, Harvard, Vancouver, ISO, and other styles
7

Tran, Thierry, Adebayo Abass, Luis Alejandro Taborda Andrade, et al. "Cost-Effective Cassava Processing: Case Study of Small-Scale Flash-Dryer Reengineering." In Root, Tuber and Banana Food System Innovations. Springer International Publishing, 2022. http://dx.doi.org/10.1007/978-3-030-92022-7_4.

Full text
Abstract:
AbstractThe development and scaling out of flash-dryer innovations for more efficient, small-scale production of high-quality cassava flour (HQCF) and starch is described. The diagnoses of cassava-processing SMEs (small and medium enterprises) revealed their energy expenditures for drying were considerably higher than those of large-scale industrial companies, which was mostly due to suboptimal design of flash-drying systems. As a result, small-scale production of cassava starch and HQCF often incurs high production costs, incompatible with market prices of final products. Taking stock of this
APA, Harvard, Vancouver, ISO, and other styles
8

Bleuanus, Sebastiaan, Genny Paviotti, and Andrea Visintin. "The Ammonia2-4 EU-Funded Project: Demonstrating a 2- Stroke and 4-stroke Large Scale Ammonia Marine Engine." In Lecture Notes in Mobility. Springer Nature Switzerland, 2025. https://doi.org/10.1007/978-3-031-89444-2_107.

Full text
Abstract:
Abstract Internal combustion engines running on ammonia are increasingly considered as important facilitator among research, industry and policy communities in reaching EU environmental goals. The overall aim of the Ammonia2–4 project is to demonstrate at full scale two types of dual fuel marine engines running on ammonia as main fuel: a 4-stroke engine and a 2-stroke medium-pressure ammonia fuel injection platform. Both engine innovations are expected to result in at least 80% less GHG emissions (including nitrous oxide emissions), NOx emissions below IMO Tier III regulations and a negligible
APA, Harvard, Vancouver, ISO, and other styles
9

De Gennaro, Michele, James Page, Isik Ozcer, Guillaume Moula, Salvatore Corcione, and Vincenzo Cusati. "Advances on the Next Generation Short-Medium Range Aircraft Rear End: The CleanSky 2 Project IMPACT." In Lecture Notes in Mobility. Springer Nature Switzerland, 2025. https://doi.org/10.1007/978-3-031-89444-2_15.

Full text
Abstract:
Abstract This paper aims at presenting the results of the CleanSky 2 European project IMPACT (GA no. 885052), granted under the Large Passenger Aircraft Integrated Technology Demonstrator (LPA-ITD), aiming at optimizing the rear-end design for the next generation Short and Medium Range (SMR) A320-like aircraft. Specifically, the project has investigated a Forward Swept Horizontal Tail Plane (FSHTP) enhanced with a Leading-Edge eXtension (LeX) device. The activities have focused on the optimisation of the horizontal stabilizer, accounting for the coupled aerodynamic, aeroelastic and, for the fi
APA, Harvard, Vancouver, ISO, and other styles
10

Zuckerman, Paul. "Funding Large Projects: Private Money for Large Projects." In BIEC Yearbook 1989–1990. Macmillan Education UK, 1989. http://dx.doi.org/10.1007/978-1-349-11350-7_17.

Full text
APA, Harvard, Vancouver, ISO, and other styles

Conference papers on the topic "Medium and large projects"

1

Putra, Luis Ode, Irwan Ridwan Rahim, and Rosmariani Arifuddin. "Analysis of Construction Disputes in South Sulawesi: Contractor Companies Perspective." In International Conference on Research in Engineering and Science Technology (IC-REST) 2023. Trans Tech Publications Ltd, 2025. https://doi.org/10.4028/p-pnnq84.

Full text
Abstract:
South Sulawesi is one of Indonesia's provinces with great potential in the construction sector. However, South Sulawesi faces various challenges in the construction sector, including construction disputes. This study aims to analyze the factors that cause construction disputes between small, medium, and large construction companies in South Sulawesi. Data were collected using questionnaires to project stakeholders and previous research. The method used was Structural Equation Modeling with a Partial Least Squares system. Seven factors cause disputes in construction projects, namely the problem
APA, Harvard, Vancouver, ISO, and other styles
2

Al-Soud, Mohammed Abu, and Magnus Genrup. "Advanced Medium-Large Steam Cycles." In 2024 International Conference on Electrical, Computer and Energy Technologies (ICECET). IEEE, 2024. http://dx.doi.org/10.1109/icecet61485.2024.10698545.

Full text
APA, Harvard, Vancouver, ISO, and other styles
3

Sun, Yufeng, and Xun He. "Research on countermeasure and management situation for large and medium biogas projects of China." In 2013 International Conference of Information Science and Management Engineering. WIT Press, 2013. http://dx.doi.org/10.2495/isme133723.

Full text
APA, Harvard, Vancouver, ISO, and other styles
4

Poltie, Brian M., Emmanuel S. Udoh, and Luis F. Luna-Reyes. "Understanding Smart City Projects and Priorities across Large, Medium and Small Cities in the United States." In dg.o '20: The 21st Annual International Conference on Digital Government Research. ACM, 2020. http://dx.doi.org/10.1145/3396956.3397867.

Full text
APA, Harvard, Vancouver, ISO, and other styles
5

Chinda, Thanwadee. "Investigation of Safe Behaviors in Small, Medium, and Large Food Companies in Thailand." In International Conference on Engineering, Project, and Production Management. Association of Engineering, Project, and Production Management, 2011. http://dx.doi.org/10.32738/ceppm.201109.0022.

Full text
APA, Harvard, Vancouver, ISO, and other styles
6

Bin, Li, and Cui Tiening. "The research on product market of the large and medium-sized methane project." In 2011 International Conference on Electronics, Communications and Control. IEEE, 2011. http://dx.doi.org/10.1109/icecc.2011.6067717.

Full text
APA, Harvard, Vancouver, ISO, and other styles
7

Turner, M., K. Gutteridge, D. Thiele, and C. Welbourn. "Experiences with implementing multi-user database platforms to increase quality and efficiency of management and communications on large and medium size infrastructure projects." In 8th International Conference on Railway Engineering (ICRE 2018). Institution of Engineering and Technology, 2018. http://dx.doi.org/10.1049/cp.2018.0061.

Full text
APA, Harvard, Vancouver, ISO, and other styles
8

Liu, T., R. Ahmadi-Naghadeh, R. M. Buckley, et al. "Cyclic Characterisation of Low-to-Medium Density Chalk for Offshore Driven Pile Design." In Innovative Geotechnologies for Energy Transition. Society for Underwater Technology, 2023. http://dx.doi.org/10.3723/hopx5443.

Full text
Abstract:
Project-specific advanced laboratory testing is employed increasingly frequently in site investigations for major offshore projects. Such testing needs to focus on characterising properties under in-situ conditions, while also catering for the effects of foundation installation and subsequent service conditions, including cyclic loading. Low-to-medium density chalk, a variable soft biomicrite, can be de-structured to soft paste under dynamic percussion or large-strain repetitive shearing, posing significant challenges and uncertainties for driven pile design. This paper draws on key outcomes f
APA, Harvard, Vancouver, ISO, and other styles
9

Place, Trevor, Greg Sasaki, Colin Cathrea, and Michael Holm. "Pressure Test Planning to Prevent Internal Corrosion by Residual Fluids." In 2012 9th International Pipeline Conference. American Society of Mechanical Engineers, 2012. http://dx.doi.org/10.1115/ipc2012-90308.

Full text
Abstract:
Strength and leak testing (AKA ‘hydrotesting’, and ‘pressure testing’) of pipeline projects remains a primary method of providing quality assurance on new pipeline construction, and for validating structural integrity of the as-built pipeline [1][2][3]. A myriad of regulations surround these activities to ensure soundness of the pipeline, security of the environment during and after the pressure testing operation, as well as personnel safety during these activities. CAN/CSA Z662-11 now includes important clauses to ensure that the pipeline designer/builder/operator consider the potential corro
APA, Harvard, Vancouver, ISO, and other styles
10

Shrestha, Rakish, Joseph A. Ronevich, Lisa Fring, et al. "Compatibility of Medium Density Polyethylene (MDPE) for Distribution of Gaseous Hydrogen." In ASME 2022 Pressure Vessels & Piping Conference. American Society of Mechanical Engineers, 2022. http://dx.doi.org/10.1115/pvp2022-84791.

Full text
Abstract:
Abstract Numerous projects are looking into distributing blends of natural gas and different amounts of gaseous hydrogen through the existing natural gas distribution system, which is widely composed of medium density polyethylene (MDPE) line pipes. The mechanical behavior of MDPE with hydrogen is not well understood; therefore, the effect of gaseous H2 on the mechanical properties of MDPE needs to be examined. In the current study, we investigate the effects of gaseous H2 on fatigue life and fracture resistance of MDPE in the presence of 3.4 MPa gaseous H2. Fatigue life tests were also conduc
APA, Harvard, Vancouver, ISO, and other styles

Reports on the topic "Medium and large projects"

1

Marcos Morezuelas, Paloma. Gender and Renewable Energy: Wind, Solar, Geothermal and Hydroelectric Energy. Inter-American Development Bank, 2014. http://dx.doi.org/10.18235/0003068.

Full text
Abstract:
This document focuses on how to incorporate a gender perspective in operations that support the construction, operation and maintenance of medium- and large-scale renewable wind, solar, geothermal and hydroelectric energy installations connected to the grid for purposes of power generation. Additionally, there is also a section on rural energy that is applicable to small installations and mini-grids, or to exceptional cases where medium- and large-scale facilities provide electricity to a community. The document (i) identifies the possible gender equality challenges and opportunities as part o
APA, Harvard, Vancouver, ISO, and other styles
2

Tassitano, Jim, Daniel Olsen, Charles Mitchell, and Bryan Willson. GRI-03-0083 NO2 Emissions from 2SC Large Bore Natural Gas Engines. Pipeline Research Council International, Inc. (PRCI), 2018. http://dx.doi.org/10.55274/r0011537.

Full text
Abstract:
NO2 emissions data from previous EECL projects on a large bore, slow speed, two-stroke lean burn engine is reanalyzed, looking at the effect of engine variables on the formation of NO2. Included are variations of operating conditions, fuel delivery, and ignition systems. By looking at the emission trends found in the data, techniques may be proposed for the reduction of NO2 emissions. An investigation into the effectiveness of catalysts on NO2 emissions is performed using data taken from previous testing on a medium bore, high speed, four-stroke lean burn engine. A summation of the current und
APA, Harvard, Vancouver, ISO, and other styles
3

Putriastuti, Massita Ayu Cindy, Vivi Fitriyanti, and Muhammad Razin Abdullah. Leveraging the Potential of Crowdfunding for Financing Renewable Energy. Purnomo Yusgiantoro Center, 2021. http://dx.doi.org/10.33116/br.002.

Full text
Abstract:
• Renewable energy (RE) projects in Indonesia usually have IRR between 10% and 15% and PP around 6 to 30 years • Attractive return usually could be found in large scale RE projects, although there are numerous other factors involved including technology developments, capacity scale, power purchasing price agreements, project locations, as well as interest rates and applied incentives. • Crowdfunding (CF) has big potential to contribute to the financing of RE projects especially financing small scale RE projects. • P2P lending usually targeted short-term loans with high interest rates. Therefor
APA, Harvard, Vancouver, ISO, and other styles
4

Lopez, Vanessa D., Benito F. Perez, Harold R. Harold R., and Melanie D. Johnson. Power Modeling Tools : Market Assessment. U.S. Army Engineer Research and Development Center, 2024. http://dx.doi.org/10.21079/11681/49468.

Full text
Abstract:
This work was performed by the Energy—Power and Mechanical Systems Branch, US Army Construction Engineering Research Laboratory (CERL), Engineer Research and Development Center (ERDC).This technical note provides a survey and market assessment of power modeling tools to assist the Office of the Assistant Secretary of the Army (OASA), Installations, Energy, and Environment (IE&amp;E), with effective decision-making when considering the features, advantages, and disadvantages of the software tools available for power system modeling on a typical small, medium, or large Army installation. This su
APA, Harvard, Vancouver, ISO, and other styles
5

Hendrick, Stephen, and Ana Jimenez Santamaria. The 2024 State of OSPOs and Open Source Management: New Horizons for OSPOs in Small and Medium Organizations. The Linux Foundation, 2024. https://doi.org/10.70828/fxmr3018.

Full text
Abstract:
Now in its 7th year, the TODO Group's 2024 Open Source Program Office (OSPO) study explores the evolving role of OSPOs, comparing enterprises of different sizes. This report highlights OSPO benefits, challenges, and projected growth, in comparison with data from previous years to understand how these findings are trending. Key findings show that although 77% of large organizations have an OSPO, only 19% of small organizations have one. Implementing an OSPO is key for awareness of open source software use and dependencies, and they can improve license compliance and increased transparency. The
APA, Harvard, Vancouver, ISO, and other styles
6

Kim, Changmo, Ghazan Khan, Brent Nguyen, and Emily L. Hoang. Development of a Statistical Model to Predict Materials’ Unit Prices for Future Maintenance and Rehabilitation in Highway Life Cycle Cost Analysis. Mineta Transportation Institute, 2020. http://dx.doi.org/10.31979/mti.2020.1806.

Full text
Abstract:
The main objectives of this study are to investigate the trends in primary pavement materials’ unit price over time and to develop statistical models and guidelines for using predictive unit prices of pavement materials instead of uniform unit prices in life cycle cost analysis (LCCA) for future maintenance and rehabilitation (M&amp;R) projects. Various socio-economic data were collected for the past 20 years (1997–2018) in California, including oil price, population, government expenditure in transportation, vehicle registration, and other key variables, in order to identify factors affecting
APA, Harvard, Vancouver, ISO, and other styles
7

Weeks, Timothy "Dash." DTPH56-13-X-000013 Modern High-Toughness Steels for Fracture Propagation and Arrest Assessment-Phase II. Pipeline Research Council International, Inc. (PRCI), 2018. http://dx.doi.org/10.55274/r0012037.

Full text
Abstract:
NIST work developed processes to identify the stress/strain/crack velocity conditions for unstable high-rate ductile crack propagation found in a full-scale pipeline burst test and duplicate those conditions in a medium-scale test. With modeling to validate conditions and assumptions used in reducing the scale of the tests. A medium-scale test to elucidate material property data necessary to qualify high-strength high-toughness steels based on the correlation to large-scale tests. Parametric determination of the material properties governing fracture propagation or arrest-ability was developed
APA, Harvard, Vancouver, ISO, and other styles
8

Hammouti, A., S. Larmagnat, C. Rivard, and D. Pham Van Bang. Use of CT-scan images to build geomaterial 3D pore network representation in preparation for numerical simulations of fluid flow and heat transfer, Quebec. Natural Resources Canada/CMSS/Information Management, 2023. http://dx.doi.org/10.4095/331502.

Full text
Abstract:
Non-intrusive techniques such as medical CT-Scan or micro-CT allow the definition of 3D connected pore networks in porous materials, such as sedimentary rocks or concrete. The definition of these networks is a key step towards the evaluation of fluid flow and heat transfer in energy resource (e.g., hydrocarbon and geothermal reservoirs) and CO2 sequestration research projects. As material heterogeneities play a role at all scales (from micro- to project-scale), numerical models represent a powerful tool for bridging the gap between small-scale measurements provided by X-ray imaging techniques
APA, Harvard, Vancouver, ISO, and other styles
9

Berzins, Valdis, and Salah Badr. Robust Scheduling for Large Projects. Defense Technical Information Center, 1993. http://dx.doi.org/10.21236/ada279753.

Full text
APA, Harvard, Vancouver, ISO, and other styles
10

Leveque, E., M. Zarea, R. Batisse, and P. Roovers. IPC-BST-R01 Burst Strength of Gouges in Low Toughness Gas Transmission Pipes. Pipeline Research Council International, Inc. (PRCI), 2006. http://dx.doi.org/10.55274/r0011781.

Full text
Abstract:
EPRG research aimed at establishing a limit on the toughness value that separates toughness-dependent from toughness-independent failure behavior. More specifically, one objective is to evaluate the toughness-dependent Battelle formula for burst resistance of gouges for (very) low toughness values. This mainly experimental project checks this behavior on several gas transmission pipes, a small diameter one, 150 mm, a medium diameter one, 350 mm, and a large diameter one, 900 mm. Pipe material is carefully characterized in terms of tensile properties, Charpy energy, and shear area. Then, based
APA, Harvard, Vancouver, ISO, and other styles
We offer discounts on all premium plans for authors whose works are included in thematic literature selections. Contact us to get a unique promo code!