Academic literature on the topic 'PROBLEMS OF COST MANAGEMENT'

Create a spot-on reference in APA, MLA, Chicago, Harvard, and other styles

Select a source type:

Consult the lists of relevant articles, books, theses, conference reports, and other scholarly sources on the topic 'PROBLEMS OF COST MANAGEMENT.'

Next to every source in the list of references, there is an 'Add to bibliography' button. Press on it, and we will generate automatically the bibliographic reference to the chosen work in the citation style you need: APA, MLA, Harvard, Chicago, Vancouver, etc.

You can also download the full text of the academic publication as pdf and read online its abstract whenever available in the metadata.

Journal articles on the topic "PROBLEMS OF COST MANAGEMENT"

1

Tijs, S. H., and T. S. H. Driessen. "Game Theory and Cost Allocation Problems." Management Science 32, no. 8 (August 1986): 1015–28. http://dx.doi.org/10.1287/mnsc.32.8.1015.

Full text
APA, Harvard, Vancouver, ISO, and other styles
2

Dickson, David. "Cost overruns, management problems found in British Antarctic projects." Nature 362, no. 6420 (April 1993): 486. http://dx.doi.org/10.1038/362486a0.

Full text
APA, Harvard, Vancouver, ISO, and other styles
3

Sinha, Pritibhushan. "Assignment problems with changeover cost." Annals of Operations Research 172, no. 1 (August 27, 2009): 447–57. http://dx.doi.org/10.1007/s10479-009-0620-6.

Full text
APA, Harvard, Vancouver, ISO, and other styles
4

Toomer, Heather. "Seventeenth-Century Baby Clothes? The Problems of Identification." Costume 55, no. 1 (March 2021): 24–48. http://dx.doi.org/10.3366/cost.2021.0181.

Full text
Abstract:
This article follows a study of a collection of baby clothes assumed to be of late seventeenth-century date to ascertain whether or not that assumption might be correct. The collection is unusual in containing caps, rare in themselves but also decorated with lace frills in the adult frelange style; a rare pair of sleeves with paned oversleeves; and christening and other items for wear by a swaddled infant which are more common in known collections but here, more unusually, trimmed with Flemish bobbin lace. The article discusses the items in terms of their relationships with each other, their construction, their fabrics and how they were worn. Comparisons with similar and related articles in other collections and in seventeenth-century portraits of adults and children enable the author to conclude that the articles probably do date from the late seventeenth century but from slightly different decades.
APA, Harvard, Vancouver, ISO, and other styles
5

Shao, Yong Gang, Jing Zhe Xu, and Zhong Yuan Xia. "Analysis of Transmission Line Engineering Construction Stage Cost Management Problems." Advanced Materials Research 850-851 (December 2013): 1094–97. http://dx.doi.org/10.4028/www.scientific.net/amr.850-851.1094.

Full text
Abstract:
In recent years, the rapid development of the national economy has brought rapid growth in electricity demand; the power grid construction has entered a period of rapid development. Construction of power transmission line project is an important part of power grid construction,the cost management of construction stage, it is of great significance for the entire project cost management, improve the efficiency of construction enterprises. In this paper, based on the theory of cost management in construction stage, from the three aspects of social and economic factors, human factors and natural factors, analyzed the current situation and problems of transmission line engineering construction cost management and to the actual engineering data are discussed. Finally, in view of the present situation and problems of the construction cost management, this paper puts forward some suggestions.
APA, Harvard, Vancouver, ISO, and other styles
6

Alabdan, Rana Ibrahim. "Major Problems related to Information Management." INTERNATIONAL JOURNAL OF COMPUTERS & TECHNOLOGY 12, no. 3 (January 7, 2014): 3347–49. http://dx.doi.org/10.24297/ijct.v12i3.3243.

Full text
Abstract:
Technological advancements in computing and communication technology have most recently grown rapidly. This growth has further been motivated by the high-speed networks and the declining cost of purchasing computers. The trend has enabled the running and fast transfers of various applications such as data and information, graphics, voice and movies. The use of computers and technology in communication has transformed various organizational systems to the digital era.
APA, Harvard, Vancouver, ISO, and other styles
7

Venkateswarlu, B., and C. Muralidaran. "Efficient Solutions of Time versus Cost Transportation Problems." International Journal of Logistics Systems and Management 1, no. 1 (2020): 1. http://dx.doi.org/10.1504/ijlsm.2020.10033630.

Full text
APA, Harvard, Vancouver, ISO, and other styles
8

Whitehall, F. B. "Review of Problems with a Quality Cost System." International Journal of Quality & Reliability Management 3, no. 3 (March 1986): 43–58. http://dx.doi.org/10.1108/eb002869.

Full text
APA, Harvard, Vancouver, ISO, and other styles
9

Ma, Zhao Xia, and Guang Cai Yan. "Analysis on the Problems and Measures to the Construction Project Cost Management." Advanced Materials Research 971-973 (June 2014): 2458–61. http://dx.doi.org/10.4028/www.scientific.net/amr.971-973.2458.

Full text
Abstract:
To survive and prosper in a more competitive construction market nowadays, a company must strengthen the cost management of construction project. This paper expounds the present situation of the construction project cost management, existent problem in the process of the construction project cost management. Countermeasure analysis of perfecting the construction project cost management is discussed in respect to the management concept and method, information technology application, the people-oriented and sustainable concept of development.
APA, Harvard, Vancouver, ISO, and other styles
10

Shin, Bumshick, and Kyu-Han Kim. "TIDAL POWER GENERATION IN GAROLIM BAY, KOREA." Coastal Engineering Proceedings 1, no. 33 (December 14, 2012): 70. http://dx.doi.org/10.9753/icce.v33.management.70.

Full text
Abstract:
Among the ocean energy, tidal power generation has a great advantage on large development possibilities despite of its huge construction cost and difficulty in finding an applicable location. Furthermore, once tidal power generation is developed, various developmental benefits are expected which are not only producing semi-permanent energy but also gaining a bridge role, tourism resource effects, adjustability of flood inundation inside the bay and other multi development effects(Roger H. Charlier.,2003, John Twidell, 2006). Nevertheless, unfavorable impacts on the bay environmental have also been pointed out. The environmental problems include mud flat extinction and marine eco-system disruption. The participation of local residents is essential to resolve ecological and socioeconomic issues. In this study, the feasibility of tidal power generation is examined by reviewing the hydraulic characteristics of a target area in the Garorim bay on the west coast of Korea.
APA, Harvard, Vancouver, ISO, and other styles
More sources

Dissertations / Theses on the topic "PROBLEMS OF COST MANAGEMENT"

1

Ferre, Jose L. "Construction management : a viable solution to traditional project delivery problems." Thesis, Georgia Institute of Technology, 1986. http://hdl.handle.net/1853/22378.

Full text
APA, Harvard, Vancouver, ISO, and other styles
2

Engevall, Stefan. "Cost allocation in some routing problems : a game theoretic approach /." Linköping : Univ, 2002. http://www.bibl.liu.se/liupubl/disp/disp2002/tek754s.pdf.

Full text
APA, Harvard, Vancouver, ISO, and other styles
3

Zaharieva, Elissaveta. "Supply chain management and international marketing problems in transitional economies : evidence from the Bulgarian wine industry." Thesis, University of Newcastle Upon Tyne, 2002. http://ethos.bl.uk/OrderDetails.do?uin=uk.bl.ethos.273515.

Full text
APA, Harvard, Vancouver, ISO, and other styles
4

Dlakwa, Mohammed Musa. "Analysis of some problems in the management and cost control of public sector construction projects in Nigeria." Thesis, University of Stirling, 1990. http://hdl.handle.net/1893/2144.

Full text
Abstract:
Development is a difficult, painful and long-term enterprise. Not only because of world wide social and economic changes with extensive debts problems, inflation, recession and slow growth, but it is also a matter of finding the technically and economically optimum solution. Over the long-term, the challenge for developing countries is to use their limited resources more efficiently and more equitably through the management of all investment outlays in both the public and private sector. Construction is a major investment sector in Nigeria, attracting an average of over 60% of all capital investment, with over 70% of that 60% sponsored by the public sector. Construction projects handled by the public sector in developing countries are however fraught with problems, from inception through to completion and beyond. This is well known to members of the public sector agencies. Year after year, in good times and bad, development projects suffer from a host of problems: some of design; others of appraisal; and still others of implementation. Most construction projects are characterised by overruns in cost and time, and are sometimes halted altogether before completion. It is therefore necessary to understand the problems underlying the system being practised, to establish a realistic pattern, and to be able to interpret and correct any abnormalities. A lack of understanding of the constraints leads to unrealistic planning, and to later problems that may become insoluble. This research was therefore aimed at identifying these problems, many of which arise from attempts to implement a technology, in this case management technology, in a country other than the country of its origin. In a comparative study between Nigeria and Scotland a large number of public agencies which sponsor construction projects, and the contracting and consulting organisations that work for these agencies, were surveyed using both face-to-face interviews and the postal questionnaire technique. It was found that the major problems in Nigeria are: bureaucratic obstacles affecting timely payment to contractors; ambiguity in consultant/client contract agreements; lack of sufficient qualified professionals in the agencies; and lack of suitable information on which to base initial estimates. Recommendations for improving practice in Nigeria include: administrative reform of construction agencies to reduce the trammels of bureaucracy; a better system of funding by central Government; establishment of a construction cost information agency; and payment of competitive salaries to public sector professional staff. These changes, taking into account the cultural environment of Nigeria, should enable decisions to be made with greater certainty of outcome by all parties involved.
APA, Harvard, Vancouver, ISO, and other styles
5

Bettemir, Onder Halis. "Optimization Of Time-cost-resource Trade-off Problems In Project Scheduling Using Meta-heuristic Algorithms." Phd thesis, METU, 2009. http://etd.lib.metu.edu.tr/upload/12611971/index.pdf.

Full text
Abstract:
In this thesis, meta-heuristic algorithms are developed to obtain optimum or near optimum solutions for the time-cost-resource trade-off and resource leveling problems in project scheduling. Time cost trade-off, resource leveling, single-mode resource constrained project scheduling, multi-mode resource constrained project scheduling and resource constrained time cost trade-off problems are analyzed. Genetic algorithm simulated annealing, quantum simulated annealing, memetic algorithm, variable neighborhood search, particle swarm optimization, ant colony optimization and electromagnetic scatter search meta-heuristic algorithms are implemented for time cost trade-off problems with unlimited resources. In this thesis, three new meta-heuristic algorithms are developed by embedding meta-heuristic algorithms in each other. Hybrid genetic algorithm with simulated annealing presents the best results for time cost trade-off. Resource leveling problem is analyzed by five genetic algorithm based meta-heuristic algorithms. Apart from simple genetic algorithm, four meta-heuristic algorithms obtained same schedules obtained in the literature. In addition to this, in one of the test problems the solution is improved by the four meta-heuristic algorithms. For the resource constrained scheduling problems
genetic algorithm, genetic algorithm with simulated annealing, hybrid genetic algorithm with simulated annealing and particle swarm optimization meta-heuristic algorithms are implemented. The algorithms are tested by using the project sets of Kolisch and Sprecher (1996). Genetic algorithm with simulated annealing and hybrid genetic algorithm simulated annealing algorithm obtained very successful results when compared with the previous state of the art algorithms. 120-activity multi-mode problem set is produced by using the single mode problem set of Kolisch and Sprecher (1996) for the analysis of resource constrained time cost trade-off problem. Genetic algorithm with simulated annealing presented the least total project cost.
APA, Harvard, Vancouver, ISO, and other styles
6

Pfister, Christina Cara. "Problems of beginning teachers at the secondary level." Related electronic resource: Current Research at SU : database of SU dissertations, recent titles available full text, 2006. http://proquest.umi.com/login?COPT=REJTPTU0NWQmSU5UPTAmVkVSPTI=&clientId=3739.

Full text
APA, Harvard, Vancouver, ISO, and other styles
7

Ozen, Aykut. "Material Flow Cost Versus Congestion In Dynamic Distributed Facility Layout Problem." Master's thesis, METU, 2008. http://etd.lib.metu.edu.tr/upload/12609602/index.pdf.

Full text
Abstract:
In this thesis, we study both dynamic and distributed facility layout problems, where the demand for product mix changes over time. We propose a new simulated annealing algorithm, SALAB, for the dynamic facility layout problem. Four variants of SALAB find the best known solution for 20 of the 48 benchmark problems from the literature, improving upon the best known solutions of 18 problems. We modify SALAB to obtain DSALAB, solving the dynamic distributed facility layout problem with the objective of minimizing relocation cost and total (full and empty) travel cost of the material handling system. We simulate DSALAB solutions of randomly generated problems to study the tradeoff between total cost and congestion in the system. Our experimental results indicate that distributing the department duplicates throughout the facility reduces the total cost with diminishing returns and causes increasing congestion. Therefore, distribution beyond a certain level is not justified.
APA, Harvard, Vancouver, ISO, and other styles
8

El-Meshaialy, Faisal. "Managerial and manpower problems : labour turnover, costs and causes in manufacturing industries; the case of Kuwait." Thesis, Cardiff University, 1990. http://ethos.bl.uk/OrderDetails.do?uin=uk.bl.ethos.314779.

Full text
APA, Harvard, Vancouver, ISO, and other styles
9

Degirmenci, Guvenc. "The Budget Constrained Discrete Time/cost Trade-off Problem In Project Networks." Master's thesis, METU, 2008. http://etd.lib.metu.edu.tr/upload/12609737/index.pdf.

Full text
Abstract:
The time/cost trade-off models in project management aim to compress the project completion time by accelerating the activity durations at an expense of additional resources. The budget problem in discrete time/cost trade-off scheduling selects the time/cost mode -among the discrete set of specified modes- for each activity so as to minimize the project completion time without exceeding the available budget. There may be alternative modes that solve the budget problem optimally, however each solution may have a different total cost value. In this study we aim to find the minimum cost solution among the optimal solutions of the budget problem. We analyze the structure of the problem together with its linear programming relaxation and derive some mechanisms for reducing the problem size. We solve the reduced problem by linear programming relaxation and branch and bound based approximation and optimization algorithms. We find that our branch and bound algorithm finds optimal solutions for medium-sized problem instances in reasonable times and the approximation algorithms produce high quality solutions. We also discuss the way our algorithms could be used to construct the time/cost trade-off curve.
APA, Harvard, Vancouver, ISO, and other styles
10

Croxton, Keely L. "Modeling and solving network flow problems with piecewise linear costs, with applications in supply chain management." Thesis, Massachusetts Institute of Technology, 1999. http://hdl.handle.net/1721.1/9786.

Full text
Abstract:
Thesis (Ph. D.)--Massachusetts Institute of Technology, Dept. of Electrical Engineering and Computer Science; and, Massachusetts Institute of Technology, Sloan School of Management, 1999.
Includes bibliographical references (p. 130-132).
by Keely L. Croxton.
Ph.D.
APA, Harvard, Vancouver, ISO, and other styles
More sources

Books on the topic "PROBLEMS OF COST MANAGEMENT"

1

Management and cost accounting. 4th ed. London: International Thomson Business Press, 1996.

Find full text
APA, Harvard, Vancouver, ISO, and other styles
2

Management and cost accounting. 3rd ed. London: Chapman & Hall, 1992.

Find full text
APA, Harvard, Vancouver, ISO, and other styles
3

Management and cost accounting. Workingham, Berkshire, England: Van Nostrand Reinhold (UK), 1985.

Find full text
APA, Harvard, Vancouver, ISO, and other styles
4

Drury, Colin. Management and cost accounting. London: Chapman & Hall, 1992.

Find full text
APA, Harvard, Vancouver, ISO, and other styles
5

Management and cost accounting. 2nd ed. London: Van Nostrand Reinhold, 1988.

Find full text
APA, Harvard, Vancouver, ISO, and other styles
6

Drury, Colin. Management and cost accounting. 2nd ed. London: Chapman & Hall, 1988.

Find full text
APA, Harvard, Vancouver, ISO, and other styles
7

Drury, Colin. Management and cost accounting: Student's manual. 5th ed. London: Thomson Learning, 2000.

Find full text
APA, Harvard, Vancouver, ISO, and other styles
8

Bromwich, Michael. Management practices and cost management problems in Japanese-affiliated companies in the United Kingdom. London: Chartered Institute of Management Accountants, 1994.

Find full text
APA, Harvard, Vancouver, ISO, and other styles
9

Mallouk, Brenda M. Deluxe Spa Products Incorporated: Using management accounting for costing and decision making. Toronto: McGraw-Hill Ryerson, 1995.

Find full text
APA, Harvard, Vancouver, ISO, and other styles
10

Mallouk, Brenda M. Deluxe Spa Products Incorporated: Using management accounting for costing and decision making. 3rd ed. Toronto: McGraw-Hill Ryerson, 2003.

Find full text
APA, Harvard, Vancouver, ISO, and other styles
More sources

Book chapters on the topic "PROBLEMS OF COST MANAGEMENT"

1

Gee, Kenneth P. "The Single-period Cost Variance Investigation Decision." In Advanced Management Accounting Problems, 97–108. London: Macmillan Education UK, 1986. http://dx.doi.org/10.1007/978-1-349-18147-6_10.

Full text
APA, Harvard, Vancouver, ISO, and other styles
2

Gee, Kenneth P. "The Multi-period Cost Variance Investigation Decision." In Advanced Management Accounting Problems, 109–22. London: Macmillan Education UK, 1986. http://dx.doi.org/10.1007/978-1-349-18147-6_11.

Full text
APA, Harvard, Vancouver, ISO, and other styles
3

Gee, Kenneth P. "The Single-period Cost Variance Investigation Decision." In Advanced Management Accounting Problems, 231–33. London: Macmillan Education UK, 1986. http://dx.doi.org/10.1007/978-1-349-18147-6_28.

Full text
APA, Harvard, Vancouver, ISO, and other styles
4

Gee, Kenneth P. "The Multi-period Cost Variance Investigation Decision." In Advanced Management Accounting Problems, 234–35. London: Macmillan Education UK, 1986. http://dx.doi.org/10.1007/978-1-349-18147-6_29.

Full text
APA, Harvard, Vancouver, ISO, and other styles
5

Gee, Kenneth P. "The Single-period Cost Variance Investigation Decision." In Advanced Management Accounting Problems, 296–300. London: Macmillan Education UK, 1986. http://dx.doi.org/10.1007/978-1-349-18147-6_46.

Full text
APA, Harvard, Vancouver, ISO, and other styles
6

Gee, Kenneth P. "The Multi-period Cost Variance Investigation Decision." In Advanced Management Accounting Problems, 301–2. London: Macmillan Education UK, 1986. http://dx.doi.org/10.1007/978-1-349-18147-6_47.

Full text
APA, Harvard, Vancouver, ISO, and other styles
7

Gee, Kenneth P. "Stochastic Cost-Volume-Profit Analysis and Decision Theory." In Advanced Management Accounting Problems, 123–31. London: Macmillan Education UK, 1986. http://dx.doi.org/10.1007/978-1-349-18147-6_12.

Full text
APA, Harvard, Vancouver, ISO, and other styles
8

Gee, Kenneth P. "Stochastic Cost-Volume-Profit Analysis and Decision Theory." In Advanced Management Accounting Problems, 236–37. London: Macmillan Education UK, 1986. http://dx.doi.org/10.1007/978-1-349-18147-6_30.

Full text
APA, Harvard, Vancouver, ISO, and other styles
9

Gee, Kenneth P. "Stochastic Cost-Volume-Profit Analysis and Decision Theory." In Advanced Management Accounting Problems, 303–5. London: Macmillan Education UK, 1986. http://dx.doi.org/10.1007/978-1-349-18147-6_48.

Full text
APA, Harvard, Vancouver, ISO, and other styles
10

Kiziukiewicz, Teresa, and Elzbieta Jaworska. "Behavioral Aspects of Cost Management." In Problems, Methods and Tools in Experimental and Behavioral Economics, 21–34. Cham: Springer International Publishing, 2018. http://dx.doi.org/10.1007/978-3-319-99187-0_2.

Full text
APA, Harvard, Vancouver, ISO, and other styles

Conference papers on the topic "PROBLEMS OF COST MANAGEMENT"

1

"Problems and Solutions of Construction Project Cost Management." In 2019 International Conference on Arts, Management, Education and Innovation. Clausius Scientific Press, 2019. http://dx.doi.org/10.23977/icamei.2019.038.

Full text
APA, Harvard, Vancouver, ISO, and other styles
2

Li, Hongxian, and Hongxiang Ouyang. "Time-Cost Trade-Off Problems of Engineering Project with Running Income." In Engineering Management. IEEE, 2008. http://dx.doi.org/10.1109/icrmem.2008.10.

Full text
APA, Harvard, Vancouver, ISO, and other styles
3

Wang, Qinghua, Xiaozhong Xiong, Wenhao Tian, and Liang He. "Low-Cost RFID: Security Problems and Solutions." In 2011 International Conference on Management and Service Science (MASS 2011). IEEE, 2011. http://dx.doi.org/10.1109/icmss.2011.5998331.

Full text
APA, Harvard, Vancouver, ISO, and other styles
4

"MODERN PROBLEMS AND METHODS OF COST MANAGEMENT IN ENTERPRISES." In Russian science: actual researches and developments. Samara State University of Economics, 2020. http://dx.doi.org/10.46554/russian.science-2020.03-2-17/20.

Full text
APA, Harvard, Vancouver, ISO, and other styles
5

Zhang, Yi. "Research of Enterprise Cost Control Based on Target Cost Management." In 3rd International Conference on Judicial, Administrative and Humanitarian Problems of State Structures and Economic Subjects (JAHP 2018). Paris, France: Atlantis Press, 2018. http://dx.doi.org/10.2991/jahp-18.2018.64.

Full text
APA, Harvard, Vancouver, ISO, and other styles
6

Luo, Lingyan. "The problems and countermeasures of construction enterprises on logistics cost control." In 2013 6th International Conference on Information Management, Innovation Management and Industrial Engineering (ICIII). IEEE, 2013. http://dx.doi.org/10.1109/iciii.2013.6703162.

Full text
APA, Harvard, Vancouver, ISO, and other styles
7

"PROBLEMS OF COST MANAGEMENT AT THE ENTERPRISE IN MODERN CONDITIONS." In Russian science: actual researches and developments. Samara State University of Economics, 2019. http://dx.doi.org/10.46554/russian.science-2019.10-2-48/52.

Full text
APA, Harvard, Vancouver, ISO, and other styles
8

Radionova, Nataliia Y., Lidiya V. Synytsia, and Svitlana O. Krasniuk. "Systematization of Cost Management Problems at Garment Enterprises of Ukraine." In 6th International Conference on Economics, Management, Law and Education (EMLE 2020). Paris, France: Atlantis Press, 2021. http://dx.doi.org/10.2991/aebmr.k.210210.004.

Full text
APA, Harvard, Vancouver, ISO, and other styles
9

Liu Lihong. "Notice of Retraction: On project cost information management problems and countermeasures." In Business Management and Electronic Information. 2011 International Conference on Business Management and Electronic Information (BMEI 2011). IEEE, 2011. http://dx.doi.org/10.1109/icbmei.2011.5914450.

Full text
APA, Harvard, Vancouver, ISO, and other styles
10

Guo, Yanli, and Chengli Zhu. "Study on Common Problems and Countermeasures of Construction Cost." In 2018 International Conference on Sports, Arts, Education and Management Engineering (SAEME 2018). Paris, France: Atlantis Press, 2018. http://dx.doi.org/10.2991/saeme-18.2018.102.

Full text
APA, Harvard, Vancouver, ISO, and other styles

Reports on the topic "PROBLEMS OF COST MANAGEMENT"

1

Kraynova, O. S., and A. V. Pelushenko. Management costs of trade enterprises: problems and ways of their optimization. Ljournal, 2016. http://dx.doi.org/10.18411/kray-2016-artc-00061.

Full text
APA, Harvard, Vancouver, ISO, and other styles
2

Fordham, Wayne. Grounds Management Cost Reduction Strategies. Fort Belvoir, VA: Defense Technical Information Center, June 1993. http://dx.doi.org/10.21236/ada268510.

Full text
APA, Harvard, Vancouver, ISO, and other styles
3

Walthall, Rhonda. Unsettled Topics Concerning Adopting Blockchain Technology in Aerospace. SAE International, October 2020. http://dx.doi.org/10.4271/epr2020021.

Full text
Abstract:
In the aerospace industry, competition is high and the need to ensure safety and security while managing costs is paramount. Furthermore, stakeholders—who gain the most by working together—do not necessarily trust each other. Now, mix that with changing enterprise technologies, management of historical records, and customized legacy systems. This issue touches all aspects of the aerospace industry, from frequent flyer miles to aircraft maintenance and drives tremendous inefficiency and cost. Technology that augments, rather than replaces, is needed to transform these complex systems into efficient, digital processes. Blockchain technology offers collaborative opportunities for solving some of the data problems that have long challenged the industry. This SAE EDGE™ Research Report by Rhonda D. Walthall examines how blockchain technology could impact the aerospace industry and addresses some of the unsettled concerns surrounding its implementation.
APA, Harvard, Vancouver, ISO, and other styles
4

Tarditi, David, and Amer Diwan. Measuring the Cost of Storage Management,. Fort Belvoir, VA: Defense Technical Information Center, May 1995. http://dx.doi.org/10.21236/ada295426.

Full text
APA, Harvard, Vancouver, ISO, and other styles
5

Feizollahi, F., and D. Shropshire. Waste Management Facilities Cost Information Report. Office of Scientific and Technical Information (OSTI), October 1992. http://dx.doi.org/10.2172/10170336.

Full text
APA, Harvard, Vancouver, ISO, and other styles
6

Lee, Jongsub, Junho Oh, and David Yermack. Credit Default Swaps, Agency Problems, and Management Incentives. Cambridge, MA: National Bureau of Economic Research, November 2017. http://dx.doi.org/10.3386/w24064.

Full text
APA, Harvard, Vancouver, ISO, and other styles
7

Orlin, James B., and Clifford Stein. Parallel Algorithms for the Assignment and Minimum-Cost Flow Problems. Fort Belvoir, VA: Defense Technical Information Center, July 1992. http://dx.doi.org/10.21236/ada460051.

Full text
APA, Harvard, Vancouver, ISO, and other styles
8

Minsker, Barbara S. Cost-Effective Risk Management of Groundwater Contamination. Fort Belvoir, VA: Defense Technical Information Center, March 2001. http://dx.doi.org/10.21236/ada393312.

Full text
APA, Harvard, Vancouver, ISO, and other styles
9

McConnell, Joshua, Jason Sickler, and Trent Yang. The Problems Behind the Problems:" Systems Engineering and Program Management Risk Factors in Acquisition Programs". Fort Belvoir, VA: Defense Technical Information Center, August 2004. http://dx.doi.org/10.21236/ada428243.

Full text
APA, Harvard, Vancouver, ISO, and other styles
10

Lundeen, A. S., K. M. Hsu, and D. E. Shropshire. Waste management facilities cost information: System cost model product description. Revision 2. Office of Scientific and Technical Information (OSTI), February 1996. http://dx.doi.org/10.2172/224316.

Full text
APA, Harvard, Vancouver, ISO, and other styles
We offer discounts on all premium plans for authors whose works are included in thematic literature selections. Contact us to get a unique promo code!

To the bibliography