Contents
Academic literature on the topic 'Produktionslayout'
Create a spot-on reference in APA, MLA, Chicago, Harvard, and other styles
Consult the lists of relevant articles, books, theses, conference reports, and other scholarly sources on the topic 'Produktionslayout.'
Next to every source in the list of references, there is an 'Add to bibliography' button. Press on it, and we will generate automatically the bibliographic reference to the chosen work in the citation style you need: APA, MLA, Harvard, Chicago, Vancouver, etc.
You can also download the full text of the academic publication as pdf and read online its abstract whenever available in the metadata.
Dissertations / Theses on the topic "Produktionslayout"
Leander, Oscar. "Förändring av produktionslayout Studier av omfattande förändringar i produktionslayouten." Thesis, Högskolan i Borås, Institutionen Ingenjörshögskolan, 2011. http://urn.kb.se/resolve?urn=urn:nbn:se:hb:diva-20262.
Full textSpelmans, Daniel. "Översyn av produktionslayout." Thesis, Karlstad University, Karlstad University, Karlstad University, 2009. http://urn.kb.se/resolve?urn=urn:nbn:se:kau:diva-4258.
Full textDet här examensarbetet har utförts på Metso Paper Karlstad AB, Karlstad. Arbetet ingår som avslutande del i maskiningenjörsprogrammet vid Karlstads universitet. Metso Paper Karlstad AB tillverkar mjukpappersmaskiner vilket man har gjort i drygt hundra år. Idag är man en världsledande leverantör med kunder över hela världen, hälften av världens mjukpapper (tissue) tillverkas idag på en maskin levererad från Metso.
Produktionen vid Metso Paper Karlstad AB har under åren genomgått ett antal omorganisationer, vilka har påverkat tillverkningen. Någon större anpassning av verkstadslayouten har inte gjorts under de gångna åren vilket i sin tur har påverkat produktiviteten. Den sammanlagda verkstadsytan med tillhörande maskinpark är idag större än den för tissue aktuella produktionen är. Det finns därför ett behov av att finna nya externa kunder via utökad legotillverkning.
Uppgiften för examensarbetet var att ta fram ett förslag för en flödesorienterad produktion, med hänsyn till nuvarande volym av produktion, för en anpassning mot eventuell tillverkning av delar till vindkraft.
Resultatet visar att en ny layout för att få ett bättre flöde i dagens produktion inte kan motiveras mot vilka kostnader detta skulle medföra. Då operationstiderna är långa för produkterna i varje maskin, så är den tid och sträcka produkterna färdas mellan operationerna liten i sammanhanget.
Förslaget för tillverkning av den nya produkten som studerats i rapporten är en layout som är snabb och billig att sätta upp, och tillåter en till att börja med mindre serietillverkning. Med ytterligare lite investeringar så kan en bra produktivitet uppnås utan att nuvarande produktion blir lidande.
Ett koncept för tillverkning av den nya produkten på längre sikt togs fram, detta ska ses som ett förslag till underlag för vidareutveckling av produktionen.
This thesis has been carried out at Metso Paper Karlstad AB, Karlstad. The work is concluding part of a mechanical engineer program at Karlstad University. Metso Paper Karlstad AB manufactures tissue paper machines which they have done over a hundred years. Today they are a world leading supplier with customers all over the world, half of the world's tissue paper is currently produced on a machine supplied by Metso. The production at Metso Paper Karlstad AB has over the years undergone a number of reorganizations, which has affected the production. No major adjustment of the engineering layout has been made over the past few years which in turn has affected productivity. The total surface engineering and related machinery is now larger than that of tissue current production. There is therefore needed to find new external customers through expanded subcontracting. The task of the thesis was to develop a proposal for a flow-oriented production, with regard to the current volume of production, for an adaptation against possible manufacture of parts for wind power. The result shows that a new layout to get a better flow in the current production can not be justified against the costs that would entail. When the operation times are long for the products in each machine, so is the time and distance the products travel between operations small in the context. The proposal for the manufacture of the new product examined in this report is a layout that is quick and inexpensive to set up, and allows to start with smaller series. With a little additional investment a good productivity can be achieved without the current production is suffering. A concept for the production of the new product in the longer term was developed, this should be seen as a proposal for further development of production.
Hultenius, Syversen David, and Emanuel Eklund. "Framtagning av förslag på produktionslayout." Thesis, Tekniska Högskolan, Högskolan i Jönköping, JTH, Maskinteknik, 2017. http://urn.kb.se/resolve?urn=urn:nbn:se:hj:diva-36575.
Full textHuynh, Nhi. "Utveckling av produktionslayout av monteringsavdelning på GARO AB." Thesis, Tekniska Högskolan, Högskolan i Jönköping, JTH, Industriell organisation och produktion, 2012. http://urn.kb.se/resolve?urn=urn:nbn:se:hj:diva-20214.
Full textRagnarsson, Anders. "Framtagning av produktionslayout och produktutveckling för tillverkning av hängskenor till hyllsystem." Thesis, Högskolan Dalarna, Maskinteknik, 2013. http://urn.kb.se/resolve?urn=urn:nbn:se:du-12091.
Full textFredin, Annie, and Erica Hammar. "Funktionsorienterad kontra flödesorienterad produktionslayout : -Produktionskapacitetseffekter vid layoutförändring vid fabrikstillverkning av bostäder." Thesis, Blekinge Tekniska Högskola, Institutionen för industriell ekonomi, 2017. http://urn.kb.se/resolve?urn=urn:nbn:se:bth-14905.
Full textThe industrial companies of today are constantly striving for increased efficiency meanwhiletrying to keep down costs to increase their competitiveness (Sörqvist, 2013). In order todecrease costs and improve manufacturing layouts it is important to have a well-plannedmanufacturing layout (Chittratanawat and Noble, 1999). Two different types ofmanufacturing layouts are the functional manufacturing layout and the cell manufacturinglayout. Throughput time can be used to measure and analyse a process in a manufacturinglayout (Lin, 2008). The variables that make out the throughput time in this study are set-uptime, operating time, WIP inventory and time of transportation. The aim of this study is toanalyze how the characteristics of a production process affect which production layout ispreferable. A specific aim of this study is to analyze how throughput time is affected by achange in the manufacturing layout. In this study a case study has been made to study an existing manufacturing layout that canbe compared to a possible manufacturing layout by simulation, to analyse the effect of achange in the manufacturing layout. BoKlok was chosen as suitable company for the casestudy as the company fulfilled the two criteria of this study; a certain level of functionalmanufacturing layout and cell manufacturing layout and at least one identified bottle neck inthe production. To simulate the result of the manufacturing layout Monte Carlo-simulationwas used, as it is a useful tool for simulation of complex systems. The result of the measures in the current situation analysis shows that the WIP inventorystands for 99,14 % of the total throughput time for the chosen process and that the change inthe layout results in that the total throughput time is decreased by 99,51 %. If the WIPinventory is disregarded the throughput time of the chosen process is decreased by 45,25 %.Another positive effect shown in this study is that 380 more outer walls can be produced peryear given that the manufacturing is in a constant flow. This means an increased percentilein the production effect by 82,61 %. This study shows that the change in the layout has anegative effect on the utilization of the processing machines. The study also shows that theutilization of the machine that processes plasterboards is reduced by 96,54 %. A limitation of this study is that only one sub process in production was studied. The layoutchange can have an effect on other parts of the production that has not been studied in thisstudy. It is possible that lead times emerge in other sub processes of the production, whichwill show by analyzing the chosen process in the production. The conclusion that can be drawn from the analyzed result is that the throughput time for thechosen sub process was decreased by an increased level of cell manufacturing layoutbecause all four variables that make up the throughput time in this study were decreased.
Löfqvist, Ellen. "Värdeflödesanalys i samband med layoutförändringar : En fallstudie på Shiloh Industries." Thesis, Tekniska Högskolan, Högskolan i Jönköping, JTH, Maskinteknik, 2015. http://urn.kb.se/resolve?urn=urn:nbn:se:hj:diva-27202.
Full textNolmark, Joakim, and Martin Aronsson. "Nyckelaspekter vid utformning av produktionslayout : Key aspects in the design of production layout." Thesis, Tekniska Högskolan, Högskolan i Jönköping, JTH, Industriell organisation och produktion, 2013. http://urn.kb.se/resolve?urn=urn:nbn:se:hj:diva-21349.
Full textGasslander, Lina, and Nasrin Posae. "Analys av kapacitetpotential och produktionslayout i robotcell : Examensarbete utfört på Swepart Transmission AB." Thesis, Högskolan i Jönköping, Tekniska Högskolan, 2019. http://urn.kb.se/resolve?urn=urn:nbn:se:hj:diva-45308.
Full textDetta examensarbete är utfört på Swepart transmission AB i Liatorp. Företaget är ett tillverkande företag av transmissionslösningar. Allt efter som kundkrav och tillverkningsvolymer ökar innebär det att högre krav ställs på produktionen. Syftet med arbetet har därför varit att höja OEE-talet och lönsamheten i en av företagets produktionsceller, med tillhörande svarv. Studien är begränsad till de tre vanligaste artiklarna som går i cell 1: 433, 401 och 296. Frågeställningens syfte är att identifiera kapacitetspotentialen i cellen, men även att analysera vilka åtgärder som kan göras för att höja kapaciteten. För att svara på frågeställningarna har observationer av produktionen gjorts och insamlade data från Axxos har använts. Produktionslayouten har noga studerats för att få reda på vilka faktorer som påverkar utnyttjandegraden i cellen. Med denna data har OEE-talet räknats ut för cellen, både för hela cellen och för de olika artiklarna. Även tidsaxlar över robotens och maskinernas cykeltider i cellen har gjorts för att se vilka tidsförluster som sker i cellen. Resultatet visar att de största kapacitetsförlusterna ligger i anläggningsutnyttjandet för två av artiklarna, där svarven är den styrande faktorn. Tidsaxeln för den sista artikeln visar dock att cykeltiden enkelt kan minskas genom att öka hastigheten för fräsen. Det finns också stora förluster som kan förbättras i tillgängligheten, där personalbrist utgör en stor del av stoppen. En annan viktig del att ta i beaktning är att arbeta med svarven enligt flaskhalsteori. Detta innebär att se till att svarven alltid är tillgänglig för produktion. En viktig men enkel åtgärd är att öka tillverkningstakten för artikeln 433. Detta skulle innebära att den möjliga körtiden för svarven hade ökats, och därmed för hela cellen på grund av att svarven är en flaskhals. En annan viktig åtgärd är att se över sättet de arbetar med deras OEE-tal i Axxos, då de enligt det nuvarande arbetssättet döljer viktiga och stora förluster. Det är också viktigt att se till att stoppen och cykeltider i svarven också registrerar i Axxos. Eftersom svarven är en flaskhals är den det viktigaste att hålla koll på. Arbetet har visat att det finns stor kapacitetspotential i cellen, men att det är till stor del begränsat av svarvens långsamma produktionstakt. Det är därför viktigt att behandla svarven som en flaskhals och att eliminera de faktorer som gör att svarven inte kan producera under planerad produktionstid.
Tigér, Rickard. "Masterplan för svetsavdelning : Förstudie." Thesis, Karlstad University, Faculty of Technology and Science, 2007. http://urn.kb.se/resolve?urn=urn:nbn:se:kau:diva-1124.
Full textDet här examensprojektet har utförts på Volvo CE, Hauler & Loader Division, Arvika. Projektet ingick som ett avslutande moment i maskiningenjörsprogrammet vid
Karlstads universitet. Volvo i Arvika tillverkar hjullastare vilket man har gjort sedan mitten av 60-talet. Fabriken har idag ca 1150 anställda som tillsammans levererar över 6000 hjullastare per år.
Produktionsvolymen i Arvikafabriken ökar allt mer vilket medför att ett behov av många investeringar för att klara denna volymtillväxt har uppstått. Den huvudsakliga tillverkningen på svetsavdelningen består av fram- och bakramstillverkning. Problemet är att tillverkningen är trångbodd och att vissa ramflöden är i behov av förbättring.
Projektets uppgift bestod av att undersöka möjligheter och konsekvenser av att installera två nya svetsrobotar i befintlig byggnad och på sikt skapa en separat framram resp. bakramsverkstad. Arbetets huvudmål är att få höjd kapacitet i svetstillverkningen av ramar.
Resultatet av projektet visar att möjlighet finns att installera två nya svetsrobotar i de befintliga lokalerna, en robot för framramsvetsning samt en för bakramsvetsning. Ramtillverkningen är separerad med en verkstad för framramar i byggnad 1 samt en verkstad för bakramar i byggnad 2. (se bilaga 8, 50 och 51).
Flera flöden har förbättrats genom att arbetsstationer har flyttats vilket i sin tur har inneburit mindre transportbehov i verkstaden. Uppdelningen av tillverkningen av fram- och bakramar har lett till ett tydligare flöde. De nya flödena syns i produktionsscheman och layoutflödesscheman (bilaga 52-69).
Kostnaden för att genomföra projektet uppskattas till omkring 26 milj. kr.
Ett ytterligare koncept, ”koncept 2”, har utretts som innehåller en större utbyggnad av bakramsverkstaden för att klara en större expansion av tillverkningen. Det kommer att kosta ca 38 milj. kr.
This master’s thesis was performed at Volvo CE, Hauler & Loader Division, Arvika. The project was a part of the Mechanical engineering program at the University of Karlstad. Volvo in Arvika is manufacturing wheelloaders and has done that since back in the sixties. Today they are about 1150 employees who together deliver over 6000 loaders a year.
The production volume at the Arvika-plant is increasing and therefore there is a need for new investments in the plant. At the plant’s welding department the main manufacturing is the welding of front- and rear frames. The problem is that the manufacturing is cabined and some of the frame flows is in need of improvement.
The task of the project was to examine the possibilities and identify the consequences of installing two new welding robots in the existing building and create separate front and rear frame workshops. The main reason for that is to reach a higher capacity in the manufacturing of frames.
The result of the project shows that there are possibilities to install two new welding robots in the existing building, one for front frame welding and one for rear frame welding. The frame manufacturing has been separated with a workshop for front frames in building 1 and a workshop for rear frames in building 2 (see appendices 8, 50 and 51).
Several flows has been improved due to workstations have been moved resulting in less need of transports in the workshop. The separation of front and rear frame manufacturing causes the flow of frames to be more clear and visible. The new flows are shown in production diagrams and layout-flow diagrams (see appendices 52-69).
The cost for going through with the project is estimated to around 26 million sek.
An additional concept, “concept 2”, has been investigated which contains an extended workshop for rear frames to manage a larger expansion of the production. It will cost around 38 million sek.