Academic literature on the topic 'Problemas de Scheduling'
Create a spot-on reference in APA, MLA, Chicago, Harvard, and other styles
Consult the lists of relevant articles, books, theses, conference reports, and other scholarly sources on the topic 'Problemas de Scheduling.'
Next to every source in the list of references, there is an 'Add to bibliography' button. Press on it, and we will generate automatically the bibliographic reference to the chosen work in the citation style you need: APA, MLA, Harvard, Chicago, Vancouver, etc.
You can also download the full text of the academic publication as pdf and read online its abstract whenever available in the metadata.
Journal articles on the topic "Problemas de Scheduling"
Villafáñez, Félix A., David Poza, Adolfo López-Paredes, and Javier Pajares. "Una nomenclatura unificada para problemas de programación de proyectos (RCPSP and RCMPSP)." Dirección y Organización, no. 64 (March 5, 2018): 56–60. http://dx.doi.org/10.37610/dyo.v0i64.523.
Full textGarcía-Hernández, Ma de Guadalupe, and Antonio Garrido. "Integración de Planificación y Scheduling: Un Modelo General y Flexible." Acta Universitaria 16, no. 3 (December 1, 2006): 36–46. http://dx.doi.org/10.15174/au.2006.177.
Full textAsmat, Rafael, Edmundo Vergara, and Flabio Gutiérrez. "Medidas de robustez y estabilidad para problemas de scheduling con incertidumbre: Una revisión del estado del arte." Selecciones Matemáticas 6, no. 2 (December 30, 2019): 297–310. http://dx.doi.org/10.17268/sel.mat.2019.02.16.
Full textSouza, Felipe Ribeiro, Leonardo Soares Chaves, Hudson Burgarelli, Alizeibek Nader, Carlos Arroyo, and Luiz Alberto. "Direct stockpile scheduling: Mathematical formulation." DYNA 85, no. 204 (January 1, 2018): 296–301. http://dx.doi.org/10.15446/dyna.v85n204.62642.
Full textNajarro, Rodolfo, Ringo López, Ruth Elizabeth Racines, and Amilkar Puris. "Un Algoritmo Genético Híbrido para la Optimización del Flow Shop Scheduling bajo Restricciones de Entornos Reales." Enfoque UTE 8, no. 5 (December 18, 2017): 14–25. http://dx.doi.org/10.29019/enfoqueute.v8n5.176.
Full textPenha, Renato, Cristina Dai Prá Martens, and Claudia Terezinha Kniess. "Proposta de um modelo computacional para alocação de recursos humanos em múltiplos projetos." Revista de Gestão e Projetos 10, no. 3 (December 18, 2019): 31–45. http://dx.doi.org/10.5585/gep.v10i3.14831.
Full textTejada Muñoz, Guillermo. "Enrutamiento y secuenciación óptimos en un flexible job shop multiobjetivo mediante algoritmos genéticos." Industrial Data 19, no. 2 (December 23, 2016): 124. http://dx.doi.org/10.15381/idata.v19i2.12846.
Full textTavares Neto, Roberto Fernandes, and Moacir Godinho Filho. "Otimização por colônia de formigas para o problema de sequenciamento de tarefas em uma única máquina com terceirização permitida." Gestão & Produção 20, no. 1 (March 2013): 76–86. http://dx.doi.org/10.1590/s0104-530x2013000100006.
Full textBarboza, Angela Olandoski, Flavio Neves Junior, Silvana Ligia Vincenzi Bortolotti, and Rosely Antunes de Souza. "Programação Linear Inteira Mista e Algoritmo Genético aplicados ao Problema de Transferência e Estocagem de Produtos em uma Indústria Petrolífera." Sistemas & Gestão 10, no. 4 (February 29, 2016): 561–74. http://dx.doi.org/10.20985/1980-5160.2015.v10n4.448.
Full textGómez, Arthur Tórgo, and Luiz Antonio N. Lorena. "Modelagem de sistemas de manufatura flexíveis considerando restrições temporais e a capacidade do magazine." Gestão & Produção 5, no. 1 (April 1998): 69–80. http://dx.doi.org/10.1590/s0104-530x1998000100005.
Full textDissertations / Theses on the topic "Problemas de Scheduling"
Escamilla, Fuster Joan. "Eficiencia Energética y Robustez en Problemas de Scheduling." Doctoral thesis, Universitat Politècnica de València, 2016. http://hdl.handle.net/10251/64062.
Full text[ES] Muchos de los problemas industriales se pueden modelar como un problema de scheduling donde algunos recursos son asignados a tareas a fin de minimizar el tiempo de finalización, para reducir el uso de los recursos, el tiempo de inactividad, etc. Job-Shop scheduling (JSP) es el problema más utilizado. En JSP hay diferentes trabajos, cada trabajo tiene diferentes tareas y estas tareas tienen que ser ejecutadas por diferentes máquinas. JSP puede ser extendido a otros problemas con el fin de simular una mayor cantidad de problemas reales. En este trabajo se ha utilizado el problema job shop scheduling con operadores JSO(n, p), donde cada tarea también debe ser asistida por un operador de un conjunto limitado de ellos. Además, hemos ampliado el clásico problema JSP a un problema donde las máquinas pueden consumir diferentes cantidades de energía al procesar tareas a diferentes velocidades (JSMS). En JSMS las operaciones tiene que ser ejecutadas por una máquina que tiene la posibilidad de trabajar a diferentes velocidades. Los problemas de scheduling consideran indicadores de optimización tales como: el procesamiento de tiempo, la calidad y el coste. Sin embargo, hoy en día los gobiernos y los empresarios están interesados también en el control del consumo de energía debido al aumento de la demanda y del precio de los combustibles, la reducción de las reservas de materias primas energéticas y la creciente preocupación por el calentamiento global. En esta tesis, hemos desarrollado nuevas técnicas de búsqueda metaheurística para modelar y resolver el problema JSMS. La robustez es una característica común en los problemas de la vida real. Un sistema persiste si permanece en funcionamiento y mantiene sus principales características a pesar de las perturbaciones continuas, cambios o incidencias. Hemos desarrollado una técnica para resolver el problema JSO(n, p) con el objetivo de obtener soluciones robustas y optimizadas. Hemos desarrollado un modelo dual para relacionar los criterios de optimalidad con el consumo de energía y la robustez/estabilidad en el problema JSMS. Este modelo se ha desarrollado para proteger a las tareas dinámicas contra incidencias, con el fin de obtener soluciones sólidas y que tengan en cuenta el consumo de la energía. El modelo dual propuesto ha sido evaluado con un algoritmo memético para comparar el comportamiento frente al modelo original. En el problema JSMS hay una relación entre la eficiencia energética, la robustez y el makespan. Por lo tanto, se estudia la relación entre estos tres objetivos. Se desarrollan fórmulas analíticas para representar la relación estimada entre estos objetivos. Los resultados muestran el equilibrio entre makespan y robustez, y la relación directa entre la robustez y eficiencia energética. Para reducir el makespan, el consumo de energía tiene que ser aumentado para poder procesar las tareas más rápido. Cuando el consumo de energía es bajo, debido a que las máquinas no están trabajando a la velocidad más alta, si una incidencia aparece, la velocidad de estas máquinas puede ser aumentada con el fin de recuperar el tiempo perdido por la incidencia. Por lo tanto la robustez está directamente relacionada con el consumo de energía. Además, la robustez también está directamente relacionada con el makespan porque, cuando el makespan aumenta hay más huecos en la solución, que en caso de surgir incidencias, estas pueden ser absorbidas por estos buffers naturales. La combinación de robustez y estabilidad da un valor añadido debido a que si una incidencia no puede ser absorbida directamente por la tarea interrumpida, esta puede ser reparada mediante la participación un pequeño número de tareas.En este trabajo se proponen dos técnicas diferentes para gestionar el rescheduling sobre el problema JSMS. Este trabajo representa un avance en el estado del arte en los problemas de scheduling y en el problema donde el consumo de energía p
[CAT] Molts dels problemes industrials es poden modelar com un problema de scheduling on alguns recursos són assignats a tasques a fi de minimitzar el temps de finalització, per a reduir l'ús dels recursos, el temps d'inactivitat, etc. Existeixen diversos tipus de problemes de scheduling que intenten representar diferents situacions que poden aparèixer en els problemes del món real. Job-Shop scheduling (JSP) és el problema més utilitzat. En JSP hi ha diferents treballs, cada treball té diferents tasques i aquestes tasques han de ser executades per diferents màquines. JSP pot ser estès a altres problemes amb la finalitat de simular una major quantitat de problemes reals. En aquest treball s'ha utilitzat el problema job shop scheduling amb operadors JSO(n, p), on cada tasca també ha de ser assistida per un operador d'un conjunt limitat d'ells. A més, hem ampliat el clàssic problema JSP a un problema on les màquines poden consumir diferents quantitats d'energia per a processar tasques a diferents velocitats (JSMS). Els problemes de scheduling consideren indicadors d'optimització tals com: el processament de temps, la qualitat i el cost. No obstant açò, avui en dia els governs i els empresaris estan interessats també amb el control del consum d'energia a causa de l'augment de la demanda i del preu dels combustibles, la reducció de les reserves de matèries primeres energètiques i la creixent preocupació per l'escalfament global. En aquesta tesi, hem desenvolupat noves tècniques de cerca metaheurística per a modelar i resoldre el problema JSMS. La robustesa és una característica comuna en els problemes de la vida real. Un sistema persisteix si continua en funcionament i manté les seues principals característiques malgrat les pertorbacions contínues, canvis o incidències. Hem desenvolupat una tècnica per a resoldre el problema JSO(n, p) amb l'objectiu d'obtenir solucions robustes i optimitzades. Hem desenvolupat un model dual per a relacionar els criteris de optimalidad amb el consum d'energia i la robustesa/estabilitat en el problema JSMS. Aquest model s'ha desenvolupat per a protegir a les tasques dinàmiques contra incidències, amb la finalitat d'obtenir solucions sòlides i que tinguen en compte el consum de l'energia. El model dual proposat ha sigut evaluat amb un algorisme memético per a comparar el comportament front un model original. En el problema JSMS hi ha una relació entre l'eficiència energètica, la robustesa i el makespan. Per tant, s'estudia la relació entre aquests tres objectius. Es desenvolupen fórmules analítiques per a representar la relació estimada entre aquests objectius. Els resultats mostren l'equilibri entre makespan i robustesa, i la relació directa entre la robustesa i l'eficiència energètica. Per a reduir el makespan, el consum d'energia ha de ser augmentat per a poder processar les tasques més ràpid. Quan el consum d'energia és baix, a causa que les màquines no estan treballant a la velocitat més alta, si una incidència apareix, la velocitat d'aquestes màquines pot ser augmentada amb la finalitat de recuperar el temps perdut per la incidència. Per tant la robustesa està directament relacionada amb el consum d'energia. A més, la robustesa també està directament relacionada amb el makespan perquè, quan el makespan augmenta hi ha més buits en la solució, que en cas de sorgir incidències, aquestes poden ser absorbides per els buffers naturals. La combinació de robustesa i estabilitat dóna un valor afegit a causa de que si una incidència no pot ser absorbida directament per la tasca interrompuda, aquesta pot ser reparada mitjançant la participació d'un xicotet nombre de tasques. En aquest treball es proposen dues tècniques diferents per a gestionar el rescheduling sobre el problema JSMS. Aquest treball representa un avanç en l'estat de l'art en els problemes de scheduling i, en particular, en el problema on el consum d'energia pot ser controlat per
Escamilla Fuster, J. (2016). Eficiencia Energética y Robustez en Problemas de Scheduling [Tesis doctoral no publicada]. Universitat Politècnica de València. https://doi.org/10.4995/Thesis/10251/64062
TESIS
Ferreira, Ubirajara Rocha. "Problemas em Scheduling estocastico do tipo flow-shop no-wait." Instituto Tecnológico de Aeronáutica, 1989. http://www.bd.bibl.ita.br/tde_busca/arquivo.php?codArquivo=1879.
Full textVerdugo, Silva Víctor Ignacio. "Convex and online optimization: Applications to scheduling and selection problems." Tesis, Universidad de Chile, 2018. http://repositorio.uchile.cl/handle/2250/168128.
Full textConvex optimization has been a powerful tool for designing algorithms. In practice is a widely used in areas such as operations research and machine learning, but also in many fundamental combinatorial problems they yield to the best know approximations algorithms providing unconditional guarantees over the solution quality. In the first part of this work we study the effect of constructing convex relaxations to a packing problem, based on applying lift & project methods. We exhibit a weakness of this relaxations when they are obtained from the natural formulations of this problem, by showing the impossibility of reducing the gap even when this relaxations are very large. We provide a way of combining symmetry breaking procedures and lift & project methods to obtain arbitrarily good gaps. In the second part of this thesis we study online selection problems, that is, elements arrive over time and we have to select some of them, irrevocably, in order to meet some combinatorial constraints, but also trying to maximize the quality of the selection. Usually this quality in measured in terms of weight, but we consider a stronger variant in which weights are not necessarily known because of information availability. Instead, as long as we can rank the elements, we can provide a general framework to obtain approximation algorithms with good competitive ratios in many contexts.
Turatti, Rangel. "Solução de problemas complexos de programação através de regras desenvolvidas em tecnologia APS." reponame:Biblioteca Digital de Teses e Dissertações da UFRGS, 2010. http://hdl.handle.net/10183/35618.
Full textThe competitive environment in which firms operate is characterized by frequent changes in product demand and a necessity to reduce costs. To succeed against the competition, it is necessary to gain competitive advantage by improving the production process, providing faster responses to changes in demand and proper use of productive resources. In this context, the use of Advanced Planning and Scheduling software with custom programming rule allows improved planning and programming company towards the objectives mentioned. This study proposes a systematic development and deployment of custom programming rules, next it is presented a case study which detail the stages proposed in the systematic, from the understanding of the business requirement until the evaluation of results.
Rivera, Letelier Orlando Luis. "Cotas para el precio de la anarquía de juegos de Scheduling." Tesis, Universidad de Chile, 2012. http://www.repositorio.uchile.cl/handle/2250/111965.
Full textEl objetivo principal del presente trabajo de memoria de título es el cálculo de cotas para precio de la anarquía de algunos juegos asociados a problemas de scheduling. Se comienza realizando una revisión general de lo que son los problemas de scheduling, un algoritmo de aproximación y la relación que existe entre teoría de juegos y los problemas de scheduling. Ahí se identifica el cuociente de aproximación del algoritmo de Smith para problemas de scheduling, con el precio de la anarquía de un juego asociado. Se realiza también una revisión de los principales resultados conocidos útiles para el presente trabajo. Más adelante se calcula el precio de la anarquía para ciertos juegos de scheduling donde la función objetivo es la suma ponderada de los tiempos de completación. Se demuestra que en el caso de máquinas idénticas, el precio de la anarquía en estrategias mixtas es 3/2. Se demuestra también que en máquinas paralelas con velocidades, el precio de la anarquía es mayor o igual a 2. Por último, se prueba acá que en el caso en que todos los trabajos tienen el mismo tamaño, el precio de la anarquía del juego de scheduling en máquinas paralelas con velocidades y suma ponderada de los tiempos de completación como función objetivo es 1. Para seguir se estudia el juego asociado al problema de scheduling en el cual la función objetivo es la suma de los tiempos de completación, y las máquinas son todas excepto una idénticas entre sí, la máquina restante es de velocidad mayor a las demás, y las máquinas que son más lentas son una cantidad suficientemente grande. Para este juego de scheduling se demuestra que el precio de la anarquía es e/(e-1). Después se estudia el juego mencionado anteriormente en su caso más general, en el cual la cantidad de máquinas lentas no está restringida a ser suficientemente grande. Para este problema se demuestra que el precio de la anarquía está acotado superiormente por 5/3. Se muestra además un problema de programación lineal cuyo óptimo acota superiormente el precio de la anarquía del juego de scheduling de máquinas paralelas con velocidades y suma de los tiempos de completación como función objetivo. Finalmente, se plantea como conjetura que el precio de la anarquía del juego asociado al problema de scheduling más general antes mencionado es efectivamente e/(e-1), y se muestran pruebas computacionales que fueron realizadas, con las cuales se justifica el plantear esta conjetura.
Gerchman, Marcos. "Problemas de otimização na engenharia de produção e transportes." reponame:Biblioteca Digital de Teses e Dissertações da UFRGS, 2016. http://hdl.handle.net/10183/142727.
Full textThis study aims to solve complex problems in different segments of Production Engineering and Transportation using optimization techniques. Different areas are considered, such as the areas of health systems, transport and sensory analysis, involving the timetable scheduling problem and cluster analysis. Specifically, this works aims to: (i) in relation to the hospital sector, allocate surgical specialties in a timetable in order to minimize the variance of postoperative time; (ii) for the sensory analysis, develop an index able to identify panelists who require training, using concepts of cluster analysis; (iii) in the airport sector, identify airports with low predictive capacity of demand and relate them to their physical characteristics, using cluster analysis. In all addressed problems, solutions involving optimization methods were adequate, with satisfactory results.
Sierra, Sánchez María Rita. "Mejora de algoritmos de búsqueda heurística mediante poda por dominancia. Aplicación a problemas de scheduling." Doctoral thesis, Universidad de Oviedo, 2009. http://hdl.handle.net/10803/11140.
Full textFerreira, Alessandra Henriques. "Proposta de um modelo em programação linear para a solução de problemas de sistemas produtivos job shop com setup dependentes da sequência." Universidade de São Paulo, 2012. http://www.teses.usp.br/teses/disponiveis/12/12139/tde-11062012-194916/.
Full textSequencing problems are very common, they happen every time there is a choice regarding the order in which several tasks can be performed. The business can be an airline, a hotel, a computer manufacturer or a university; these issues are part of their routine. The application of the sequencing techniques allows, for example, reducing the costs and fastening the supply chain all over the world. This work has an approach to Scheduling principles and techniques, with the objective of proposing a sequencing model for the solution of a problem in productive systems such as job shop with n tasks and m machines, considering setup times dependent on the sequence and adopting a short term planning. The goal is to minimize the waste of unproductive time. In this context, the research presents an approach both exploratory and applied. It can be considered exploratory, once that the literature review is a main reference to the development of a mathematical model. It is applied when we consider the development of the model and evaluation of its applicability. Thus, from the problem definition and the model development by the use of mathematical techniques and approaches of the operational research, we found that the conclusions drawn from the model might infer decisions for a real problem. The considerations shown here aim to report the facts given in the conducted experiments, intending to contribute to future researches in the area.
Peixoto, Robson Roberto Souza. "Algoritmos para problemas de escalonamento em grades." [s.n.], 2011. http://repositorio.unicamp.br/jspui/handle/REPOSIP/275753.
Full textDissertação (mestrado) - Universidade Estadual de Campinas, Instituto de Computação
Made available in DSpace on 2018-08-18T10:12:53Z (GMT). No. of bitstreams: 1 Peixoto_RobsonRobertoSouza_M.pdf: 1268588 bytes, checksum: ff8a093aa133696dcd5bbe31bc4d6e78 (MD5) Previous issue date: 2011
Resumo: Nesta dissertação estudamos algoritmos para resolver problemas de escalonamento de tarefas em grades computacionais. Dado um conjunto de tarefas submetidas a uma grade computacional, deve-se definir em quais recursos essas tarefas serão executadas. Algoritmos de escalonamento são empregados com o objetivo de minimizar o tempo necessário para executar todas as tarefas (makespan) que foram submetidas. Nosso foco é estudar os atuais algoritmos de escalonamento usados em grades computacionais e comparar estes algoritmos. Nesta dissertação apresentamos algoritmos onlines, aproximados e heurísticas para o problema. Como resultados novos, provamos fatores de aproximação para o algoritmo RR quando utilizado para resolver os problemas R; sit|Tj|Cmax, R; sit|Tj|TPCC, R; sit|Tj = L| Cmax e R; sit|Tj = L|TPCC é justo. Por fim, definimos uma interface que adiciona replicação de tarefas a qualquer algoritmo de escalonamento, onde nós mostramos a aproximação desta interface, e apresentamos uma comparação via simulação dos algoritmos sem e com replicação. Nossas simulações mostram que, com a utilização de replicação, houve a redução no makespan de até 80% para o algoritmo Min-min. Nas nossas análises também fazemos uso da métrica RTPCC que calcula exatamente a quantidade de instruções que foram usadas para executar todas as tarefas
Abstract: In this dissertation, we studied algorithms to solve task scheduling problems in computational grids. Given a task set that was submitted to a computational grid, the problem is to define in which resources these tasks will be executed and the order they will be executed. Scheduling algorithms are used in order to minimize the time required to execute all tasks (makespan). We studied the most recent scheduling algorithms proposed to be used in computational grids, and then compare them using simulations. In this dissertation we also present approximate algorithms and new heuristics for the problem. As new results, we proved approximation factors to the RR algorithm when applied to solve the problems R; sit|Tj|Cmax, R; sit|Tj|TPCC, R; sit|Tj = L| Cmax and R; sit|Tj = L|TPCC. Finally, we defined an interface that adds task replication capability to any scheduling algorithm. We then show approximation results for algorithms using this interface, and present a comparison of well know algorithms with and without replication. This comparison is done via simulation. Our simulations show that, with replication, there was up to 80% of reduction in the makespan to some algorithms like the Min-min
Mestrado
Teoria da Computação
Mestre em Ciência da Computação
Pires, Renan Ferraz. "Um estudo sobre problemas de escalonamento de tarefas com atrasos de comunicação de valores extremos." reponame:Biblioteca Digital de Teses e Dissertações da UFRGS, 2013. http://hdl.handle.net/10183/104801.
Full textThis Master’s Thesis presents a study on scheduling problems subject to communication delays. More precisely, this work involves job scheduling problems with a number of parallel machines, limited or not, and where the tasks (or jobs) have unit execution time, and are subject to some precedence relation. Communication delays are imposed at each pair of preceding tasks, taking extreme values, which may be negligible or infinitely large. The objective is minimize the completion time of the latest job to be processed, that is, to get the minimum makespan. Thus, NP-hard results are demonstrated for two cases. For the first, when the number of processors is indicated in the instance of the problem, and this result holds even when the precedence relation is restricted to a set of chains (P|chains; cij ∈ {0, ∞}; pj = 1|Cmax). The second results is valid when arbitrary precedence relations are allowed, and any fixed number of processors (greater than one) is available (P2|prec;cij ∈ {0, ∞}; pj = 1|Cmax). Two other problems are demonstrated to have polynomial time solutions, both when an unlimited number of processors are available. The first result imposes the precedence relation to be an out-tree (P∞|tree; cij ∈ {0, ∞}; pj = 1|Cmax). The second result is valid when the execution of the same job on multiples processors are allowed (P∞|prec; cij ∈ {0, ∞}; pj = 1|Cmax). For both cases, polynomial algorithms are presented. Finally, results are presented for the problem of job scheduling that are partitioned in sets which must be executed on the same processors. The problem is demonstrated to be NP-hard even if the precedence relation consists of two chains. Also, it is shown that the problem becomes solvable in polynomial time if the number of partitions is limited by a constant and the chains are restricted by a constant on either their number, or the number of tasks that each chain may have. As future work, this study leaves open whether is NP-hard the case to schedule tasks subject to such communication delays with extreme values, when a fixed number of processors is available, and the precedence relations are some how restricted, for example, by an out-tree (Pm|out-tree;cij ∈ {0, ∞}; pj = 1|Cmax).
Books on the topic "Problemas de Scheduling"
Khodr, Hussein M. Scheduling problems and solutions. Hauppauge, N.Y: Nova Science Publishers, 2011.
Find full textBaptiste, Philippe. Constraint-Based Scheduling: Applying Constraint Programming to Scheduling Problems. Boston, MA: Springer US, 2001.
Find full textClaude, Le Pape, and Nuijten Wim, eds. Constraint-based scheduling: Applying constraint programming to scheduling problems. Boston: Kluwer Academic, 2001.
Find full textOvacik, Irfan M. Decomposition Methods for Complex Factory Scheduling Problems. Boston, MA: Springer US, 1997.
Find full textSham, Ki Shek. Knowledge based approach to general scheduling problems. (s.l: The Author), 1990.
Find full textOvacik, Irfan M., and Reha Uzsoy. Decomposition Methods for Complex Factory Scheduling Problems. Boston, MA: Springer US, 1997. http://dx.doi.org/10.1007/978-1-4615-6329-7.
Full textEiselt, H. A., and C. L. Sandblom. Decision Analysis, Location Models, and Scheduling Problems. Berlin, Heidelberg: Springer Berlin Heidelberg, 2004. http://dx.doi.org/10.1007/978-3-540-24722-7.
Full textOvacik, Irfan M. Decomposition methods for complex factory scheduling problems. Boston, Mass: Kluwer Academic Publishers, 1997.
Find full textChiong, Raymond, and Sandeep Dhakal. Natural intelligence for scheduling, planning and packing problems. Berlin: Springer, 2009.
Find full textChiong, Raymond, and Sandeep Dhakal, eds. Natural Intelligence for Scheduling, Planning and Packing Problems. Berlin, Heidelberg: Springer Berlin Heidelberg, 2009. http://dx.doi.org/10.1007/978-3-642-04039-9.
Full textBook chapters on the topic "Problemas de Scheduling"
T’kindt, Vincent, and Jean-Charles Billaut. "Shop problems." In Multicriteria Scheduling, 165–215. Berlin, Heidelberg: Springer Berlin Heidelberg, 2002. http://dx.doi.org/10.1007/978-3-662-04986-0_8.
Full textBrucker, Peter. "Batching Problems." In Scheduling Algorithms, 252–63. Berlin, Heidelberg: Springer Berlin Heidelberg, 1998. http://dx.doi.org/10.1007/978-3-662-03612-9_8.
Full textBrucker, Peter. "Batching Problems." In Scheduling Algorithms, 248–53. Berlin, Heidelberg: Springer Berlin Heidelberg, 1995. http://dx.doi.org/10.1007/978-3-662-03088-2_8.
Full textBrucker, Peter. "Batching Problems." In Scheduling Algorithms, 265–78. Berlin, Heidelberg: Springer Berlin Heidelberg, 2001. http://dx.doi.org/10.1007/978-3-662-04550-3_8.
Full textBrucker, Peter. "Batching Problems." In Scheduling Algorithms, 265–78. Berlin, Heidelberg: Springer Berlin Heidelberg, 2004. http://dx.doi.org/10.1007/978-3-540-24804-0_8.
Full textPinedo, Michael L. "Overview of Stochastic Scheduling Problems." In Scheduling, 607–10. Boston, MA: Springer US, 2011. http://dx.doi.org/10.1007/978-1-4614-2361-4_26.
Full textPinedo, Michael L. "Complexity Classification of Deterministic Scheduling Problems." In Scheduling, 603–6. Boston, MA: Springer US, 2011. http://dx.doi.org/10.1007/978-1-4614-2361-4_25.
Full textT’kindt, Vincent, and Jean-Charles Billaut. "Single machine problems." In Multicriteria Scheduling, 147–63. Berlin, Heidelberg: Springer Berlin Heidelberg, 2002. http://dx.doi.org/10.1007/978-3-662-04986-0_7.
Full textT’kindt, Vincent, and Jean-Charles Billaut. "Parallel machines problems." In Multicriteria Scheduling, 217–61. Berlin, Heidelberg: Springer Berlin Heidelberg, 2002. http://dx.doi.org/10.1007/978-3-662-04986-0_9.
Full textBrucker, Peter. "Shop Scheduling Problems." In Scheduling Algorithms, 145–228. Berlin, Heidelberg: Springer Berlin Heidelberg, 1998. http://dx.doi.org/10.1007/978-3-662-03612-9_6.
Full textConference papers on the topic "Problemas de Scheduling"
Uetz, Marc. "Approximation algorithms for scheduling under uncertainty." In Workshop on dynamic scheduling problems. Polish Mathematical Society, 2016. http://dx.doi.org/10.14708/isbn.978-83-937220-7-5p25-30.
Full textGawiejnowicz, Stanisław, and Wiesław Kurc. "Solving a time-dependent scheduling problem by interior point method." In Workshop on dynamic scheduling problems. Polish Mathematical Society, 2016. http://dx.doi.org/10.14708/isbn.978-83-937220-7-5p35-38.
Full textGerstl, Enrique, Baruch Mor, and Gur Mosheiov. "Minmax scheduling with acceptable lead-times: Extensions to position-dependent processing times, due-window and job rejection." In Workshop on dynamic scheduling problems. Polish Mathematical Society, 2016. http://dx.doi.org/10.14708/isbn.978-83-937220-7-5p39-41.
Full textKononov, Alexander, and Yulia Kovalenko. "An 'almost-exact' solution to speed scaling scheduling of parallel jobs with preemption." In Workshop on dynamic scheduling problems. Polish Mathematical Society, 2016. http://dx.doi.org/10.14708/isbn.978-83-937220-7-5p43-46.
Full textKurc, Wiesław, and Stanisław Gawiejnowicz. "Directed sets, Möbius inversing formula and time-dependent scheduling on precedence-constrained machines." In Workshop on dynamic scheduling problems. Polish Mathematical Society, 2016. http://dx.doi.org/10.14708/isbn.978-83-937220-7-5p51-54.
Full textLin, Bertrand M.-T. "Relocation scheduling with optional recycling operations." In Workshop on dynamic scheduling problems. Polish Mathematical Society, 2016. http://dx.doi.org/10.14708/isbn.978-83-937220-7-5p55-58.
Full textOcetkiewicz, Krzysztof M., and Michał Małafiejski. "Financial scheduling with time-dependent resource consumption." In Workshop on dynamic scheduling problems. Polish Mathematical Society, 2016. http://dx.doi.org/10.14708/isbn.978-83-937220-7-5p59-62.
Full textOron, Daniel, Dvir Shabtay, and George Steiner. "Scheduling on identical parallel machines with controllable processing times to minimize the makespan." In Workshop on dynamic scheduling problems. Polish Mathematical Society, 2016. http://dx.doi.org/10.14708/isbn.978-83-937220-7-5p63-66.
Full textPrzybylski, Bartłomiej. "Precedence constrained position-dependent scheduling on parallel machines via schedule transformations." In Workshop on dynamic scheduling problems. Polish Mathematical Society, 2016. http://dx.doi.org/10.14708/isbn.978-83-937220-7-5p67-69.
Full textRustogi, Kabir, and Vitaly A. Strusevich. "Single machine scheduling subject to a generalized linear cumulative effect." In Workshop on dynamic scheduling problems. Polish Mathematical Society, 2016. http://dx.doi.org/10.14708/isbn.978-83-937220-7-5p71-74.
Full textReports on the topic "Problemas de Scheduling"
Nurre, Sarah G., and Jeffrey J. Carlson. Integrated network design and scheduling problems :. Office of Scientific and Technical Information (OSTI), January 2014. http://dx.doi.org/10.2172/1147479.
Full textSadeh, Norman, Katia Sycara, and Yalin Xiong. Backtracking Techniques for Hard Scheduling Problems. Fort Belvoir, VA: Defense Technical Information Center, January 1993. http://dx.doi.org/10.21236/ada277992.
Full textBertsekas, D. P., and D. A. Castanon. Rollout Algorithms for Stochastic Scheduling Problems. Fort Belvoir, VA: Defense Technical Information Center, April 1998. http://dx.doi.org/10.21236/ada459559.
Full textHowe, Adele, and L. D. Whitley. Exploiting Problem Structure in Scheduling. Fort Belvoir, VA: Defense Technical Information Center, October 2000. http://dx.doi.org/10.21236/ada387486.
Full textDenley, Tristan, Talmage J. Reid, and Haidong Wu. Applications of Random Methods in Combinatories and Scheduling Problems. Fort Belvoir, VA: Defense Technical Information Center, December 2002. http://dx.doi.org/10.21236/ada408961.
Full textHowe, Adele, and L. D. Whitley. Advancing Air Force Scheduling through Modeling Problem Topologies. Fort Belvoir, VA: Defense Technical Information Center, August 2006. http://dx.doi.org/10.21236/ada460845.
Full textKramer, Laurence A., and Stephen F. Smith. The AMC Scheduling Problem: A Description for Reproducibility. Fort Belvoir, VA: Defense Technical Information Center, November 2005. http://dx.doi.org/10.21236/ada597518.
Full textSadeh, Norman, Katia Sycara, and Yalin Xiong. Backtracking Techniques for the Job Shop Scheduling Constraint Satisfaction Problem. Fort Belvoir, VA: Defense Technical Information Center, January 1994. http://dx.doi.org/10.21236/ada289435.
Full textGlazebrook, Kevin D., Donald P. Gaver, and Patricia A. Jacobs. Military Stochastic Scheduling Treated As a 'Multi-Armed Bandit' Problem. Fort Belvoir, VA: Defense Technical Information Center, September 2001. http://dx.doi.org/10.21236/ada385864.
Full textKnighton, Shane A. A Value Focus Thinking Approach to the Academic Course Scheduling Problem. Fort Belvoir, VA: Defense Technical Information Center, January 1998. http://dx.doi.org/10.21236/ada425493.
Full text