Academic literature on the topic 'PROBLEMS OF COST MANAGEMENT'
Create a spot-on reference in APA, MLA, Chicago, Harvard, and other styles
Consult the lists of relevant articles, books, theses, conference reports, and other scholarly sources on the topic 'PROBLEMS OF COST MANAGEMENT.'
Next to every source in the list of references, there is an 'Add to bibliography' button. Press on it, and we will generate automatically the bibliographic reference to the chosen work in the citation style you need: APA, MLA, Harvard, Chicago, Vancouver, etc.
You can also download the full text of the academic publication as pdf and read online its abstract whenever available in the metadata.
Journal articles on the topic "PROBLEMS OF COST MANAGEMENT"
Tijs, S. H., and T. S. H. Driessen. "Game Theory and Cost Allocation Problems." Management Science 32, no. 8 (August 1986): 1015–28. http://dx.doi.org/10.1287/mnsc.32.8.1015.
Full textDickson, David. "Cost overruns, management problems found in British Antarctic projects." Nature 362, no. 6420 (April 1993): 486. http://dx.doi.org/10.1038/362486a0.
Full textSinha, Pritibhushan. "Assignment problems with changeover cost." Annals of Operations Research 172, no. 1 (August 27, 2009): 447–57. http://dx.doi.org/10.1007/s10479-009-0620-6.
Full textToomer, Heather. "Seventeenth-Century Baby Clothes? The Problems of Identification." Costume 55, no. 1 (March 2021): 24–48. http://dx.doi.org/10.3366/cost.2021.0181.
Full textShao, Yong Gang, Jing Zhe Xu, and Zhong Yuan Xia. "Analysis of Transmission Line Engineering Construction Stage Cost Management Problems." Advanced Materials Research 850-851 (December 2013): 1094–97. http://dx.doi.org/10.4028/www.scientific.net/amr.850-851.1094.
Full textAlabdan, Rana Ibrahim. "Major Problems related to Information Management." INTERNATIONAL JOURNAL OF COMPUTERS & TECHNOLOGY 12, no. 3 (January 7, 2014): 3347–49. http://dx.doi.org/10.24297/ijct.v12i3.3243.
Full textVenkateswarlu, B., and C. Muralidaran. "Efficient Solutions of Time versus Cost Transportation Problems." International Journal of Logistics Systems and Management 1, no. 1 (2020): 1. http://dx.doi.org/10.1504/ijlsm.2020.10033630.
Full textWhitehall, F. B. "Review of Problems with a Quality Cost System." International Journal of Quality & Reliability Management 3, no. 3 (March 1986): 43–58. http://dx.doi.org/10.1108/eb002869.
Full textMa, Zhao Xia, and Guang Cai Yan. "Analysis on the Problems and Measures to the Construction Project Cost Management." Advanced Materials Research 971-973 (June 2014): 2458–61. http://dx.doi.org/10.4028/www.scientific.net/amr.971-973.2458.
Full textShin, Bumshick, and Kyu-Han Kim. "TIDAL POWER GENERATION IN GAROLIM BAY, KOREA." Coastal Engineering Proceedings 1, no. 33 (December 14, 2012): 70. http://dx.doi.org/10.9753/icce.v33.management.70.
Full textDissertations / Theses on the topic "PROBLEMS OF COST MANAGEMENT"
Ferre, Jose L. "Construction management : a viable solution to traditional project delivery problems." Thesis, Georgia Institute of Technology, 1986. http://hdl.handle.net/1853/22378.
Full textEngevall, Stefan. "Cost allocation in some routing problems : a game theoretic approach /." Linköping : Univ, 2002. http://www.bibl.liu.se/liupubl/disp/disp2002/tek754s.pdf.
Full textZaharieva, Elissaveta. "Supply chain management and international marketing problems in transitional economies : evidence from the Bulgarian wine industry." Thesis, University of Newcastle Upon Tyne, 2002. http://ethos.bl.uk/OrderDetails.do?uin=uk.bl.ethos.273515.
Full textDlakwa, Mohammed Musa. "Analysis of some problems in the management and cost control of public sector construction projects in Nigeria." Thesis, University of Stirling, 1990. http://hdl.handle.net/1893/2144.
Full textBettemir, Onder Halis. "Optimization Of Time-cost-resource Trade-off Problems In Project Scheduling Using Meta-heuristic Algorithms." Phd thesis, METU, 2009. http://etd.lib.metu.edu.tr/upload/12611971/index.pdf.
Full textgenetic algorithm, genetic algorithm with simulated annealing, hybrid genetic algorithm with simulated annealing and particle swarm optimization meta-heuristic algorithms are implemented. The algorithms are tested by using the project sets of Kolisch and Sprecher (1996). Genetic algorithm with simulated annealing and hybrid genetic algorithm simulated annealing algorithm obtained very successful results when compared with the previous state of the art algorithms. 120-activity multi-mode problem set is produced by using the single mode problem set of Kolisch and Sprecher (1996) for the analysis of resource constrained time cost trade-off problem. Genetic algorithm with simulated annealing presented the least total project cost.
Pfister, Christina Cara. "Problems of beginning teachers at the secondary level." Related electronic resource: Current Research at SU : database of SU dissertations, recent titles available full text, 2006. http://proquest.umi.com/login?COPT=REJTPTU0NWQmSU5UPTAmVkVSPTI=&clientId=3739.
Full textOzen, Aykut. "Material Flow Cost Versus Congestion In Dynamic Distributed Facility Layout Problem." Master's thesis, METU, 2008. http://etd.lib.metu.edu.tr/upload/12609602/index.pdf.
Full textEl-Meshaialy, Faisal. "Managerial and manpower problems : labour turnover, costs and causes in manufacturing industries; the case of Kuwait." Thesis, Cardiff University, 1990. http://ethos.bl.uk/OrderDetails.do?uin=uk.bl.ethos.314779.
Full textDegirmenci, Guvenc. "The Budget Constrained Discrete Time/cost Trade-off Problem In Project Networks." Master's thesis, METU, 2008. http://etd.lib.metu.edu.tr/upload/12609737/index.pdf.
Full textCroxton, Keely L. "Modeling and solving network flow problems with piecewise linear costs, with applications in supply chain management." Thesis, Massachusetts Institute of Technology, 1999. http://hdl.handle.net/1721.1/9786.
Full textIncludes bibliographical references (p. 130-132).
by Keely L. Croxton.
Ph.D.
Books on the topic "PROBLEMS OF COST MANAGEMENT"
Management and cost accounting. 4th ed. London: International Thomson Business Press, 1996.
Find full textManagement and cost accounting. Workingham, Berkshire, England: Van Nostrand Reinhold (UK), 1985.
Find full textDrury, Colin. Management and cost accounting. 2nd ed. London: Chapman & Hall, 1988.
Find full textDrury, Colin. Management and cost accounting: Student's manual. 5th ed. London: Thomson Learning, 2000.
Find full textBromwich, Michael. Management practices and cost management problems in Japanese-affiliated companies in the United Kingdom. London: Chartered Institute of Management Accountants, 1994.
Find full textMallouk, Brenda M. Deluxe Spa Products Incorporated: Using management accounting for costing and decision making. Toronto: McGraw-Hill Ryerson, 1995.
Find full textMallouk, Brenda M. Deluxe Spa Products Incorporated: Using management accounting for costing and decision making. 3rd ed. Toronto: McGraw-Hill Ryerson, 2003.
Find full textBook chapters on the topic "PROBLEMS OF COST MANAGEMENT"
Gee, Kenneth P. "The Single-period Cost Variance Investigation Decision." In Advanced Management Accounting Problems, 97–108. London: Macmillan Education UK, 1986. http://dx.doi.org/10.1007/978-1-349-18147-6_10.
Full textGee, Kenneth P. "The Multi-period Cost Variance Investigation Decision." In Advanced Management Accounting Problems, 109–22. London: Macmillan Education UK, 1986. http://dx.doi.org/10.1007/978-1-349-18147-6_11.
Full textGee, Kenneth P. "The Single-period Cost Variance Investigation Decision." In Advanced Management Accounting Problems, 231–33. London: Macmillan Education UK, 1986. http://dx.doi.org/10.1007/978-1-349-18147-6_28.
Full textGee, Kenneth P. "The Multi-period Cost Variance Investigation Decision." In Advanced Management Accounting Problems, 234–35. London: Macmillan Education UK, 1986. http://dx.doi.org/10.1007/978-1-349-18147-6_29.
Full textGee, Kenneth P. "The Single-period Cost Variance Investigation Decision." In Advanced Management Accounting Problems, 296–300. London: Macmillan Education UK, 1986. http://dx.doi.org/10.1007/978-1-349-18147-6_46.
Full textGee, Kenneth P. "The Multi-period Cost Variance Investigation Decision." In Advanced Management Accounting Problems, 301–2. London: Macmillan Education UK, 1986. http://dx.doi.org/10.1007/978-1-349-18147-6_47.
Full textGee, Kenneth P. "Stochastic Cost-Volume-Profit Analysis and Decision Theory." In Advanced Management Accounting Problems, 123–31. London: Macmillan Education UK, 1986. http://dx.doi.org/10.1007/978-1-349-18147-6_12.
Full textGee, Kenneth P. "Stochastic Cost-Volume-Profit Analysis and Decision Theory." In Advanced Management Accounting Problems, 236–37. London: Macmillan Education UK, 1986. http://dx.doi.org/10.1007/978-1-349-18147-6_30.
Full textGee, Kenneth P. "Stochastic Cost-Volume-Profit Analysis and Decision Theory." In Advanced Management Accounting Problems, 303–5. London: Macmillan Education UK, 1986. http://dx.doi.org/10.1007/978-1-349-18147-6_48.
Full textKiziukiewicz, Teresa, and Elzbieta Jaworska. "Behavioral Aspects of Cost Management." In Problems, Methods and Tools in Experimental and Behavioral Economics, 21–34. Cham: Springer International Publishing, 2018. http://dx.doi.org/10.1007/978-3-319-99187-0_2.
Full textConference papers on the topic "PROBLEMS OF COST MANAGEMENT"
"Problems and Solutions of Construction Project Cost Management." In 2019 International Conference on Arts, Management, Education and Innovation. Clausius Scientific Press, 2019. http://dx.doi.org/10.23977/icamei.2019.038.
Full textLi, Hongxian, and Hongxiang Ouyang. "Time-Cost Trade-Off Problems of Engineering Project with Running Income." In Engineering Management. IEEE, 2008. http://dx.doi.org/10.1109/icrmem.2008.10.
Full textWang, Qinghua, Xiaozhong Xiong, Wenhao Tian, and Liang He. "Low-Cost RFID: Security Problems and Solutions." In 2011 International Conference on Management and Service Science (MASS 2011). IEEE, 2011. http://dx.doi.org/10.1109/icmss.2011.5998331.
Full text"MODERN PROBLEMS AND METHODS OF COST MANAGEMENT IN ENTERPRISES." In Russian science: actual researches and developments. Samara State University of Economics, 2020. http://dx.doi.org/10.46554/russian.science-2020.03-2-17/20.
Full textZhang, Yi. "Research of Enterprise Cost Control Based on Target Cost Management." In 3rd International Conference on Judicial, Administrative and Humanitarian Problems of State Structures and Economic Subjects (JAHP 2018). Paris, France: Atlantis Press, 2018. http://dx.doi.org/10.2991/jahp-18.2018.64.
Full textLuo, Lingyan. "The problems and countermeasures of construction enterprises on logistics cost control." In 2013 6th International Conference on Information Management, Innovation Management and Industrial Engineering (ICIII). IEEE, 2013. http://dx.doi.org/10.1109/iciii.2013.6703162.
Full text"PROBLEMS OF COST MANAGEMENT AT THE ENTERPRISE IN MODERN CONDITIONS." In Russian science: actual researches and developments. Samara State University of Economics, 2019. http://dx.doi.org/10.46554/russian.science-2019.10-2-48/52.
Full textRadionova, Nataliia Y., Lidiya V. Synytsia, and Svitlana O. Krasniuk. "Systematization of Cost Management Problems at Garment Enterprises of Ukraine." In 6th International Conference on Economics, Management, Law and Education (EMLE 2020). Paris, France: Atlantis Press, 2021. http://dx.doi.org/10.2991/aebmr.k.210210.004.
Full textLiu Lihong. "Notice of Retraction: On project cost information management problems and countermeasures." In Business Management and Electronic Information. 2011 International Conference on Business Management and Electronic Information (BMEI 2011). IEEE, 2011. http://dx.doi.org/10.1109/icbmei.2011.5914450.
Full textGuo, Yanli, and Chengli Zhu. "Study on Common Problems and Countermeasures of Construction Cost." In 2018 International Conference on Sports, Arts, Education and Management Engineering (SAEME 2018). Paris, France: Atlantis Press, 2018. http://dx.doi.org/10.2991/saeme-18.2018.102.
Full textReports on the topic "PROBLEMS OF COST MANAGEMENT"
Kraynova, O. S., and A. V. Pelushenko. Management costs of trade enterprises: problems and ways of their optimization. Ljournal, 2016. http://dx.doi.org/10.18411/kray-2016-artc-00061.
Full textFordham, Wayne. Grounds Management Cost Reduction Strategies. Fort Belvoir, VA: Defense Technical Information Center, June 1993. http://dx.doi.org/10.21236/ada268510.
Full textWalthall, Rhonda. Unsettled Topics Concerning Adopting Blockchain Technology in Aerospace. SAE International, October 2020. http://dx.doi.org/10.4271/epr2020021.
Full textTarditi, David, and Amer Diwan. Measuring the Cost of Storage Management,. Fort Belvoir, VA: Defense Technical Information Center, May 1995. http://dx.doi.org/10.21236/ada295426.
Full textFeizollahi, F., and D. Shropshire. Waste Management Facilities Cost Information Report. Office of Scientific and Technical Information (OSTI), October 1992. http://dx.doi.org/10.2172/10170336.
Full textLee, Jongsub, Junho Oh, and David Yermack. Credit Default Swaps, Agency Problems, and Management Incentives. Cambridge, MA: National Bureau of Economic Research, November 2017. http://dx.doi.org/10.3386/w24064.
Full textOrlin, James B., and Clifford Stein. Parallel Algorithms for the Assignment and Minimum-Cost Flow Problems. Fort Belvoir, VA: Defense Technical Information Center, July 1992. http://dx.doi.org/10.21236/ada460051.
Full textMinsker, Barbara S. Cost-Effective Risk Management of Groundwater Contamination. Fort Belvoir, VA: Defense Technical Information Center, March 2001. http://dx.doi.org/10.21236/ada393312.
Full textMcConnell, Joshua, Jason Sickler, and Trent Yang. The Problems Behind the Problems:" Systems Engineering and Program Management Risk Factors in Acquisition Programs". Fort Belvoir, VA: Defense Technical Information Center, August 2004. http://dx.doi.org/10.21236/ada428243.
Full textLundeen, A. S., K. M. Hsu, and D. E. Shropshire. Waste management facilities cost information: System cost model product description. Revision 2. Office of Scientific and Technical Information (OSTI), February 1996. http://dx.doi.org/10.2172/224316.
Full text