Academic literature on the topic 'Plan of building side'

Create a spot-on reference in APA, MLA, Chicago, Harvard, and other styles

Select a source type:

Consult the lists of relevant articles, books, theses, conference reports, and other scholarly sources on the topic 'Plan of building side.'

Next to every source in the list of references, there is an 'Add to bibliography' button. Press on it, and we will generate automatically the bibliographic reference to the chosen work in the citation style you need: APA, MLA, Harvard, Chicago, Vancouver, etc.

You can also download the full text of the academic publication as pdf and read online its abstract whenever available in the metadata.

Journal articles on the topic "Plan of building side"

1

Alhaj Hasan, Ola, Didier Defer, and Isam Shahrour. "Optimization of District Heating Consumption Using Random Heating Scenario Generator." Applied Mechanics and Materials 704 (December 2014): 479–82. http://dx.doi.org/10.4028/www.scientific.net/amm.704.479.

Full text
Abstract:
This paper proposes a new method to optimize the control of the heating system of a district in a way that fulfills the thermal regulations and comfort in the whole district from one side and guarantees the minimization of the energy consumption (and bill) from the other side. This new method depends on coupling buildings with different functionalities and needs. A heating plan for the coupled entities will be generated afterwards. This plan makes advantage of the difference in occupation timing of the buildings and has as constraints the thermal comfort of the occupants and the maximum availa
APA, Harvard, Vancouver, ISO, and other styles
2

Li, Yi, Q. S. Li, and K. L. Ju. "Experimental Investigation of the Wind Pressure Distribution and Wind Interference Effects on a Typical Tall Building." Advanced Materials Research 639-640 (January 2013): 444–51. http://dx.doi.org/10.4028/www.scientific.net/amr.639-640.444.

Full text
Abstract:
Most tall buildings are constructed in the prosperous center of large cities, where is inevitable to be surrounded by many interfering buildings. Wind interference effects among buildings should not be neglected. Therefore, it is necessary to investigate wind interference effects on such tall buildings. Based on the wind tunnel test of rigid model of a tall building, the wind pressure distribution on the building with interfering buildings around it has been researched, the contours of the mean and fluctuate wind pressure coefficients have also been presented. It has been found that shielding
APA, Harvard, Vancouver, ISO, and other styles
3

Sari, Dany, and Yun-Shang Chiou. "Do Energy Conservation Strategies Limit the Freedom of Architecture Design? A Case Study of Minsheng Community, Taipei, Taiwan." Sustainability 11, no. 7 (2019): 2003. http://dx.doi.org/10.3390/su11072003.

Full text
Abstract:
The residential sector is one of the largest energy-consuming sectors in Taiwan. Taiwan applies building codes and appliance standards to reduce the total energy demand for buildings, especially for façade design. Some research studies demonstrate that design decisions regarding the envelope shape have a direct effect on a building’s energy performance. This paper presents a comparative study of four façade design strategies for low-rise residential buildings by combining energy performance and architectural creativity. The research aims to provide insights for Taiwan’s building designers and
APA, Harvard, Vancouver, ISO, and other styles
4

Sun, Wei, Pengfei Li, Yagang Liu, and Yu Songhun. "DRAGON IN THE CLOUD, SOARING FORWARD*-East Nanyang Station Cultural Architectural Design Expression." E3S Web of Conferences 236 (2021): 05086. http://dx.doi.org/10.1051/e3sconf/202123605086.

Full text
Abstract:
As a city's transportation gateway, the high-speed rail station is also a business card for displaying and disseminating urban culture. The thesis takes the design process of East Nanyang Station, the largest single-line side station building in China as an example, elaborates the design concept of extracting "dragon in the cloud, soaring forward" as the creative design concept, and discusses the station building from three aspects: the overall plan of the station building, spatial form and spatial details cultural design expression.
APA, Harvard, Vancouver, ISO, and other styles
5

Ying, Xiaoyu, and Wenzhe Li. "Effect of Floor Shape Optimization on Energy Consumption for U-Shaped Office Buildings in the Hot-Summer and Cold-Winter Area of China." Sustainability 12, no. 5 (2020): 2079. http://dx.doi.org/10.3390/su12052079.

Full text
Abstract:
This paper explored the effects of the side proportion of building floor shape on building energy consumption. It is based on the analysis of regression models that were developed in the present study. The simplified building models can be used to conduct a parametric study to investigate the effect of building plane shape parameters on total heating and cooling load. DesignBuilder was used to build and simulate individual building configuration. Energy consumption simulations for forty-eight U-shaped buildings with different plane layouts were performed to create a comprehensive dataset cover
APA, Harvard, Vancouver, ISO, and other styles
6

Amin, J. A., and A. K. Ahuja. "Effects of Side Ratio on Wind-Induced Pressure Distribution on Rectangular Buildings." Journal of Structures 2013 (August 12, 2013): 1–12. http://dx.doi.org/10.1155/2013/176739.

Full text
Abstract:
This paper presents the results of wind tunnel studies on 1 : 300 scaled-down models of rectangular buildings having the same plan area and height but different side ratios ranging from 0.25 to 4. Fluctuating values of wind pressures are measured at pressure points on all surfaces of models and mean, maximum, minimum, and r.m.s. values of pressure coefficients are evaluated. Effectiveness of the side ratios of models in changing the surface pressure distribution is assessed at wind incidence angle of 0° to 90° at an interval of 15°. Side ratio of models has considerable effects on the magnitud
APA, Harvard, Vancouver, ISO, and other styles
7

Connors, Joseph. "S. Ivo Alla Sapienza: The First Three Minutes." Journal of the Society of Architectural Historians 55, no. 1 (1996): 38–57. http://dx.doi.org/10.2307/991054.

Full text
Abstract:
Francesco Borromini's masterpiece, the university chapel of S. Ivo alla Sapienza in Rome, was built over three pontificates, with many radical changes after each conclave. This is a study of the first building period under Urban VIII Barberini, and in particular of the earliest known plan for the church, datable to 1642, now kept in the Archivio di Stato in Rome. The drawing shows the basic plan of the church-a triangle-plus-apses-minus-angles-being moved, manipulated, and stretched as Borromini fine-tuned his design. The plan contains echoes of centralized buildings by Baldassarre Peruzzi and
APA, Harvard, Vancouver, ISO, and other styles
8

Iyati, Wasiska, Eryani Nurma Yulita, Jusuf Thojib, and Heru Sufianto. "The Impact of Aspect Ratio on External Heat Gain of Multi-storey Office Buildings in Jakarta." Review of Urbanism and Architectural Studies 16, no. 1 (2018): 24–31. http://dx.doi.org/10.21776/ub.ruas.2018.016.01.2.

Full text
Abstract:
The narrow land in big cities such as Jakarta, increases the amount of high rise building, especially multi-storey office building. Office building consumes much energy to provide air conditioning to meet the thermal comfort inside the building. On the other hand, the building shape, building envelope, and building orientation to the sun's position are the main factors in building design aspects that affect the amount of cooling load. This study aims to investigate the impact of the aspect ratio or the ratio of the longer dimension of an oblong plan to the shorter, on external heat gain of mul
APA, Harvard, Vancouver, ISO, and other styles
9

Heriyanto, Budi. "PHYSICAL AND FUNCTIONAL RESIDENTIAL CHANGES AT TEBET UTARA DALAM STREET CORRIDOR, SOUTH JAKARTA." International Journal on Livable Space 3, no. 1 (2018): 53. http://dx.doi.org/10.25105/livas.v3i1.2957.

Full text
Abstract:
<div class="page" title="Page 1"><div class="section"><div class="layoutArea"><div class="column"><p><span>The 1997-2000 economic crises have provoked the rise of a number of speculators alongside the corridor of Jalan Tebet Utara. The function of residential buildings on the left and right sides of the road was developed not only as a residential place but also as a commercial area with the target market of young people. These conditions had an effect on the phenomenon of architectural transformation on the absence of permission for a commercial building th
APA, Harvard, Vancouver, ISO, and other styles
10

Heriyanto, Budi. "PHYSICAL AND FUNCTIONAL RESIDENTIAL CHANGES AT TEBET UTARA DALAM STREET CORRIDOR, SOUTH JAKARTA." International Journal on Livable Space 3, no. 1 (2018): 53. http://dx.doi.org/10.25105/livas.v3i1.3934.

Full text
Abstract:
<p><strong><em>Abstract</em></strong></p><p><em>The 1997-2000 economic crises have provoked the rise of a number of speculators alongside the corridor of Jalan Tebet Utara. The function of residential buildings on the left and right sides of the road was developed not only as a residential place but also as a commercial area with the target market of young people. These conditions had an effect on the phenomenon of architectural transformation on the absence of permission for a commercial building that was not in line with the General Spatial Pla
APA, Harvard, Vancouver, ISO, and other styles
More sources

Dissertations / Theses on the topic "Plan of building side"

1

Invald, Roman. "Stavebně technologická příprava bytového domu ve Velkém Meziříčí." Master's thesis, Vysoké učení technické v Brně. Fakulta stavební, 2013. http://www.nusl.cz/ntk/nusl-226497.

Full text
Abstract:
The thesis concerns the construction of an apartment building in Velke Mezirici. The project describes construction and engineering solutions of the building itself. It consists of the technical report, the financial proposal, the construction site drawings, the building schedule, the supervisory and testing procedures, technological standards (thermal insulation and roof assembly), construction machinery, BOZP, fire safety regulations and construction maintenance.
APA, Harvard, Vancouver, ISO, and other styles
2

Kašpar, Radek. "Stavebně technologický projekt oční kliniky." Master's thesis, Vysoké učení technické v Brně. Fakulta stavební, 2017. http://www.nusl.cz/ntk/nusl-265452.

Full text
Abstract:
Diploma thesis with construction technological project Eye Clinic. Contents of construction technological project are project engineering report, study of realization of main technological stages, engineering report of site equipment, technological regulation scaffolding and technological regulation insulation, inspection and test plan
APA, Harvard, Vancouver, ISO, and other styles
3

Patrný, Jan. "Stavebně technologický projekt výrobní haly v Litomyšli." Master's thesis, Vysoké učení technické v Brně. Fakulta stavební, 2016. http://www.nusl.cz/ntk/nusl-240170.

Full text
Abstract:
This thesis consists of a technological project of the production hall realization in Litomyšl. The main part of the project is a building schedule and a financial plan of the construction itself. Moreover thesis consists of a building site equipment design, construction machinery needed for building and a workplace safety plan. The process of selected realization parts are described in the technological manual and the quality control and inspection plan.
APA, Harvard, Vancouver, ISO, and other styles
4

Alameri, Muhamed, and Mahmoud Zaaroura. "Visualisering av APD-Plan med hjälp av 3D och BIM : En studie om utveckling av APD-visualisering i byggbranschen." Thesis, Malmö universitet, Fakulteten för teknik och samhälle (TS), 2021. http://urn.kb.se/resolve?urn=urn:nbn:se:mau:diva-40913.

Full text
Abstract:
Trots den nytta som BIM har på ett projekt så finns det fortfarande företag som väljer att skapa sina APD-planer på det traditionella arbetssättet. Det traditionella arbetssättet innebär att APD-planen upprättas på den gamla metoden som vanligtvis görs med 2D. Anledningen bakom att det fortfarande finns företag som upprättar APD-planer på den traditionella arbetsmetoden är att de inte finns någon tillräcklig vilja eller kunskap att ändra arbetsmetod trots att metoden anses vara osäker och tidskrävande. Det har istället förekommit en ny arbetsmetod för att frambringa planer och ritningar som sk
APA, Harvard, Vancouver, ISO, and other styles
5

Jedlička, Jan. "Příprava a řízení zakázky ve stavebním podniku." Master's thesis, Vysoké učení technické v Brně. Fakulta stavební, 2019. http://www.nusl.cz/ntk/nusl-391986.

Full text
Abstract:
This diploma thesis aims to describe preparation and management of a contract in a building company using the tools of project control. The thesis contains a theoretical and a practical part, where the problem is first explained theoretically and then practically on the chosen contract. This contact is a block of flats in Stepanov, which was realized in the years 2017 and 2018 by the building company Moravostav Brno, a. s.
APA, Harvard, Vancouver, ISO, and other styles
6

Uriarte, Otazua Urtza. "Light and taste : third plane side‐view combined with complex fenestration system atmospheres under midday clear sky at restaurants." Doctoral thesis, Universitat Politècnica de Catalunya, 2016. http://hdl.handle.net/10803/404022.

Full text
Abstract:
This thesis deals with sunny side-lit indoor atmospheres, in which an outdoor view is required and a calm environment to enhance concentration. Different window systems were compared: a single fully glazed façade and complex façades. The complex façades were composed of large or small windows that combined a light shelf and prismatic film complex fenestration systems. The luminance and illuminance distribution parameters were selected to assess the light atmosphere. The Daylight Glare Probability (DGP) index was used to evaluate the luminance distribution and the Daylight Autonomy (DA) index
APA, Harvard, Vancouver, ISO, and other styles
7

Kralovič, Antonín. "Bytový dům ve Stromovce - stavebně technologický projekt." Master's thesis, Vysoké učení technické v Brně. Fakulta stavební, 2019. http://www.nusl.cz/ntk/nusl-391930.

Full text
Abstract:
The aim of the diploma thesis is to describe the building-technological project for the construction of a residential building in Hradec Králové. The apartment building is five-storey and has 33 residential units. The work is systematically divided into smaller logical units. First, the project is described in a technical report, followed by studies of the realization of the main building. After the description of the project, an indicative time and financial plan is prepared, which is refined by the schedule and budget itemization of the main building. An integral part of the design is mechan
APA, Harvard, Vancouver, ISO, and other styles
8

Cahlík, Jakub. "Polyfunkční dům v Šumperku. Stavebně technologická příprava stavby." Master's thesis, Vysoké učení technické v Brně. Fakulta stavební, 2015. http://www.nusl.cz/ntk/nusl-227731.

Full text
Abstract:
The subject of the thesis is the construction and technological preparation of construction multifunctional building in Šumperk. The work includes a study of the implementation of all major phases of construction technology, building equipment, time and financial plan, design of the main building mechanisms, the timetable for the main building, technical regulations, inspection and test quality plan, schedule of occupational health and safety risks with the plan and selected structural details.
APA, Harvard, Vancouver, ISO, and other styles
9

Bajerová, Marie. "Stavebně technologický projekt hotelu Chopin v Bratislavě." Master's thesis, Vysoké učení technické v Brně. Fakulta stavební, 2018. http://www.nusl.cz/ntk/nusl-371866.

Full text
Abstract:
This final thesis is focused on technological project Hotel Chopin in Bratislava. The technological project deals with the planning of the entire construction and focuses on the design of the site equipment, time plan of the building development and the detailed time plan of the building structure. Further focuses on the construction cast-in-place reinforced concrete structures. It prepares the technological prescription for cast-in place reinforced structures, inspection and test plan and the plan of safety risks and measures. Part of the project is also the construction budget and the mechan
APA, Harvard, Vancouver, ISO, and other styles
10

Zeman, Roman. "Stavebně technologický projekt výrobní haly v Polničce." Master's thesis, Vysoké učení technické v Brně. Fakulta stavební, 2017. http://www.nusl.cz/ntk/nusl-265361.

Full text
Abstract:
The diploma thesis deals with the issue of the building technology project of the structural work of industrial building belonging to CECHO company in Polnička. The industrial building consists of two building objects, shop floor and office building. The main aim of the thesis is to focus on the time and financial management of the construction, schedule, site equipment management including time schedule of establishment and removal of temporary site equipment objects and their rental costs, transport routes planning, proposal of main building equipment, oversized transport and technological r
APA, Harvard, Vancouver, ISO, and other styles
More sources

Books on the topic "Plan of building side"

1

Building your bright side. Wynwood Press, 1991.

Find full text
APA, Harvard, Vancouver, ISO, and other styles
2

Thakkar, Mohit. Building React Apps with Server-Side Rendering. Apress, 2020. http://dx.doi.org/10.1007/978-1-4842-5869-9.

Full text
APA, Harvard, Vancouver, ISO, and other styles
3

Kies, Theo. The South African building plan. De Jager-HAUM, 1986.

Find full text
APA, Harvard, Vancouver, ISO, and other styles
4

Service, United States National Park. Denali, Alaska: Development concept plan, south side. U.S. Dept. of the Interior, National Park Service, 1997.

Find full text
APA, Harvard, Vancouver, ISO, and other styles
5

Michigan. Dept. of Transportation. Building Michigan's future: State transportation plan. Michigan Dept. of Transportation, 1988.

Find full text
APA, Harvard, Vancouver, ISO, and other styles
6

Shelley, Silver, ed. The pill protection plan. Grapevine, 1989.

Find full text
APA, Harvard, Vancouver, ISO, and other styles
7

Wilkinson, Thomas Lee. Strength of bolted timber connections with steel side members. U.S. Dept. of Agriculture, Forest Service, Forest Products Laboratory, 1992.

Find full text
APA, Harvard, Vancouver, ISO, and other styles
8

Wilkinson, Thomas Lee. Strength of bolted timber connections with steel side members. U.S. Dept. of Agriculture, Forest Service, Forest Products Laboratory, 1992.

Find full text
APA, Harvard, Vancouver, ISO, and other styles
9

Wilkinson, Thomas Lee. Strength of bolted timber connections with steel side members. U.S. Dept. of Agriculture, Forest Service, Forest Products Laboratory, 1992.

Find full text
APA, Harvard, Vancouver, ISO, and other styles
10

1874-1954, Bennett Edward H., Moore Charles 1855-1942, and Commercial Club of Chicago, eds. Plan of Chicago. Great Books Foundation, 2009.

Find full text
APA, Harvard, Vancouver, ISO, and other styles
More sources

Book chapters on the topic "Plan of building side"

1

Bhattacharya, Satadru, and Sujit Kumar Dalui. "Effect of Side Ratio on V Plan Shaped High-Rise Building Under Wind Excitation." In Lecture Notes in Civil Engineering. Springer International Publishing, 2021. http://dx.doi.org/10.1007/978-3-030-80312-4_75.

Full text
APA, Harvard, Vancouver, ISO, and other styles
2

Haine, Charles. "Building Your Plan." In Business and Entrepreneurship for Filmmakers. Routledge, 2019. http://dx.doi.org/10.4324/9780429029714-4.

Full text
APA, Harvard, Vancouver, ISO, and other styles
3

Reichardt, Jürgen. "Master Building Plan." In Handbook Factory Planning and Design. Springer Berlin Heidelberg, 2015. http://dx.doi.org/10.1007/978-3-662-46391-8_12.

Full text
APA, Harvard, Vancouver, ISO, and other styles
4

Smith, William. "Server-Side Programming." In Systems Building with Oracle. Macmillan Education UK, 2004. http://dx.doi.org/10.1007/978-0-230-00094-0_10.

Full text
APA, Harvard, Vancouver, ISO, and other styles
5

Brudenell, Pat. "Building Relationships." In The Other Side of Profound Handicap. Macmillan Education UK, 1986. http://dx.doi.org/10.1007/978-1-349-18305-0_5.

Full text
APA, Harvard, Vancouver, ISO, and other styles
6

Michalk, Dale, and Rob Cameron. "Integrating Client-Side Script." In Building ASP.NET Server Controls. Apress, 2004. http://dx.doi.org/10.1007/978-1-4302-0799-3_8.

Full text
APA, Harvard, Vancouver, ISO, and other styles
7

Bertram, Adam. "Plan Before You Code." In Building Better PowerShell Code. Apress, 2020. http://dx.doi.org/10.1007/978-1-4842-6388-4_4.

Full text
APA, Harvard, Vancouver, ISO, and other styles
8

Gard'ner, James Maitland. "Preparing the Conservation Plan." In Understanding Historic Building Conservation. Blackwell Publishing Ltd, 2008. http://dx.doi.org/10.1002/9780470691823.ch14.

Full text
APA, Harvard, Vancouver, ISO, and other styles
9

Siegel, Marc H. "Building the Framework—Plan/Assess." In Preventing and Managing Violence in Organizations. CRC Press, 2018. http://dx.doi.org/10.4324/9781351020503-6.

Full text
APA, Harvard, Vancouver, ISO, and other styles
10

Cui, Sunan, Randall K. Ten Haken, and Issam El Naqa. "Building a Predictive Model of Toxicity." In Modelling Radiotherapy Side Effects. CRC Press, 2019. http://dx.doi.org/10.1201/b21956-2.

Full text
APA, Harvard, Vancouver, ISO, and other styles

Conference papers on the topic "Plan of building side"

1

Gendrin*, A., G. Sosio, U. Miersemann, et al. "Building a monitoring plan for a CO2injection site." In SEG Technical Program Expanded Abstracts 2014. Society of Exploration Geophysicists, 2014. http://dx.doi.org/10.1190/segam2014-0127.1.

Full text
APA, Harvard, Vancouver, ISO, and other styles
2

Kontrimovičius, Robertas, Leonas Ustinovičius, and Mantas Vaišnoras. "Calculating and estimating construction site plan preparation works and temporary objects, using virtual reality technology." In The 13th international scientific conference “Modern Building Materials, Structures and Techniques”. Vilnius Gediminas Technical University, 2019. http://dx.doi.org/10.3846/mbmst.2019.202.

Full text
Abstract:
Aim of the article: to create a prototype of an information system of an optimized site plan using virtual reality technology (VRT). The article consists of two parts. The first part: the review of the literary sources used; a comparative analysis of the existing models of the construction site plans. Second part: the description of the prototype development of the information system (the algorithm) using building information modeling (BIM), and VRT.
APA, Harvard, Vancouver, ISO, and other styles
3

Wolff, David E., William Bailey, and Tom Skoczylas. "Hydrogen Generation Can Reduce New Plant Design and Building Costs." In ASME 2013 Power Conference. American Society of Mechanical Engineers, 2013. http://dx.doi.org/10.1115/power2013-98018.

Full text
Abstract:
Large electric power plant generators typically use gaseous hydrogen to remove heat from the generator windings and deliver the heat to the cooling water. Hydrogen is used in a closed cycle, and only a modest amount of makeup hydrogen is used daily to make up for hydrogen losses — typically about 300 to 700 scf/d. The range of hydrogen usage depends on several factors. In addition to hydrogen used for makeup, all power plants using hydrogen-cooled generators must plan for hydrogen supply to re-gas a generator after the generator has been degassed. Typical generator re-gas quantities are in the
APA, Harvard, Vancouver, ISO, and other styles
4

Pointner, Andreas, Christoph Praschl, Oliver Krauss, Andreas Schuler, Emmanuel Helm, and Gerald Zwettler. "Line Clustering and Contour Extraction in the Context of 2D Building Plans." In WSCG'2021 - 29. International Conference in Central Europe on Computer Graphics, Visualization and Computer Vision'2021. Západočeská univerzita, 2021. http://dx.doi.org/10.24132/csrn.2021.3101.2.

Full text
Abstract:
For the purpose of analyzing a building according to its accessibility or structural resilience, printed 2D floorplans are not sufficient because of the missing link to semantic information. This paper tackles this issue andintroduces a concept for clustering classified lines of a floor plan and for creating semantically enriched contourelements based on different image processing, computer vision and machine learning algorithms. Based on ageneral line clustering approach, we introduce type specific methods forwalls,windows,doorsandstairs. Theresulting clusters are in turn used for a contour c
APA, Harvard, Vancouver, ISO, and other styles
5

Kitamura, Akihiro, Takashi Okada, Sinichiro Asazuma, Shinichi Uematsu, and Takashi Ishibashi. "Glovebox Dismantling Activities and Decommissioning Plan for Plutonium Fuel Fabricating Facility." In 12th International Conference on Nuclear Engineering. ASMEDC, 2004. http://dx.doi.org/10.1115/icone12-49511.

Full text
Abstract:
The gloveboxes and process equipment used at plutonium fuel handling facilities have had to be replaced due to deterioration or the need to make changes. So far, their removal and replacement has taken place more than 30 times in Plutonium Fuel Center, Japan Nuclear Cycle Development Institute (JNC). In most recent dismantling activities, we removed four giant gloveboxes (total size, 110 cubic meters) which possessed equipment to recover plutonium from mixed oxide (MOX) fuel scraps. We have implemented a number of procedural improvements in dismantling activities and collected various kinds of
APA, Harvard, Vancouver, ISO, and other styles
6

Otoyo, Teruyoshi, Akihito Otani, Shunsuke Fukushima, et al. "Development of an Evaluation Method for Seismic Isolation Systems of Nuclear Power Facilities: Part 4 — Failure Behavior of Crossover Piping for Seismic Isolation System." In ASME 2014 Pressure Vessels and Piping Conference. American Society of Mechanical Engineers, 2014. http://dx.doi.org/10.1115/pvp2014-29011.

Full text
Abstract:
This paper provides a part of the series titled “Development of an Evaluation Method for Seismic Isolation Systems of Nuclear Power Facilities”. This part shows the failure behavior of crossover piping installed in a seismic isolated plant. The considered crossover piping is supported on one side by an isolated building and by a non-isolated building on the other side. During an earthquake, the piping structure is deformed due to the large relative displacements between the two buildings and at the same time excited by the different building seismic responses. Therefore, the high-pressure cros
APA, Harvard, Vancouver, ISO, and other styles
7

Ene, Daniela. "Preliminary Waste Management Plan of European Spallation Source." In ASME 2013 15th International Conference on Environmental Remediation and Radioactive Waste Management. American Society of Mechanical Engineers, 2013. http://dx.doi.org/10.1115/icem2013-96154.

Full text
Abstract:
The European Spallation Source (ESS) is the European common effort in designing and building a next generation large-scale user facility for studies of the structure and dynamics of materials. The proposed schematic layout of the ESS facility is based on a linear driver (linac) directing the proton beam (5 MW of 2.5 GeV) of 2.8 ms long pulses with a 20 Hz on a tungsten target where neutrons are produced via spallation reactions. Further the neutrons will be moderated to thermal and subthermal energies in a couple of moderators placed around the target. The moderators feed 22 beamlines guiding
APA, Harvard, Vancouver, ISO, and other styles
8

Kavaliauskas, Donatas, and Leonidas Sakalauskas. "Conceptual model of productivity bot for smart construction planning." In The 13th international scientific conference “Modern Building Materials, Structures and Techniques”. Vilnius Gediminas Technical University, 2019. http://dx.doi.org/10.3846/mbmst.2019.003.

Full text
Abstract:
One of the most important tasks in modern construction is to build a building according to the desired time schedule. This requires a timetable for the construction stages processes. The schedule is also easy to adapt and to plan the renovation of a building or maintenance works. Without a good schedule site manager cannot effectively handle construction area processes. The solution to this problem is the proposed productivity bot concept based on metaheuristic algorithms. Metaheuristic algorithms allow to improve the construction planning process schedules compared with conventional planning
APA, Harvard, Vancouver, ISO, and other styles
9

Ding, Wowo, Yusheng Gu, and Lian Tang. "Identify Urban Spatial Patterns Based on the Plot Shapes and Building Setting in Downtown of Nanjing." In 24th ISUF 2017 - City and Territory in the Globalization Age. Universitat Politècnica València, 2017. http://dx.doi.org/10.4995/isuf2017.2017.5924.

Full text
Abstract:
Yusheng Gu, Lian Tang, Wowo DingSchool of Architecture & Urban Planning, Nanjing University, No.22 Hankou Rd, Jiangsu 210093, P.R.ChinaE-mail: guyushengnju@163.com, tanglian@nju.edu.cn, dww@nju.edu.cnTel: +86 13951786797; +86 25 8359 7205Key words: Spatial Configuration, Building Pattern, Plot Pattern, Plot Boundary Line The geometric characteristics of modern cities have been difficult to describe that is important for urban design, which deserve to be further interpreted. Taking advantage of Conzen’s methodology, the building is tightly related with its plot, which means the certain
APA, Harvard, Vancouver, ISO, and other styles
10

Eto, Hiroaki, Chiaki Sato, Koichi Masuda, et al. "Basic Plan of Medi-Float on Big Disaster Installed in the River." In ASME 2015 34th International Conference on Ocean, Offshore and Arctic Engineering. American Society of Mechanical Engineers, 2015. http://dx.doi.org/10.1115/omae2015-42009.

Full text
Abstract:
An innumerable number of buildings in the coastal part of the east side of Japan were devastated by the Great East Japan Earthquake and Tsunami. Medical institutions also suffered the damage caused by tsunami, and the function to carry out the medical act has been spoiled. And the disabled concentrated on the medical institution which avoided tsunami damage. Under such circumstances, assistance from the water area began three days after the earthquake disaster, and much support supplies reached the stricken area. It was revealed that the support from the water area including the river was extr
APA, Harvard, Vancouver, ISO, and other styles

Reports on the topic "Plan of building side"

1

Wagenblast, G. R. ,. Westinghouse Hanford. Hanford site post NPH building inspection plan. Office of Scientific and Technical Information (OSTI), 1996. http://dx.doi.org/10.2172/663117.

Full text
APA, Harvard, Vancouver, ISO, and other styles
2

Author, Not Given. Monitoring plan for characterization of the Building 3028 leak site. Office of Scientific and Technical Information (OSTI), 1986. http://dx.doi.org/10.2172/7198336.

Full text
APA, Harvard, Vancouver, ISO, and other styles
3

Ladd, Aaron, William Micheel, Steve Prideaux, and Adam Ralston. Building Blocks : Redevelopment Concept Plan for Downtown Davenport Industrial Site. University of Iowa, 2008. http://dx.doi.org/10.17077/uf78-4aak.

Full text
APA, Harvard, Vancouver, ISO, and other styles
4

Author, Not Given. Monitoring plan for characterization of the Building 3019 leak site. Office of Scientific and Technical Information (OSTI), 1986. http://dx.doi.org/10.2172/6501524.

Full text
APA, Harvard, Vancouver, ISO, and other styles
5

Bergeron, B. Site 200 - Building 225 Construction ProjectSTEEL PIPE ABANDONMENT WORK PLAN (October 2020). Office of Scientific and Technical Information (OSTI), 2020. http://dx.doi.org/10.2172/1673192.

Full text
APA, Harvard, Vancouver, ISO, and other styles
6

Bohrman, D. E., and E. M. Ingram. Revised corrective action plan for underground storage tank 2331-U at the Building 9201-1 Site. Office of Scientific and Technical Information (OSTI), 1993. http://dx.doi.org/10.2172/10106594.

Full text
APA, Harvard, Vancouver, ISO, and other styles
7

ITLV. Corrective Action Investigation plan for Corrective Action Unit 263: Area 25 Building 4839 Leachfield, Nevada Test Site, Nevada, March 1999. Office of Scientific and Technical Information (OSTI), 1999. http://dx.doi.org/10.2172/9054.

Full text
APA, Harvard, Vancouver, ISO, and other styles
8

J. L. Smith. Streamlined Approach for Environmental Restoration Plan for Corrective Action Unit 113: Reactor Maintenance, Assembly, and Disassembly Building Nevada Test Site, Nevada. Office of Scientific and Technical Information (OSTI), 2001. http://dx.doi.org/10.2172/788467.

Full text
APA, Harvard, Vancouver, ISO, and other styles
9

Olson, A. L., and S. J. Nacht. Corrective Action Plan for CAU No. 95: Area 15 EPA Farm Laboratory Building, Decontamination and Demolition Closure Activities - Nevada Test Site. Rev. 0. Office of Scientific and Technical Information (OSTI), 1997. http://dx.doi.org/10.2172/623031.

Full text
APA, Harvard, Vancouver, ISO, and other styles
10

PARSONS ENGINEERING SCIENCE INC DENVER CO. Corrective Action Plan for Expanded Bioventing System Site SS-41, Former Building 93 (Fuel Pumping Station Number 3), Charleston Air Force Base, South Carolina. Defense Technical Information Center, 1997. http://dx.doi.org/10.21236/ada384968.

Full text
APA, Harvard, Vancouver, ISO, and other styles
We offer discounts on all premium plans for authors whose works are included in thematic literature selections. Contact us to get a unique promo code!