To see the other types of publications on this topic, follow the link: Processos BIM.

Dissertations / Theses on the topic 'Processos BIM'

Create a spot-on reference in APA, MLA, Chicago, Harvard, and other styles

Select a source type:

Consult the top 50 dissertations / theses for your research on the topic 'Processos BIM.'

Next to every source in the list of references, there is an 'Add to bibliography' button. Press on it, and we will generate automatically the bibliographic reference to the chosen work in the citation style you need: APA, MLA, Harvard, Chicago, Vancouver, etc.

You can also download the full text of the academic publication as pdf and read online its abstract whenever available in the metadata.

Browse dissertations / theses on a wide variety of disciplines and organise your bibliography correctly.

1

Parreira, João Pedro de Castro. "Implementação BIM nos processos organizacionais em empresas de construção – um caso de estudo." Master's thesis, Faculdade de Ciências e Tecnologia, 2013. http://hdl.handle.net/10362/9907.

Full text
Abstract:
Dissertação para obtenção do Grau Mestre em Engenharia Civil – Perfil de Construção<br>No decorrer dos tempos, a indústria da construção tem sido desafiada com projetos cada vez mais di-nâmicos, complexos e exigentes ao nível dos custos e prazos. O método tradicional de gestão da cons-trução já não é suficiente para garantir, de forma eficiente, o cumprimento das exigências da indústria. O Building Information Modeling (BIM) permite a mudança deste paradigma, na busca de maior pro-dutividade e competitividade das várias partes interessadas da indústria AEC. Atualmente é fundamental que as em
APA, Harvard, Vancouver, ISO, and other styles
2

Patacas, João Luís Mendes da Luz. "Metodologia para suporte de processos colaborativos na indústria da construção baseada em interoperabilidade e BIM." Master's thesis, Faculdade de Ciências e Tecnologia, 2012. http://hdl.handle.net/10362/9323.

Full text
Abstract:
Dissertação para obtenção do Grau Mestre em Engenharia Civil – Perfil de Construção<br>O Building Information Modelling (BIM) apresenta-se como metodologia para o desenvolvimento de projectos e gestão de empreendimentos na indústria da Arquitectura, Engenharia e Construção (AEC). A utilização da metodologia BIM na indústria AEC tem como objectivos aumentar a produtividade,eficiência, qualidade de construção, e simultaneamente reduzir custos ao longo do ciclo de vida dos empreendimentos. Para tal, há que garantir a interoperabilidade entre as Tecnologias de Informação e Comunicação (TIC) util
APA, Harvard, Vancouver, ISO, and other styles
3

Durante, Fábio Kischel. "Proposta de diretrizes para o desenvolvimento do projeto do sistema de produção apoiado pelos processos BIM." reponame:Repositório Institucional da UFPR, 2016. http://hdl.handle.net/1884/46186.

Full text
Abstract:
Orientador : Prof. Dr. Sérgio Scheer<br>Dissertação (mestrado) - Universidade Federal do Paraná, Setor de Tecnologia, Programa de Pós-Graduação em Construção Civil. Defesa: Curitiba, 19/09/2016<br>Inclui referências : f. 95-102<br>Area de concentração : Ambiente construído e gestão<br>Resumo: Empreendimentos de construção civil têm se tornado cada vez mais complexos e difíceis de se gerenciar. A despeito do que acontece em outras indústrias, o uso de tecnologias da informação e comunicação na indústria da construção é considerado baixo e a baixa produtividade do setor pode ser atribuída, també
APA, Harvard, Vancouver, ISO, and other styles
4

FARONI, M. C. C. "BIM NOS PROCESSOS DE GESTÃO DE FACILIDADES EM UMA UNIVERSIDADE: ESTUDO DE CASO E DIRETRIZES PRELIMINARES." Universidade Federal do Espírito Santo, 2017. http://repositorio.ufes.br/handle/10/9501.

Full text
Abstract:
Made available in DSpace on 2018-08-01T23:58:57Z (GMT). No. of bitstreams: 1 tese_11597_Mariane Cortes Cavalcante.pdf: 13445421 bytes, checksum: ef006ffc196a835792d23037f39c5e2d (MD5) Previous issue date: 2017-07-25<br>Utilizar processos eficientes para a gestão de facilidades pode aprimorar o desempenho espacial, humano, econômico e ambiental, e ao mesmo tempo diminuir os custos com operação, manutenção, e gasto energético ao longo dos anos de uma instalação. Visto que muitas informações são geradas por uma edificação durante o seu ciclo de vida, para que esta gestão seja efetiva é
APA, Harvard, Vancouver, ISO, and other styles
5

Pinha, Amanda Puchille. "Integração entre BIM e BPS: desafios na avaliação de desempenho ambiental na era do projeto e processos digitais." Universidade de São Paulo, 2017. http://www.teses.usp.br/teses/disponiveis/16/16132/tde-27062017-143107/.

Full text
Abstract:
Simulações computacionais são um recurso de grande valia no projeto do edifício, particularmente na área de desempenho ambiental, permitindo predizer fenômenos complexos como desempenho térmico, lumínico, acústico e energético dos edifícios e de seu entorno. O surgimento do BIM (Building Information Modeling ou Modelagem da Informação da Construção), por sua vez, forneceu aos profissionais da indústria da construção novas ferramentas para auxiliar na criação e gestão da informação da construção. Ao combinar um modelo 3D com um banco de dados único do projeto, BIM acaba por reduzir a perda de i
APA, Harvard, Vancouver, ISO, and other styles
6

Costa, José Martins Cavalcanti da. "Diagnóstico da implantação do BIM em empresas construtoras com foco nos processos de planejamento, orçamento e controle de obras." Universidade Federal de São Carlos, 2015. https://repositorio.ufscar.br/handle/ufscar/7179.

Full text
Abstract:
Submitted by Bruna Rodrigues (bruna92rodrigues@yahoo.com.br) on 2016-09-14T13:50:50Z No. of bitstreams: 1 DissJMCC.pdf: 7653909 bytes, checksum: 16867609454d01488a53ab8fb6c5f11a (MD5)<br>Approved for entry into archive by Marina Freitas (marinapf@ufscar.br) on 2016-09-15T13:53:30Z (GMT) No. of bitstreams: 1 DissJMCC.pdf: 7653909 bytes, checksum: 16867609454d01488a53ab8fb6c5f11a (MD5)<br>Approved for entry into archive by Marina Freitas (marinapf@ufscar.br) on 2016-09-15T13:53:35Z (GMT) No. of bitstreams: 1 DissJMCC.pdf: 7653909 bytes, checksum: 16867609454d01488a53ab8fb6c5f11a (MD5)<br>Mad
APA, Harvard, Vancouver, ISO, and other styles
7

Guerretta, Luis Felipe. "A modelagem da informação da construção (BIM) em empresas instaladoras de sistemas prediais." Universidade de São Paulo, 2017. http://www.teses.usp.br/teses/disponiveis/3/3153/tde-26062017-144132/.

Full text
Abstract:
Modelagem da Informação da Construção ou BIM (Building Information Modeling) é um processo inovador aplicado na gestão de todo o ciclo de vida de um empreendimento. Por meio do BIM, desenvolve-se o modelo virtual do empreendimento a ser construído. Os componentes deste modelo contêm geometria e parâmetros com dados técnicos relevantes para sua caracterização e utilização. No segmento de obras de sistemas prediais, os contratantes ditam os valores dos contratos, cabendo às empresas construtoras e instaladoras fazerem uma estimativa de orçamento acurada para dominar os custos e mensurar seus ris
APA, Harvard, Vancouver, ISO, and other styles
8

Bataglin, Fernanda Saidelles. "Modelo para gestão dos processos logísticos em obras de sistemas pré-fabricados engineer-to-order." reponame:Biblioteca Digital de Teses e Dissertações da UFRGS, 2017. http://hdl.handle.net/10183/174422.

Full text
Abstract:
A crescente necessidade de reduzir os prazos e os custos dos empreendimentos de construção e de melhorar a qualidade das edificações e as condições de trabalho tem incentivado a adoção de sistemas pré-fabricados. Entretanto, a adoção desses sistemas exige uma intensa troca de informações entre a obra e a fábrica, de forma a sincronizar a fabricação dos componentes, as operações logísticas e o processo de montagem na obra, principalmente em ambientes engineer-to-order (ETO). Em sistemas do tipo ETO, o pedido do cliente é realizado nas etapas iniciais do projeto, e existe um elevado grau de ince
APA, Harvard, Vancouver, ISO, and other styles
9

Soliman, Junior João. "Framework para suporte à verificação automatizada de requisitos regulamentares em projetos hospitalares." reponame:Biblioteca Digital de Teses e Dissertações da UFRGS, 2018. http://hdl.handle.net/10183/182369.

Full text
Abstract:
Empreendimentos hospitalares são reconhecidos pela complexidade que está associada a todas as fases de seu ciclo de vida: projeto, construção e operação. Os projetos da saúde são altamente influenciados por regulamentações locais. Estes conjuntos de códigos e legislações contém informações prescritivas e são importantes ao projeto, uma vez que as especificações são, usualmente, definidas de acordo com os critérios neles contidos. Ao longo do processo de desenvolvimento de produto, as especificações devem ser verificadas frente aos requisitos extraídos destas regulamentações. Este processo, se
APA, Harvard, Vancouver, ISO, and other styles
10

Campos, Patricia Farrielo de. "Light Steel Framing: uso em construções habitacionais empregando a modelagem virtual como processo de projeto e planejamento." Universidade de São Paulo, 2014. http://www.teses.usp.br/teses/disponiveis/16/16132/tde-11072014-155539/.

Full text
Abstract:
O déficit habitacional brasileiro é cada vez maior e os sistemas construtivos utilizados para diminuir a carência de moradias, em sua grande maioria, são lentos e constituídos de forma artesanal. Atualmente, a região brasileira com maior necessidade de unidades habitacionais de baixa renda é a Sudeste, onde se encontra o Estado de São Paulo que representa 19% do déficit habitacional brasileiro. Além disso, o difícil gerenciamento dos projetos envolvidos na construção (arquitetônico, estrutural, elétrico, entre outros), elaborados em diferentes softwares, e a complexa gestão das obras convencio
APA, Harvard, Vancouver, ISO, and other styles
11

Jansson, Magnus, and Kristian Knutsson. "Förändringar av arbetssätt vid implementering av BIM : En kvalitativ studie av två traditionella projekteringars arbetssätt och tid- och resursplanering samt vilka förändringar som är nödvändiga vid implementering av BIM." Thesis, KTH, Byggteknik och design, 2012. http://urn.kb.se/resolve?urn=urn:nbn:se:kth:diva-101675.

Full text
Abstract:
I en rapport från 2005 framtagen av FoU-Väst i samverkan med Centrum för management i byggsektorn (CMB) konstateras att en betydande del av allt slöseri i byggsektorn är kopplat till fel och konsekvenserna av dessa, med andra ord felkostnader. Studien visar att felkostnader står för cirka 10 % av ett projekts produktionskostnad.   Byggsektorn står nu, år 2012, inför förändringar i sitt arbetssätt för att minska antalet fel, öka kvaliteten och effektiviteten. BIM – Building Information Modeling, möjliggör ett smartare sätt att skapa, använda och förvalta information genom hela bygg- och förvalt
APA, Harvard, Vancouver, ISO, and other styles
12

Sjödin, Magnus, and Tobias Rasping. "Analys av BIM-processen i ombyggnadsprojekt." Thesis, KTH, Byggvetenskap, 2011. http://urn.kb.se/resolve?urn=urn:nbn:se:kth:diva-92567.

Full text
Abstract:
Idag används BIM, byggnadsinformationsmodellering, i fler och fler nybyggnadsprojekt och det finns mängder med information att inhämta om detta både i tryckta tidskrifter och på internet. En obesvarad fråga är dock hur arbetsgången ser ut när BIM ska användas i ombyggnadsprojekt. Informationen som går att finna om detta är begränsad trots att ombyggnadsprojekt utgör en betydande del av byggverksamheten, såväl i Sverige som internationellt. Målet med denna rapport är därför att undersöka hur ombyggnadsprojekt i dagsläget utförs med BIM som arbetssätt. Processen att arbeta med BIM har undersökts
APA, Harvard, Vancouver, ISO, and other styles
13

Àvila, Genís. "Geometria i forma dels pinacles de la Sagrada Família, d’Antoni Gaudí." Doctoral thesis, Universitat Politècnica de Catalunya, 2015. http://hdl.handle.net/10803/311443.

Full text
Abstract:
Based on the study and analysis of existing buildings, and using three-dimensional modeling software, we can understand and thus explain the main mechanisms for historic buildings design and construction, making them understandable to non-specialist audiences. Knowledge of CAD softwares devices allow us a deeper study of the development of mechanisms that describe the building before constructing it or when we have to rebuild them into their original state if they have been destroyed or partially sunk. The thesis explores these resources from various examples from Antoni Gaudí works, Catalonia
APA, Harvard, Vancouver, ISO, and other styles
14

Chavez, Guerrero Rodrigo Americo, and Chung Sebastian Rodrigo Vilchez. "Optimización del proceso de valorización de subcontratistas utilizando el software Dynamo y BIM." Bachelor's thesis, Universidad Peruana de Ciencias Aplicadas (UPC), 2020. http://hdl.handle.net/10757/654170.

Full text
Abstract:
En la industria de la construcción es usual que los contratistas busquen contar con subcontratistas con el fin de asegurar la calidad de los trabajos de mayor especialización como acabados, equipamiento, etc. Sin embargo, esto genera que se incremente la supervisión y control de estos trabajos. A partir del análisis de 04 proyectos de edificaciones multifamiliares, se detectó que existe una deficiencia en el proceso de valorización de los subcontratistas de acabados. La investigación desarrolla una propuesta de optimización de este proceso, basada en la herramienta Dynamo dentro de un ent
APA, Harvard, Vancouver, ISO, and other styles
15

Mazza, Enrico. "La digitalizzazione del processo costruttivo: la strategia Building Information Modeling and Management (BIMM) applicata ad un caso di studio di edilizia scolastica." Master's thesis, Alma Mater Studiorum - Università di Bologna, 2016.

Find full text
Abstract:
L’obiettivo della tesi è quello di fare una panoramica sulla strategia BIM e quindi sulla digitalizzazione del processo costruttivo. Grazie alla analisi di un caso di studio, altro obiettivo è quello di analizzare e valutare la metodologia BIM 4D/5D, ossia la gestione dei tempi e dei costi di realizzazione dell’opera. Nella prima fase si affronta il tema del BIM, con una analisi sull’evoluzione degli strumenti di elaborazione e rappresentazione digitale del progetto architettonico, su come questi strumenti si differenzino sia dal punto di vista operativo che concettuale rivoluzionando il fluss
APA, Harvard, Vancouver, ISO, and other styles
16

Gómez, Alarco Julio Martín. "Administración de tecnologías Bim para la optimización de procesos en empresas constructoras de la provincia de Huancayo." Bachelor's thesis, Universidad Continental, 2019. http://repositorio.continental.edu.pe/handle/continental/5529.

Full text
Abstract:
La presente investigación tiene como finalidad analizar aquellos procedimientos que sirvan para la implementación de tecnologías BIM los cuales permitirán optimizar los procesos en las empresas constructoras de Huancayo.Al concluir con la investigación se puede determinar que las empresas no consideran importante realizar una implementación de nuevas tecnologías para desarrollar sus proyectos, tales como las tecnologías BIM y no cuentan con manuales de funciones que les permita optimizar los procesos que desarrollan.
APA, Harvard, Vancouver, ISO, and other styles
17

Manzione, Leonardo. "Proposição de uma estrutura conceitual de gestão do processo de projeto colaborativo com o uso do BIM." Universidade de São Paulo, 2013. http://www.teses.usp.br/teses/disponiveis/3/3146/tde-08072014-124306/.

Full text
Abstract:
A crescente difusão do uso da tecnologia BIM mostra que um novo paradigma para o trabalho colaborativo em projeto precisa ser criado. Em diferentes países e cenários, percebem-se muitas barreiras a serem transpostas para o aproveitamento pleno dos benefícios do BIM. Faltam conhecimentos sobre a integração da nova tecnologia para a melhoria do processo de projeto. Falta também uma compreensão abrangente e uma visão geral de fatores não tecnológicos, caso das relações e interdependências na intersecção entre a gestão do processo de projeto e o BIM. Nesse contexto, a escassez de teorias que busqu
APA, Harvard, Vancouver, ISO, and other styles
18

Santos, Sérgio de Oliveira [UNESP]. "Uma educação para além do bem e do mal: o limiar da experiência educativa de um móbile solto no furacão." Universidade Estadual Paulista (UNESP), 2010. http://hdl.handle.net/11449/90053.

Full text
Abstract:
Made available in DSpace on 2014-06-11T19:24:18Z (GMT). No. of bitstreams: 0 Previous issue date: 2010-08-20Bitstream added on 2014-06-13T18:20:33Z : No. of bitstreams: 1 santos_so_me_rcla.pdf: 737719 bytes, checksum: 54e8ec4e700320637c2ec9c1b7709da7 (MD5)<br>A vida que nos constitui e nos atravessa pede representatividade. Em sentido amplo, somos vida – uma pluralidade de forças atuando. Uma idéia ou um valor é um tipo de força ambivalente que, naquilo que o ser humano experimenta como subjetividade privada, pode limitar ou ampliar as infinitas possibilidades de manifestação de sua vida sin
APA, Harvard, Vancouver, ISO, and other styles
19

Maciel, Alex Roda. "Automação do processo de corte e dobra de armaduras para estruturas de concreto integrada ao processo BIM." Universidade de São Paulo, 2018. http://www.teses.usp.br/teses/disponiveis/3/3153/tde-28082018-142552/.

Full text
Abstract:
A consolidação do processo de Modelagem da Informação da Construção (BIM) tende a contribuir para o aumento da eficiência da indústria da construção civil, fomentando novos fluxos de trabalho e permitindo o reuso de informações ao longo do ciclo de vida dos empreendimentos. Apesar do potencial de integração e automação associados ao processo BIM, o uso das informações digitais contidas no modelo para facilitar a pré-fabricação de produtos para a construção mostra-se incipiente. Nota-se que emprego da fabricação digital encontra obstáculos sobretudo em setores que atuam de modo segregado, e que
APA, Harvard, Vancouver, ISO, and other styles
20

Marques, Fernando Henrique Barbosa. "Projeto executivo assistido pela modelagem BIM como instrumento de apoio ao processo construtivo." Universidade Federal de Goiás, 2014. http://repositorio.bc.ufg.br/tede/handle/tede/7871.

Full text
Abstract:
Submitted by Luciana Ferreira (lucgeral@gmail.com) on 2017-10-11T14:09:50Z No. of bitstreams: 2 Dissertação - Fernando Henrique Barbosa Marques - 2014.pdf: 19347469 bytes, checksum: 64d7eb3df340843f95e437f11dfddfbb (MD5) license_rdf: 0 bytes, checksum: d41d8cd98f00b204e9800998ecf8427e (MD5)<br>Approved for entry into archive by Luciana Ferreira (lucgeral@gmail.com) on 2017-10-11T14:10:16Z (GMT) No. of bitstreams: 2 Dissertação - Fernando Henrique Barbosa Marques - 2014.pdf: 19347469 bytes, checksum: 64d7eb3df340843f95e437f11dfddfbb (MD5) license_rdf: 0 bytes, checksum: d41d8cd98f00b204e9800998
APA, Harvard, Vancouver, ISO, and other styles
21

Pires, Ema Sofia F. S. "Bem-estar subjectivo: processos cognitivos e afecto positivo." Master's thesis, Universidade de Évora, 2010. http://hdl.handle.net/10174/19027.

Full text
Abstract:
O presente trabalho de investigação visa aprofundar o campo de estudo no âmbito do Bem-Estar subjetivo. Especificamente, propõe-se apreciar qual o papel do Processamento Cognitivo "Aberto" (e outras formas de Coping) na relação entre Satisfação com o Suporte Social e o Afecto Positivo e Negativo. A metodologia usada segue um método correlaciona/ quantitativo através do recurso ao software de análise estatística SPSS. As análises de regressão simples e múltipla mostraram que diferentes variáveis, como as cognitivas (Processamento Cognitivo "Aberto" e outras formas de Coping) e os pessoais e s
APA, Harvard, Vancouver, ISO, and other styles
22

Dias, Meriellen. "Estudo da degradação da enrofloxacina em solução aquosa por meio de processos foto-oxidativos." Universidade de São Paulo, 2013. http://www.teses.usp.br/teses/disponiveis/3/3137/tde-23052014-003818/.

Full text
Abstract:
As tecnologias utilizadas em estações de tratamento de água e efluentes não são eficientes para a remoção total de resíduos farmacêuticos e os efeitos dessas substâncias sobre o meio ambiente e a saúde humana ainda não são bem conhecidos. No presente trabalho, estudou-se a degradação do antibiótico enrofloxacina (ENRO) por fotólise e pelo processo H2O2/UV na presença de compostos bio-orgânicos (BOS), que têm se apresentado como interessantes promotores da oxidação de poluentes. Os experimentos foram realizados em um reator fotoquímico tubular de imersão com fonte radiante (lâmpada de xenônio)
APA, Harvard, Vancouver, ISO, and other styles
23

Teixeira, Junior Gilmar. "Modelagem de sistemas de informação para a mineração de processos: características e propriedades das linguagens." Universidade Federal de Goiás, 2017. http://repositorio.bc.ufg.br/tede/handle/tede/7596.

Full text
Abstract:
Submitted by Luciana Ferreira (lucgeral@gmail.com) on 2017-07-19T11:05:26Z No. of bitstreams: 2 Dissertação - Gilmar Teixeira Junior - 2017.pdf: 6982787 bytes, checksum: c52c456e0cb8184f1f7144d862bff726 (MD5) license_rdf: 0 bytes, checksum: d41d8cd98f00b204e9800998ecf8427e (MD5)<br>Approved for entry into archive by Luciana Ferreira (lucgeral@gmail.com) on 2017-07-19T11:05:52Z (GMT) No. of bitstreams: 2 Dissertação - Gilmar Teixeira Junior - 2017.pdf: 6982787 bytes, checksum: c52c456e0cb8184f1f7144d862bff726 (MD5) license_rdf: 0 bytes, checksum: d41d8cd98f00b204e9800998ecf8427e (MD5)<br>Made a
APA, Harvard, Vancouver, ISO, and other styles
24

Gutiérrez-Roig, Mario. "Experiments and models for human decision-making: social dilemmas, pedestrian movement and financial markets." Doctoral thesis, Universitat de Barcelona, 2016. http://hdl.handle.net/10803/395188.

Full text
Abstract:
The revolution of ICT technologies in Digital Era combined with progress of ComplexitySciences have lead to the emergence of Computational Social Science, whose purposeis to analyze society in a quantitative way. Physics, can provide some tools in suchendeavor. Here, a new experimental framework called Pop-Up Experiments, based in Citizen Science philosophy and scientic rigor of Behavioral Experiments, is proposed.Experiments and mathematical models, in agreement with them, are used to validate and explain stylized facts of social phenomena concerning three diferent areas regard
APA, Harvard, Vancouver, ISO, and other styles
25

Zhu, Kechen, and Kechen Zhu. "Chemical and Microbial Processes for Rhodium Recovery." Thesis, The University of Arizona, 2017. http://hdl.handle.net/10150/625349.

Full text
Abstract:
This is the first report that demonstrates the ability of anaerobic methanogenic granular sludge to reduce Rh(III) to Rh(0). Recovery of rhodium(Rh) during anaerobic incubations under abiotic and biotic condition with different electron donors was studied. H2 and formate reduced Rh(III) to Rh(0) nanoparticles(NPs) in the absence of microorganisms. However, the presence of microorganism was crucial for Rh(III) reduction with ethanol. Results of X-ray powder diffraction (XRD) and transmission electron microscopy (TEM) confirmed the formation of Rh(0) NPs and indicated the localization and morpho
APA, Harvard, Vancouver, ISO, and other styles
26

Wetzel, Eric Michael. "The Use of a BIM-Based Framework to Support Safe Facility Management Processes." Diss., Virginia Tech, 2016. http://hdl.handle.net/10919/73414.

Full text
Abstract:
According to the United States Bureau of Labor Statistics, 293 people lost their life from 2008-2012 in the field of Facility Management (FM). In that same timeframe, private employers recorded 98,420 cases of occupational injuries and illness, with 26,190 cases requiring a minimum of 31 days away from work. Workers in this field are at constant risk of electrical shock, falls, crushing, cuts, and bruises and as a result, have a much higher rate of injury and illness than the national average. Case study analysis confirms that many of the recorded accidents could have been avoided had the
APA, Harvard, Vancouver, ISO, and other styles
27

Ströhlein, Guido. "Modeling of reactive- and bio-chromatographic processes /." Zürich : ETH, 2007. http://e-collection.ethbib.ethz.ch/show?type=diss&nr=16950.

Full text
APA, Harvard, Vancouver, ISO, and other styles
28

Farfán, Tataje Edwin Zaid, and Pisfil Jorge Daniel Chavil. "Análisis y evaluación de la implementación de la metodología bim en empresas peruanas." Bachelor's thesis, Universidad Peruana de Ciencias Aplicadas (UPC), 2016. http://hdl.handle.net/10757/621662.

Full text
Abstract:
Aborda el nivel de implementación que tienen las empresas peruanas en el uso del BIM como herramienta tecnológica y metodología de trabajo. Lo que se pretende en la investigación es conocer los impactos del BIM en los proyectos mediante el análisis cualitativo y cuantitativo de los resultados obtenidos y el retorno de inversión que experimentan las empresas que están a la vanguardia en su implementación. Para ello, la tesis está dividida en cinco capítulos. El primer capítulo trata aspectos generales de la tesis en el que se contextualiza la industria de la construcción en el Perú y se present
APA, Harvard, Vancouver, ISO, and other styles
29

Bastidas, Cristobal Joseph Bryan, and Araujo Jerson George Herrera. "Análisis de interferencias para movimiento de tierras en las infraestructuras viales en el Perú para prevenir los retrabajos en la etapa de planeamiento, mediante la Metodología de Gestión BIM. Caso de estudio, Camino Vecinal Puente Techin – Cruce Chirimoyo, Distrito de Querocotillo- Provincia Cutervo-Cajamarca tramo km 0+000 al 15+000." Bachelor's thesis, Universidad Peruana de Ciencias Aplicadas (UPC), 2020. http://hdl.handle.net/10757/652572.

Full text
Abstract:
En la siguiente investigación, se llevó a cabo la implementación de la Gestión BIM (Building Information Modeling) en la etapa de planeamiento del proyecto vial , MEJORAMIENTO CAMINO VECINAL PUENTE TECHIN – CRUCE CHIRIMOYO, DISTRITO DE QUEROCOTILLO- PROVINCIA CUTERVO-CAJAMARCA KM 0+000 AL 15+000, mediante uso de herramientas (softwares) BIM para el diseño y análisis, con el objetivo localizar las interferencias y prevenir los retrabajos, de acuerdo a los resultados obtenidos se propuso posibles soluciones a estas interferencias, las cuales fueron debatidas mediante una Gestión Colaborativa com
APA, Harvard, Vancouver, ISO, and other styles
30

Oliveira, Marina Rodrigues de. "Modelagem virtual e prototipagem rápida aplicadas em projeto de arquitetura." Universidade de São Paulo, 2011. http://www.teses.usp.br/teses/disponiveis/18/18141/tde-07042011-110243/.

Full text
Abstract:
O presente trabalho de mestrado estuda a aplicação de tecnologias e ferramentas de modelagem virtual e prototipagem rápida em projeto de Arquitetura, abordando casos em escritórios brasileiros e instituições de ensino que utilizam laboratórios de prototipagem rápida no desenvolvimento de projeto. A partir da revisão bibliográfica abrangendo processo de projeto, projeto paramétrico, modelagem virtual, Building Information Model(ing), prototipagem rápida, buscou-se desenvolver a ligação do trabalho acadêmico desses temas com a prática e o desenvolvimento de projeto a fim de estudar as interferên
APA, Harvard, Vancouver, ISO, and other styles
31

Tabesh, Mahsa. "An investigation to introduce BIM in undergraduate civil engineering teaching to improve construction processes." Thesis, Stellenbosch : Stellenbosch University, 2015. http://hdl.handle.net/10019.1/96697.

Full text
Abstract:
Thesis (MSc)--Stellenbosch University, 2015.<br>ENGLISH ABSTRACT: The popularity of Building Information Modelling (BIM) has grown rapidly within the construction industry, motivated by its potential advantages for improving construction processes. A majority of the world’s leading firms have adopted BIM solutions by moving from 2D or even 3D CAD to BIM techniques. However, for companies in South Africa this transition has not been the same as for firms in Europe and the USA. Besides the improvements which can be achieved by viewing a computer model of the designed facility, BIM provides
APA, Harvard, Vancouver, ISO, and other styles
32

Stradiotto, Júlia. "Processo BIM em projetos de licitações de obras públicas em obras do CRAS-SC." Universidade do Vale do Rio dos Sinos, 2018. http://www.repositorio.jesuita.org.br/handle/UNISINOS/7457.

Full text
Abstract:
Submitted by JOSIANE SANTOS DE OLIVEIRA (josianeso) on 2018-12-13T15:16:28Z No. of bitstreams: 1 Júlia Stradiotto_.pdf: 6066989 bytes, checksum: 3e8b5920abe56e064f188b5ed013c581 (MD5)<br>Made available in DSpace on 2018-12-13T15:16:28Z (GMT). No. of bitstreams: 1 Júlia Stradiotto_.pdf: 6066989 bytes, checksum: 3e8b5920abe56e064f188b5ed013c581 (MD5) Previous issue date: 2018-08-31<br>CAPES - Coordenação de Aperfeiçoamento de Pessoal de Nível Superior<br>O aumento de prazos e custos previstos em obras públicas, principalmente em países em desenvolvimento, gera a necessidade de buscar soluç
APA, Harvard, Vancouver, ISO, and other styles
33

Pereira, Thelma Maria Franco Rabelo Ara?jo. "Hist?rias de vida de mulheres idosas :um estudo sobre o bem-estar subjetivo na velhice." Universidade Federal do Rio Grande do Norte, 2005. http://repositorio.ufrn.br:8080/jspui/handle/123456789/17526.

Full text
Abstract:
Made available in DSpace on 2014-12-17T15:39:00Z (GMT). No. of bitstreams: 1 ThelmaMFRAP.pdf: 574286 bytes, checksum: ed90ec4f6f20b1647f4dadb92a4d5860 (MD5) Previous issue date: 2005-10-10<br>Coordena??o de Aperfei?oamento de Pessoal de N?vel Superior<br>The elderly population growth in Brazil and in the world is an incontestable reality, arising from a significant declining rate in mortality and fertility, resulting from the remarkable improvements in the quality of life of the people. Associated with the introduction of new technologies in the medical area, these issues have been highly co
APA, Harvard, Vancouver, ISO, and other styles
34

Mazzei, Giancarlo. "Il processo BIM di supporto alla progettazione e manutenzione impiantistica: i modelli federati nella gestione digitale del complesso demaniale in Piazza VIII Agosto a Bologna, sede del Provveditorato Interregionale per le Opere Pubbliche Lombardia – Emilia-Romagna." Master's thesis, Alma Mater Studiorum - Università di Bologna, 2020. http://amslaurea.unibo.it/21500/.

Full text
Abstract:
Nell'industria delle costruzioni AEC, l'utilizzo di elaborati grafici 2D (non coordinati fra le rispettive discipline) può dar luogo ad una ripetitività ed errata interpretazione dei dati, riprogettazione degli elementi, ritardi durante l'esecuzione dei lavori e rischi di contenzioso. Il presente lavoro è stato sviluppato con l'obiettivo di analizzare l'efficacia dei processi digitali nella gestione informativa a supporto di futuri interventi di progettazione e manutenzione impiantistica su edifici esistenti. È stato assunto come caso studio l'impianto di riscaldamento invernale del complesso
APA, Harvard, Vancouver, ISO, and other styles
35

McDonnell, Matthew. "Two-photon readout methods for an ion trap quantum information processor." Thesis, University of Oxford, 2003. http://ethos.bl.uk/OrderDetails.do?uin=uk.bl.ethos.275267.

Full text
APA, Harvard, Vancouver, ISO, and other styles
36

Ribeiro, Inês Luís. "Processos participados para a (re)qualificação & integração." Master's thesis, Universidade de Lisboa, Faculdade de Arquitetura, 2016. http://hdl.handle.net/10400.5/13640.

Full text
APA, Harvard, Vancouver, ISO, and other styles
37

Mazzotti, Matilde <1986&gt. "Physiological studies to optimize algal biomass production in phytoremediation processes." Doctoral thesis, Alma Mater Studiorum - Università di Bologna, 2015. http://amsdottorato.unibo.it/6934/.

Full text
Abstract:
Nowadays microalgae are studied, and a number of species already mass-cultivated, for their application in many fields: food and feed, chemicals, pharmaceutical, phytoremediation and renewable energy. Phytoremediation, in particular, can become a valid integrated process in many algae biomass production systems. This thesis is focused on the physiological and biochemical effects of different environmental factors, mainly macronutrients, lights and temperature on microalgae. Microalgal species have been selected on the basis of their potential in biotechnologies, and nitrogen occurs in all cha
APA, Harvard, Vancouver, ISO, and other styles
38

Spina, Fabrizio. "Ottimizzazione di sistemi di ventilazione meccanica mediante software di modellazione BIM." Master's thesis, Alma Mater Studiorum - Università di Bologna, 2019.

Find full text
Abstract:
La progettazione impiantistica, che in ambiente BIM prende il nome di MEP (Mechanical, Electrical e Plumbing), è una delle parti più recentemente sviluppate del BIM. La modellazione degli impianti è stata per molto tempo trascurata, seppure l’interoperabilità del BIM permetta un perfetto coordinamento e controllo delle interferenze già in fase di progettazione e una velocità di modellazione non indifferente. Presumibilmente ciò è stato legato all’incapacità del software, fino a tempi molto recenti, di effettuare calcoli e verifiche con affidabilità direttamente nell’ambiente di modellazione.
APA, Harvard, Vancouver, ISO, and other styles
39

Estevanim, Mayanna. "Processos no jornalismo digital: do Big Data à visualização de dados." Universidade de São Paulo, 2016. http://www.teses.usp.br/teses/disponiveis/27/27152/tde-06032017-094238/.

Full text
Abstract:
A sociedade está cada vez mais digitalizada, dados em diferentes extensões são passíveis de serem armazenados e correlacionados, temos um volume, variedade e velocidade de dados humanamente imensuráveis sem o auxílio de computadores. Neste cenário, falamos de um jornalismo de dados que visa o entendimento de temas complexos de relevância social e que sintoniza a profissão com as novas necessidades de compreensão informativa contemporânea. O intuito desta dissertação é problematizar a visualização de dados no jornalismo brasileiro partindo exatamente do que é esta visualização de dados jornalís
APA, Harvard, Vancouver, ISO, and other styles
40

Jönsson, Patricia. "Evaluation in which context a 32-bit, rather than an 8-bit processor may be appropriate to use, based on power consumption." Thesis, Malmö högskola, Fakulteten för teknik och samhälle (TS), 2017. http://urn.kb.se/resolve?urn=urn:nbn:se:mau:diva-20846.

Full text
Abstract:
Uttrycket Internet of Things växer sig större och större och världen är på väg att ha 50miljarder uppkopplade enheter till 2020. IoT-enheter är beroende av att ha en låg effektförbrukningoch därför är en processor med låg effektförbrukning viktigt att ha. Denna studieutför tester på två strömsnåla processorer för att komma fram till vilken processor somär mest lämplig till vilken IoT-produkt. Testningen utgick från tre applikationer som i sintur baseras på verkliga IoT-situationer. De tre applikationerna har olika intesitetsnivåer. Iden första applikationen arbetar processorerna inte särskilt
APA, Harvard, Vancouver, ISO, and other styles
41

Montiveros, Toribio Jossef Michel. "Facility management de edificaciones universitarias con el uso de tecnología BIM." Master's thesis, Universidad Peruana de Ciencias Aplicadas (UPC), 2018. http://hdl.handle.net/10757/624948.

Full text
Abstract:
Este trabajo de investigación planeta una propuesta de solución para la Gestión de la Operación y Mantenimiento de los edificios existentes de una Universidad acorde a las nuevas tendencias de la industria 4.0 en nuestro sector, el de la construcción, con el uso de las tecnologías BIM (7D). La gestión operación y mantenimiento (O&M) de los activos físicos de la Universidad Continental (caso de estudio) es aun tradicional por el uso de herramientas de gestión poco productivas y no se ajustan a un plan de mantenimiento integral que se alinean a los objetivos de la organización. En el desarrollo
APA, Harvard, Vancouver, ISO, and other styles
42

Descorps-Declere, Stéphane. "Modélisation du processus d'annotation par une architecture blackboard." Paris 6, 2006. http://www.theses.fr/2006PA066165.

Full text
Abstract:
Devant la multiplication des projets de séquençage de génomes complets, il est aujourd’hui essentiel de disposer d’outils informatiques performants capables d'aider l’utilisateur biologiste vers un meilleur usage des méthodes d’analyses. Ceci s’avère particulièrement important en raison des très nombreuses méthodes d’analyse disponibles ainsi que des grandes quantités de données concernées. Ce travail vise à apporter une contribution à cette problématique, par l’élaboration d’un modèle bio-informatique adapté à l’annotation de génomes complets. Avec l’étude de l’état de l’art, nous avons dégag
APA, Harvard, Vancouver, ISO, and other styles
43

Tian, Yuan Michael. "Dynamic optimisation of batch processes using neural network modelling methods." Thesis, University of Newcastle Upon Tyne, 2001. http://ethos.bl.uk/OrderDetails.do?uin=uk.bl.ethos.366780.

Full text
APA, Harvard, Vancouver, ISO, and other styles
44

Villamayor, Ibarra José Fernando. "Integração de modelos de processo e produto na fase de construção para o controle da produção e da qualidade com o apoio de BIM." reponame:Biblioteca Digital de Teses e Dissertações da UFRGS, 2016. http://hdl.handle.net/10183/149814.

Full text
Abstract:
Os controles de produção e qualidade executados no canteiro de obras têm sido frequentemente associados a trâmites burocráticos, sendo limitados a tarefas administrativas, em lugar de adicionar valor para os clientes internos e externos. Por esta razão, diversas pesquisas propuseram abordagens e indicadores para a integração entre controles de produção e qualidade. Uma das abordagens apontadas na literatura como promissora consiste no uso de dispositivos móveis, para apoiar a implementação destes controles. Tais dispositivos permitem a gestão de grandes quantidades de informações, evitando ret
APA, Harvard, Vancouver, ISO, and other styles
45

Parker, Scott Paton. "New approaches to real time monitoring of bio-manufacturing processes." Thesis, University of Strathclyde, 2017. http://digitool.lib.strath.ac.uk:80/R/?func=dbin-jump-full&object_id=27914.

Full text
Abstract:
Over the past decade the bioprocessing industry has embraced and led the creation of a number of initiatives to drive process development and optimisation. There has consequently been an increased demand for tools capable of meeting the requirements of these initiatives. Spectroscopic monitoring systems such as Near infrared (NIR), Mid infrared (MIR) and Raman can provide a number of substantial advantages over more conventional off-line monitoring methods, normally applied to bioprocessing. With these techniques the bioprocessing industry has means of meeting these demanding challenges. The a
APA, Harvard, Vancouver, ISO, and other styles
46

Ancona, Andrew J. "Healing Through Bio-Geometries: A Study of Designed Natural Processes." University of Cincinnati / OhioLINK, 2017. http://rave.ohiolink.edu/etdc/view?acc_num=ucin1491303530064519.

Full text
APA, Harvard, Vancouver, ISO, and other styles
47

Potysz, Anna. "Copper metallurgical slags : mineralogy, bio/weathering processes and metal bioleaching." Thesis, Paris Est, 2015. http://www.theses.fr/2015PESC1201/document.

Full text
Abstract:
Les principaux objectifs étaient d'évaluer la stabilité de l'environnement des scories métallurgiques de Cu résultant de différentes périodes d'activités industrielles et de différentes technologies de fusion. Parmi les scories étudiées, on retrouve: les scories historiques cristallines (SH) ainsi que modernes: les scories de four vertical (SFS), les scories granulées (GS) et les scories de plomb (LS). Les différentes approches adoptées dans ce travail de thèse ont tenu compte de: i) la composition chimique et la phase minérale des scories, ii) la sensibilité à la lixiviation des scories sous
APA, Harvard, Vancouver, ISO, and other styles
48

Gardner, Peter. "The use of infrared spectroscopy to monitor bio-catalytic processes." Thesis, University of Strathclyde, 2012. http://digitool.lib.strath.ac.uk:80/R/?func=dbin-jump-full&object_id=25537.

Full text
Abstract:
Industrial biotransformation processes are becoming increasingly important for the production of single enantiomers of both low value commodity and high value fine chemicals. Despite this demand and the regulatory authorities encouragement of a quality by design approach, the application of process analytical technology to these systems has, to date, been relatively limited. A more traditional off-line approach involving chromatographic methods is still commonly employed for the quantification of key analytes during the process. In-situ measurements tend to be limited to physical parameters of
APA, Harvard, Vancouver, ISO, and other styles
49

Krone, Philipp. "Magnetization Reversal Processes of Nanostructure Arrays." Doctoral thesis, Universitätsbibliothek Chemnitz, 2011. http://nbn-resolving.de/urn:nbn:de:bsz:ch1-qucosa-71358.

Full text
Abstract:
In the thesis at hand, different concepts of magnetic recording were investigated both from an experimental and theoretical point of view. On the one hand, micromagnetic simulations of bit patterned media were performed examining the influence of magnetic and geometrical parameters on the magnetization reversal mechanism of the bit array. In this regard, the recording concept called exchange coupled composite (ECC) media was applied in combination with bit patterned media (BPM). It was demonstrated that ECC/BPM is superior in terms of narrowing the SFD which is vital for the implementation of
APA, Harvard, Vancouver, ISO, and other styles
50

Alnaser, Aljwhara A. "The implication of BIM use on communication channels in design processes for Saudi architectural engineering (AE) firms." Thesis, University of Reading, 2018. http://centaur.reading.ac.uk/79816/.

Full text
Abstract:
This research explores the implications of implementing building information modelling (BIM) on existing communication channels used in the design processes for professionals at architecture, engineering (AE) firms in the Kingdom of Saudi Arabia. Although considerable research on communication channels exists in terms of their effectiveness in collaborative environments, such as face to face meetings versus computer-mediated communication (CMC) technologies, to date relatively few studies have investigated the effect of implementing BIM on existing communication channel mechanisms at Saudi AE
APA, Harvard, Vancouver, ISO, and other styles
We offer discounts on all premium plans for authors whose works are included in thematic literature selections. Contact us to get a unique promo code!