Academic literature on the topic 'MET projekt'

Create a spot-on reference in APA, MLA, Chicago, Harvard, and other styles

Select a source type:

Consult the lists of relevant articles, books, theses, conference reports, and other scholarly sources on the topic 'MET projekt.'

Next to every source in the list of references, there is an 'Add to bibliography' button. Press on it, and we will generate automatically the bibliographic reference to the chosen work in the citation style you need: APA, MLA, Harvard, Chicago, Vancouver, etc.

You can also download the full text of the academic publication as pdf and read online its abstract whenever available in the metadata.

Journal articles on the topic "MET projekt"

1

Ishigami, Junya. "Álombéli táj: Art biofarm projekt, Tocsigi (Tochigi), Japán." Metszet 10, no. 1 (2019): 46–49. http://dx.doi.org/10.33268/met.2019.1.7.

Full text
APA, Harvard, Vancouver, ISO, and other styles
2

Banaitienė, Nerija, Audrius Banaitis, and Artūras Norkus. "RISK MANAGEMENT IN PROJECTS: PECULIARITIES OF LITHUANIAN CONSTRUCTION COMPANIES / RIZIKOS VALDYMAS PROJEKTUOSE: LIETUVOS STATYBOS ĮMONIŲ SAVITUMAI." International Journal of Strategic Property Management 15, no. 1 (April 14, 2011): 60–73. http://dx.doi.org/10.3846/1648715x.2011.568675.

Full text
Abstract:
Risk analysis and management is nowadays a critical factor to successful construction project management, as construction projects tend to be more complex, dynamic, always unique, and competition increasingly tougher. risk management helps the project participants—client, contractor or developer, consultant, and supplier—to meet their commitments and minimize negative impacts on construction project scope, cost, schedule (and quality, as a Result). The benefits of the risk management process include identifying and analyzing risks, and improvement of construction project management processes and effective use of resources. This paper reports the research that aims to discover how construction companies perceive the significance of the construction projects risks they face and the extent to which they employ potential risk responses. Santrauka Šiandien rizikos analizė ir valdymas yra svarbūs sėkmingam statybos projektų valdymui, nes statybos projektai tampa vis sudėtingesni, dinamiškesni, visada unikalūs, o konkurencija tarp statybos bendrovių taip pat didėja. Rizikos valdymas padeda projekto dalyviams—užsakovui, plėtotojui, rangovui, konsultantui ir tiekėjui—vykdyti savo įsipareigojimus ir sumažinti neigiamą taką statybos projekto apimčiai, išlaidoms, tvarkaraščiui ir kokybei kaip rezultatui. Rizikos valdymo proceso metu sistemingai nustatomi, analizuojami ir reaguojama į potencialius rizikos veiksnius, todėl statybos projektai valdomi efektyviau, veiksmingai naudojami ištekliai. Šiame straipsnyje trumpai pristatomas tyrimas, kuriuo siekiama sužinoti, kaip statybos bendrovės suvokia statybos projektų rizikos veiksnius, su kuriais jiems tenka susidurti, ir kokią reagavimo strategiją ir atsakomuosius veiksmus jos renkasi.
APA, Harvard, Vancouver, ISO, and other styles
3

Ortiz-Moncada, Rocío, María Morales-Suárez-Varela, Ángeles Avecilla-Benítez, Aurora Norte Navarro, Rocío Olmedo-Requena, Carmen Amezcua-Prieto, José Cancela, et al. "Factors Associated with Meat Consumption in Students of Spanish Universities: UniHcos Project." International Journal of Environmental Research and Public Health 16, no. 20 (October 15, 2019): 3924. http://dx.doi.org/10.3390/ijerph16203924.

Full text
Abstract:
The level of meat consumption is one of the main deviations from the Mediterranean diet pattern in Spanish university students. The objective of this cross-sectional descriptive study is to analyze the association between sociodemographic factors and the consumption of fresh and processed meat in Spanish university students. This study is part of a cohort of 11 Spanish universities with 9862 university students (UniHcos Project). A descriptive analysis and a chi2 test were carried out to assess differences between personal and sociodemographic variables and meat consumption, and binary logistic regression analysis to assess factors associated with consumption; 19.9% and 73.5% met the recommendations for meat-fresh and meat-processed consumption, respectively. Only 3.8% of students meet the recommendations for both fresh and processed meat. Statistically significant differences were found between sex, BMI, employment, housing, and coexistence regarding compliance with recommendations. Female employed students living in rental accommodations with a partner are more likely to meet the recommendations for fresh meats while male, normal weight, employed students living in rental accommodations with a partner are more likely to meet the recommendations for processed meats. There is a lack of compliance with the recommendations for consumption of fresh meat in Spanish university students, differences in compliance among students of differing regions and an association with sex, employment, housing, and coexistence regarding compliance.
APA, Harvard, Vancouver, ISO, and other styles
4

Slater, Mark. "Locating Project Studios and Studio Projects." Journal of the Royal Musical Association 141, no. 1 (2016): 167–202. http://dx.doi.org/10.1080/02690403.2016.1151241.

Full text
Abstract:
ABSTRACTVia a longitudinal case study of a studio project (Middlewood Sessions, 2004–12), this research explores processes of music-making in the increasingly prevalent context of the project studio to give an insight into contemporary music-making practices. Predicated upon technologies of decreasing size but increasing processing power, project studios represent a diversification of musical creativity in terms of the persons and locations of music production. Increasingly mobile technologies lead to increasingly mobile practices of music production, which presents a challenge to the seemingly simple question: where is the project studio? In response, I propose an ontology of project-studio music-making that sets out what conditions have to be met for location, as an active proposition, to take place.
APA, Harvard, Vancouver, ISO, and other styles
5

Miśkiewicz, Dorota, and Bartosz Rogojsza. "Training projects in the Szczecin Met ropolitan Area – case study." Europa Regionum 33 (2017): 71–80. http://dx.doi.org/10.18276/er.2017.33-07.

Full text
APA, Harvard, Vancouver, ISO, and other styles
6

Sivle, Anders Doksæter, Amalie Kvame Holm, Jelmer Jeuring, Hans Olav Hygen, and Mai-Linn Finstad Svehagen. "TV meteorologists at MET Norway as climate communicators." Advances in Science and Research 18 (April 9, 2021): 27–31. http://dx.doi.org/10.5194/asr-18-27-2021.

Full text
Abstract:
Abstract. Climate change ought to be a natural part of the weather conversation on TV, radio and social media. Inspired by similar projects in other countries, the Norwegian Meteorological institute established a project in 2019 to develop their TV meteorologists as climate change communicators. The main objective in the project was to integrate research-based, localized climate content in the weather presentation, as to inform and engage the Norwegian public about climate change. Over a period of almost two years, the project has produced several climate stories on the national TV-news. The majority of the stories have also been shared through social media and through press releases to reach a wide range of audiences. In this paper, experiences from the project at the Norwegian Meteorological institute are shared along with recommendations for climate communication. We claim that TV meteorologists can have an important role in climate change communication, with a potential that is often not yet fully realized, and give our thoughts on how to further develop their role.
APA, Harvard, Vancouver, ISO, and other styles
7

Ghosh, Saumyendu, and Mirosław J. Skibniewski. "ENTERPRISE RESOURCE PLANNING SYSTEMS IMPLEMENTATION AS A COMPLEX PROJECT: A CONCEPTUAL FRAMEWORK." Journal of Business Economics and Management 11, no. 4 (December 31, 2010): 533–49. http://dx.doi.org/10.3846/jbem.2010.26.

Full text
Abstract:
The purpose of this paper is to investigate current literature on critical success factors (CSF) and risk factors (RF) of enterprise resource planning (ERP) system implementation and provide a systemic explanation of complexities involved in such implementation. This study will compile literature that highlighted possible references to CSFs of ERP implementations, definition of complex projects and ERP are compared with project management and project governance impacts. By analyzing highly likely CFS and RFs mentioned in literature, CSF and RFs will be mapped to project complexities involved in any ERP implementation. This is an exploratory study as it is based on literature review to understand ERP implementation and validations. The future research needs to include data collection from ERP adopters and longitudinal analyses of trends based on advances in ERP project management and governance capabilities in different ERP implementations. This article will be significant contribution to current body of knowledge because it helps us understand ERP application implementation as a complex project instead of linear system as currently documented in the literature. This article has outlined the conceptual revisions needed to extend the new project management approach from its current linear way of looking into project management of ERP projects. The article suggests that ERP project management is best understood within the context of environmental complexities. This paper is the first attempt to explore ERP implementations based on current enterprise environment and how to meet those CSF and RFs from complexity perspective. Santrauka Straipsnio tikslas – išnagrineti dabartinius literatūros šaltinius apie imones ištekliu planavimo sistemos igyvendinimo kritinius sekmes ir rizikos veiksnius, pateikti sistemiška kliūčiu, su kuriomis galima susidurti igyvendinant sistema, paaiškinima. Ši analize grindžiama tokiais literatūros šaltiniais, kuriuose kalbama ar užsimenama apie kritinius imones ištekliu planavimo sekmes veiksnius, sudetiniu projektu apibrežima, o imones ištekliu planavimas lyginamas su projektu valdymo poveikiais. Labiausiai tiketini analizuojamieji kritines sekmes ir rizikos veiksniai, mineti literatūroje, bus atvaizduojami tarp projektu kliūčiu, itrauktu bet kuriame imones ištekliu planavimo igyvendinimo etape. Tai yra aiškinamasis tyrimas, nes grindžiamas literatūros apžvalga imones ištekliu planavimo ir valdymo klausimais. Tolesniam tyrimui reikia surinkti duomenis iš ištekliu planavimo sistema idiegusiu imoniu ir atlikti ilgalaike pažangos tendenciju analize, valdant ištekliu planavimo projektus, bei ivertinti skirtingu imones ištekliu valdymo planu igyvendinimo galimybes. Šiame straipsnyje pateikiama daug žiniu apie imoniu ištekliu planavimo sistemos igyvendinima kaip kompleksini projekta, o ne šiuo metu literatūroje pateikiama linijine sistema. Straipsnyje numatyti konceptualūs taisymai, norint nuo dabartinio linijinio požiūrio pereiti prie naujojo imones ištekliu planavimo projektu valdymo požiūrio. Pažymeta, kad ištekliu planavimo projektu valdymas geriausiai suvokiamas aplinkos sudetingumo kontekste. Šis straipsnis – tai pirmasis meginimas ištirti imones ištekliu planavimo igyvendinima esamoje imones aplinkoje ir bandymas susidoroti su kritiniais sekmes ir rizikos veiksniais atsižvelgiant i kylančias kliūtis.
APA, Harvard, Vancouver, ISO, and other styles
8

van Dijk, Tim. "Succesvol inburgeren met Project JA Statushouders." Sociaal Bestek 82, no. 3 (October 2020): 11–13. http://dx.doi.org/10.1007/s41196-020-0674-1.

Full text
APA, Harvard, Vancouver, ISO, and other styles
9

Sortland, Venke Marie, and Ina Coll Kjølmoen. "Landing - dansekunstnere med stedssans." Nordic Journal of Dance 2, no. 1 (December 1, 2011): 2–7. http://dx.doi.org/10.2478/njd-2011-0002.

Full text
Abstract:
Abstract The performance group Landing was established in 2005 by 11 dance and performing artists, with an artistic vision to create site-specific dance projects. In 2008 Landing created an extensive site-specific project at the fully running St Olavs Hospital in Trondheim that was entitled Landing08. In this article we will share some of our experiences of this project. In 2010 Landing was reorganized into a production unit lead by us. Our aim is to initiate, produce, and support art projects that challenge target groups, sites and formats of presentation.
APA, Harvard, Vancouver, ISO, and other styles
10

Baalousha, Yousef, and Tahir Çelik. "AN INTEGRATED WEB-BASED DATA WAREHOUSE AND ARTIFICIAL NEURAL NETWORKS SYSTEM FOR UNIT PRICE ANALYSIS WITH INFLATION ADJUSTMENT / INTEGRUOTA INTERNETINĖ DUOMENŲ SAUGYKLOS IR DIRBTINIŲ NEURONINIŲ TINKLŲ SISTEMA, SKIRTA VIENETO KAINAI ANALIZUOTI ATSIŽVELGIANT Į INFLIACIJĄ." Journal of Civil Engineering and Management 17, no. 2 (July 12, 2011): 157–67. http://dx.doi.org/10.3846/13923730.2011.576806.

Full text
Abstract:
Estimating is a fundamental part of construction projects. Accurate cost estimate is the single most important element involved in the series of events that leads to a profitable completion of a contract in construction industry. The success or failure of a project depends on the accuracy of cost estimation. A cost estimate becomes more difficult and more complicated under inflationary medium. An unpredictable inflation rate and long progress payment delay during this period makes the budgeting function very difficult, if not impossible. The cost estimation process uses lots of data. The availability of the appropriate data at the appropriate time is one of the main factors affecting the accuracy of the cost estimation. As the complexity of the estimating task increases computerized system becomes increasingly important. The estimator should develop a good system of estimating forms and procedures that exactly meet the requirements of the pro- ject, and that is understood and accessible by all team members. This system should provide the ability to define material, labor hour and equipment hour quantities required for the project. Material, labor, and equipment unit costs are then applied to the bill of quantities. This paper presents An Integrated Web-Based Data Warehouse and Artificial Neural Net- works Model for Unit Price Analysis with Inflation Adjustment system called “DANUP“. Web facilities and database management capabilities of Microsoft Visual Studio 2005 are applied to create a data warehouse which is mainly aimed to integrate data from multiple heterogeneous databases and other information sources. The System also supports integrated cost index for adjusting the effect of inflation during estimating process. An artificial neural network model for forecast- ing the cost indices in Turkey for the project period has been developed. A construction project takes relatively long time to complete, effective communication among the project participants during the project period is important. A web based system is developed to facilitate the collection of construction cost information and communication. The web based sys- tem focuses on demonstrating the potential of data centric web data bases in enhancing the communication process during project execution. End users can access the database through the internet and perform certain transactions according to their authorization. Santrauka Sąmatos sudarymas – esminė statybos projektų dalis. Tiksli sąnaudų sąmata – vienas svarbiausių elementų, susijusių su įvykiais, kurie statybų sektoriuje leidžia pelningai įvykdyti sutartį. Projekto sėkmė arba žlugimas priklauso nuo to, ar tiksliai įvertintos sąnaudos. Infliacinėje aplinkoje sąnaudas įvertinti sunkiau ir sudėtingiau. Dėl neprognozuojamo infliacijos lygio ir ilgalaikių dalinių mokejimų vėlavimo per tokį laikotarpį biudžetą numatyti itin sunku, o gal net neįmanoma. Vertinant sąnaudas reikia gausybės duomenų. Galimybė reikiamu metu gauti reikiamus duomenis – vienas pagrindinių veiksnių, darančių įtaką sąnaudų sąmatos tikslumui. Kadangi sąmatas sudaryti vis sudėtingiau, vis svarbiau yra naudoti kompiuterizuotas sistemas. Sąmatininkas turi suformuoti gerą sąmatų sudarymo formų ir procedūrų sistemą, tiksliai atitinkančią projekto reikalavimus, suprantamą ir prieinamą visiems komandos nariams. Tokioje sistemoje reikia funkcijos, leidžiančios nurodyti projektui reikalingų medžiagų, darbo valandų ir įrangos naudojimo valandų skaičius. Tuomet medžiagų, darbo ir įrangos vienetų kainos įtraukiamos i sąmatą. Šiame darbe pristatoma integruoto internetinio duomenų saugyklos ir dirbtinių neuroninių tinklų modelio, tinkamo analizuoti vieneto kainą, atsižvelgiant į infliacija, sistema, pavadinta ”DANUP“. Naudojant Microsoft Visual Studio 2005 internetines ir duomenų bazių valdymo funkcijas, sukuriama duomenų saugykla, kurios svarbiausias tikslas – integruoti iš daugybės heterogeninių duomenų bazių ir kitų informacijos šaltinių gautus duomenis. Be to, naudojant sistemą galima sudaryti integruotą sąnaudų indeksą, kuris sudarant sąmatą leidžia įvertinti infliacijos poveikį. Buvo sukurtas dirbtinio neuroninio tinklo modelis, leidžiantis Turkijoje prognozuoti sąnaudų indeksus, kurie galios vykstant projektui. Statybos projektas trunka gana ilgai, taigi vykdant projektą svarbu, kad bendravimas tarp jo dalyvių būtų efektyvus. Buvo sukurta internetinė sistema, padedanti rinkti informaciją apie statybų sąnaudas ir bendrauti tarpusavyje. Pagrindinis internetinės sistemos tikslas – parodyti, kaip, remiantis duomenų kiekiu grindžiamomis internetinėmis duomenų bazėmis, vykdant projektą galima pagerinti komunikaciją. Galutiniai vartotojai duomenų bazę gali pasiekti internetu ir, priklausomai nuo prieigos lygio, atlikti tam tikras operacijas.
APA, Harvard, Vancouver, ISO, and other styles
More sources

Dissertations / Theses on the topic "MET projekt"

1

Nouhi, Amin. "Dialog med kunden i projektet." Thesis, Uppsala universitet, Industriell teknik, 2015. http://urn.kb.se/resolve?urn=urn:nbn:se:uu:diva-310421.

Full text
Abstract:
The high rate of failed IT projects has become a real and relevantconcern of many businesses. Businesses are dissipating theirresources on failed IT projects. More often, IT projects fail toachieve most of their intended purpose of increasing productivity,lowering operating costs, improving the quality of work. Althoughthere have been many studies done through the years in an attemptto find the causes behind IT-project failure, there is still noconsensus about the underlying causes. The question itself iscomplex with many different aspects to consider. The researcherswithin this field mostly acknowledge this problem. Against thisbackground, the primary focus of this study is to explore what theclients within the IT-projects think about the way IT-projects areconducted and what they think has to be done to better the chancesof success for these projects. For the outcome of this study to bewell-founded interviews were also done with those responsible onthe supplier side in order to cover both sides viewpointconcerning the IT-projects. The way IT-projects are conducted nowseems to have a process-based approach to the problem that has tobe solved, this is because the project has to go through a numberof steps that have been defined before the project has even begun.The fact that the upcoming project has a predefined plan to followis not the problem since it is reasonable to have a plan for theupcoming project. Having a predefined plan for the upcomingproject without really understanding the problem that has to beaddressed in detail through the IT-project is a major problem. This study has proven that it is very common that the peopleinvolved in an IT-project do not understand each other whilediscussing the project. This leads to the conclusion that the waythat IT-projects are conducted right now, where the supplier ofthe IT-solutions even if they have extensive experience fromconducting IT-projects and therefor say that “we know what has tobe done” to put more emphasis into understanding the problem thathas to be solved through consultation with the client. The need toput more emphasis on understanding the client is something that isalso confirmed through various models presented in this study.
APA, Harvard, Vancouver, ISO, and other styles
2

Johansson, Elin, and Engblom Stephanie Gräns. "Projektledares motivation och metod : Med utgångspunkt från Vrooms förväntansteori." Thesis, Linnéuniversitetet, Institutionen för organisation och entreprenörskap (OE), 2015. http://urn.kb.se/resolve?urn=urn:nbn:se:lnu:diva-45163.

Full text
Abstract:
In today’s changing environment, creation of projects by organizations has become more common. The problem is, though, that the knowledge of the subject is still limited which causes many projects to fail. This has made it extra important to have a good project manager whocanlead the project in the right direction. While doing this both the project method and the project manager’s motivation are contributing sources. That is why this studywill take a deeper look into the project methodand the motivation of the project manager and also the relationship between these two. To do this, this study is based on a theory of motivation, the Vroom’s expectancy theory. The purpose with this study is to create a greater understanding for the project methodand how it is affected by the motivation. This is a qualitative study in which interviews with four project managers has been done. The results showed that there is a connection both between the different variables in the Expectancy theory, but also connected to how these are affecting the project method.
I dagens ombytliga samhälle har det blivit allt vanligare att företag skapar projekt. Kunskapen kring området har dock inte hunnit med i utvecklingstakten vilket har gjort att många projekt misslyckas. En viktig faktor är projektledaren som påverkar projektet på många plan vilket gör att både projektledarens arbetssätt samt motivation spelar in. Det är just dessa två eller närmare bestämt projektmetoden och projektledarens motivation samt relationen mellan dem som den här studien kommer atttitta närmare på. För att göra det såhar studien utgått från en teori om motivation som heter Vrooms förväntansteorin. Syftet med studien är att skapa en ökad förståelse för projektmetodenoch hur den kan påverkas av motivationen. En kvalitativ studie där intervjuer med fyra projektledare har gjorts vilka resulterade i att samband mellan både de olika variablerna i förväntansteorin kunde hittas och samband i hur dessa påverkar projektmetoden. Utifrån resultaten drar studien slutsatsen att motivationen kanpåverka hur projektledaren använder projektmetoden via de olika variablerna i förväntansteorin.
APA, Harvard, Vancouver, ISO, and other styles
3

Granat, Nina. "''Ämnesintegrerade projekt är kul, men...'' : En studie om hur musiklärare erfar samarbete med andra ämneslärare i kulturskolan." Thesis, Karlstads universitet, Institutionen för konstnärliga studier (from 2013), 2019. http://urn.kb.se/resolve?urn=urn:nbn:se:kau:diva-72319.

Full text
Abstract:
Syftet med studien är att få insikt i hur musiklärare i kulturskoal erfar ämnesintegrerade projekt samt hur inkluderingsarbete kan främjas av sådana projekt. För att kunna uppnå detta syfte utgår studien från följande forskningsfrågor: Vilka erfarenheter har musiklärare av ämnesintegrerade projekt i kulturskolan? Och i vilken utsträckning upplevs ämnesintegrerade projekt kunna påverka inkluderingsarbete i kulturskolan? Studiens kunskapsteoretiska utgångspunkt är interpretativism och den vetenskapsfilosofiska utgångspunkten fenomenologi. För att uppnå syfte och svara på frågeställningarna har semistrukturerade intervjuer gjorts med tre musiklärare som arbetar på varsin musik- eller kulturskola i Sverige. Resultatet presenteras i två övergripande teman. Teman är Resurser för och motivation till kreativt arbete samt social interaktion. I resultatet framkommer många likheter i de intervjuade musiklärarnas utsagor vilka till stor del handlar om en positiv inställning till utförandet av ämnesintegrerade projekt och främjandet av inkluderingsarbete i musik- och kulturskolan. Möjligheten och motivationen till att vilja utföra projekt skiljer sig däremot åt mellan musiklärarna vilka bland annat påverkas av tillgång till resurser och samarbete mellan kollegor.
The purpose of this study is to get a view of how music teachers in the Swedish music schools experience projects where different art subjects are integrated with each other and to see if these projects can facilitate that more people get included in these schools. In order to achieve this purpose, the study is based on the following research questions: In what ways does music teachers experience subject integrated projects in the Swedish music schools?, In what way can subject integrated projects facilitate that more people get included in the Swedish music schools according to music teachers? The theoretical foundation of the study is interpretivism and the philosophical perspective is phenomenology. Semi-structured interviews were conducted with three music teachers whom where all working in one music school each. The result is presented in two overall themes. Resources and motivation for creative work is the first theme. The second theme is Social interaction. The result reveal that the experience the music teachers describes when it comes to subject integrated projects and the work with including more people to the music schools are quite similar too each other. The experience is however different within the teachers answes when it comes to the possibility and the motivation to participate or lead a subject integrated project. The result reveal that possibilities and motivation is affected by resources and the cooperation in between colleges.
APA, Harvard, Vancouver, ISO, and other styles
4

de, la Gardie Louise, and Christina Johansson. "Ekonomistyrning av projekt med olika grad av osäkerhet." Thesis, Linköping University, Department of Management and Economics, 2003. http://urn.kb.se/resolve?urn=urn:nbn:se:liu:diva-1548.

Full text
Abstract:

Bakgrund: En stor del av projekten som genomförs överskrider de ramar som finns vad gäller budget, tid och kvalitetsspecifikationer. De problem som uppstår vid ekonomistyrning av projekt kan troligtvis till viss del härledas till att projekt genomförs i olika miljöer och således utsätts för olika grad av osäkerhet. Detta, i kombination med varje projekts unikhet, leder till antagandet att alla projekt inte kan styras på samma sätt, utan istället måste sannolikt ekonomistyrningen anpassas till det enskilda projektets förutsättningar.

Syfte: Syftet är att beskriva och analysera hur ekonomistyrningen utformas samt även hur den bör utformas i projekt som kännetecknas av olika grad av osäkerhet.

Genomförande: Undersökningen genomfördes i form av en fallstudie och den empiriska informationen samlades in genom fyra intervjuer på lika många företag som arbetar med olika sorters projekt. De undersökta projekten är ett implementeringsprojekt, ett byggprojekt och två utvecklingsprojekt.

Resultat: Vi har konstaterat att implementeringsprojektet uppvisar minst osäkerheter medan utvecklingsprojekten är mest osäkra och även oförutsägbara. Den främsta osäkerheten i samtliga projekt kan härledas till kunden och dennes preferenser. Vidare skiljer sig ekonomistyrningen åt i de olika projekten, bl a genom budgetens och tidsplanens upprättande och användning samt acceptansen av avvikelser från planen, vilket påvisar att alla projekt inte kan styras på samma sätt.

APA, Harvard, Vancouver, ISO, and other styles
5

Ahlénius, Emma, and Lovisa Öst. "Att ge eller att inte ge : En studie om projektledares arbete med återkoppling." Thesis, Karlstads universitet, Handelshögskolan, 2016. http://urn.kb.se/resolve?urn=urn:nbn:se:kau:diva-42919.

Full text
Abstract:
Bakgrunden till vår uppsats är att återkoppling behövs som verktyg på en arbetsplats för att få medarbetare att trivas. Detta har i grund och botten anknytning till vårt behov av att känna oss accepterade och av att känna samhörighet. Forskning har visat att bekräftelse från omvärlden är en viktig del för individens självbild. Särskilt i en projektorganisation är återkoppling betydelsefullt, eftersom projektgrupper ofta består av nya konstellationer av människor som snabbt måste lära sig att samarbeta. Om ett bra arbete med återkoppling sker kan detta få positiva effekter på arbetsprestationer. Problematiken kring att ge återkoppling handlar om att ge den på ett konstruktivt sätt som får mottagaren att ta åt sig. Genom att granska tidigare forskning undersökte vi varför det finns ett behov av återkoppling i pro-jektgrupper, vad forskningen säger att givaren bör tänka på när det handlar om återkoppling samt vad konsekvenserna och resultatet kan bli av återkoppling. Vårt syfte är att utifrån den forskning som idag finns undersöka hur arbetet med åter-koppling ser ut i praktiken för fem stycken projektledare. Vi ställde oss bland an-nat frågeställningarna: Ger projektledare återkoppling? På vilka sätt? Hur ser de på arbete med återkoppling? Vet de hur teorin ser ut kring ämnet? Arbetar de med att bli bättre på att ge återkoppling? För att undersöka frågeställningarna använde vi oss av en kvalitativ metod i form av semistrukturerade intervjuer. Projektle-darna arbetar alla inom samma bransch, fastighetsförvaltningsbranschen. Våra intervjudata bearbetades genom transkribering samt kodning efter förutbestämda teman. I vår analys jämförs den teoretiska bakgrunden med den empiriska datan vi insamlat. En matris med en sammanställning av det insamlade materialet återfinns i bilaga 2. Vår slutsats är bland annat att projektledare mest arbetar med positiv återkoppling och att negativ återkoppling kan vara problematiskt att ge. Vi fann även att projektledarna inte hade någon teoretisk kunskap om ämnet återkoppling utan de färdigheter de besatt hade de lärt sig genom erfarenhet.
The background of our paper is that feedback is needed as a tool on during work to make the individuals feel comfortable. This is basically related to our need of feeling accepted and to feel affinity. Research has demonstrated that the confirmation from the outside world is an important part of the individual's selfimage. In a project based environment, feedback is important, as project groups often consist of new constellations of people who quickly must learn to work together. If feed-back could be used successfully, this can have positive effects on work perfor-mance. The problem of providing feedback is how to give it in a constructive way so the receiver to take in the information and accept it. By examining past research, we examined why there is a need for feedback in project teams, what the research says that the giver should consider when it comes to feedback, and what consequences and results of feedback could be. Our purpose is, based on existing research, to examine how feedback is used in practice for five project managers. We asked ourselves following questions: Do project managers provide feedback? In what ways? How do they work with feedback? Do they know how the theory looks about the topic? How do they work to become better at giving feedback? To examine the issues, we used a qualitative approach in the form of semi-structured interviews. The interview subjects were all working in the same indus-try, the real estate industry. Our interview data were processed by transcribing and coding by predetermined themes. In our analysis we compared the theoretical background of the empirical data we collected. A matrix with a compilation of the collected data is presented in appendix 2. Our conclusion is that project managers mostly work with positive feedback and that giving negative feedback is perceived problematic. We also discovered that the project managers lacked a theo-retical knowledge about the subject and that the skills they possessed, had they learned through experience.
APA, Harvard, Vancouver, ISO, and other styles
6

Johnsson, Julia, and Anna Olin. "Styrning i vägprojekt: Med fokus på förutsättningar och risker : En kvalitativ flerfallsstudie inom Trafikverket." Thesis, Linnéuniversitetet, Institutionen för ekonomistyrning och logistik (ELO), 2020. http://urn.kb.se/resolve?urn=urn:nbn:se:lnu:diva-96648.

Full text
Abstract:
Bakgrund och problem: Projekt präglas vanligtvis av en otillräcklig måluppfyllelse, exempelvis gällande tid, kostnad och kvalitet. Detta går även att finna vid anläggnings- och infrastrukturprojekt, vilka dessutom är betydande för samhällets möjligheter för kommunikation och transport. Att infrastrukturprojekt, vilka bedrivs av den offentliga verksamheten Trafikverket, inte uppnår sina mål resulterar i förseningar och att skattepengar inte nyttjas maximalt. Detta tyder även på att projekten är svårstyrda utifrån de föränderliga förutsättningar och risker som präglar projekttypen, vilket gör det relevant att studera ämnet vidare.  Syfte: Syftet med studien är att öka kunskapen om hur styrningen går tillväga vid vägprojekt med fokus på förutsättningar och risker. Detta utförs genom att beskriva hur Trafikverkets process styrs i vägprojekt och identifiera samt analysera förutsättningar och risker som kan påverka projekten. Metod: Studien är en kvalitativ flerfallsstudie inom Trafikverket. Det teoretiska materialet har erhållits från vetenskapliga artiklar, litteratur och rapporter. Det empiriska materialet är insamlat genom ett snöbollsurval där åtta respondenter inkluderades. Totalt genomfördes elva semistrukturerade intervjuer. Webbsidor och dokument är också en del av det empiriskt insamlade materialet. Vid genomförandet av studien har vi utgått ifrån forskningsetiska överväganden och kvalitetskriterier, i syfte att öka dess pålitlighet, trovärdighet, konfirmering och överförbarhet.  Slutsats: Studien konstaterar att vägprojekt styrs utifrån en version av stage-gate-modellen och att det även finns inslag av den agila metoden angående riskhanteringen. Styrtriangelns tre dimensioner tid, kostnad och kvalitet utgör ett fokus inom vägprojekt, dimensionen kvalitet beskrivs däremot som innehåll. Förutom att styrtriangeln består av ett inre beroende finns även en yttre påverkan gentemot andra projekt. Detta innebär att ett projekts styrtriangel har en inverkan på ett annat projekts dimensioner, vilket är ett teoretiskt bidrag som studien belyst. Det identifierades även totalt åtta förutsättningar, sex risker och åtta faktorer som betraktas vara både förutsättningar och risker inom vägprojekt. Samtliga av dessa förutsättningar och risker styrs samt hanteras. Det redogörs för att dessa påverkar varandra, vilket styrningen av dem bör ta hänsyn till. Sammantaget fastställs det att styrningen av vägprojekt är komplext på grund av dessa samband och uppkomsten av oförutsägbara händelser. Detta bidrar till en praktisk och teoretisk kunskap angående styrningen med hänsyn till förutsättningar och risker eftersom dessa har studerats i samband med varandra.
Background and problem: Projects are usually characterized by insufficient goal fulfillment, regarding time, cost and quality for example. This can also be found in construction and infrastructure projects, which are important for society's opportunities for communication and transport. The fact that infrastructure projects, which are carried out by the public authority Trafikverket, do not achieve their goals, results in delays and that tax money is not used to the maximum. This also indicates that the projects are difficult to manage on the basis of the changing conditions and risks that characterize the project type, which makes it relevant to study the subject further. Purpose: The purpose of the study is to increase the knowledge of how management is used in road projects with a focus on conditions and risks. This is accomplished by describing how Trafikverkets process is managed in road projects and identifying and analyzing conditions and risks that can affect the projects. Method: The study is a qualitative multi-case study within Trafikverket. The theoretical material has been obtained from scientific articles, literature and reports. The empirical material was collected through a snowball selection in which eight respondents were included. In total, eleven semi-structured interviews were conducted. Web pages and documents are also part of the empirically collected material. In conducting the study, we included research ethical considerations and quality criteria, with the aim of increasing its reliability, credibility, confirmation and transferability. Conclusion: The study finds that road projects are managed based on a version of the stage-gate model and that there are also elements of the agile method regarding risk management. The three dimensions in the iron triangle time, cost and quality are a focus within road projects, but the quality dimension is described as content. In addition to the iron triangle consisting of an internal dependency, there is also an external influence on other projects. This means that one project's control triangle has an impact on another project's dimensions, which is a theoretical contribution that the study illustrated. A total of eight conditions, six risks and eight factors were also identified, which are considered to be both conditions and risks in road projects. All of these conditions and risks are managed. It is stated that these affect each other, which their management should take into account. Overall, it is determined that the management of road projects is complex due to these relationships and the occurrence of unpredictable events. This contributes to a practical and theoretical knowledge of the management with regard to the conditions and risks as these have been studied in conjunction with each other.
APA, Harvard, Vancouver, ISO, and other styles
7

Eriksson, Markus, and Pelle Forssén. "Att skapa lönsamhet för små företag som arbetar med IT-projekt : En undersökning om projektledning som utförs av små företag inom konsultbranschen för IT-lösningar." Thesis, Södertörn University College, School of Business Studies, 2009. http://urn.kb.se/resolve?urn=urn:nbn:se:sh:diva-2168.

Full text
Abstract:

Problem: How does project managing appear in small IT-consulting companies and how does the project manager carry out their projects to create successful solutions for their customers?

Purpose: The research has the purpose to analyze and review how IT-consults in small companies work and lead their projects to create profitability for the company, which leads to a good development for the company. 

 Methodology: The research is made on eight research objects in IT-consulting business and the sizes of them are between 1-49 employees. The research is made with a qualitative method to get closer to the research objects. Therefore the research is made in forms of interviews. The analysis is grounded on a comparison between the research data and the theories that are used in the research.

Theoretical perspectives: The theories which have been used in the research are Involvement theory (Fill, 1999), PAFF-metoden (Marcusson & Ahlin, 2002), Projektledning (Tonnquist, 2006), Jakten på det effektiva projektet (Engwall, 1999) och Mervärde (Grönroos, 2002)

Empirical foundation: The research data are founded from the interviews of the eight research objects, they have the fictive names: Gondor, Minas Morgul, Minas Tirith, Mordor, Osgiliath, Rivendell, Rohan and The Shire.

 Analysis/Result: Each study object starts their projects with a pre-study phase, as the PAFF-method describes it. Each study object majorly involves their customers, which is equal to Fill’s theory about high involvement buying processes. This shows that the study objects are aware that they sell solutions that require high involvement of the customers. Four of the study object enjoy seeing that the customer contributes with high engagement and maintain a good level of ambition for the project; this is consistent with Engwall’s theory about organizational ideal types. 

Conclusion: The project manager chooses not to rupture the present institutionalism. The project manager initiates the project with a pre-study phase. The project manager is sure to involve their customers. The service guaranty the project manager uses is “problem-free-guaranty”. The role of the project manager is to plan and organize the project; the project manager should also be a good communicator.

APA, Harvard, Vancouver, ISO, and other styles
8

Nordin, Johan. "Systemintegration med Rational Unified Process : Utveckling av riktlinjer för inledande faser av en systemintegration med hjälp av RUP." Thesis, Örebro University, Swedish Business School at Örebro University, 2009. http://urn.kb.se/resolve?urn=urn:nbn:se:oru:diva-5272.

Full text
Abstract:

Det existerar i dagsläget många färdigutvecklade mjukvaror för att underlätta olika organisationers processer.  Dessa mjukvaror täcker ofta stor del av den funktionalitet som organisationen behöver – till ett förhållandevis lågt pris.

Priset för att skräddarsy mjukvara, i motsats till färdigutvecklad mjukvara, efter sin egen organisation kan, speciellt när företaget är litet, vara väldigt högt i förhållande till lönsamheten. Då alla organisationer är olika, och således har olika funktionalitetskrav kan flera system behövas för att täcka dem. Överlappningen som sker mellan systemen ger plats för redundant data, som utan noggrann kontroll kan bli felaktig data.

En lösning är att integrera mjukvaror med varandra för att skapa bryggor emellan och således ta bort risken för felaktig data. Detta är ursprungspunkten för denna undersökning. Bristen på information om hur en sådan systemutveckling bör ske är motivet för denna utredning. Utredningens syfte är att täcka detta kunskapsbehov.

Genom att använda aktionsforskning, som förespråkar nära samarbete mellan praktiker och forskare, har ett organisationsspecifikt problem studerats. Artefakter från vissa delar av systemutvecklingsmetoden Rational Unified Process(RUP) har utvecklats för att ge organisationen ett praktiskt bidrag, samtidigt som ett akademiskt bidrag i form av riktlinjer har utvecklats. Eftersom avgränsning till vissa delar av RUP är gjord utvecklades inte ett fullt system utan artefakter för att underlätta själva utvecklingen – en slags förstudie.

Riktlinjerna, som speglar det praktiska bidraget, visar på ett ökat behov av att beskriva och illustrera arkitekturen hos det system som ska utvecklas. Men även ytterligare kunskap om de system som skall integreras bör utvecklas, detta innebär ett behov av närmare samarbete med organisationen.

RUP kan kompletteras med ytterligare metoddelar för att täcka speciella behov som projektet kan ha – detta inkluderar metoddelar för att hantera integrationsprojekt. Det är denna undersöknings slutsats att sådan komplettering inte är nödvändig i mindre projekt då RUP redan beskurits ordentligt under situationsanpassningen. Artefakter för att beskriva arkitektuella aspekter av projektet finns i RUP och inkluderingen av dessa bör täcka de behov ett mindre projekt har.

Undersökningen har även studerat hur integrationsfokuset påverkat valda delar av RUP. Resultatet av denna frågeställning är ytterligare modell-element i några artefakter samt ett antal ytterligare artefakter för att beskriva arkitektur.

APA, Harvard, Vancouver, ISO, and other styles
9

Algkvist, Nordfors Dante, and Jakob Andersson. "Utvecklingsprocessen för projekt med olika innovationsgrad." Thesis, KTH, Integrerad produktutveckling, 2021. http://urn.kb.se/resolve?urn=urn:nbn:se:kth:diva-298030.

Full text
Abstract:
Företag över hela världen är beroende av innovation för att vara fortsatt konkurrensstarka på sin respektive marknad. Innovation existerar i olika grad där låg innovation, eller inkrementellinnovation, kan ses som en vidareutveckling av en produkt eller tjänst där mindre ändringar görs. Hög innovation, eller radikal innovation, kan istället ses som en utveckling av en helt ny produkt eller tjänst, som inte redan är existerande på marknaden. Alla företag använder projekt av olika storleksgrad med olika syfte. Projekten kan skilja sig sinsemellan med avseende på den grad av innovation som de har. I denna rapport undersöks och diskuteras det hur olika grader av innovation påverkar utvecklingsprocessen i projekt. Undersökningen har skett på ett företag inom halvledarindustrin som specialiserar sig inom högteknologiska produkter. Undersökningen har skett i form av fyra intervjuer av anställda med olika roller på företaget. Det är ett relativt litet företag som även är ensamma i Norden med tillverkning och distribuering av sina produkter. Inför arbetet har en litteraturundersökning genomförts, följt av intervjuer med fyra respondenter på det aktuella företaget. Resultatet visar på att det egentligen inte är några skillnader mellan projekt av olika innovationsgrad när det kommer till planeringsfasen av projekten. Under hela utvecklingsprocessen skiljer sig projekt av olika innovationsgrad åt med avseende på tid, resurshantering, externa parters påverkan, vikten av ett effektivt projekt samt hur viktigt ett projekt är för företaget. Resultaten från denna studie är inte absoluta i och med att det är ett litet företag med endast ungefär 50 anställda. Det är även ett företag inom en nischad bransch. För att resultatet ska vara applicerbart inom samtliga organisationer och företag krävs fortsatt forskning och en vidareutveckling på detta arbete där fler företag av olika storlekar inom olika sektorer analyseras och jämförs med varandra. De insikter och slutsatser samt den kunskap som detta arbete genererat kan då vara en källa till fortsatt forskning inom ämnet.
Companies all over the world are dependent on innovation in order to continuously keep their position on their specific market. Innovation exists within different grades whereas low innovation, or incremental innovation, can be seen as a further development of an already existing product or service. High innovation, or radical innovation, can instead be seen as a development of a completely new product or service, which is not already on the market. All companies use projects of different sizes and with different goals. The projects might differ between themself with respect to the grade of innovation. This report examines and discusses how different grades of innovation affect the development process within the project. The study has taken place on a company within the semiconductor industry where they specialize in highly technological products. It is a rather small company who is singularly responsible for the manufacturing and distribution of the products in the Nordic. Before the study, a preliminary investigation was made, followed by interviews with four respondents on the company in question. The results show that there is no actual difference between projects of different grades of innovation when it comes to the planning phase of the project. During the whole development phase the projects differ with respect to time, handling of resources, the impact of external parties, the importance of an effective project and the importance of the project to the company. The results from this study are not absolute due to the fact that it is a small company with only about 50 employees. It is also a company within a fairly niche industry. To have the result being applicable within all industries and companies, continuous research and further development of this study is needed where different companies of different sizes in different industries are analyzed and compared to each other. The experience and knowledge that this report brings might be a source for further research within the subject.
APA, Harvard, Vancouver, ISO, and other styles
10

Edström, Linnéa. "Armbandsbaserad pulsoximetri : Ett egenkonstruerat system med reflekterande teknik och jämförelse mot traditionell mätteknik vid normal och nedsatt hudtemperatur." Thesis, Umeå universitet, Institutionen för tillämpad fysik och elektronik, 2016. http://urn.kb.se/resolve?urn=urn:nbn:se:umu:diva-123293.

Full text
Abstract:
I rapporten presenteras en lågkostnads, portabel och bärbar design av ett nytt system med reflekterande teknik för pulsoximetri. Arbetet har utförts som ett projekt, inkluderande elektronikkonstruktion, mjukvaruutveckling, design av inkapsling för prototypen samt fortlöpande tester av både hård- och mjukvara under arbetets gång. Resultatet av arbetet är ett egenkonstruerat system för pulsoximetri. Med hjälp av bluetooth-teknik kan systemet kommunicera trådlöst med en PC, laptop eller mobiltelefon som stöder bluetooth 4.0. Mätvärden visas i realtid på PC/laptop/mobiltelefon. Programvaran är skriven i mbed med programspråket C++ för mikroprocessorn. Projektet kräver olika tekniska färdigheter såsom signalbehandling, programmering, kretskortskonstruktion och mikroprocessorer. Totalt sett är projektet en bra introduktion till medicintekniska enheter och en grund för elektronikingenjörer. Syftet och målet med examensarbetet har till större delen uppnåtts och vidare tester samt utveckling av produkten är möjlig.
In this report a low-cost, portable and wearable design of a new system with reflective technologyfor pulse oximetry is presented. The work has been executed as a project, including electronics construction, software development, a design of the embedding for the prototype and continuous tests of both the hardware and software during the work in progress. The result of this work is a prototype system for pulse oximetry. The system can communicate through Bluetooth wireless interface with a PC, laptop or smartphone which supports Bluetooth 4.0. The measurements are shown in real time on a PC/laptop/smartphone. The software is written in mbed with the language C++ for the microprocessor. The project demands different technical skills like signal processing, programming, electronic design and microprocessors. Over all the project is a good introduction for medical technology and a basis for electronic engineers. The purpose and goal with the thesis is considered to be reached for the most part and further testing and development of the product is possible.
APA, Harvard, Vancouver, ISO, and other styles
More sources

Books on the topic "MET projekt"

1

L'élargissement met-il en péril le projet européen? Paris: La Documentation française, 2011.

Find full text
APA, Harvard, Vancouver, ISO, and other styles
2

Tony, Harrison. The men who have sex with men project. Manchester: Man Coll of Midwifery & Nursing, 1995.

Find full text
APA, Harvard, Vancouver, ISO, and other styles
3

Rota, Ve ronique Messager. Gestion de projet: Vers les me thodes agiles. Paris: Eyrolles, 2008.

Find full text
APA, Harvard, Vancouver, ISO, and other styles
4

Edvik, Anders. Projektformen och det industriella arvet: Med exempel frå̊n sjukvården. [Göteborg]: Göteborgs universitet, Institutionen för arbetsvetenskap, 2008.

Find full text
APA, Harvard, Vancouver, ISO, and other styles
5

O'Connor, Ann Marie. Men in prostitution: The mp project. Dublin: Gay Mens Health Project, 1997.

Find full text
APA, Harvard, Vancouver, ISO, and other styles
6

Hofman, H. D. Bedrijfsrapportage Campina Melkunie Maasdam: PRISMA Project Industriële Successen met Afvalpreventie. Den Haag: Nederlandse Organisatie voor Technologisch Aspectenonderzoek, 1991.

Find full text
APA, Harvard, Vancouver, ISO, and other styles
7

Rota, Ve ronique Messager. Gestion de projet: Vers les me thodes agiles. 2nd ed. Paris: Eyrolles, 2009.

Find full text
APA, Harvard, Vancouver, ISO, and other styles
8

Aldrin, Buzz. Men from earth. New York: Bantam Books, 1989.

Find full text
APA, Harvard, Vancouver, ISO, and other styles
9

Ping, Xu, and Song Hongxin, eds. Project 98 Zhong wen ban ru men yu ti gao. Beijing: Qing hua da xue chu ban she, 1999.

Find full text
APA, Harvard, Vancouver, ISO, and other styles
10

Koppert, P. C. Bedrijfsrapportage DSM Resins Benelux BV: PRISMA Project Industriële Successen met Afvalpreventie. Den Haag: Nederlandse Organisatie voor Technologisch Aspectenonderzoek, 1991.

Find full text
APA, Harvard, Vancouver, ISO, and other styles
More sources

Book chapters on the topic "MET projekt"

1

Rudzki, Thore. "Projekt-Kontrolle." In Projektmanagement mit dem HTPM, 67–114. Wiesbaden: Vieweg+Teubner Verlag, 1988. http://dx.doi.org/10.1007/978-3-322-90606-9_3.

Full text
APA, Harvard, Vancouver, ISO, and other styles
2

Brand, Michael. "Projekt Hebelpresse." In FEM-Praxis mit SolidWorks, 116–48. Wiesbaden: Springer Fachmedien Wiesbaden, 2016. http://dx.doi.org/10.1007/978-3-658-09387-7_7.

Full text
APA, Harvard, Vancouver, ISO, and other styles
3

Brand, Michael. "Projekt Schweißkonstruktion." In FEM-Praxis mit SolidWorks, 149–72. Wiesbaden: Springer Fachmedien Wiesbaden, 2016. http://dx.doi.org/10.1007/978-3-658-09387-7_8.

Full text
APA, Harvard, Vancouver, ISO, and other styles
4

Brand, Michael. "Projekt Hydraulikzylinder." In FEM-Praxis mit SolidWorks, 173–79. Wiesbaden: Springer Fachmedien Wiesbaden, 2016. http://dx.doi.org/10.1007/978-3-658-09387-7_9.

Full text
APA, Harvard, Vancouver, ISO, and other styles
5

Brand, Michael. "Projekt Hebelpresse." In FEM-Praxis mit SolidWorks, 117–48. Wiesbaden: Springer Fachmedien Wiesbaden, 2013. http://dx.doi.org/10.1007/978-3-8348-2234-5_7.

Full text
APA, Harvard, Vancouver, ISO, and other styles
6

Brand, Michael. "Projekt Hydraulikzylinder." In FEM-Praxis mit SolidWorks, 172–78. Wiesbaden: Springer Fachmedien Wiesbaden, 2013. http://dx.doi.org/10.1007/978-3-8348-2234-5_9.

Full text
APA, Harvard, Vancouver, ISO, and other styles
7

Aupperle, Martin. "Projekt Texteditor." In Objektorientiert mit TURBO C++, 512–38. Wiesbaden: Vieweg+Teubner Verlag, 1992. http://dx.doi.org/10.1007/978-3-322-93857-2_14.

Full text
APA, Harvard, Vancouver, ISO, and other styles
8

Volhard, Franz. "Projekte." In Bauen mit Leichtlehm, 235–93. Vienna: Springer Vienna, 2013. http://dx.doi.org/10.1007/978-3-7091-1266-3_9.

Full text
APA, Harvard, Vancouver, ISO, and other styles
9

Häger, Wolfgang, and Dirk Bauermeister. "Projekt Schraubstock." In 3D-CAD mit Inventor 2011, 1–88. Wiesbaden: Vieweg+Teubner, 2011. http://dx.doi.org/10.1007/978-3-8348-8183-0_1.

Full text
APA, Harvard, Vancouver, ISO, and other styles
10

Borgwardt, Angela. "Das Projekt." In Im Umgang mit der Macht, 15–75. Wiesbaden: VS Verlag für Sozialwissenschaften, 2002. http://dx.doi.org/10.1007/978-3-322-80426-6_1.

Full text
APA, Harvard, Vancouver, ISO, and other styles

Conference papers on the topic "MET projekt"

1

Dave, Janak, and Janet Dong. "An Industry-University Collaboration Experience on a Senior Project." In ASME 2010 International Mechanical Engineering Congress and Exposition. ASMEDC, 2010. http://dx.doi.org/10.1115/imece2010-37456.

Full text
Abstract:
Students working toward a baccalaureate degree in Mechanical/Electrical Engineering Technology at the University of Cincinnati are required to complete a “Design, Build, and Test” senior capstone design project. Some of these capstone design projects are done in collaboration with industries to meet their needs. One of the projects during 2009–2010 academic year is to meet the needs of the packaging industry. The student team will design and recommend a specialized End of Arm Tool for palletizing applications. They will build a scaled model and the industrial sponsor may build the full product at the later date. A team of three students from Mechanical Engineering Technology at the University of Cincinnati are working on this project, which gives them an opportunity to showcase the knowledge and skills learned in their coursework and during the co-op (cooperative) experience, as well as to develop the additional skills needed to be successful in a team oriented business world. This team is working on a technically complex project from concept-to-design, build, test, and then to have the possibility of their product being used in commercial applications. This paper will give a description of the MET senior capstone design course sequence at University of Cincinnati and the list of pre-requisites for the capstone design sequence. It will also describe the design of 2009–2010 End of Arm Tool (EOAT) project and the plans for building a scaled model. Included too, is a description of how Industry-University Collaboration can improve student learning.
APA, Harvard, Vancouver, ISO, and other styles
2

Rothman, Johanna. "Metrics and Software Project Management for the 21st Century." In ASME 1995 15th International Computers in Engineering Conference and the ASME 1995 9th Annual Engineering Database Symposium collocated with the ASME 1995 Design Engineering Technical Conferences. American Society of Mechanical Engineers, 1995. http://dx.doi.org/10.1115/edm1995-0850.

Full text
Abstract:
Abstract There is general agreement among the experts and practitioners that a crisis exists in Software Engineering. This crisis is in the area of software quality and schedules. How do we better predict product development progress on an ongoing basis? The quick answer is that all project managers need to know these things: • What are the requirements for functionality, cost, and schedule? • Do I have sufficient resources to meet those requirements? • Am I on target to meet those requirements? These questions are particularly critical for companies who produce complex software, such as real-time or process control products. There are ways to ensure that the requirements of schedule, functionality, and cost are met during project development. This paper will discuss project management activities, possible development process, and predictive measurements for project tracking and prediction for complex software products.
APA, Harvard, Vancouver, ISO, and other styles
3

Dong, J., and J. Dave. "Design-Build-Test: The Capstone Design Project." In ASME 2007 International Mechanical Engineering Congress and Exposition. ASMEDC, 2007. http://dx.doi.org/10.1115/imece2007-41452.

Full text
Abstract:
Students working toward baccalaureate degree in Mechanical Engineering Technology (MET) at University of Cincinnati (UC) are required to complete a “Design, Build, and Test” senior capstone design project. Two of these capstone design projects during the 2005–2006 academic year were to design and build vehicles. One is a Basic Utility Vehicle (BUV), which was geared to meet the needs of developing countries for an affordable transportation. The national competition was held in Indianapolis, IN. The other one is an Autocross racing vehicle, which was built to meet the Sports Car Club of America (SCCA) Autocross specifications, and raced in the regional/local events. The Institute for Affordable Transportation (IAT) hosts a competition of designing and building BUV each year in Indianapolis, IN. IAT is a not-for-profit organization devoted to improving the living standards and enable economic growth in the developing world by creating a simple vehicle that can be assembled almost anywhere, by almost anyone. The competition tests and judges all of the entries to identify best design and suitable vehicles for developing countries. IAT has donated several vehicles to needy countries in South America and Africa. The SCCA is a 60,000-member not-for-profit organization featuring the most active membership participation in motorsports today. The foundation of the SCCA is its Club Racing program with over 2,000 amateur and professional motor sports events each year. One team of MET students built a BUV, and another team of students built an Autocross racing car as their senior projects. From concept to a final working vehicle with meeting the IAT’s or SCCA’s specifications, there are many challenges. The expertise and knowledge acquired from student’s coursework and co-op were utilized. This paper will give the short description of the senior capstone design course sequence at University of Cincinnati: the list of pre-requisites of its sequence, and partially describes 2005–2006 BUV and Autocross projects and the team experiences of the projects from start to finish.
APA, Harvard, Vancouver, ISO, and other styles
4

Brackin, Patricia D., and J. Darrell Gibson. "Techniques for the Implementation, Administration, and Evaluation of Industrially Sponsored Capstone Design Projects in the ME Curriculum." In ASME 2006 International Mechanical Engineering Congress and Exposition. ASMEDC, 2006. http://dx.doi.org/10.1115/imece2006-16026.

Full text
Abstract:
The benefits of company sponsored capstone design projects, both to academia and to industry, have been well established. At Rose-Hulman the benefits to students include the broadening of their engineering skills, the required interaction with practicing engineers, the strengthening of teaming skills by working in design groups, the development of communication skills with required oral and written reports, and the experiences of project management. These projects are "owned and managed" by the student teams with company contacts providing appropriate data and information and with faculty serving as advisors only. The authors have developed and improved these student/industry interactions over the last few years with over 120 students working with about 30 different companies each year. ABET 2000 requires that graduates demonstrate the ability to design a system, component or process to meet a given need. The capstone design course is the natural place to assess whether or not the outcome is met. It is the purpose of this paper to identify the necessary steps for soliciting, screening, and selecting the types of company projects that will enhance educational objectives and further industrial partnerships. A further purpose is to demonstrate how the course is used to assess the ABET design outcome. Finally the paper discusses how the authors have recently improved this client based design experience and the quality of the final design by utilizing project managers from Rose-Hulman Ventures (the innovation and incubation technology arm of Rose-Hulman) as "design review teams" to meet with and to serve as additional resources to the student teams.
APA, Harvard, Vancouver, ISO, and other styles
5

Korb, Samuel, Rafael Sacks, and Otto Alhava. "A Portfolio/Process/Operations (PPO) Analysis of a Meta-Project Production System in Renovation Projects." In 25th Annual Conference of the International Group for Lean Construction. International Group for Lean Construction, 2017. http://dx.doi.org/10.24928/2017/0322.

Full text
APA, Harvard, Vancouver, ISO, and other styles
6

Al-wahaibi, Yahya Mansoor, and Abdullah Khalifa Al-Hadhrami. "Lenses Heterogeneity Effects on Water Alternating Gas Injection in Oil Wet Porous Media." In SPE Project and Facilities Challenges Conference at METS. Society of Petroleum Engineers, 2011. http://dx.doi.org/10.2118/139607-ms.

Full text
APA, Harvard, Vancouver, ISO, and other styles
7

Mohamed, Ibrahim Mohamed, Jia He, and Hisham A. Nasr-El-Din. "Sulfate Precipitation During CO2 Sequestration in Carbonate Rock." In SPE Project and Facilities Challenges Conference at METS. Society of Petroleum Engineers, 2011. http://dx.doi.org/10.2118/139828-ms.

Full text
APA, Harvard, Vancouver, ISO, and other styles
8

Relwani, Harendra Jayant, Anupindi Dattatreya Sarma, and Reza Salamat. "Specialties of energy conservation and application of control systems in a large cooling water project." In SPE Project and Facilities Challenges Conference at METS. Society of Petroleum Engineers, 2011. http://dx.doi.org/10.2118/139832-ms.

Full text
APA, Harvard, Vancouver, ISO, and other styles
9

Al-Saeedi, Mohammed Jasem, Fayez Abdulrahman Al-Fayez, mahesh sounderrajan, Mishary Najeeb Al-Mudhaf, Abdual Qader Al-Kandary, Manoj Mishra, Harish Maliekkal, and Osama Ghoneim. "Solving Deep, Hard/Abrasive 16-in Application Challenges with New PDC Technology Saves Operator 13 Days Rig Time, Kuwait." In SPE Project and Facilities Challenges Conference at METS. Society of Petroleum Engineers, 2011. http://dx.doi.org/10.2118/139873-ms.

Full text
APA, Harvard, Vancouver, ISO, and other styles
10

Almehthel, Rashed Hamad, Wilfred Carvalho, and Mauyed Mehdi. "Thick Black Liquid Formation in Production Facilities Centrifugal Compressors." In SPE Project and Facilities Challenges Conference at METS. Society of Petroleum Engineers, 2011. http://dx.doi.org/10.2118/141859-ms.

Full text
APA, Harvard, Vancouver, ISO, and other styles

Reports on the topic "MET projekt"

1

Farmer, M. T., S. Lomperski, D. J. Kilsdonk, R. W. Aeschlimann, and S. Basu. OECD MCCI project Melt Eruption Test (MET) design report, Rev. 2. April 15, 2003. Office of Scientific and Technical Information (OSTI), May 2011. http://dx.doi.org/10.2172/1014857.

Full text
APA, Harvard, Vancouver, ISO, and other styles
2

Spaulding, Jesse. Thinklab Meta [project]. ThinkLab, May 2014. http://dx.doi.org/10.15363/thinklab.1.

Full text
APA, Harvard, Vancouver, ISO, and other styles
3

Verhoeven, J. T. W., R. Timmer, H. A. van Schooten, J. Groten, and H. J. Russchen. Grondig boeren met mais : eindrapportage project t/m 2016. Lelystad: Stichting Wageningen Research (WR), business unit Praktijkonderzoek Akkerbouw, Groene ruimte en Vollegrondsgroenten, 2017. http://dx.doi.org/10.18174/425053.

Full text
APA, Harvard, Vancouver, ISO, and other styles
4

Álvarez, Carola, Leonardo Corral, Ana Cuesta, José Martínez, César Montiel, and Consuelo Yépez. Project Completion Report Analysis: Factors Behind Project Success and Effectiveness. Inter-American Development Bank, March 2021. http://dx.doi.org/10.18235/0003116.

Full text
Abstract:
The goal of development assistance is to deliver measurable results. At the Inter-American Development Bank (IDB), the Development Effectiveness Framework (DEF) was adopted to enhance the likelihood this goal is met. The key objective of this analysis is to enhance our understanding of the role the set of tools and processes adopted at the IDB, from project design to completion, play in the assessment of a projects success and effectiveness. Specifically, we are interested in teasing out the role different dimensions of project design, assessed through the Development Effectiveness Matrix (DEM), and execution performance indicators, as per the Project Monitoring Report (PMR), have on the delivery of effective and successful projects measured through the Project Completion Report (PCR) methodology implemented at the IDB. We also explore the validation process of PCRs and delve into the effectiveness analysis at the level of specific objectives and result indicators, identifying key pitfalls associated with objectives not being met. Overall, our findings provide strong validation for the DEF and its tools. We find robust evidence for the importance of the quality at entry assessment conducted through the DEM. In particular, the quality of the results matrix at approval is a strong determinant of project success and effectiveness at closure, and the quality of the Evaluation Plan is strongly associated with the effectiveness of a project. In terms of execution performance, our analysis finds that, on average, projects that execute a lower share of their approved loan amount, are put on Alert, or are classified as a Problem, in its first three years of execution; and projects that experience a higher share of their outputs discontinued, with respect to their first results matrix, are most likely to be ineffective in achieving their objectives and will likely be rated as unsuccessful.
APA, Harvard, Vancouver, ISO, and other styles
5

Verhoeven, J. T. W., D. A. van der Schans, H. A. van Schooten, and J. Groten. Grondig boeren met maïs in Drenthe: eindverslag project periode 2012-2015. Lelystad: Praktijkonderzoek Plant & Omgeving, onderdeel van Wageningen UR, Business Unit Akkerbouw, Groene Ruimte en Vollegrondsgroenten, 2015. http://dx.doi.org/10.18174/393360.

Full text
APA, Harvard, Vancouver, ISO, and other styles
6

Verhoeven, J. T. W., R. Timmer, H. A. van Schooten, J. Groten, and M. Wesselink. Grondig boeren met mais in Drenthe : rapportage project t/m 2017. Bleiswijk: Stichting Wageningen Research, Wageningen Plant Research, Business unit Open Teelten, 2018. http://dx.doi.org/10.18174/448061.

Full text
APA, Harvard, Vancouver, ISO, and other styles
7

Sjölander, Jens, and Pål Brunnström. Idéburen sektorssamverkan med Malmö universitet. Malmö University, 2021. http://dx.doi.org/10.24834/isbn.9789178771929.

Full text
Abstract:
Den här rapporten är en delrapport inom ramen för det Vinnovafinansierade projektet Strategiska partnerskap för effektiv och transparent samverkan (Spets) och belyser Malmö universitets samverkan med organisationer inom den idéburna sektorn. Rapporten bygger på en intervjustudie med tio idéburna organisationer, och speglar samverkan med Malmö universitet ur deras perspektiv: vilken samverkan som bedrivs, vad den ger organisationerna, utmaningar och hinder samt möjlighet för utveckling av samverkan, till exempel genom ett strategiskt partnerskapsavtal.Rapporten visar att det på Malmö universitet sker en hel del samverkan både kopplat till forskning, utbildning och nyttiggörande och att denna samverkan när den sker i relation till idéburen sektor främst är kopplad till tre av universitetets fakulteter – Fakulteten Kultur och samhälle, Fakulteten Hälsa och samhälle samt Fakulteten Lärande och samhälle. De intervjuade organisationernas motiv för samverkan med universitetet varierar, och undersökningen indikerar att organisationerna ser samverkan som ett sätt att fylla behov av kunskap och kompetensförsörjning, att genom vänlig kritik stimulera till nytänkande, samt att ge organisationerna ökad legitimitet i deras arbete för samhällsförändring. Undersökningen visar att det finns behov av ökad systematik i samverkan och att mer skulle kunna göras för att stärka samverkan kring forskning och utbildning. De intervjuade organisationerna lyfter behovet av mer forskning om och tillsammans med den idéburna sektorns organisationer och behovet av mer samverkan kopplat till studenters uppsatser och praktik. Här finns en möjlighet att möta organisationernas behov av kunskap, kompetens och framtida personal. Det finns även ett behov av fler arenor för möten, gärna regelbundet återkommande, mellan universitetet och den idéburen sektor, och organisationerna efterlyser även generellt ökade kunskaper om den idéburna sektorns särart, förutsättningar och behov, inom akademin såväl som i samhället i stort. Undersökningen belyser även behovet av utökat stöd och finansiering för forskare som samverkar med idéburen sektor, då finansiering av samverkan är ett särskilt problem.
APA, Harvard, Vancouver, ISO, and other styles
8

Petersen, Karen Bjerg, and Frans Ørsted Andersen. Fulton-projektet. Forskningsrapport. Aarhus University Library, 2021. http://dx.doi.org/10.7146/aul.424.

Full text
Abstract:
Denne rapport, hvis målgruppe er den brede offentlighed med et særligt blik for personale i det pædagogiske område, gør rede for Fulton følgeforskningen og dens resultater i perioden fra 2017 til 2021. Selve Fulton-projektet blev igangsat i 2017 som et samarbejde mellem Fulton Fonden, Esbjerg Kommune og Lauritzen Fonden med henblik på at give udsatte unge i Esbjerg Kommune en mulighed for at komme ud af deres daglige omgivelser og problemstillinger ved at få et ophold på skonnerten Fulton og indgå i skibets daglige aktiviteter. Hensigten med Fulton-projektet er først og fremmest at få udsatte unge i Esbjerg Kommune ”tilbage på ret køl”. Afhængig af den enkelte unges forudsætninger, har de unge gennem kortere og/eller længevarende ophold på skonnerten Fulton skullet indgå på lige fod med skipper og den øvrige besætning i de daglige aktiviteter, der er forbundet med skonnerten Fultons sejladser i de danske farvande. Dette skal dog ses i sammenhæng med at Fulton samtidig afspejler den klassiske hierarkiske kultur, der altid har været på sejlskibe, og som kan ses som nødvendig for at skibet overhovedet kan sejle sikkerhedsmæssigt forsvarligt.
APA, Harvard, Vancouver, ISO, and other styles
9

Hugman, R. H. DOE/METC GASIS Project. Second quarterly report, 1997. Office of Scientific and Technical Information (OSTI), July 1997. http://dx.doi.org/10.2172/620964.

Full text
APA, Harvard, Vancouver, ISO, and other styles
10

Piercy, Candice, Safra Altman, Todd Swannack, Carra Carrillo, Emily Russ, and John Winkelman. Expert elicitation workshop for planning wetland and reef natural and nature-based features (NNBF) futures. Engineer Research and Development Center (U.S.), August 2021. http://dx.doi.org/10.21079/11681/41665.

Full text
Abstract:
This special report discusses the outcomes of a September 2019 workshop intended to identify barriers to the consideration and implementation of natural and nature-based features (NNBF) in US Army Corps of Engineers (USACE) civil works projects. A total of 23 participants representing seven USACE districts, the US Army Engineer Research and Development Center (ERDC), and the University of California–Santa Cruz met at USACE’s South Atlantic Division Headquarters in Atlanta, Georgia, to discuss how to facilitate the implementation of NNBF into USACE project planning for wetlands and reefs using six categories: (1) site characterization, (2) engineering and design analysis, (3) life-cycle analysis, (4) economic analysis, (5) construction analysis, (6) and operation and maintenance (and monitoring). The workshop identified seven future directions in wetland and reef NNBF research and development: • Synthesize existing literature and analysis of existing projects to better define failure modes. • Determine trigger points that lead to loss of feature function. • Identify performance factors with respect to coastal storm risk management (CSRM) performance as well as ecological performance. • Focus additional research into cobenefits of NNBF. • Quantify the economic life-cycle costs of a project. • Improve technology transfer with regards to NNBF research and topics.
APA, Harvard, Vancouver, ISO, and other styles
We offer discounts on all premium plans for authors whose works are included in thematic literature selections. Contact us to get a unique promo code!

To the bibliography