To see the other types of publications on this topic, follow the link: Prefabricated timber construction.

Dissertations / Theses on the topic 'Prefabricated timber construction'

Create a spot-on reference in APA, MLA, Chicago, Harvard, and other styles

Select a source type:

Consult the top 23 dissertations / theses for your research on the topic 'Prefabricated timber construction.'

Next to every source in the list of references, there is an 'Add to bibliography' button. Press on it, and we will generate automatically the bibliographic reference to the chosen work in the citation style you need: APA, MLA, Harvard, Chicago, Vancouver, etc.

You can also download the full text of the academic publication as pdf and read online its abstract whenever available in the metadata.

Browse dissertations / theses on a wide variety of disciplines and organise your bibliography correctly.

1

Marzec, Cindy, and Joachim Gustavsson. "VALUE STREAM MAPPING – A CASE STUDY OF CONSTRUCTION SUPPLY CHAINOF PREFABRICATED MASSIVE TIMBER FLOOR ELEMENT." Thesis, Växjö University, School of Management and Economics, 2007. http://urn.kb.se/resolve?urn=urn:nbn:se:vxu:diva-1606.

Full text
Abstract:
<p>The purpose of this Master Thesis is to study how the value stream mapping concept can be applied along the construction supply chain for prefabricated massive timber floor elements. Identification and qualification of waste are starting points to propose suggestions on how to reduce and/or eliminate them. In order to use the value stream mapping along the construction supply chain, pertinent data has been collected and analyzed. To conduct the value stream mapping, the first three steps of the lean thinking principles in construction have been followed. The first step aims at defining the
APA, Harvard, Vancouver, ISO, and other styles
2

Fält, Pernilla. "Från 2D till BIM i ett trähusföretag : Transition from 2D-CAD to BIM in a timber frame home company." Thesis, Växjö University, School of Technology and Design, 2009. http://urn.kb.se/resolve?urn=urn:nbn:se:vxu:diva-5675.

Full text
Abstract:
<p>A prefabricated timber frame house previously built by Villafabriken AB has been modeled in Autodesk Revit Architectural, a 3D-program based on BIM-technology. This has been done tosee if it’s possible to produce the publications that Villafabriken demands from the designengineer’s work, and examine which possible extra values that may arise compared to traditional 2D-CAD drawing.BIM is short for Building Information Modeling. Everything is stored in a single database and a change in the project file is automatically updated across the project. BIM provides more than just drawings since inf
APA, Harvard, Vancouver, ISO, and other styles
3

Janás, Ondřej. "Bytový dům." Master's thesis, Vysoké učení technické v Brně. Fakulta stavební, 2020. http://www.nusl.cz/ntk/nusl-409852.

Full text
Abstract:
The master thesis deals with structural analyzing of timber house structure. In the thesis, two variants are discussed with detailed focus on one of them. The chosen variant is made up by platform frame system. This system is getting more popular in the Czech Republic.
APA, Harvard, Vancouver, ISO, and other styles
4

Lindgren, Aron, and Daniel Larsson. "Våningspåbyggnad av miljonprogrammets flerbostadshus : Förutsättningar och kontroller för genomförandet av våningspåbyggnader." Thesis, KTH, Byggteknik och design, 2012. http://urn.kb.se/resolve?urn=urn:nbn:se:kth:diva-102010.

Full text
Abstract:
Under de så kallade rekordåren mellan 1961-1975 byggdes det totalt 920,000 lägenheter i flerbostadshus i Sverige, och idag finns omkring 850,000 av dessa kvar. Den vanligaste byggnadstekniken under perioden var med byggande av förtillverkade våningshöga fasadelement tillsammans med en platsbyggd bokhyllestomme med tvärgående bärande innerväggar och gavlar. Syftet med arbetet är att kontrollera om en våningspåbyggnad på ett referenshus från miljonprogrammet med bokhyllestomme är möjlig för att skapa nya lägenheter som medför ökade hyresintäkter för fastighetsägaren, och kan medverka till ökad v
APA, Harvard, Vancouver, ISO, and other styles
5

Vaněk, Jiří. "Technologický projekt sportovní haly v obci Nové Veselí." Master's thesis, Vysoké učení technické v Brně. Fakulta stavební, 2012. http://www.nusl.cz/ntk/nusl-225618.

Full text
Abstract:
This Master's thesis deals with the technological project of sports hall in New Veseli . This work includes the construction and technological equipment for the study site , ZOV , technological regulations, building equipment, wider transport relations, budget calculation , time planning , inspection and test plan , design mechanisms , job security this building , balance resources.
APA, Harvard, Vancouver, ISO, and other styles
6

Bartošová, Andrea. "Občanská stavba." Master's thesis, Vysoké učení technické v Brně. Fakulta stavební, 2020. http://www.nusl.cz/ntk/nusl-409977.

Full text
Abstract:
Basic of this Diploma thesis is Civil construction in Kostelec nad Orlici, which is in a part of city, where is planning off-grid community housing. Part of off-grid community housing is considered a partially sistainable civil construction, serving both for cultural use through the club, for commercial purposes such as various salons (hairdresser, massage or shop), as well as for sports activities with the possibility of small refreshments, such as bouldering, climbing wall and exercise hall. Four sustainable (off-grid) familly houses, which aren´t the subject of this thesis, are considered.
APA, Harvard, Vancouver, ISO, and other styles
7

Paananen, Linnea, and Injonglan Gamm Burom. "En möjlighet till en hållbar byggbransch : Jämförelsestudie mellan stommaterialen KL-trä och prefabricerad betong." Thesis, KTH, Byggteknik och design, 2019. http://urn.kb.se/resolve?urn=urn:nbn:se:kth:diva-259934.

Full text
Abstract:
Byggbranschen står idag för cirka 21 procent av Sveriges totala årliga utsläpp av växthusgaser. En stor utmaning är att kunna uppnå klimatlagens mål som innebär att Sverige inte ska ha några nettoutsläpp av växthusgaser i atmosfären de kommande decennierna. Samtidigt ökar behovet av fler bostäder i samband med en ökad befolkning. Betong är det material som dominerar dagens industriella byggande av flervåningshus och i samband med den tidigare svenska lagen som förbjöd träkonstruktioner med fler än två våningar är träbyggandet i Sverige inte lika etablerat i samma utsträckning som betongkonstru
APA, Harvard, Vancouver, ISO, and other styles
8

Hauke, Christopher, and Björn Johansson. "Effektivisering vid hantering av prefabricerade stomelement." Thesis, KTH, Byggteknik och design, 2017. http://urn.kb.se/resolve?urn=urn:nbn:se:kth:diva-213511.

Full text
Abstract:
Efterfrågan på bostäder är idag större än på länge samtidigt som byggbranschen kämpar med pressade byggtider och låga vinstmarginaler. Vinstmarginalen kan ökas genom att effektivisera logistiken och eliminera onödiga kostnader som uppstår i samband med bristande planering. Syftet med rapporten är att hjälpa Peab att identifiera var onödiga kostnader uppstår i samband med hantering av prefabricerade stomelement. Detta sker genom att jämföra arbetet med logistikfrågor på två likvärdiga Peab-projekt, vilka är KTH-studentbostäder samt Roddaren och Simmaren. Resultatet bygger till största del på dj
APA, Harvard, Vancouver, ISO, and other styles
9

Štěpánek, Michal. "Stavebně technologická příprava skladového a administrativního objektu v Černé za Bory." Master's thesis, Vysoké učení technické v Brně. Fakulta stavební, 2020. http://www.nusl.cz/ntk/nusl-409948.

Full text
Abstract:
The aim of this diploma thesis is the construction and technological solution of the warehouse and administrative building in Černá za Bory. The diploma thesis contains technological procedures for assembly of reinforced concrete skeleton and realization of industrial floor. This work solves problems that could arise during the assembly of the skeleton and realization of industrial floor. The thesis contains a construction technology project, a study of the implementation of the main technological stages, the situation of the construction with broader relations of transport routes, the project
APA, Harvard, Vancouver, ISO, and other styles
10

Kondratenko, Bohdan. "Průmyslová hala v areálu Moravostav - příprava realizace stavby." Master's thesis, Vysoké učení technické v Brně. Fakulta stavební, 2017. http://www.nusl.cz/ntk/nusl-265688.

Full text
Abstract:
This work deals with the planning of industrial hall with administrative placement execution in the complex Moravostav, Modřice. The hall is founded on bored piles. This building is made of reinforced concrete structure with prefabricated deals. The facade is consisted of sheeting panels, roof deck is made from steel trapezoidal sheets. The thesis describes the procedures and other necessary connection with construction to accelerate the actual implementation of the construction site. The aim of this work is to develop selected parts of building technology project within the scope of the annex
APA, Harvard, Vancouver, ISO, and other styles
11

Sedlák, Petr. "Přístavba výrobní haly - stavebně technologický projekt." Master's thesis, Vysoké učení technické v Brně. Fakulta stavební, 2018. http://www.nusl.cz/ntk/nusl-371981.

Full text
Abstract:
The subject of this diploma thesis is a building construction project for industrial building Rieder Beton in Jihlava. It contains an engineering report, a time schedule, a site equipment report, a design of machine assembly, a technological project together with a quality and test plan for the precast prefabricated frame and an itemized budget.
APA, Harvard, Vancouver, ISO, and other styles
12

Karabcová, Eva. "Centrální sklad ložisek ZKL v Brně - stavebně technologický projekt." Master's thesis, Vysoké učení technické v Brně. Fakulta stavební, 2015. http://www.nusl.cz/ntk/nusl-227849.

Full text
Abstract:
The content of this work is the implementation of the construction technological project of central bearing warehouse ZKL in Brno. The building serves for storage purposes predominantly. This thesis contains general information about construction, content construction technological project, technology report of storage and residential proposal of mechanical assembly, technological prescription for prefabricated scaffold and cladding panels construction Kingspan, report of healthand safety on the construction site, technology report description transportation, inspection and test plans and envi
APA, Harvard, Vancouver, ISO, and other styles
13

Zelinková, Marta. "Příprava realizace železobetonové skladovací haly v Poličce." Master's thesis, Vysoké učení technické v Brně. Fakulta stavební, 2019. http://www.nusl.cz/ntk/nusl-392184.

Full text
Abstract:
The aim of this diploma thesis is the design of an effective construction-technological project for the construction of reinforced concrete prefabricated storage halls and halls of Ravensburger Karton s.r.o.. The solution of the chosen problem is the design of the building site equipment, the verification of the transport routes, the assembly schemes, the technological regulation and the control and test plan for the precast reinforced concrete frame, the BOZP plan, the budget item and the schedule of the main building, timetable, calculation timetable and environmental aspects of the construc
APA, Harvard, Vancouver, ISO, and other styles
14

Šimonová, Aneta. "Stavebně technologický projekt bytového domu Ždírec." Master's thesis, Vysoké učení technické v Brně. Fakulta stavební, 2018. http://www.nusl.cz/ntk/nusl-372122.

Full text
Abstract:
Subject of the master's thesis is project planning and management of construction of apartment building in Ždírci nad Doubravou. There is prepared a technical report on the structural and technological project, situation with broder relations roadways, time and financial plan, studies the implementation of major technological stages, project construction site, design of building machines and mechanisms, plan for securing materiál resources, technological regulation for contact thermal insulation system, inspection and test plans contact thermal insulation system, budget of the main object, net
APA, Harvard, Vancouver, ISO, and other styles
15

Chroustovský, David. "Skladovací hala PFM Flexi - stavebně technologický projekt." Master's thesis, Vysoké učení technické v Brně. Fakulta stavební, 2018. http://www.nusl.cz/ntk/nusl-371958.

Full text
Abstract:
The aim of this diploma thesis is the design of an effective construction-technological project for the construction of reinforced concrete prefabricated storage halls by PFM-Flexi, s.r.o. The solution of the chosen problem is the design of the building site equipment, the verification of the transport routes of the key materials, the assembly schemes, the technological regulation and the control and test plan for the precast reinforced concrete frame, the BOZP plan, the comparison of the two versions of the installation in financial terms, the budget item and the schedule of the main building
APA, Harvard, Vancouver, ISO, and other styles
16

Řeháček, Martin. "Příprava a organizace výstavby výrobního areálu." Master's thesis, Vysoké učení technické v Brně. Fakulta stavební, 2013. http://www.nusl.cz/ntk/nusl-226494.

Full text
Abstract:
This master’s thesis relate to the preparation and organization of the production area’s construction of the SPEDUR company in Žďár nad Sázavou. The thesis contents technical report on the construction technological project, construction site, time plans, project of the equipment site, draft of the mechanisms, control and testing plan, environmental plan, risks of safety and health at work and calculation for this construction.
APA, Harvard, Vancouver, ISO, and other styles
17

Holba, Petr. "Příprava a realizace výrobní haly v Hulíně." Master's thesis, Vysoké učení technické v Brně. Fakulta stavební, 2019. http://www.nusl.cz/ntk/nusl-391944.

Full text
Abstract:
The topic of the diploma thesis is a solution of the construction and a technological project of a production hall in Hulín. The thesis consists of an accompanying and a summary technical report, a study of the main technological stages implementation, a coordination situation of the construction with the closer transport relations, a solution of wider transport route relationships including a proposal of the building supply and an oversized transport solution, an object time schedule and a financial plan of the construction including the staff balance, a time schedule for the selected process
APA, Harvard, Vancouver, ISO, and other styles
18

Mézl, Petr. "Stavebně technologický projekt přístavby výrobní haly." Master's thesis, Vysoké učení technické v Brně. Fakulta stavební, 2019. http://www.nusl.cz/ntk/nusl-392054.

Full text
Abstract:
This diploma thesis deals with the construction and technological project of the extension of the production hall Granitol a.s. in Moravian Beroun. The thesis focuses on the technological stage of assembly of the prefabricated skeleton of the rough top structure and the laying of the floor formation. In addition, an extended accompanying and summary technical report, a technical report on transport relations and coordination of oversized transport, a time and financial plan for the construction, a budget for the prefabricated skeleton, a timetable and the balance of the workers, the design of
APA, Harvard, Vancouver, ISO, and other styles
19

Chytal, Roman. "Výrobní hala nástrojárny firmy TOKOZ - stavebně technologický projekt." Master's thesis, Vysoké učení technické v Brně. Fakulta stavební, 2015. http://www.nusl.cz/ntk/nusl-227181.

Full text
Abstract:
The thesis is focused on building technology solutions construction production hall toolmaking of company TOKOZ,a.s. in Žďár nad Sázavou. This thesis contains technical report, construction site equipment project, time and financial plan, bill of quantities, technology study of the major technology stages, mechanical assembly design, technological specification, quality inspections and risks in the implementation of ground works.
APA, Harvard, Vancouver, ISO, and other styles
20

Bartek, Petr. "Vybrané části stavebně technologického projektu mateřské školy v Brně." Master's thesis, Vysoké učení technické v Brně. Fakulta stavební, 2020. http://www.nusl.cz/ntk/nusl-409914.

Full text
Abstract:
This thesis deals with a construction-technology plan of two-story nursery school in Brno, district Bystrc. Thesis contains engineering report, financial and time schedule for structures, project of construction site, noise study, technological notes and inspection and test plans for cast-in-place reinforced concrete slabs and for prestressed concrete Spiroll floor slabs, formwork study, list of main machines used during construction, time schedule, needed quantity of workers and itemized budged for carcass, budged for whole building and comparison of cranes. Moreover, in appendices are drawin
APA, Harvard, Vancouver, ISO, and other styles
21

Sokola, Jiří. "Administrativní budova v Brně, stavebně technologická příprava stavby." Master's thesis, Vysoké učení technické v Brně. Fakulta stavební, 2017. http://www.nusl.cz/ntk/nusl-265247.

Full text
Abstract:
Thesis I worked on a project basis provided the building permit for an office complex of two identical fourth storey buildings which from the first storey intersects the inner atrium. The buildings are located within the CTZone Brno in the street Masna. The buildings are designed so that the ground floor is a garage for cars and retail space for rent and above-ground floors are reserved for office space lease. Objects are based on a floating pile conducted by the CFA, which builds prefabricated concrete skeleton. The cladding is formed by a combined system of aluminum windows, masonry face and
APA, Harvard, Vancouver, ISO, and other styles
22

Mouka, Jiří. "Víceúčelový objekt v Lužici - stavebně technologický projekt." Master's thesis, Vysoké učení technické v Brně. Fakulta stavební, 2018. http://www.nusl.cz/ntk/nusl-371979.

Full text
Abstract:
The diploma thesis deals with the solution of the multi-purpose building project in Lužice. This work includes the extended accompanying and summary technical report, the coordination situation of the construction, the technical report of the transport relations and the coordination of the oversized transport, the object time schedule and the financial plan of the construction, the plan for providing the material resources containing the staff balance for the construction of the main building, the time schedule for the assembly of the prefabricated skeleton, technological standard for prefabri
APA, Harvard, Vancouver, ISO, and other styles
23

Lupač, David. "Distribuční sklady v Praze - stavebně technologický projekt." Master's thesis, Vysoké učení technické v Brně. Fakulta stavební, 2017. http://www.nusl.cz/ntk/nusl-265317.

Full text
Abstract:
The subject of this thesis is the construction and technological project for distribution warehouses in Prague. Textual part contains a technical report on construction technology project, wider relations of traffic routes with marked critical points, the study of the main technological stages of the building, principles of organization of construction, design of the main building machines and mechanisms, technological regulations, inspection and test plans, health and safety on the site. In the section with attachments there is a map of the locality, drawings of site facilities, including roa
APA, Harvard, Vancouver, ISO, and other styles
We offer discounts on all premium plans for authors whose works are included in thematic literature selections. Contact us to get a unique promo code!