Journal articles on the topic 'Processos BIM'
Create a spot-on reference in APA, MLA, Chicago, Harvard, and other styles
Consult the top 50 journal articles for your research on the topic 'Processos BIM.'
Next to every source in the list of references, there is an 'Add to bibliography' button. Press on it, and we will generate automatically the bibliographic reference to the chosen work in the citation style you need: APA, MLA, Harvard, Chicago, Vancouver, etc.
You can also download the full text of the academic publication as pdf and read online its abstract whenever available in the metadata.
Browse journal articles on a wide variety of disciplines and organise your bibliography correctly.
Moreira, Lorena Claudia de Souza, and Regina Coeli Ruschel. "Impacto da adoção de BIM em Facility Management: uma classificação." PARC Pesquisa em Arquitetura e Construção 6, no. 4 (2015): 277. http://dx.doi.org/10.20396/parc.v6i4.8634982.
Full textManenti, Eloisa Marcon, Fernanda Fernandes Marchiori, and Leonardo de Aguiar Corrêa. "Plano de execução BIM: proposta de diretrizes para contratantes e fornecedores de projeto." Ambiente Construído 20, no. 1 (2020): 65–85. http://dx.doi.org/10.1590/s1678-86212020000100363.
Full textSouza de Passos, Paulo Rafael, and Izabel Maria Lima. "O uso da plataforma bim na compatibilização de projetos da construção civil." Tecno-Lógica 25, no. 2 (2021): 227–35. http://dx.doi.org/10.17058/tecnolog.v25i2.16448.
Full textRibeiro, Ciro Jr Martins, and Romante Ezer Ferreira Rodrigues. "MELHORES PRÁTICAS EM GERENCIAMENTO DE PROJETOS CIVIS PELO USO DO BUILDING INFORMATION MODELING – BIM." e-xacta 12, no. 1 (2019): 1. http://dx.doi.org/10.18674/exacta.v12i1.2250.
Full textTaype, Lisseth Espinoza, and Eloisa Dezen-Kempter. "Contribuição de BIM para a segurança laboral na construção civil." PARC Pesquisa em Arquitetura e Construção 11 (March 14, 2020): e020002. http://dx.doi.org/10.20396/parc.v11i0.8653811.
Full textAparecida Costa, Heliara, MARCIO PRESENTE DE SOUZA, GUILHERME QUINILATO BALDESSIN, GABRIELA ALBANO, and MARCIO MINTO FABRÍCIO. "MODELAGEM BIM PARA REGISTRO DIGITAL DO PATRIMÔNIO ARQUITETÔNICO MODERNO." Revista Projetar - Projeto e Percepção do Ambiente 6, no. 1 (2021): 49–68. http://dx.doi.org/10.21680/2448-296x.2021v6n1id21331.
Full textSilva, Paula Heloisa da, Julianna Crippa, and Sergio Scheer. "BIM 4D no planejamento de obras: detalhamento, benefícios e dificuldades." PARC Pesquisa em Arquitetura e Construção 10 (February 26, 2019): e019010. http://dx.doi.org/10.20396/parc.v10i0.8650258.
Full textLatreille, Denise, and Sergio Scheer. "Análise de quantitativos provenientes de um modelo BIM 5D para adequação ao processo orçamentário das empresas de construção civil." Gestão & Tecnologia de Projetos 16, no. 1 (2020): 96–108. http://dx.doi.org/10.11606/gtp.v16i1.163499.
Full textTramontano, Marcelo, Juliano Pita, and Dayanna Mello Sousa. "Building Information Modelling em processos decisórios participativos." Design e Tecnologia 10, no. 21 (2020): 54–69. http://dx.doi.org/10.23972/det2020iss21pp54-69.
Full textRuschel, Regina Coeli, Max Lira Veras Xavier de Andrade, and Marcelo de Morais. "O ensino de BIM no Brasil: onde estamos?" Ambiente Construído 13, no. 2 (2013): 151–65. http://dx.doi.org/10.1590/s1678-86212013000200012.
Full textFernandes, Guilherme von der Heyde, Carlos Torres Formoso, and Patrícia Tzortzopoulos-Fazenda. "Método para verificação automatizada de requisitos em empreendimentos Habitacionais de Interesse Social." Ambiente Construído 18, no. 4 (2018): 259–78. http://dx.doi.org/10.1590/s1678-86212018000400304.
Full textPereira, Lucas Melchiori, Fernanda Aranha Saffaro, Ercilia Hitomi Hirota, and Celso Saito. "ESTUDO EXPLORATÓRIO COMPARATIVO DA EFICÁCIA ENTRE PROTÓTIPOS FÍSICO, ANALÍTICO 2D E 3D NA IDENTIFICAÇÃO DE INCONSISTÊNCIAS DE PROJETOS." Gestão & Tecnologia de Projetos 10, no. 1 (2015): 28. http://dx.doi.org/10.11606/gtp.v10i1.83373.
Full textBiotto, Clarissa Notariano, Carlos Torres Formoso, and Eduardo Luis Isatto. "Uso de modelagem 4D e Building Information Modeling na gestão de sistemas de produção em empreendimentos de construção." Ambiente Construído 15, no. 2 (2015): 79–96. http://dx.doi.org/10.1590/s1678-86212015000200015.
Full textBaldauf, Juliana Parise, Carlos Torres Formoso, and Luciana Inês Gomes Miron. "Modelagem de requisitos de clientes de empreendimentos habitacionais de interesse social com o uso de BIM." Ambiente Construído 13, no. 3 (2013): 177–95. http://dx.doi.org/10.1590/s1678-86212013000300011.
Full textDe Andrade Martins, Daniel, and Adauri Silveira Rodrigues Junior. "Análise da Comparativa da Utilização da Tecnologia BIM em Projeto de Residências Unifamiliares." Revista Eletrônica TECCEN 12, no. 2 (2019): 02–10. http://dx.doi.org/10.21727/teccen.v12i2.2035.
Full textRuschel, Regina Coeli. "Modelagem da Informação da Construção." PARC Pesquisa em Arquitetura e Construção 5, no. 1 (2014): 3. http://dx.doi.org/10.20396/parc.v5i1.8634539.
Full textSilva, Juliano Lima da, Andréa Quadrado Mussi, Thaísa Leal da Silva, Paola Zardo, and Lauro André Ribeiro. "Desenvolvimento de plug-ins voltados para a análise de requisitos da Norma de Desempenho Brasileira." Gestão & Tecnologia de Projetos 14, no. 2 (2019): 46–64. http://dx.doi.org/10.11606/gtp.v14i2.147285.
Full textOliveira, Fernando Marcio, Leonardo Salazar Bittencourt, and David Rodrigues Silva Dória. "Uma ferramenta BIM para simulação de eficiência energética nas fases iniciais de projeto." PARC Pesquisa em Arquitetura e Construção 11 (March 15, 2020): e020003. http://dx.doi.org/10.20396/parc.v11i0.8653782.
Full textSilva, Bruno Thiago Rego Valeriano, and Maryangela Geimba de Lima. "Proposta de integração entre BIM e ACV utilizando composições de serviço." PARC Pesquisa em Arquitetura e Construção 12 (July 15, 2021): e021017. http://dx.doi.org/10.20396/parc.v12i00.8659910.
Full textCôco Júnior, Verley Henry, and Gabriela Celani. "Algoritmização do projeto arquitetônico em BIM: uma aplicação na indústria de banheiros pré-fabricados." Gestão & Tecnologia de Projetos 16, no. 2 (2021): 73–92. http://dx.doi.org/10.11606/gtp.v16i2.181038.
Full textCogima, Camila Kimi, Rodrigo Vinicius De Carvalho Nascimento, Pedro Victor Vieira De Paiva, Marco Antonio Garcia de Carvalho, and Eloisa Dezen-Kempter. "Scan-to-HBIM aplicado à igreja da Pampulha de Oscar Niemeyer." Gestão & Tecnologia de Projetos 15, no. 1 (2020): 117–34. http://dx.doi.org/10.11606/gtp.v15i1.152828.
Full textBritto, Saulo Almeida dos Santos, Sergio Scheer, Calvin Kam, and Martin Fischer. "O USO DO VDC SCORECARD NA VALIDAÇÃO DE MÉTODOS PARA ANÁLISE DE DESEMPENHO DA GESTÃO DO PROCESSO DE PROJETO NO CENÁRIO BRASILEIRO." Gestão & Tecnologia de Projetos 10, no. 2 (2015): 71. http://dx.doi.org/10.11606/gtp.v10i2.102844.
Full textPaula, Nathália de, Mônica Emiko Uechi, and Silvio Burrattino Melhado. "Novas demandas para as empresas de projeto de edifícios." Ambiente Construído 13, no. 3 (2013): 137–59. http://dx.doi.org/10.1590/s1678-86212013000300009.
Full textBastos Porsani, Gabriela, Kattalin Del Valle de Lersundi, Ana Sánchez-Ostiz Gutiérrez, and Carlos Fernández Bandera. "Interoperability between Building Information Modelling (BIM) and Building Energy Model (BEM)." Applied Sciences 11, no. 5 (2021): 2167. http://dx.doi.org/10.3390/app11052167.
Full textQueiróz, Gabriel Ramos de, Giane de Campos Grigoletti, and Joaquim César Pizzutti dos Santos. "Interoperability between Autodesk Revit and EnergyPlus for thermal simulations of buildings." PARC Pesquisa em Arquitetura e Construção 10 (January 25, 2019): e019005. http://dx.doi.org/10.20396/parc.v10i0.8652852.
Full textBoton, Conrad, and Daniel Forgues. "Practices and Processes in BIM Projects: An Exploratory Case Study." Advances in Civil Engineering 2018 (August 6, 2018): 1–12. http://dx.doi.org/10.1155/2018/7259659.
Full textCuperschmid, Ana Regina Mizrahy, Marina Graf Grachet, and Márcio Minto Fabrício. "Realidade Aumentada como auxílio à montagem de parede em wood-frame." PARC Pesquisa em Arquitetura e Construção 6, no. 4 (2015): 266. http://dx.doi.org/10.20396/parc.v6i4.8640947.
Full textKozin, V. F., N. I. Buryak, and A. V. Bliznyuk. "Electrochemical Processes at the Bi0–Bi3+ Interface in Chloride Melts." Surface Engineering and Applied Electrochemistry 54, no. 5 (2018): 446–51. http://dx.doi.org/10.3103/s1068375518050071.
Full textBlaich, Lutz, and Martin Schröder. "Wer ETIM sagt, muss auch VDI 3805 sagen." HLH 71, no. 05-06 (2020): 40–42. http://dx.doi.org/10.37544/1436-5103-2020-05-06-40.
Full textBehazdan, Amir H., Shahin Vassign, and Ali Mostafavi. "Teaching millennials with augmented reality: cases from the U.S. education system." PARC Pesquisa em Arquitetura e Construção 7, no. 4 (2016): 265. http://dx.doi.org/10.20396/parc.v7i4.8649284.
Full textMarzouk, Mohamed, and Nada Elmansy. "Roadmapping BIM Implementation Processes Using IDEF0 Diagrams." International Journal of 3-D Information Modeling 7, no. 1 (2018): 49–63. http://dx.doi.org/10.4018/ij3dim.2018010104.
Full textCarvalho, Henrique José Silva, Paula Letícia Tissei, Helena Fernanda Graf, and Sérgio Scheer. "PROCESSO BIM EM EDIFICAÇÃO DE CONTAINERS REAPROVEITADOS." MIX Sustentável 3, no. 2 (2017): 101. http://dx.doi.org/10.29183/2447-3073.mix2017.v3.n2.101-107.
Full textLeal, Bianca Marques Figueiredo, and Mônica Santos Salgado. "Propostas de incorporação de BIM no curso de Arquitetura e Urbanismo." PARC Pesquisa em Arquitetura e Construção 10 (July 25, 2019): e019025. http://dx.doi.org/10.20396/parc.v10i0.8653676.
Full textSiniak, Nikolai, Sabina Źróbek, Vsevolod Nikolaiev, and Sergey Shavrov. "Building Information Modeling for Housing Renovation - Example for Ukraine." Real Estate Management and Valuation 27, no. 2 (2019): 97–107. http://dx.doi.org/10.2478/remav-2019-0018.
Full textZanni, Mariangela, Kirti Ruikar, and Robby Soetanto. "Systematising multidisciplinary sustainable building design processes utilising BIM." Built Environment Project and Asset Management 10, no. 5 (2020): 637–55. http://dx.doi.org/10.1108/bepam-05-2020-0088.
Full textHerr, Christiane M., and Thomas Fischer. "BIM adoption across the Chinese AEC industries: An extended BIM adoption model." Journal of Computational Design and Engineering 6, no. 2 (2018): 173–78. http://dx.doi.org/10.1016/j.jcde.2018.06.001.
Full textCodinhoto, Ricardo, Arto Kiviniemi, Sergio Kemmer, and Cecilia Gravina da Rocha. "BIM-FM Implementation." International Journal of 3-D Information Modeling 2, no. 2 (2013): 1–15. http://dx.doi.org/10.4018/ij3dim.2013040101.
Full textMehrbod, Sarmad, Sheryl Staub-French, and Melanie Tory. "BIM-based building design coordination: processes, bottlenecks, and considerations." Canadian Journal of Civil Engineering 47, no. 1 (2020): 25–36. http://dx.doi.org/10.1139/cjce-2018-0287.
Full textNývlt, Vladimír, and Radimír Novotný. "Sharing Knowledge and Information within BIM Life Cycle Processes." MATEC Web of Conferences 279 (2019): 01001. http://dx.doi.org/10.1051/matecconf/201927901001.
Full textBiagini, Carlo, Paolo Ottobri, Neri Banti, and Andrea Bongini. "Validation processes of H-BIM models: a case study." IOP Conference Series: Materials Science and Engineering 949 (November 11, 2020): 012115. http://dx.doi.org/10.1088/1757-899x/949/1/012115.
Full textSchröder, Martin. "Beginn des BIM-Zeitalters." HLH 70, no. 03 (2019): 50–52. http://dx.doi.org/10.37544/1436-5103-2019-03-50.
Full textDe Souza, Sandro Soares, Wesley Matheus Nunes, and Paula Paganini. "Processo de Soldagem: uma Introdução aos Princípios Básicos do Processo de Soldagem TIG Aplicado na Indústria Mecânica." Revista de Ciências Exatas e Tecnologia 14, no. 14 (2020): 27–29. http://dx.doi.org/10.17921/1890-1793.2019v14n14p27-29.
Full textLima, Camila Fonseca Melo, Paulo Roberto Pereira Andery, and Ana Cecília Rocha Veiga. "Análise do processo de projeto de sistemas hidrossanitários prediais." PARC Pesquisa em Arquitetura e Construção 7, no. 2 (2016): 102. http://dx.doi.org/10.20396/parc.v7i2.8645049.
Full textKrasnikov, Aleksei, Eva Mihokova, Martin Nikl, Svetlana Zazubovich, and Yaroslav Zhydachevskyy. "Luminescence Spectroscopy and Origin of Luminescence Centers in Bi-Doped Materials." Crystals 10, no. 3 (2020): 208. http://dx.doi.org/10.3390/cryst10030208.
Full textGledson, Barry J. "Hybrid project delivery processes observed in constructor BIM innovation adoption." Construction Innovation 16, no. 2 (2016): 229–46. http://dx.doi.org/10.1108/ci-04-2015-0020.
Full textPridvizhkin, S. V., N. S. Davydov, A. V. Belkevich, and M. K. Kozhevnikova. "BIM technologies in customer service business processes. Commercial pricing classifier." IOP Conference Series: Materials Science and Engineering 481 (March 11, 2019): 012042. http://dx.doi.org/10.1088/1757-899x/481/1/012042.
Full textAyyaz, Malik, Kirti Ruikar, and Stephen Emmitt. "Towards Understanding BPR Needs for BIM Implementation." International Journal of 3-D Information Modeling 1, no. 4 (2012): 18–28. http://dx.doi.org/10.4018/ij3dim.2012100103.
Full textZhang, Lili, Zhiqiang Wang, Chun Hu та Baoyou Shi. "Enhanced photocatalytic performance by the synergy of Bi vacancies and Bi0 in Bi0-Bi2-δMoO6". Applied Catalysis B: Environmental 257 (листопад 2019): 117785. http://dx.doi.org/10.1016/j.apcatb.2019.117785.
Full textFrench, Jeff. "Marketing do bem público." Revista de Gestão dos Países de Língua Portuguesa 16, no. 3 (2017): 4. http://dx.doi.org/10.12660/rgplp.v16n3.2017.78369.
Full textBruce, Sonya. "Tracking two competitive bid processes." Electricity Journal 1, no. 3 (1988): 7–9. http://dx.doi.org/10.1016/s1040-6190(88)80016-2.
Full text