Academic literature on the topic 'Project managment'

Create a spot-on reference in APA, MLA, Chicago, Harvard, and other styles

Select a source type:

Consult the lists of relevant articles, books, theses, conference reports, and other scholarly sources on the topic 'Project managment.'

Next to every source in the list of references, there is an 'Add to bibliography' button. Press on it, and we will generate automatically the bibliographic reference to the chosen work in the citation style you need: APA, MLA, Harvard, Chicago, Vancouver, etc.

You can also download the full text of the academic publication as pdf and read online its abstract whenever available in the metadata.

Journal articles on the topic "Project managment"

1

Vaandering, Eric. "Transitioning CMS to Rucio Data Managment." EPJ Web of Conferences 245 (2020): 04033. http://dx.doi.org/10.1051/epjconf/202024504033.

Full text
Abstract:
Following a thorough review in 2018, the CMS experiment at the CERN LHC decided to adopt Rucio as its new data management system. Rucio is emerging as a community software project and will replace an aging CMSonly system before the start-up of LHC Run 3 in 2021. Rucio was chosen after an evaluation determined that Rucio could meet the technical and scale needs of CMS. The data management system for CMS needs to manage the current data sample of approximately 200 PB of data with 1 PB of transfers per day. The data management system must also have a development path suitable for LHC Run 4 (2026) data rates, which are expected to be 50 times larger. This contribution details the ongoing CMS adoption process as we replace our legacy system with Rucio, focusing on the challenges of integrating Rucio into an established set of experimental tools and procedures. This will include the migration of metadata, the construction of interfaces to the rest of the CMS computing tools, scale tests, operations, monitoring, and the plan to gradually turn over primary responsibility for the management of data to Rucio. A description of CMS user data management with Rucio will also be provided.
APA, Harvard, Vancouver, ISO, and other styles
2

Bartl, S., S. Schümberg, and M. Deutsch. "Revising time series of the Elbe river discharge for flood frequency determination at gauge Dresden." Natural Hazards and Earth System Sciences 9, no. 6 (November 5, 2009): 1805–14. http://dx.doi.org/10.5194/nhess-9-1805-2009.

Full text
Abstract:
Abstract. The German research programme RIsk MAnagment of eXtreme flood events has accomplished the improvement of regional hazard assessment for the large rivers in Germany. Here we focused on the Elbe river at its gauge Dresden, which belongs to the oldest gauges in Europe with officially available daily discharge time series beginning on 1 January 1890. The project on the one hand aimed to extend and to revise the existing time series, and on the other hand to examine the variability of the Elbe river discharge conditions on a greater time scale. Therefore one major task were the historical searches and the examination of the retrieved documents and the contained information. After analysing this information the development of the river course and the discharge conditions were discussed. Using the provided knowledge, in an other subproject, a historical hydraulic model was established. Its results then again were used here. A further purpose was the determining of flood frequency based on all pre-processed data. The obtained knowledge about historical changes was also used to get an idea about possible future variations under climate change conditions. Especially variations in the runoff characteristic of the Elbe river over the course of the year were analysed. It succeeded to obtain a much longer discharge time series which contain fewer errors and uncertainties. Hence an optimized regional hazard assessment was realised.
APA, Harvard, Vancouver, ISO, and other styles
3

Cobos Godoy, David. "Gestión del Tiempo. Solución al problema de la Doble Ligadura." Dirección y Organización, no. 57 (December 11, 2015): 74–84. http://dx.doi.org/10.37610/dyo.v0i57.482.

Full text
Abstract:
Hoy en día en la búsqueda de la optimización del tiempo resulta imprescindible en cualquier empresa, administrarlo de forma eficaz permite reducir costes, aumentar la satisfacción de los clientes, mejorar los resultados con menos esfuerzos…. Los diagramas de Gantt son sin duda de gran ayuda en esta labor, existiendo herramientas informáticas que permiten no solo su representación gráfica de forma muy sencilla, sino la explotación de los datos que se desprenden de la relación existente entre el final e inicio de una actividad, con el final e inicio del resto de actividades. En el presente artículo se propone, en base a la experiencia, una metodología de trabajo para controlar el tiempo de un conjunto de actividades, así como el planteamiento y la solución al problema de la Doble Ligadura, que a buen seguro, habrá dado más de un quebradero de cabeza a muchos técnicos.Palabras claves: gestión del tiempo, doble ligadura, camino crítico, ligadura crítica, Gantt.Time Managment: Solution to the problem of double constraintAbstract: Many technicians, in their professional activity, need to control the execution deadline of all the activities or components that make up projects, works, and processes. In an attempt to address that need, and even before the existence of computers, Henry L. Grantt proposed a methodology for the graphic representation of those activities, so as to give an approximate idea of who they each interacted with the others, as well as each of the activities’ impact on the total execution period. Computer science has allowed the creation of various tools that lead to easily and intuitively elaborate Grantt diagrams, and to use the information about each activity’s duration and the relation that exists between the start and end of each activity with the others. The Critical Path analysis allows the classification of activities as critical and non-critical. A delay in execution of the former will result in a delay on the total execution period, whereas non-critical activities function within a margin in such a way that a delay in completion will have little to no impact on the total execution period. Among all of the computing tools in existence on the market for the generation of Grantt diagrams, Microsoft Project is perhaps the most widely used by technicians. It basically requires two inputs: the estimated duration of each of the activities making up a project, and the existing relations between their start and end. Said relations require conditioning through Restraints, the end or start of an activity with the start or end of another. These restraints imply the joining of two activities under the condition that the start or end of one will only occur after a determined period of time from the start or end of the other. Microsoft Project presents the important restriction of not allowing to establish more than one restraint between two activities; meaning, if for instance, the start of one activities is conditioned by the start of another, there will not be any more relations between those two activities, such as the end of said activities, in which case incorrect or hardly comprehensive data may be constructed. The above mentioned restriction is not a minor problem, for if analyzed correctly, when the start of one activity conditions the start of another, which frequently occurs, the ends of both activities will likely also be similarly related. For example, a facade closing evidently cannot be started until part of the structure has been completed, but it is not less true that the closing cannot be finished until after the total execution of the structure. In this article, I will attempt to explain in simple but rigorous manner the fundamental elements of the technical programming of a project. A work methodology will be proposed to ease the work of the technicians, and I will try to offer a solution to the problem of the Double Restraint between activities, which has certainly been making it difficult for the many technicians who use Microsoft Project on a daily basis.Keywords: Time Management, Double Constraint, Critical Path, Critical Constraint, Gantt
APA, Harvard, Vancouver, ISO, and other styles
4

Ibrahimova, Aytakin. "Role of e-states in providing of informational security." Law Review of Kyiv University of Law, no. 1 (April 15, 2020): 401–6. http://dx.doi.org/10.36695/2219-5521.1.2020.79.

Full text
Abstract:
Changes and innovations began in information society have affected to economic, social, political and cultural life. Notion of new state; model of e-state begins to gain importance as a result of formed changed in area of managment. Notion of traditional state managment has been replaced with the notion of state managment holding features of clearness, transperancy, convenient, rapidity and effectivness as a result of establishment of e-state. The relocation of information technology in public services to the electronic environment has led to changes in e-government management. That’s why, in the recent time, application of e-state has been widely widespreaded in area of state regarding the international and national level. Governments around the world, taking advantage of growing information and communication technologies, initiate projects to develop political norms aimed at improving the efficiency and effectiveness of public administration. During this time, the efforts of governments are also supported by international organizations. The emphasis of this problem on the part of both international and national structures has led to the fact that, along with the services of the electronic state, various methods of their technological and political characteristics are being formed. In this context, the problem of the electronic state in both the conceptual and applied aspects has been widely discussed and used in many scientific studies and literature for a short period of time. Thanks to the electronic state, which means the provision of public services in the electronic environment, public access to services is becoming faster and cheaper. E-government is also explained as the provision of public services to citizens through information and communication technologies. Although the electronic state is considered as a new concept, the means that determine the novelty of the electronic state are associated with the methods and characteristics used that underline this concept. The concept of the state still retains its original purpose. The only new thing here is how and in what ways the electronic state fulfills its function, in contrast to the traditional one. Consequently, the electronic state is actually considered as a model that emphasizes the structural state of the state, and not as an approach based on the continuation of the traditional state. We can say that the electronic state is not just a government website, but all that exists within the framework of political, social, economic and technological means.
APA, Harvard, Vancouver, ISO, and other styles
5

Kosowski, Piotr, and Jerzy Stopa. "An Estimation of Profitability of Investment Projects in The Oil and Gas Industry Using Real Options Theory / Ocena Opłacalności Projektów Inwestycyjnych W Przemyśle Naftowym Z Wykorzystaniem Teorii Opcji Realnych." Archives of Mining Sciences 57, no. 2 (November 12, 2012): 391–401. http://dx.doi.org/10.2478/v10267-012-0025-2.

Full text
Abstract:
Abstract Paper discusses issues relating to the valuation of investment efficiency in the oil and gas industry using a real options theory. The example of investment pricing using real options was depicted and it was confronted with the analysis executed with the use of traditional methods. Indicators commonly used to evaluate profitability of investment projects, based on a discounted cash flow method, have a few significant drawbacks, the most meaningful of which is staticity which means that any changes resulting from a decision process during the time of investment cannot be taken into consideration. In accordance with a methodology that is currently used, investment projects are analysed in a way that all the key decisions are made at the beginning and are irreversible. This approach assumes, that all the cash flows are specified and does not let the fact that during the time of investment there may appear new information, which could change its original form. What is also not analysed is the possibility of readjustment, due to staff managment’s decisions, to the current market conditions, by expanding, speeding up/slowing down, abandoning or changing an outline of the undertaking. In result, traditional methods of investment projects valuation may lead to taking wrong decisions, e.g. giving up an owned exploitation licence or untimely liquidation of boreholes, which seem to be unprofitable. Due to all the above-mentioned there appears the necessity of finding some other methods which would let one make real and adequate estimations about investments in a petroleum industry especially when it comes to unconventional resources extraction. One of the methods which has been recently getting more and more approval in a world petroleum economics, is a real options pricing method. A real option is a right (but not an obligation) to make a decision connected with an investment in a specified time or time interval. According to the method a static model of pricing using DCF is no longer used; an investment project is divided into a series of steps and after each one there is a range of possible investment decisions, technical and organizational issues and all the others called ‘real options’. This lets one take many different varieties of modyfiying a strategy while pricing the project. This also makes it possible to react to the changing inner and outer situation and introducing new information while accomplishing the investment project. Owing to those, the decision process is a continuous operation, what is an actual vision of a real investment project management in the petroleum industry.
APA, Harvard, Vancouver, ISO, and other styles
6

Hsiao-Mei, Liang, Wang Chih-Hwa, Shann-Ren, Kang, Hsuuw Yan-Der, and Hung Kuo-Hsiang. "Employing Ultrahigh-Frequency RFID Technology on Deer Farm Managment." Indian Journal of Animal Research, OF (September 29, 2015). http://dx.doi.org/10.18805/ijar.5541.

Full text
Abstract:
This project uses ultrahigh-frequency (UHF) ear tags and readers with a readable range of 3 to 5 m. Forty stags were tagged with radio-frequency identification (RFID) ear tags and allocated into 20 pens. When deer with RFID ear tags walked through the aisle, handheld RFID readers, used as personal digital assistants (PDAs), and stationary RFID readers in frequency range received signals from the tags, and individual deer tag data were transmitted immediately and completely through wireless PDAs to a computer. The inputted data were sent to the deer-farm management system to be collated and organized. Farmers obtained individual deer data without approaching the deer, which decreased the risk of the deer attacking. Employing UHF-RFID technology integrated with software contributes to enhancing the efficiency of deer identification and farm management.
APA, Harvard, Vancouver, ISO, and other styles
7

Reyes Ramírez, Raúl Eduardo, Deborah Mercedes Castro Castillo, Maribel Díaz Espinoza, and Raquel Zapata Quispe. "FACTORES QUE INFLUYEN EN EL DESARROLLO DE PROYECTOS EN INSTITUCIONES PÚBLICAS." Revista Iberoamericana de la Educación, December 2, 2021. http://dx.doi.org/10.31876/ie.vi.111.

Full text
Abstract:
El presente artículo aborda el desarrollo de alternativas respondiendo a necesidades de colectivos humanos, los objetivos se inspiran en un trabajo de investigación en desarrollo que persigue identificar los elementos de diseño de un proyecto especial, diagnosticar los factores que inciden en la ejecución de proyectos especiales, determinar los factores para la mejora de estos proyectos, en este sentido, la respuesta estratégica para identificar las necesidades y su aplicación a carencias como la salud, educación, empleo, acceso a la vivienda y servicios eléctricos, y sanitarios que afectan a los ciudadanos, Munsibay (2019), Armendáriz & Fretes, (2017), Lovón (2019), entre otros, destacan la existencia de necesidades y cómo los proyectos aporten respuestas para la población, la metodología es investigación empírica, como fenómeno contemporáneo en entorno real con informantes de la gestión de proyectos especiales, analizando creación y gestión. Los resultados estarán orientados por Project Managment Institute (PMI), zonas de conocimiento, debatiendo la desviación de costos, tiempo en la ejecución, calidad de logro, llegando a conclusiones y recomendaciones vinculadas a estos bajo los lineamientos de la teoría general de sistemas cuyo enfoque profundiza las características a nivel estructural y funcional de los proyectos como sistemas activos, flexibles y auditables. Palabras clave: Proyectos especiales- sistemas activos - respuesta estratégica
APA, Harvard, Vancouver, ISO, and other styles
8

Sorto Rivas, Francisco. "La importancia de la gestión de proyectos en la industria de la construcción." AKADEMOS, July 18, 2017, 51–67. http://dx.doi.org/10.5377/akademos.v1i26.4437.

Full text
Abstract:
En este artículo se resalta la importancia que tiene la gestión profesional de proyectos de construcción, para el éxito fi nanciero de los contratistas, ya que muchas veces se descuida la labor de seguimiento de las obras, ignorándose a veces inclusive el cronograma de entregables, sujeto a las restricciones presupuestarias delimitadas durante la etapa de planifi cación. El control oportuno sirve para identificar desviaciones en las fechas de entrega programadas y en relación con el presupuesto original; a partir de ello, se pueden implementar medidas correctivas que eviten demoras inaceptables para los contratantes y que impidan la elevación de los costos más allá de la conveniencia fi nanciera de los contratistas.El descuido en el control de los proyectos puede provocar, incluso, el abandono de proyectos o la ruina de los empresarios de la construcción. En todo caso, este control tiene por fi nalidad tomar decisiones oportunas para recuperar el tiempo perdido y evitar la sangría financiera detectada, en un momento determinado, durante la ejecución de los proyectos.Para garantizar una gestión responsable y profesional de los proyectos de construcción existen guías elaboradas por el Project Managment Institute, Inc. y que forman parte del diseño curricular de los programas de posgrado relacionados con la gestión de proyectos, tal como sucede con la Universidad Doctor José Matías Delgado.AKADEMOS, Año 10, Vol. 1, No 26, Enero-Junio 2016: 51-67
APA, Harvard, Vancouver, ISO, and other styles
9

Barkworth, Mary, Benjamin Brandt, Curtis Dyreson, Neil Cobb, and Will Pearse. "Symbiota2: Enabling greater collaboration and flexibility in mobilizing biodiversity data." Biodiversity Information Science and Standards 3 (June 19, 2019). http://dx.doi.org/10.3897/biss.3.37208.

Full text
Abstract:
Symbiota, the most used biodiversity content management system in the United States, has helped mobilize over 35 million specimen records from over 750 natural history collections via 40+ separate installations. Most Symbiota records come from natural history collections but some Symbiota instances also incorporate records from observations, images, publications, and gardens. Symbiota serves as both a data management system for entering, annotating, and cleaning occurrence data, images and associated specimen data (e.g., genetic sequences, images, publications) and as a primary aggregator/publisher for data stored in any database system that can export to a comma separated value (csv) file. Symbiota integrates and displays data and images from many resources in multiple formats, some of which appeal primarily to researchers, others to land managers, educators, and the general public. After nearly 20 years, Symbiota is going through a major software revision through Symbiota2, a US National Science Foundation-funded project. The broad goals of Symbiota2 are to make it easier for developers to add new functionality, to improve usability, and to help site managers administer a site. Symbiota2 will have a plugin-based architecture that will allow developers to encapsulate functionality in a plugin. Symbiota2 will improve usability by supporting off-line use, enabling Wordpress (content-managment system) integration, and having a customizable user interface. Symbiota2 will help site managers by simplifying installation and management of a site. The three-year project is on-going, but so far we have created a Symbiota2 GithHub repository and a Docker image with all the necessary components for installing, configuring, and running Symbiota2, an object relational mapping (ORM) of the tables in the database management system (DBMS), and web services to connect to the DBMS via the ORM. We used Doctrine 2 for the ORM and API-Platform for the web services. By the third quarter of 2019, we anticipate deploying the plugin framework to encourage developers to create new functionality for biodiversity content management.
APA, Harvard, Vancouver, ISO, and other styles
10

Polacchini, Dirceu Teixeira. "Uma análise da mudança de paradigma na gestão para os stakeholders aplicada no Conselho Administrativo de Defesa Econômica – CADE, na implantação do projeto: CADE sem papel (Sistema Eletrônico de Informações – SEI)." Universitas: Gestão e TI 6, no. 2 (December 20, 2016). http://dx.doi.org/10.5102/un.gti.v6i2.4139.

Full text
Abstract:
O presente artigo faz uma análise do impacto da sinergia na gestão de stakeholders em projetos complexos, tomando por base o projeto “Cade sem Papel” do Conselho Administrativo de Defesa Econômica - Cade, cujo objetivo principal é a implantação do processo eletrônico por meio da adoção do Sistema Eletrônico de Informação – SEI. O estudo se baseia nos fundamentos estabelecidos no PMI (Project Managment Institute) para o gerenciamento dos interessados seguindo o modelo tradicional e considera a análise da sinergia na governança do projeto com a aplicação da retroalimentação sistêmica e dinâmica (em tempo real) visando a minimizar os efeitos da entropia. O estudo parte de uma análise descritiva do caso por meio de pesquisa documental e participativa, com resultados que evidenciam as integrações da metodologia do Guia do Conhecimento em Gerenciamento de Projetos – PMBOK. Os processos sinérgicos foram efetivos a ponto de possibilitar a implantação da solução num curto intervalo de tempo gerando um processo global de mudança nas áreas fim e meio, bem como para toda a sociedade. O marco temporal dessa mudança foi o dia 1º de janeiro de 2015, data a partir da qual o Cade passou a utilizar unicamente processos eletrônicos. Para o sucesso nas alterações dos procedimentos operacionais da autarquia adota-se um modelo efetivo de endomarketing que capacitou os 320 servidores, incluindo os ocupantes de cargos mais elevados. O reconhecimento social pode ser expresso por meio do prêmio da Transparência Ativa alcançado por uma entrega do projeto em concurso promovido pela Controladoria-Geral da União - CGU.
APA, Harvard, Vancouver, ISO, and other styles
More sources

Dissertations / Theses on the topic "Project managment"

1

De, Freitas Pedro Boleo. "A project managment model for social habitat development in Southern Mozambique." Thesis, University of Salford, 2011. http://ethos.bl.uk/OrderDetails.do?uin=uk.bl.ethos.539154.

Full text
APA, Harvard, Vancouver, ISO, and other styles
2

Sundström, Sofia, and Elinor Thelander. "Designing a user interface for web based project managment in film production." Thesis, Linköping University, Department of Science and Technology, 2004. http://urn.kb.se/resolve?urn=urn:nbn:se:liu:diva-2403.

Full text
Abstract:

The aim of this thesis project is to create a user interface for a web based film production project management portal. This implies creating a site map and a functionality specification based on the needs of the people working in the film production industry. The project was made on account of The Chimney Pot, a post production company in Stockholm. For the scope of this project, the research was concentrated on the part of film production that concerns The Chimney Pot, i.e. the procedures that take place after a film has been recorded. The research also focused on people working in the area of Stockholm, even if their clients and customers in other areas of Sweden and abroad were indirectly included in order for the project portal to be a usable tool in projects where these people are involved.

Before any visible results can be seen in a web production project, a range of preparation steps needs to be taken. Planning is essential if the final product shall work properly. Extensive research has to be done into the industry. In order to make the product usable, the intended users, their requirements, work procedures and environment need to be examined. Only when there are substantial results and enough knowledge about the industry, the actual implementation can start. The first step is to make a functionality specification, next a site map should be produced and the technical architecture should be specified. These are the areas that are covered in this project, but there are also recommendations about how the further development should be made. Important aspects in the next phase are to create a budget, to put together a development team and to create a graphic user interface. In the whole process the issues of usability need to be considered, i.e. efficiency, flexibility, learnability and satisfaction.

The key requirements for the project portal turned out to be speed and effectiveness. The user interface was designed to be intuitive and to be shallow, which means that the user should be able to perform any task with the least amount of mouse clicks possible. Another intention with the produced user interface is for it to be clearly divided into the four main areas that could be extracted from the user requirements. They are planning, project details, communication and file sharing. Directly after logging on to the project portal, the user should get an overview of all these areas. Other important considerations were security, version control and seamlessness. These issues demand a thorough planning of the technical architecture and this thesis provides some useful tips for the further development of the technical specification.

APA, Harvard, Vancouver, ISO, and other styles
3

Gergeľ, Frederik. "Optimalizace projektového řízení zavedením agilní metodiky." Master's thesis, Vysoké učení technické v Brně. Fakulta podnikatelská, 2019. http://www.nusl.cz/ntk/nusl-402039.

Full text
Abstract:
The thesis deals with optimization of project management in a custom web development company. The theoretical part is devoted to the description of traditional and agile approaches of project management. The analytical part describes the current state of project management. The main part of the thesis consists of optimization of project management by agile SCRUM method, case study implementation and evaluation of benefits and costs of introduced change.
APA, Harvard, Vancouver, ISO, and other styles
4

Žurovska, Elžbieta. "Projektų valdymo problemos, jų sprendimai." Master's thesis, Lithuanian Academic Libraries Network (LABT), 2009. http://vddb.library.lt/obj/LT-eLABa-0001:E.02~2006~D_20081203_203543-94342.

Full text
Abstract:
Darbo uždaviniai: Apibrėžti projektų valdymą, galimas problemas apibrėžti personalo vadybos sampratą; atskleisti mokymosi šiuolaikinėje organizacijoje svarbą; ištirti apmokymų poreikį realiai egzistuojančioje Lietuvos organizacijoje; pateikti apibendrinančias išvadas. Šio darbo pagrindinis uždavinys buvo atskleisti ir išanalizuoti projektų valdymo problemas personalo vadybos aspektu.
This work „Project managment, problems, prevency soliutions“ is analizy of the training importance in the successful activity of the company and project management. It was necessary to show that increasing results of the company activity depend on human resourses management. It’s showed the need to organize training regulary. Calculated results of the questionnaire allow organizing directly the training of staff. Tha main conclution – future belongs to those companies and organizations, who organize training regularlt, especially in project management and modern technologies.
APA, Harvard, Vancouver, ISO, and other styles
5

Bohn, Jeffrey S. "Benefits and barriers of construction project monitoring using hi-resolution automated cameras." Thesis, Atlanta, Ga. : Georgia Institute of Technology, 2009. http://hdl.handle.net/1853/28203.

Full text
APA, Harvard, Vancouver, ISO, and other styles
6

Figueroa, Rodríguez Oscar Luis. "Communication approaches in scaling-up strategies : the Hillside Managment Project (HMP) case in three ethnic regions of Oaxaca State, Mexico." Thesis, University of Reading, 2004. http://ethos.bl.uk/OrderDetails.do?uin=uk.bl.ethos.408870.

Full text
APA, Harvard, Vancouver, ISO, and other styles
7

Pinheiro, Lucidalva Ribeiro Gonçalves. "Informatização de unidades de informação velhos hábitos, novos desafios: uma abordagem da metodologia PMI." reponame:Repositório Institucional da UFBA, 2010. http://www.repositorio.ufba.br/ri/handle/ri/7919.

Full text
Abstract:
Submitted by Duarte Zeny (zenydu@gmail.com) on 2013-01-16T15:10:56Z No. of bitstreams: 1 Disserta_final_Lucidalva Ribeiro G. Pinheiro.pdf: 775397 bytes, checksum: 5210f5bc39ee2a164a556284801b5fd3 (MD5)
Made available in DSpace on 2013-01-16T15:10:56Z (GMT). No. of bitstreams: 1 Disserta_final_Lucidalva Ribeiro G. Pinheiro.pdf: 775397 bytes, checksum: 5210f5bc39ee2a164a556284801b5fd3 (MD5)
Objetivo geral buscar, investigar como é realizado o desenvolvimento dos projetos de informatização de unidades informacional e o gerenciamento da comunicação entre profissionais de Ciência da Informação (bibliotecários e arquivistas) e profissionais de Tecnologia da Informação (analistas de sistemas, programadores, entre outros profissionais). Os objetivos específicos tiveram como foco a utilização de possíveis soluções para minimizar ou eliminar as dificuldades de comunicação relatadas. Entre as possíveis soluções buscou-se verificar a existência de algum projeto para a informatização das unidades de informação; verificar se os profissionais que compunham a amostra da pesquisa conheciam ou utilizavam a metodologia do PMI (Project Management Institute). O método utilizado foi a pesquisa de campo. A amostra da pesquisa foi composta por 22 bibliotecários de realidades distintas (que deveriam colocar empresa pública e privada, no estado da Bahia) e para a coleta dos dados optou-se pela aplicação de questionário. Foi constatado que 33% dos entrevistados não elaboraram projeto para informatização de unidades de informação e 82% não conheciam e não aplicavam a metodologia PMI no desenvolvimento de atividades relacionadas à informatização. Na pesquisa foi constatado que, em relação ao problema de comunicação entre profissionais de CI e TI, 50% das respostas afirmam a existência de problemas ou ruídos na comunicação, informação que valida a premissa inicial.
Salvador
APA, Harvard, Vancouver, ISO, and other styles
8

Vajre, Chetan D. "Modeling Dynamic Interactions in a Software Development Project." [Tampa, Fla. : s.n.], 2003. http://purl.fcla.edu/fcla/etd/SFE0000096.

Full text
APA, Harvard, Vancouver, ISO, and other styles
9

Ziganshina, Madina. "Art-Map: concept of moving curatorial project and its practical realization in Aveiro." Master's thesis, Universidade de Aveiro, 2015. http://hdl.handle.net/10773/15905.

Full text
Abstract:
Mestrado em Criação Artística Contemporânea
In this dissertation, I present the results of a project which aim was to find out and try an effective model of independent curatorial project executable in small and medium cities in Portugal. The concept of Moving Curatorial Project ARTMAP is a result of theoretical research and reflection about municipal exhibition spaces and possibility of presentation of the contemporary art in these spaces. To test if this curatorial project is realizable and if there are conditions to continue it, a first trial was implemented in Aveiro. A curated international exhibition, entitled “A Poética do Visual" occupied two municipal and two private gallery spaces and brought together 111 artists from 25 different countries. The art event was carried out in collaboration with the Municipality of Aveiro and the University of Aveiro, and involved several private cultural spaces in the city. This first experience showed that there are all conditions for the presentation of contemporary art in small and medium size locations in Portugal, and for this project to be replicated in other regions of the country.
Nesta dissertação, apresento os resultados de um projecto cujo objectivo era desenvolver e experimentar um modelo eficaz e executável de projecto de curadoria em cidades de pequena e média dimensão em Portugal. O conceito de ART-MAP (Moving Curatorial Project) é resultado de pesquisa teórica e reflexão sobre os espaços municipais de exposição e sobre a possibilidade da apresentação de arte contemporânea nesses lugares. Para testar se esse projecto de curadoria é realizável e se existem condições para continuá-lo, a primeira experiência foi desenvolvida em Aveiro. A exposição internacional, intitulada "A Poética do Visual” ocupou dois espaços municipais e dois espaços culturais privados na cidade, e reuniu 111 artistas de 25 países diferentes. O evento de arte foi realizado em colaboração com a Câmara Municipal de Aveiro e a Universidade de Aveiro. Esta primeira experiência mostrou que existem todas as condições para a apresentação de arte contemporânea nas cidades de Portugal, e que este projecto pode ser replicado em outras regiões do país.
APA, Harvard, Vancouver, ISO, and other styles
10

Mutiro, Newton Sly. "The perception of corporate services in a Metropolitan Municipality on King III good governance compliance." Thesis, Cape Peninsula University of Technology, 2013. http://hdl.handle.net/20.500.11838/1000.

Full text
Abstract:
Thesis submitted in partial fulfilment of the requirements for the degree Master of Technology: Business Administration in Project Management in the Faculty of Business at the Cape Peninsula University of Technology 2013
Good governance has been and is a growing phenomenon for almost all business organisations regardless of size, profit margins and purpose for existence. Government, quasi-government, non-governmental organisations and even civic organisations have adopted a project-based approach to business. The City of Cape Town Metropolitan Municipality is one such organisation that had adopted a project-based approach to business. The challenge was how to effectively and efficiently implement governance issues around projects and business organisations. Most organisations can easily be misled if issues of governance are not clearly defined and followed. A project-based approach helps in defining the resources needed at specific times, the time required for a specific task and the cost of a specific operation. In a multi-project environment (programme) resources are shared in a well-defined manner. The City of Cape Town Metropolitan Municipality has a huge responsibility in terms of successfully initiating, planning and implementing projects successfully. The magnitude and the dynamic complexities of their operation call for proper governance structures to be established within any municipality if service delivery is the main objective. Managing complex and mega projects calls for certain leadership traits. A fusion of these traits at different management levels will be critical for effective delivery of services to the electorate. Models and plans need to be in place as guidance to successful implementation of projects. A number of people, committees and institutions have developed different governance frameworks that can be adopted by organisations as a guide to good governance. This research is based on King III guide to good governance. Challenges experienced by other Municipalities and business organisations e.g. Nelson Mandela Municipality, Eastern Cape Education Department, Transnet, LeisureNet, Limpopo Provincial government and many others, directly relate to poor governance. This therefore calls for the investigation of the Corporate Services directorate in the City of Cape Town Metropolitan Municipality to establish the level of compliance with what King III had recommended as a framework for good governance. The City of Cape Town Metropolitan Municipality has different general governance frameworks in place. However they do not use them effectively because of different issues identified by the researcher. The major challenges facing the City of Cape Town Metropolitan Municipality are effective governance communication and lack of training in the practice of good governance. There were serious discrepancies when it comes to understanding and interpreting governance issues within the different levels of management. It is expected that an organisation like the City of Cape Town Metropolitan Municipality should have proper communication channels and effective training programmes. The researcher also found that information is not readily available to people who need it most yet the expectation is that information be readily available.
APA, Harvard, Vancouver, ISO, and other styles
More sources

Books on the topic "Project managment"

1

Pautsch, Peter, and Siegfried Steininger. Lean Project Managment. München: Carl Hanser Verlag GmbH & Co. KG, 2014. http://dx.doi.org/10.3139/9783446441132.

Full text
APA, Harvard, Vancouver, ISO, and other styles
2

A, Woodroof Eric, ed. How to finance energy managment projects: Solving the "lack of capital problem". Lilburn, GA: Fairmont Press, 2012.

Find full text
APA, Harvard, Vancouver, ISO, and other styles
3

Idris, Badarussamin. Project Management Information System (PMIS): User satisfaction and business value of PMIS to a corporation. Dublin: University College Dublin, 1995.

Find full text
APA, Harvard, Vancouver, ISO, and other styles
4

Ofori, George. Implementation of Environmental Management Systems (ISO 14000) in construction project managment organisations in Singapore: Final report. Singapore: Centre for Building Performance and Construction, Mational University of Singapore, 1999.

Find full text
APA, Harvard, Vancouver, ISO, and other styles
5

Kendrick, Tom. Identifying and managing project risk: Essential tools for failure-proofing your project. 2nd ed. New York: AMACON, 2009.

Find full text
APA, Harvard, Vancouver, ISO, and other styles
6

Hensman, Lesley. ' Coming in from the cold': The managment of an external project in the host organisation : (MA Education Management dissertation). [Guildford]: [University of Surrey], 1996.

Find full text
APA, Harvard, Vancouver, ISO, and other styles
7

Micheal, Ó. hAodha, and Richardson Ita, eds. Software testing and global industry: Future paradigms. Newcastle: Cambridge Scholars, 2009.

Find full text
APA, Harvard, Vancouver, ISO, and other styles
8

Levy, Sidney M. Construction process planning and managment: An owner's guide to successful projects. Amsterdam: Butterworth-Heinemann, 2010.

Find full text
APA, Harvard, Vancouver, ISO, and other styles
9

Meredith, Jack R. Project Managment. 5th ed. John Wiley & Sons Inc, 2005.

Find full text
APA, Harvard, Vancouver, ISO, and other styles
10

Project Managment (Self Study II). Crisp Learning, 2002.

Find full text
APA, Harvard, Vancouver, ISO, and other styles
More sources

Book chapters on the topic "Project managment"

1

Pautsch, Peter, and Siegfried Steininger. "Erste Impulse für das Projektmanagement." In Lean Project Managment, 1–28. München: Carl Hanser Verlag GmbH & Co. KG, 2014. http://dx.doi.org/10.3139/9783446441132.001.

Full text
APA, Harvard, Vancouver, ISO, and other styles
2

Pautsch, Peter, and Siegfried Steininger. "Projektwelt in der Praxis." In Lean Project Managment, 29–50. München: Carl Hanser Verlag GmbH & Co. KG, 2014. http://dx.doi.org/10.3139/9783446441132.002.

Full text
APA, Harvard, Vancouver, ISO, and other styles
3

Pautsch, Peter, and Siegfried Steininger. "Optimierung mit Lean." In Lean Project Managment, 51–73. München: Carl Hanser Verlag GmbH & Co. KG, 2014. http://dx.doi.org/10.3139/9783446441132.003.

Full text
APA, Harvard, Vancouver, ISO, and other styles
4

Pautsch, Peter, and Siegfried Steininger. "Modell Lean Project Management." In Lean Project Managment, 75–103. München: Carl Hanser Verlag GmbH & Co. KG, 2014. http://dx.doi.org/10.3139/9783446441132.004.

Full text
APA, Harvard, Vancouver, ISO, and other styles
5

Pautsch, Peter, and Siegfried Steininger. "Die Prinzipien des Lean Project Management." In Lean Project Managment, 105–50. München: Carl Hanser Verlag GmbH & Co. KG, 2014. http://dx.doi.org/10.3139/9783446441132.005.

Full text
APA, Harvard, Vancouver, ISO, and other styles
6

Pautsch, Peter, and Siegfried Steininger. "Lean Project Management Produkte." In Lean Project Managment, 151–201. München: Carl Hanser Verlag GmbH & Co. KG, 2014. http://dx.doi.org/10.3139/9783446441132.006.

Full text
APA, Harvard, Vancouver, ISO, and other styles
7

Pautsch, Peter, and Siegfried Steininger. "Praxisleitfaden Lean Project Management." In Lean Project Managment, 203–30. München: Carl Hanser Verlag GmbH & Co. KG, 2014. http://dx.doi.org/10.3139/9783446441132.007.

Full text
APA, Harvard, Vancouver, ISO, and other styles
8

Pautsch, Peter, and Siegfried Steininger. "Implementierung von Lean Project Management." In Lean Project Managment, 231–62. München: Carl Hanser Verlag GmbH & Co. KG, 2014. http://dx.doi.org/10.3139/9783446441132.008.

Full text
APA, Harvard, Vancouver, ISO, and other styles
9

Pautsch, Peter, and Siegfried Steininger. "Perspektiven." In Lean Project Managment, 263–71. München: Carl Hanser Verlag GmbH & Co. KG, 2014. http://dx.doi.org/10.3139/9783446441132.009.

Full text
APA, Harvard, Vancouver, ISO, and other styles
10

Pautsch, Peter, and Siegfried Steininger. "Literaturverzeichnis." In Lean Project Managment, 273–74. München: Carl Hanser Verlag GmbH & Co. KG, 2014. http://dx.doi.org/10.3139/9783446441132.010.

Full text
APA, Harvard, Vancouver, ISO, and other styles

Conference papers on the topic "Project managment"

1

Martinez, Diliana Rodriguez, and Claudia Leon Luna. "Managment a Computer Science curriculum based on project learning." In 2012 XXXVIII Conferencia Latinoamericana En Informatica (CLEI). IEEE, 2012. http://dx.doi.org/10.1109/clei.2012.6427130.

Full text
APA, Harvard, Vancouver, ISO, and other styles
2

Mladenova, Tsvetelina. "A project managment system for time planning and resources allocation." In 2019 42nd International Convention on Information and Communication Technology, Electronics and Microelectronics (MIPRO). IEEE, 2019. http://dx.doi.org/10.23919/mipro.2019.8756834.

Full text
APA, Harvard, Vancouver, ISO, and other styles
3

Tarek Hassan, Tawfik, Al Maazmi Jamila, and Al Shamsi Omran. "How Organization Will Enhance Benefits Realization by Using Innovation Project Managment and AI (Artificial Intilligence)." In Creative Construction e-Conference 2020. Online: Budapest University of Technology and Economics, 2020. http://dx.doi.org/10.3311/ccc2020-027.

Full text
APA, Harvard, Vancouver, ISO, and other styles

Reports on the topic "Project managment"

1

Nation, Yakima Indian, Pacific Northwest Laboratory, and Washington Department of Fisheries. Yakima/Klickitat Production Project Preliminary Design Report, Appendix A: Refined Project Goals and Harvest Managment Plan : Experimental Design Plan : Genetic Risk Assessment. Office of Scientific and Technical Information (OSTI), March 1990. http://dx.doi.org/10.2172/920101.

Full text
APA, Harvard, Vancouver, ISO, and other styles
2

Mizrach, Amos, Sydney L. Spahr, Ephraim Maltz, Michael R. Murphy, Zeev Schmilovitch, Jan E. Novakofski, Uri M. Peiper, et al. Ultrasonic Body Condition Measurements for Computerized Dairy Management Systems. United States Department of Agriculture, 1993. http://dx.doi.org/10.32747/1993.7568109.bard.

Full text
Abstract:
The body condition (BC) score is recognized in the dairy industry as an essential tool for managing the energy reserves of the dairy cow, which is essential for sustaining optimal and efficient production over several lactations. The current use of BC scoring depends on the accuracy of subjective visual estimates, and this limits its kusefulness as a management aid in the dairy industry. A measuring tool that would frequently provide objective data on the cow's body reserves would be a major contribution to efficient dairy herd management. Ultrasonic sensors have the potential to be developed into an efficient BC measuring device, and the experimental use of such sensors for subcutaneous fat thickness (SDFT) estimates, as an indication for BC in beef cattle, supports this assumption. The purposes of this project were: 1. To compare visual BC scoring and ultrasonic fat thickness with on-line automated body weight (BW) measurements as monitors of nutritional adequacy of dairy cows at various stages of lactation. 2. To determine the effects of variation in digestive fill in early and late lactation on the accuracy of body weight measurements in lactating cows. 3. To modify an existing ultrasonic system and develop a specialized, low-cost sensor for repeatable determination of body condition scores by users with minimal training and skill. 4. To develop a standard for the assignment of body condition scores based on ultrasonic measurements of subdermal fat thickness. The procedure to execute these objectives involved: 1. Frequent measurement of BW, milk yield (MY), BC (visually scored) and subdermal fat thickness ultrasonically measured of dairy cows, and data analysis on average and individual basis. 2. Testing and selection of an appropriate special-purpose sensor, finding an optimum body location for working an ultrasonic measurement, prcessing the signals obtained, and correlating the resulting measurements with performance responses in lactating cows. Linking the ultrasonic signals to BC scores, and developing a BC scoring data acquisition system are the first steps towards fulfilling the necessary requirements for incorporating this device into an existing dairy herd management system, in order to provide the industry with a powerful managment tool. From the results obtained we could conclude that: 1. BC does not correlate with BW changes during all stages of lactation, although in general terms it does. These results were confirmed by individual cow BW and BC data obtained during the course of lactation, that were supported by individual objective ultrasonic measurement of SDFT. 2. BW changes reflect energy metabolism reliably ony after peak milk yield; early in lactation, a decrease in BW expresses mobilization of body reserves only qualitatively, and not quantitatively. 3. Gastrointestinal content increases throughout the whole period during which dry matter intake (DMI) increases. The drastic increase very early in lactation prevents the use of BW changes as a basis for quantitative estimatio of energy meatabolism; at this stage of lactation, konly a BC score or any other direct measurements willl provide a quantitative estimate of energy metabolism. 4. Ultrasonic measurements of subdermal fat thickness can be used to quantify changes that correlate with the actual condition of the cow, as assessed by performance and the traditional way of scoring. 5. To find the best site on the cow's body at which to obtain responses to BC and its changes in the course of lactation, additional sites have to be examined. From the present study, it seems that the sites between ribs 12 and 13 have the potential for this purpose. 6. The use of templates made it easier to repeat measurements at a desired site and spot. However, the convenient easy-to-handle way to standardize the measurement, described in this study, koffers scope for improvement. 7. The RF peak values of the A-mode are better indicators of the location of fat layer borders than image analysis, from the point of view of future commercial development. 8. The distances between the RF peaks of the A-mode can be automatically measured by suitable software, for future commercial development. 9. Proper analysis of daily body weight and milk yield data can provide the necessary information on body condition changes during lactation, until a direct BC measurement device is developed. 10. In any case, at least one visual BC assessment has to be done, preferably immediately after calving, for calibration purposes.
APA, Harvard, Vancouver, ISO, and other styles
We offer discounts on all premium plans for authors whose works are included in thematic literature selections. Contact us to get a unique promo code!

To the bibliography