Academic literature on the topic 'Operational Maturity'
Create a spot-on reference in APA, MLA, Chicago, Harvard, and other styles
Consult the lists of relevant articles, books, theses, conference reports, and other scholarly sources on the topic 'Operational Maturity.'
Next to every source in the list of references, there is an 'Add to bibliography' button. Press on it, and we will generate automatically the bibliographic reference to the chosen work in the citation style you need: APA, MLA, Harvard, Chicago, Vancouver, etc.
You can also download the full text of the academic publication as pdf and read online its abstract whenever available in the metadata.
Journal articles on the topic "Operational Maturity"
Salhieh, Loay M. "Warehouse Maturity Level and Operational Efficiency." Logforum 20, no. 4 (2024): 533–44. https://doi.org/10.17270/j.log.001118.
Full textVan der Westhuizen, Erika. "Navigating Operational Risk: Developing Criteria for Operational Risk Management Maturity in the Wake of COVID-19." Journal of Governance Risk Management Compliance and Sustainability 5, no. 1 (2025): 41–54. https://doi.org/10.31098/jgrcs.v5i1.2665.
Full textKalnay, Eugenia, Stephen J. Lord, and Ronald D. McPherson. "Maturity of Operational Numerical Weather Prediction: Medium Range." Bulletin of the American Meteorological Society 79, no. 12 (1998): 2753–69. http://dx.doi.org/10.1175/1520-0477(1998)079<2753:moonwp>2.0.co;2.
Full textKenley, C. Robert, and Terry R. Creque. "Predicting technology operational availability using technical maturity assessment." Systems Engineering 2, no. 4 (1999): 198–211. http://dx.doi.org/10.1002/(sici)1520-6858(1999)2:4<198::aid-sys2>3.0.co;2-7.
Full textRodgers, James, Christopher Delhom, Chanel Fortier, and Devron Thibodeaux. "Rapid measurement of cotton fiber maturity and fineness by image analysis microscopy using the Cottonscope®." Textile Research Journal 82, no. 3 (2011): 259–71. http://dx.doi.org/10.1177/0040517511431317.
Full textAYORINDE, Thomas A., and Oseni K. OWOLARAFE. "Effect of operational parameters on the performance of a kenaf harvester." Spanish Journal of Agricultural Research 21, no. 4 (2023): e0209. http://dx.doi.org/10.5424/sjar/2023214-19688.
Full textMtotywa, Matolwandile Mzuvukile. "Developing a Quality 4.0 Maturity Index for Improved Business Operational Efficiency and Performance." Quality Innovation Prosperity 26, no. 2 (2022): 101–27. http://dx.doi.org/10.12776/qip.v26i2.1718.
Full textKenley, C. Robert, and Terry R. Creque. "3.5.2 Predicting Technology Operational Availability Using Technical Maturity Assessment." INCOSE International Symposium 8, no. 1 (1998): 628–34. http://dx.doi.org/10.1002/j.2334-5837.1998.tb00091.x.
Full textNISTOR, Florin, and Lucian Valeriu SCIPANOV. "On the Maturity of Operational Art in Romanian Military Thinking." Romanian Military Thinking 2024, no. 4 (2024): 10–25. https://doi.org/10.55535/rmt.2024.4.01.
Full textKolukısa Tarhan, Ayça, Vahid Garousi, Oktay Turetken, Mehmet Söylemez, and Sonia Garossi. "Maturity assessment and maturity models in health care: A multivocal literature review." DIGITAL HEALTH 6 (January 2020): 205520762091477. http://dx.doi.org/10.1177/2055207620914772.
Full textDissertations / Theses on the topic "Operational Maturity"
Tervonen, P. (Pekka). "Integrated ESSQ management:as a part of excellent operational and business management—a framework, integration and maturity." Doctoral thesis, University of Oulu, 2010. http://urn.fi/urn:isbn:9789514262296.
Full textJohansson, Gustav, and Sofie Wilhelmsson. "Digital Maturity & Operational Performance : A case study in the supply-chain of the Scandinavian FMCG industry." Thesis, KTH, Industriell ekonomi och organisation (Inst.), 2018. http://urn.kb.se/resolve?urn=urn:nbn:se:kth:diva-240288.
Full textFleischmann, Martin. "Audit a hodnocení IS bank." Doctoral thesis, Vysoká škola ekonomická v Praze, 2005. http://www.nusl.cz/ntk/nusl-77064.
Full textLopez-Marcano, Sebastian E. "Measuring cross-habitat movements among habitat hotspots of fish with artificial intelligence." Thesis, Griffith University, 2022. http://hdl.handle.net/10072/414922.
Full textShah, Premal (Premal Y. ). "No-arbitrage bounds on American Put Options with a single maturity." Thesis, Massachusetts Institute of Technology, 2006. http://hdl.handle.net/1721.1/36232.
Full textMaeng, Honjae. "An application of technological maturity assessment to ROKAF T-50 aircraft production program." Thesis, Monterey, Calif. : Springfield, Va. : Naval Postgraduate School ; Available from National Technical Information Service, 2005. http://library.nps.navy.mil/uhtbin/hyperion/05Dec%5FMaeng.pdf.
Full textGarcia, Heriberto. "A Capability Maturity Model to Assess Supply Chain Performance." FIU Digital Commons, 2008. http://digitalcommons.fiu.edu/etd/191.
Full textSargent, Walter H. "Strategies to Improve Project Management Maturity Processes." ScholarWorks, 2016. https://scholarworks.waldenu.edu/dissertations/3003.
Full textJANSSON, JONAS, and FREDRIK ÅBERG. "Sales and operations planning in the processindustry : A diagnostic model." Thesis, KTH, Hållbarhet och industriell dynamik, 2014. http://urn.kb.se/resolve?urn=urn:nbn:se:kth:diva-156049.
Full textArch, Nicholas Luke. "Using design maturity assessments to improve new technology implementation in active production environments." Thesis, Massachusetts Institute of Technology, 2017. http://hdl.handle.net/1721.1/111484.
Full textBooks on the topic "Operational Maturity"
Alberts, David S. NATO NEC C2 maturity model. DoD Command and Control Research Program, 2010.
Find full textAlberts, David S. NATO NEC C2 maturity model. DoD Command and Control Research Program, 2010.
Find full textSteele, R. J. Corn objective yield: Operational vs. non-invasive maturity category determinations. 1987.
Find full textAllen, Julia H., Richard A. Caralli, and David W. White. CERT Resilience Management Model: A Maturity Model for Managing Operational Resilience. Pearson Education, Limited, 2016.
Find full textBook chapters on the topic "Operational Maturity"
Janko, Michael W. "Maturity Model." In Excellence in Operational Resilience. Routledge, 2024. http://dx.doi.org/10.4324/9781003438700-7.
Full textCorsi, Patrick, and Erwan Neau. "Going Beyond the Five Levels: a New Operational Capacity." In Innovation Capability Maturity Model. John Wiley & Sons, Inc., 2015. http://dx.doi.org/10.1002/9781119144335.ch17.
Full textBedgood, Casey J. "Leveraging Maturity Models as Operational Truth Serum." In Fit for the Leadership Challenge. Productivity Press, 2022. http://dx.doi.org/10.4324/9781003335108-18.
Full textBjelica, Dragan, Marko Mihic, and Dejan Petrovic. "Enhancing IT Project Management Maturity Assessment." In Advances in Operational Research in the Balkans. Springer International Publishing, 2019. http://dx.doi.org/10.1007/978-3-030-21990-1_13.
Full textMcGovern, Kate. "The Three Stages of Maturity in State Government." In A Public Sector Journey to Operational Excellence. Productivity Press, 2023. http://dx.doi.org/10.4324/9781003372691-4.
Full textMcFarlane, Duncan, Rengarajan Srinivasan, Alena Puchkova, Alan Thorne, and Alexandra Brintrup. "A Maturity Framework for Operational Resilience and Its Application to Production Control." In Service Orientation in Holonic and Multi-Agent Manufacturing. Springer International Publishing, 2018. http://dx.doi.org/10.1007/978-3-319-73751-5_5.
Full textLi, Jicheng, Yijie Sun, Ping Gao, and Yuan Zhang. "Research on Evaluation Methods of Operational Safety Maturity of Airlines Based on Human Factors." In Communications in Computer and Information Science. Springer Nature Switzerland, 2025. https://doi.org/10.1007/978-3-031-94165-8_33.
Full textProff, Harald, Claudia Ahrens, Wencke Neuroth, et al. "Digital Maturity Assessment – Bisherige Transformation, Typen digitaler Unternehmen, Branchen- und Ländervergleich." In Accelerating Digitalization. Springer Fachmedien Wiesbaden, 2021. http://dx.doi.org/10.1007/978-3-658-31456-9_5.
Full textBourgeois, Guillaume, Géraldine Angulo, Hassana El-Zein, Vincent Courboulay, and Mohamed Cheriet. "Advancing Sustainability Through Digital Maturity: An Open Approach for Evaluating Quebec Organizations’ Environmental Responsibility." In Accelerating the Socio-Ecological Transition. Springer Nature Switzerland, 2025. https://doi.org/10.1007/978-3-031-82896-6_9.
Full textSuárez-Barraza, Manuel F., Jesús A. Chávez-Pineda, Dailin A. Ramirez Altamirano, and María Isabel Huerta-Carvajal. "The Impact of KAIZEN on the Operational Performance of Multinational Manufacturing Companies Through the Degree of Maturity. A Mixed Study in Mexico." In Advances in Manufacturing IV. Springer Nature Switzerland, 2024. http://dx.doi.org/10.1007/978-3-031-56444-4_28.
Full textConference papers on the topic "Operational Maturity"
Cabrera, Nicolas, A. M. Rosso-Cer�n, and Viatcheslav Kafarov. "Multi-Objective Optimization and Analytical Hierarchical Process for Sustainable Power Generation Alternatives in the High Mountain Region of Santurb�n: case of Pamplona, Colombia." In The 35th European Symposium on Computer Aided Process Engineering. PSE Press, 2025. https://doi.org/10.69997/sct.129062.
Full textMuthukrishnan, Sri Murugarasan, and Sellapan Palaniappan. "Security metrics maturity model for operational security." In 2016 IEEE Symposium on Computer Applications & Industrial Electronics (ISCAIE). IEEE, 2016. http://dx.doi.org/10.1109/iscaie.2016.7575045.
Full textGüemes-Castorena, David, Carlos Chee-González, Heriberto García-Reyes, Daniel Zavala-Río, Imelda De Jesús Loera-Hernández, and Juan José Hinojosa-Cavazos. "Manufacturing Maturity Level Diagnosis for Operational Excellence." In 2023 Portland International Conference on Management of Engineering and Technology (PICMET). IEEE, 2023. http://dx.doi.org/10.23919/picmet59654.2023.10216861.
Full textMyrodia, A., and L. Hvam. "An Operational Tool to Assess Configuration Lifecycle Maturity." In 2019 IEEE International Conference on Industrial Engineering and Engineering Management (IEEM). IEEE, 2019. http://dx.doi.org/10.1109/ieem44572.2019.8978570.
Full textBackurs, Andris, Leo Jansons, and Aigars Laizans. "Water electrolysis technologies: comparison of maturity, operational and cost efficiency." In 24th International Scientific Conference Engineering for Rural Development. Latvia University of Life Sciences and Technologies, Faculty of Engineering and Information Technologies, 2025. https://doi.org/10.22616/erdev.2025.24.tf061.
Full textSalian, Dharmender. "Review of Digitalization using Artificial Intelligence Maturity Models: The Case of American Automotive SMES." In 12th International Conference on Soft Computing, Artificial Intelligence and Applications. Academy & Industry Research Collaboration Center, 2023. http://dx.doi.org/10.5121/csit.2023.132404.
Full textRuzhnikov, Alexey, and Arief Prasetyo. "Enhancing the Well Engineering Management System (WEMS) Through a Capability Maturity Model Integration (CMMI) - Based Approach." In ADIPEC. SPE, 2024. http://dx.doi.org/10.2118/221827-ms.
Full textCanina, Marita, Carmen Bruno, and Eva Monestier. "An operational framework of methods for designing ethical and sustainable future digital scenarios." In 13th International Conference on Applied Human Factors and Ergonomics (AHFE 2022). AHFE International, 2022. http://dx.doi.org/10.54941/ahfe1001507.
Full textIsoherranen, V., M. K. Karkkainen, and P. Kess. "Operational excellence driven by process maturity reviews: A case study of the ABB corporation." In 2015 IEEE International Conference on Industrial Engineering and Engineering Management (IEEM). IEEE, 2015. http://dx.doi.org/10.1109/ieem.2015.7385872.
Full textFernandes, Luara L. A., Makarand Hastak, and Dayana B. Costa. "Assessing Social, Technical, and Operational Maturity Dimensions for Digital Transformation in the Construction Phase." In 32nd Annual Conference of the International Group for Lean Construction (IGLC 32). International Group for Lean Construction, 2024. http://dx.doi.org/10.24928/2024/0214.
Full textReports on the topic "Operational Maturity"
Gallagher, Brian P. Interpreting Capability Maturity Model Integration (CMMI) for Operational Organizations. Defense Technical Information Center, 2002. http://dx.doi.org/10.21236/ada401709.
Full textPalmer, Richard L. SINCGARS-V Maturity Operational Test: Human Factors Evaluation (Synopsis). Defense Technical Information Center, 1985. http://dx.doi.org/10.21236/ada149601.
Full textRodrigo, Maria Fernanda, Claudia Figueroa, Oliver Peña-Habib, Xiomara Rojas-Asqui, and Melanie Putic. OVE's Review of Project Completion Reports (PCRs) and Expanded Supervision Reports (XSRs): The 2020 Validation Cycle. Inter-American Development Bank, 2020. http://dx.doi.org/10.18235/0002944.
Full textCallaghan, Caitlin, Danielle Peterson, Timothy Cooke, Brandon Booker, and Kathryn Trubac. Installation resilience in cold regions using energy storage systems. Engineer Research and Development Center (U.S.), 2021. http://dx.doi.org/10.21079/11681/42200.
Full textCallaghan, Caitlin, Danielle Peterson, Timothy Cooke, Brandon Booker, and Kathryn Trubac. Installation resilience in cold regions using energy storage systems. Engineer Research and Development Center (U.S.), 2021. http://dx.doi.org/10.21079/11681/42200.
Full textAquino, Sixto, and Jose Claudio Linhares Pires. Second Independent Evaluation of the Expanded Project Supervision Report Exercise. Inter-American Development Bank, 2009. http://dx.doi.org/10.18235/0010623.
Full textPires, Jose Claudio Linhares. Third Independent Evaluation of Expanded Project Supervision Report (XPSR) Exercise. Inter-American Development Bank, 2011. http://dx.doi.org/10.18235/0010614.
Full textBerkowitz, Jacob, Nathan Beane, Kevin Philley, Nia Hurst, and Jacob Jung. An assessment of long-term, multipurpose ecosystem functions and engineering benefits derived from historical dredged sediment beneficial use projects. Engineer Research and Development Center (U.S.), 2021. http://dx.doi.org/10.21079/11681/41382.
Full textSmall, Martin, Phillip Jordan, Michael Anyala, David Shelton, and Rebecca Stapleton. Assessing the Maturity of National Road Safety Management Systems. Asian Development Bank, 2023. http://dx.doi.org/10.22617/wps230159-2.
Full textGonzalez Diez, Verónica M., Nayda Ávalos, Ana María Linares, et al. IDB and IIC Project Performance: OVE’s Review of 2016 Project Completion Reports and Expanded Supervision Reports. Inter-American Development Bank, 2017. http://dx.doi.org/10.18235/0010686.
Full text