To see the other types of publications on this topic, follow the link: Project costs and scheduling.

Dissertations / Theses on the topic 'Project costs and scheduling'

Create a spot-on reference in APA, MLA, Chicago, Harvard, and other styles

Select a source type:

Consult the top 50 dissertations / theses for your research on the topic 'Project costs and scheduling.'

Next to every source in the list of references, there is an 'Add to bibliography' button. Press on it, and we will generate automatically the bibliographic reference to the chosen work in the citation style you need: APA, MLA, Harvard, Chicago, Vancouver, etc.

You can also download the full text of the academic publication as pdf and read online its abstract whenever available in the metadata.

Browse dissertations / theses on a wide variety of disciplines and organise your bibliography correctly.

1

Kanik, Yusuf. "Software Project Scheduling, Software Project Performance Measurement And Control." Master's thesis, METU, 2005. http://etd.lib.metu.edu.tr/upload/12606362/index.pdf.

Full text
Abstract:
This thesis is about software project scheduling and use of earned value method on software projects. As a result of the study, a solution for software project scheduling problems is proposed. A mathematical formulation, developed using integer programming method, is at the heart of the solution. Objective of the formulation is to minimize the development costs consisting of direct labor cost, indirect costs and probable penalty costs. The formulation takes the capability and compatibility variances among resources into account whereas contemporary approaches mostly focus on resource availabi
APA, Harvard, Vancouver, ISO, and other styles
2

Grose, Roger T. "Cost-constrained project scheduling with task durations and costs that may increase over time demonstrated with the U.S. Army future combat systems /." Thesis, View thesis via NPS View thesis via DTIC, 2004. http://handle.dtic.mil/100.2/ADA424957.

Full text
Abstract:
Thesis (M.S. in Operations Research)--Naval Postgraduate School, 2004.<br>Title from title screen (viewed June 28, 2005). "June 2004." Includes bibliographical references (p. 59-61). Also issued in paper format.
APA, Harvard, Vancouver, ISO, and other styles
3

Grose, Roger. "Cost-constrained project scheduling with task durations and costs that may increase over time : demonstrated with the U.S. Army future combat systems /." Monterey, Calif. : Springfield, Va. : Naval Postgraduate School ; Available from National Technical Information Service, 2004. http://library.nps.navy.mil/uhtbin/hyperion/04Jun%5FGrose.pdf.

Full text
APA, Harvard, Vancouver, ISO, and other styles
4

Yoo, Wi Sung. "An information-based decision making framework for evaluating and forecasting a project cost and completion date." Columbus, Ohio : Ohio State University, 2007. http://rave.ohiolink.edu/etdc/view?acc%5Fnum=osu1186596671.

Full text
APA, Harvard, Vancouver, ISO, and other styles
5

Hafizoglu, Ahmet Baykal. "Discrete Time/cost Trade-off Problem In Project Scheduling." Master's thesis, METU, 2007. http://etd.lib.metu.edu.tr/upload/12608469/index.pdf.

Full text
Abstract:
In project scheduling, the activity durations can often be reduced by dedicating additional resources. Time/Cost Trade-off Problem considers the compromise between the total cost and project duration. The discrete version of the problem assumes a number of time/cost pairs, so called modes, and selects a mode for each activity. In this thesis we consider the Discrete Time/Cost Trade-off Problem. We first study the Deadline Problem, i.e., the problem of minimizing total cost subject to a deadline on project duration. To solve the Deadline Problem, we propose several optimization and approximatio
APA, Harvard, Vancouver, ISO, and other styles
6

Zhang, Dalu. "Project Time and Cost Control Using Building Information Modeling." Thesis, North Dakota State University, 2013. https://hdl.handle.net/10365/26538.

Full text
Abstract:
Although the construction industry has been evolving for centuries and researchers have been seeking innovative solutions for decades, diverse challenges still exist in making the construction process faster, safer, cheaper and more accurate. It is believed that Building Information Modeling (BIM) can lead to greater efficiency through the incremental collaboration. The data in BIM system is extremely useful and can be generated to optimize the project delivery processes. However, since BIM increases the project design cost and requires a big learning curve, project participants are concerned
APA, Harvard, Vancouver, ISO, and other styles
7

Dáňa, Tomáš. "Plánování stavební zakázky zhotovitelem." Master's thesis, Vysoké učení technické v Brně. Fakulta stavební, 2016. http://www.nusl.cz/ntk/nusl-240467.

Full text
Abstract:
The diploma thesis deals with the process of planning the costs of a contract for construction. The thesis describes the pricing, contract for construction, construction time models, and allocation of costs during the construction. It introduces a particular contract for construction, which is analysed mainly with regard to the allocation of costs during the construction. The thesis introduces also alternative solutions for the allocation of costs during the construction. The purpose of the thesis is to compare the alternative solutions with the reality, and analyse the allocation of costs dur
APA, Harvard, Vancouver, ISO, and other styles
8

Kirbiyik, Selin. "Discrete Time/cost Trade-off Project Scheduling With A Nonrenewable Resource." Master's thesis, METU, 2009. http://etd.lib.metu.edu.tr/upload/3/12611264/index.pdf.

Full text
Abstract:
In this thesis, we consider a discrete time/cost trade-off problem with a single nonrenewable resource. We assume the resource is released at some prespecified time points and at some prespecified quantities. We also assume that the costs due to the activities are incurred at their completions. Our aim is to minimize total project completion time. We formulate the problem as a pure integer programming model. We show that the problem is strongly NP-hard. We find lower bounds by pure linear programming and mixed integer linear programming relaxations of the model. We develop three heuristic proc
APA, Harvard, Vancouver, ISO, and other styles
9

Gonzalez, Julian Santiago Sr. "Using Fuzzy Mathematical Models for construction project scheduling with time, cost and material restrictions." Ohio University / OhioLINK, 2007. http://rave.ohiolink.edu/etdc/view?acc_num=ohiou1180987976.

Full text
APA, Harvard, Vancouver, ISO, and other styles
10

Bettemir, Onder Halis. "Optimization Of Time-cost-resource Trade-off Problems In Project Scheduling Using Meta-heuristic Algorithms." Phd thesis, METU, 2009. http://etd.lib.metu.edu.tr/upload/12611971/index.pdf.

Full text
Abstract:
In this thesis, meta-heuristic algorithms are developed to obtain optimum or near optimum solutions for the time-cost-resource trade-off and resource leveling problems in project scheduling. Time cost trade-off, resource leveling, single-mode resource constrained project scheduling, multi-mode resource constrained project scheduling and resource constrained time cost trade-off problems are analyzed. Genetic algorithm simulated annealing, quantum simulated annealing, memetic algorithm, variable neighborhood search, particle swarm optimization, ant colony optimization and electromagnetic scatt
APA, Harvard, Vancouver, ISO, and other styles
11

Petráněk, Marian. "Plánování a realizace stavební zakázky." Master's thesis, Vysoké učení technické v Brně. Fakulta stavební, 2017. http://www.nusl.cz/ntk/nusl-265560.

Full text
Abstract:
This study dissertation deals with the planning and implementation of construction projects. The theoretical part gives the definition of project management structures, describes the compilation prices of construction work, time models of construction and construction tender documents. In the practical part is the description of the selected building sites, then the description deals with the alternative evalualing application of construction provided by budget program and planning documents. The aim is to evaluate the difference between the actual and alternative progress construction.
APA, Harvard, Vancouver, ISO, and other styles
12

Su, Connie Tenin. "Heurísticas construtivas para o problema de programação de projetos com custo de disponibilidade de recursos e custo de penalidade por atraso no término do projeto." Universidade de São Paulo, 2017. http://www.teses.usp.br/teses/disponiveis/3/3148/tde-27092017-105107/.

Full text
Abstract:
Este trabalho propõe uma heurística construtiva determinística e uma heurística construtiva probabilística para resolver o problema de programação de projetos com custo de disponibilidade de recursos e custo de penalidade por atraso no término do projeto (RACPT - Resource Availability Cost Problem with Tardiness). Os algoritmos combinam a flexibilidade da atividade com a flexibilidade do recurso para selecionar a próxima atividade a ser programada. A data de início de uma atividade é a data mais cedo em que sua execução não gera o maior pico de utilização dos recursos ou a data mais cedo na qu
APA, Harvard, Vancouver, ISO, and other styles
13

Ertem, Mustafa Alp. "Optimal Scope Of Work For International Integrated Systems." Master's thesis, METU, 2005. http://etd.lib.metu.edu.tr/upload/12606209/index.pdf.

Full text
Abstract:
This study develops a systems integration project scheduling model which identifies the assignment of activity responsibilities that minimizes expected project implementation cost, considering the project risk. Assignment of resources to the individual jobs comprising the project is a persistent problem in project management. Mostly, skilled labor is an essential resource and both the time and the cost incurred to perform a job depend on the resource to which job is assigned. A systems integration project includes implementation issues in the areas of shipping, installation, and commissionin
APA, Harvard, Vancouver, ISO, and other styles
14

Avendaño, Platero Claudia Del Pilar, and Avellaneda David Eduardo Dioses. "Implementación de un sistema de gestión a través del método de resultado operativo en la obra: “Camino Vecinal Salitral – Huancabamba, tramo I: DV. R2A Salitral Bigote”." Bachelor's thesis, Universidad Ricardo Palma, 2015. http://cybertesis.urp.edu.pe/handle/urp/1250.

Full text
Abstract:
Esta tesis presenta un enfoque cuantitativo, explicativo y descriptivo, aporta un sistema de gestión de costos mediante la metodología del Resultado Operativo y las diferentes bondades que presenta para incrementar los niveles de control y planificación de obra. En el desarrollo de una obra existen diferentes factores que afectan a la utilidad planificada, como atrasos en el cronograma, derroche de insumos, compras excesivas y otros que a la larga pueden terminar con dicha utilidad. Por este motivo contar con un sistema de control se vuelve vital para ejecutar una obra. El objetivo de esta te
APA, Harvard, Vancouver, ISO, and other styles
15

Kiciroglu, Ahmet. "Scheduling With Discounted Costs." Master's thesis, METU, 2003. http://etd.lib.metu.edu.tr/upload/1208321/index.pdf.

Full text
Abstract:
Majority of the studies in the scheduling literature is devoted to time based performance measures. In this thesis, we develop a model that considers monetary issues in single machine scheduling environments. We assume all the jobs should be completed by a common due date. An early revenue is earned if the completion time is before or on the due date, and a tardy revenue is gained if the job is completed after the due date. We consider restricted and unrestricted due date versions of the problem. Our objective is the maximization of the net present value of all revenues. We first investigate
APA, Harvard, Vancouver, ISO, and other styles
16

Paulus, J. J. "Online scheduling & project scheduling." Enschede : University of Twente [Host], 2009. http://doc.utwente.nl/60453.

Full text
APA, Harvard, Vancouver, ISO, and other styles
17

Evans, John. "Project scheduling tool." Monterey, Calif. : Springfield, Va. : Naval Postgraduate School ; Available from National Technical Information Service, 1997. http://handle.dtic.mil/100.2/ADA341531.

Full text
Abstract:
Thesis (M.S. in Software Engineering) Naval Postgraduate School, September 1997.<br>"September 1997." Thesis advisor(s): Valdis Berzins. Includes bibliographical references (p. 245). Also available online.
APA, Harvard, Vancouver, ISO, and other styles
18

Radi, Kamal Mohammed A. R. "Scheduling algorithm including load curtailment costs." Thesis, Queen's University Belfast, 1990. http://ethos.bl.uk/OrderDetails.do?uin=uk.bl.ethos.335465.

Full text
APA, Harvard, Vancouver, ISO, and other styles
19

Ponz, Tienda José Luis. "GRCPSP Robusto basado en Producción para Proyectos de Edificación y Construcción." Doctoral thesis, Editorial Universitat Politècnica de València, 2010. http://hdl.handle.net/10251/8540.

Full text
Abstract:
Esta Tesis doctoral representa una nueva formulación del problema del GRCPSP (Generalized Resource-Constrained Project Scheduling Problem) mediante grafos PDM (Precedence Diagramming Method) con fragmentación en entornos realistas, donde las tareas son diferenciadas entre productivas y no productivas y las dependencias entre ellas no se limitan a los ya clásicos valores de dependencia, sino que se incorpora un nuevo concepto de relación de producción, apareciendo relaciones basadas en un cierto nivel de producción necesario de otra tarea para poder comenzar, o cierta producción que quedará pen
APA, Harvard, Vancouver, ISO, and other styles
20

Ghodsi, Reza. "Project scheduling using simulation." Thesis, National Library of Canada = Bibliothèque nationale du Canada, 1998. http://www.collectionscanada.ca/obj/s4/f2/dsk2/tape17/PQDD_0001/MQ35014.pdf.

Full text
APA, Harvard, Vancouver, ISO, and other styles
21

Stork, Frederik. "Stochastic resource-constrained project scheduling." [S.l.] : [s.n.], 2001. http://deposit.ddb.de/cgi-bin/dokserv?idn=962360902.

Full text
APA, Harvard, Vancouver, ISO, and other styles
22

Smith, Tristan. "Window-based project scheduling algorithms /." view abstract or download file of text, 2004. http://wwwlib.umi.com/cr/uoregon/fullcit?p3153800.

Full text
Abstract:
Thesis (Ph. D.)--University of Oregon, 2004.<br>Typescript. Includes vita and abstract. Includes bibliographical references (leaves 189-198). Also available for download via the World Wide Web; free to University of Oregon users.
APA, Harvard, Vancouver, ISO, and other styles
23

Khamooshi, H. "Heuristic network-based project scheduling : dynamic priority scheduling method; DPSM." Thesis, Lancaster University, 1994. http://ethos.bl.uk/OrderDetails.do?uin=uk.bl.ethos.267918.

Full text
APA, Harvard, Vancouver, ISO, and other styles
24

O'Keeffe, Marilyn. "The scheduling of queues with non-linear holding costs." Thesis, University of Newcastle Upon Tyne, 2003. http://hdl.handle.net/10443/1001.

Full text
Abstract:
We consider multi-class, single server queueing systems and we seek to devise policies for server allocation which minimise some long-term cost function. In most of the work to date on the optimal dynamic control of such systems, holding cost rates are assumed to be linear in the number of customers present. Such assumptions have been argued to be unrealistic and thus inappropriate: see Van Meighem (1995). With pure priority policies, which often emerge from analyses based on linear holding cost assumptions, there is often the problem that service offered to lower priority traffic is unaccepta
APA, Harvard, Vancouver, ISO, and other styles
25

Saadoun, Tahar. "Agricultural machinery selection and scheduling of farm operations." Thesis, University of Edinburgh, 1989. http://hdl.handle.net/1842/27322.

Full text
Abstract:
The procedure of calculating annual machinery ownership costs from the discounted cash flows of the mortgaged capital cost, the repair and insurance charges and the resale income is extended to include the effect of loan rate and loan period on interest charges, the effect of capital allowances taking account of the actual balancing charges at the end of the period of ownership, and the effect of tax relief on the interest charges, repair costs and insurance premiums. The concept of marginal holding cost is applied to determine the optimum ownership period. The selection of tractor- plough com
APA, Harvard, Vancouver, ISO, and other styles
26

Pan, Hongqi 1961. "Fuzzy multi-mode resource-constrained project scheduling." Monash University, School of Business Systems, 2003. http://arrow.monash.edu.au/hdl/1959.1/5735.

Full text
APA, Harvard, Vancouver, ISO, and other styles
27

Eygelaar, Anton Burger. "Resource constrained step scheduling of project tasks." Thesis, Stellenbosch : University of Stellenbosch, 2008. http://hdl.handle.net/10019.1/4494.

Full text
Abstract:
Thesis (MScEng (Civil Engineering))--University of Stellenbosch, 2008.<br>Thesis presented in partial fulfilment of the requirements for the degree of Master of Science in Civil Engineering at the University of Stellenbosch.<br>ENGLISH ABSTRACT: The logical scheduling of activities in an engineering project currently relies heavily on the experience and intuition of the persons responsible for the schedule. In large projects the complexity of the schedule far exceeds the capacity of human intuition, and systematic techniques are required to compute a consistent sequence of activities. In
APA, Harvard, Vancouver, ISO, and other styles
28

Coffin, Mark Anthony. "R & D project selection and scheduling." Diss., This resource online, 1992. http://scholar.lib.vt.edu/theses/available/etd-06062008-165610/.

Full text
APA, Harvard, Vancouver, ISO, and other styles
29

Bauer, Mareike. "Resource-constrained project scheduling models and extensions." Hamburg Kovač, 2009. http://d-nb.info/999491407/04.

Full text
APA, Harvard, Vancouver, ISO, and other styles
30

Schulz, Andreas S., Rolf H. Möhring, Frederik Stork, and Marc Uetz. "A Note on Scheduling Problems with Irregular Starting Time Costs." Massachusetts Institute of Technology, Operations Research Center, 2000. http://hdl.handle.net/1721.1/5402.

Full text
Abstract:
In [9], Maniezzo and Mingozzi study a project scheduling problem with irregular starting time costs. Starting from the assumption that its computational complexity status is open, they develop a branch-and-bound procedure, and identify special cases that are solvable in polynomial time. In this note, we review three previously established, related results which show that the general problem is solvable in polynomial time.
APA, Harvard, Vancouver, ISO, and other styles
31

Wang, Xinyue. "Optimizing customer satisfaction and energy costs for flow shop scheduling." Electronic Thesis or Diss., université Paris-Saclay, 2024. https://www.biblio.univ-evry.fr/theses/2024/interne/2024UPASG080.pdf.

Full text
Abstract:
Les problèmes de planification liés aux tarifs multi-agents et au temps d'utilisation de l'électricité sont devenus des sujets de recherche d'actualité pour améliorer la satisfaction des clients et équilibrer l'offre et la demande en électricité. Les existant travaux révèlent que : 1) la plupart des problèmes d'ordonnancement se concentrent sur des configurations bi-agents ; 2) la plupart des recherches sur l'ordonnancement dans le cadre des tarifs horaires limitent aux machines uniques ou parallèles ou aux ateliers simplifiés ; et 3) très peu d'études prennent en compte des hypothèses réalist
APA, Harvard, Vancouver, ISO, and other styles
32

Mynyk, John. "Information technology programming standards and annual project maintenance costs." Thesis, University of Phoenix, 2014. http://pqdtopen.proquest.com/#viewpdf?dispub=3578624.

Full text
Abstract:
<p> Organizations that depend on the use of IT in their business models must maintain their systems and keep their systems current to survive (Filipek, 2008; Kulkarni, Kumar, Mookerjee, &amp; Sethi, 2009; Unterkalmsteiner et al., 2012). As most IT departments allocate as much as 80% of their budget to maintain stability while leaving only the other 20% to allow improvements (Telea et al., 2010), high cost of stability may be a reason many IT organizations cannot afford efficient staffing and even jeopardize the existence of the organization (Filipek, 2008; Talib, Abdullah, Atan, &amp; Murad, 2
APA, Harvard, Vancouver, ISO, and other styles
33

Sharma, Anamika. "An interactive visual approach to construction project scheduling." [Milwaukee, Wis.] : e-Publications@Marquette, 2009. http://epublications.marquette.edu/theses_open/14.

Full text
APA, Harvard, Vancouver, ISO, and other styles
34

Kaehkoenen, Kalle Esa Eelis. "Modelling activity dependencies for building construction project scheduling." Thesis, University of Reading, 1993. http://ethos.bl.uk/OrderDetails.do?uin=uk.bl.ethos.336061.

Full text
APA, Harvard, Vancouver, ISO, and other styles
35

Serra, Thiago. "Essays on Postoptimality, Lift-and-Project, and Scheduling." Research Showcase @ CMU, 2018. http://repository.cmu.edu/dissertations/1195.

Full text
Abstract:
This thesis offers methodological and computational contributions to integer and mixed-integer linear programming. The first area is postoptimality, in which we explore how decision diagrams can be used to compactly store and query near-optimal solutions. Our contribution is on characterizing a particular form of decision diagram relaxation, the sound decision diagram, where solutions worse than a given threshold are tolerated in order to obtain smaller decision diagrams. We introduce an operation that we denote as \sound reduction" that, if applied a sufficient number of times, leads to one a
APA, Harvard, Vancouver, ISO, and other styles
36

Steeneck, Daniel Waymouth. "Project Scheduling in the Presence of Productivity Functions." Thesis, Virginia Tech, 2009. http://hdl.handle.net/10919/34169.

Full text
Abstract:
The need for good quality project scheduling methods arises in many fields such as construction, manufacturing, and military operations, among others. In this thesis, we develop a solution methodology which determines the sequence in which the activities of the project must be processed and the resource allocation to each activity in the project to minimize the makespan of the project. We consider projects whose activities' durations are defined by convex, non-increasing time-resource trade-off functions and whose activities are not pre-emptable (i.e., once some amount of resource has been a
APA, Harvard, Vancouver, ISO, and other styles
37

Ticktin, Jordan M. "Resource-Constrained Project Scheduling with Autonomous Learning Effects." DigitalCommons@CalPoly, 2019. https://digitalcommons.calpoly.edu/theses/2103.

Full text
Abstract:
It's commonly assumed that experience leads to efficiency, yet this is largely unaccounted for in resource-constrained project scheduling. This thesis considers the idea that learning effects could allow selected activities to be completed within reduced time, if they're scheduled after activities where workers learn relevant skills. This paper computationally explores the effect of this autonomous, intra-project learning on optimal makespan and problem difficulty. A learning extension is proposed to the standard RCPSP scheduling problem. Multiple parameters are considered, including project s
APA, Harvard, Vancouver, ISO, and other styles
38

Klerides, Evelina. "Algorithms for deterministic and stochastic project scheduling problems." Thesis, Imperial College London, 2010. http://hdl.handle.net/10044/1/5537.

Full text
Abstract:
This thesis develops modelling and algorithmic approaches for two Project Scheduling Problems. We first consider the Discrete Time-Cost Tradeoff Problem (DTCTP) which involves determining an execution mode for each project activity associated to a time-cost pair so that either deadline or budget restrictions are satisfied. A new, path-based formulation is proposed which is subsequently solved using an exact cutting plane algorithm enhanced with speed-up techniques. Extensive computational results demonstrate that the algorithm can optimally solve some of the hardest and largest instances in th
APA, Harvard, Vancouver, ISO, and other styles
39

Tai, Chia-Hung C. "A stochastic project scheduling problem with resource constraints /." free to MU campus, to others for purchase, 1997. http://wwwlib.umi.com/cr/mo/fullcit?p9842569.

Full text
APA, Harvard, Vancouver, ISO, and other styles
40

McKendall, Alan R. "The space and resource constrained project scheduling problem /." free to MU campus, to others for purchase, 1999. http://wwwlib.umi.com/cr/mo/fullcit?p9953882.

Full text
APA, Harvard, Vancouver, ISO, and other styles
41

Magnanti, Thomas L., and Rita Vachani. "A Strong Cutting Plane Algorithm for Production Scheduling with Changeover Costs." Massachusetts Institute of Technology, Operations Research Center, 1987. http://hdl.handle.net/1721.1/5192.

Full text
Abstract:
Changeover costs (and times) are central to numerous manufacturing operations. These costs arise whenever work centers capable of processing only one product at a time switch from the manufacture of one product to another. Although many researchers have contributed to the solution of scheduling problems that include changeover costs, due to the problem's combinatorial explosiveness, optimization-based methods have met with limited success. In this paper, we develop and apply polyhedral methods from integer programming for a dynamic version of the problem. Computational tests with problems cont
APA, Harvard, Vancouver, ISO, and other styles
42

Jiang, Qiang. "A genetic algorithm for multiple resource-constrained project scheduling." School of Economics and Information Systems - Faculty of Commerce, 2004. http://ro.uow.edu.au/theses/256.

Full text
Abstract:
The aim of this paper is to present a new genetic algorithm approach for large scale multiple resource-constrained project-scheduling problems. This research area is very common in industry especially when a set of activities needs to be finished as soon as possible subject to two sets of constraints, (?) Precedence constraints, and (?) Resource constraints. The literature reveals that previous researches have developed numerous scheduling methods and techniques to overcome the complex nature of this problem. However, there are still no promising methods that guarantee optimal solutions as wel
APA, Harvard, Vancouver, ISO, and other styles
43

Khodakarami, Vahid. "Applying Bayesian networks to model uncertainty in project scheduling." Thesis, Queen Mary, University of London, 2009. http://qmro.qmul.ac.uk/xmlui/handle/123456789/578.

Full text
Abstract:
Risk Management has become an important part of Project Management. In spite of numerous advances in the field of Project Risk Management (PRM), handling uncertainty in complex projects still remains a challenge. An important component of Project Risk Management (PRM) is risk analysis, which attempts to measure risk and its impact on different project parameters such as time, cost and quality. By highlighting the trade-off between project parameters, the thesis concentrates on project time management under uncertainty. The earliest research incorporating uncertainty/risk in projects started in
APA, Harvard, Vancouver, ISO, and other styles
44

Montoya, casas Carlos Eduardo. "New methods for the multi-skills project scheduling problem." Thesis, Nantes, Ecole des Mines, 2012. http://www.theses.fr/2012EMNA0077/document.

Full text
Abstract:
Dans cette Thèse, nous avons introduit plusieurs procédures pour résoudre le problème d’ordonnancement du projet multi-compétences (MSPSP). L’objectif est de trouver un ordonnancement qui minimise le temps de terminaison (makespan) d’un projet, composé d’un ensemble d’activités. Les relations de précédences et les contraintes de ressource seront considérées. Dans ce problème, les ressources sont des membres du personnel qui maîtrisent plusieurs compétences. Ainsi, un certain nombre de travailleurs doit être affecté pour utiliser chaque compétence requise par une activité. Par ailleurs, nous ac
APA, Harvard, Vancouver, ISO, and other styles
45

Archer, Sandra. "STOCHASTIC RESOURCE CONSTRAINED PROJECT SCHEDULING WITH STOCHASTIC TASK INSERTION PROBLEMS." Doctoral diss., University of Central Florida, 2008. http://digital.library.ucf.edu/cdm/ref/collection/ETD/id/3520.

Full text
Abstract:
The area of focus for this research is the Stochastic Resource Constrained Project Scheduling Problem (SRCPSP) with Stochastic Task Insertion (STI). The STI problem is a specific form of the SRCPSP, which may be considered to be a cross between two types of problems in the general form: the Stochastic Project Scheduling Problem, and the Resource Constrained Project Scheduling Problem. The stochastic nature of this problem is in the occurrence/non-occurrence of tasks with deterministic duration. Researchers Selim (2002) and Grey (2007) laid the groundwork for the research on this problem. Selim
APA, Harvard, Vancouver, ISO, and other styles
46

Bibiks, Kirils. "Scheduling and Resource Efficiency Balancing. Discrete Species Conserving Cuckoo Search for Scheduling in an Uncertain Execution Environment." Thesis, University of Bradford, 2017. http://hdl.handle.net/10454/16712.

Full text
Abstract:
The main goal of a scheduling process is to decide when and how to execute each of the project's activities. Despite large variety of researched scheduling problems, the majority of them can be described as generalisations of the resource-constrained project scheduling problem (RCPSP). Because of wide applicability and challenging difficulty, RCPSP has attracted vast amount of attention in the research community and great variety of heuristics have been adapted for solving it. Even though these heuristics are structurally different and operate according to diverse principles, they are designed
APA, Harvard, Vancouver, ISO, and other styles
47

Grey, Jennifer. "BUFFER TECHNIQUES FOR STOCHASTIC RESOURCE CONSTRAINED PROJECT SCHEDULING WITH STOCHASTIC TASK INSERTIONS PROBLEMS." Doctoral diss., University of Central Florida, 2007. http://digital.library.ucf.edu/cdm/ref/collection/ETD/id/2678.

Full text
Abstract:
Project managers are faced with the challenging task of managing an environment filled with uncertainties that may lead to multiple disruptions during project execution. In particular, they are frequently confronted with planning for routine and non-routine unplanned work: known, identified, tasks that may or may not occur depending upon various, often unpredictable, factors. This problem is known as the stochastic task insertion problem, where tasks of deterministic duration occur stochastically. Traditionally, project managers may include an extra margin within deterministic task times or an
APA, Harvard, Vancouver, ISO, and other styles
48

Jheng, Ru-Lan, and 鄭如嵐. "Bi-objective resource-constrained project scheduling with robustness and resource availability cost criteria." Thesis, 2010. http://ndltd.ncl.edu.tw/handle/37495541494861329701.

Full text
Abstract:
碩士<br>國立屏東科技大學<br>工業管理系所<br>98<br>The main purpose of this study is to explore a bi-objective resource-constrained project scheduling problem with robustness and resource availability cost criteria. We propose a mixed integer nonlinear programming (MINLP) model and a particle swarm optimization (PSO) algorithm to solve the problem. The performance of the proposed PSO algorithm is manifested by comparing it with the MINLP model and the existing rules. The results indicate that the solution obtained by the PSO algorithm is very close to the optimal solution. Moreover, the results indicate that t
APA, Harvard, Vancouver, ISO, and other styles
49

Hau, Chan, and 詹昊. "Applying Building information Modeling (BIM) in Project Scheduling and cost Estimates - A Case Study." Thesis, 2014. http://ndltd.ncl.edu.tw/handle/k4j82q.

Full text
Abstract:
碩士<br>國立高雄應用科技大學<br>土木工程與防災科技研究所<br>102<br>Cost control plays a significant role in the construction life cycle. Currently, the construction industry is still using the traditional 2D drawings to conduct the quantity estimates. However, this process is often inefficient and time consuming. Moreover, it is very likely to have inaccurate estimates or omission in the BOQ. On the contrary, “Building Information Modeling” is a 3D model technique which contains different building information in different fields. The information includes materials, quantities, prices, and others. It can also achieve
APA, Harvard, Vancouver, ISO, and other styles
50

Liu, Yu Chiang, and 劉昱江. "The Application of Genetic Algorithms in the Repetitive Project Scheduling ; the Time-Cost Tradeoff Problem." Thesis, 2000. http://ndltd.ncl.edu.tw/handle/48312314457515950343.

Full text
Abstract:
碩士<br>朝陽科技大學<br>營建工程系碩士班<br>89<br>Construction time-cost trade-off analysis is an important process of the construction project planning. Construction engineers can use the floats among the activities to lower the project cost without impacting the overall project duration. Among the construction projects, such as high-rise building, some activities are performed repeatedly and have a great impact on the overall project duration and cost. These repetitive activities play more important role in the time-cost trade-off analysis. However, to perform the construction time-cost trade-off analysis f
APA, Harvard, Vancouver, ISO, and other styles
We offer discounts on all premium plans for authors whose works are included in thematic literature selections. Contact us to get a unique promo code!