Academic literature on the topic 'Project overrun'

Create a spot-on reference in APA, MLA, Chicago, Harvard, and other styles

Select a source type:

Consult the lists of relevant articles, books, theses, conference reports, and other scholarly sources on the topic 'Project overrun.'

Next to every source in the list of references, there is an 'Add to bibliography' button. Press on it, and we will generate automatically the bibliographic reference to the chosen work in the citation style you need: APA, MLA, Harvard, Chicago, Vancouver, etc.

You can also download the full text of the academic publication as pdf and read online its abstract whenever available in the metadata.

Journal articles on the topic "Project overrun"

1

Mohammad, Karukh Hassan, Noori Sadiq Ali, and Basira Majeed Najm. "Assessment of the Cost and Time Impact of Variation Orders on Construction Projects in Sulaimani Governorate." Journal of Engineering 27, no. 2 (2021): 106–25. http://dx.doi.org/10.31026/j.eng.2021.02.08.

Full text
Abstract:
Variation orders are an on-going phenomenon in construction and industry projects worldwide, particularly in the province of Sulaimani, where the project's damage from cost and schedule overrun because of variation orders. However, the effect on project costs and time overrun of variation order has yet to be identified. This study evaluates the impact of variation orders on the cost and time off in the Sulaimani governorate. Two hundred twenty-eight projects from various construction sectors built between 2007-2012 were adopted to calculate the contract cost and schedule overruns due to variat
APA, Harvard, Vancouver, ISO, and other styles
2

Mulye, Priyesh. "Significance and Analysis of Time and Cost Overrun in the Construction Industry of Mumbai." International Journal for Research in Applied Science and Engineering Technology 9, no. 11 (2021): 295–310. http://dx.doi.org/10.22214/ijraset.2021.38789.

Full text
Abstract:
Abstract: The occurrence of time and cost overrun has become quite significant in a majority of construction projects in India, which is negatively affecting the GDP and potential development of nation. As per the statistics of project cost and duration in March 2012, 179 projects out of 555 projects of worth 150 Crore INR have been facing cost and time overrun and others are at the very high risk, with the total construction cost overrun of 1.23 Lakh Crore INR. (Times, 2013) The time and cost overrun of the construction projects results in overextension of the time and finance of the client w
APA, Harvard, Vancouver, ISO, and other styles
3

Alhammadi, Yasir, Mohammad S. Al-Mohammad, and Rahimi A. Rahman. "Modeling the Causes and Mitigation Measures for Cost Overruns in Building Construction: The Case of Higher Education Projects." Buildings 14, no. 2 (2024): 487. http://dx.doi.org/10.3390/buildings14020487.

Full text
Abstract:
The formidable need for building projects places greater pressure on stakeholders to deliver these projects on time, within the budget, and with high quality. However, many building projects have experienced extensive cost overruns despite extensive research on their causes and mitigation measures. Thus, the effectiveness of mitigation measures is questionable. This study examines the status of cost overrun in building construction projects and develops a structural equation model to establish the relationships between causes of cost overrun and mitigation measures, using higher education buil
APA, Harvard, Vancouver, ISO, and other styles
4

Korgaonker, M. G. "Project Management: A Survey of Current Practices and Implications." Vikalpa: The Journal for Decision Makers 12, no. 4 (1987): 11–28. http://dx.doi.org/10.1177/0256090919870402.

Full text
Abstract:
In completing a large project there is a time overrun of the order of three years on a scheduled project duration of 3.7 years and a cost overrun of 140 per cent. Production losses are five times the cost overrun due to delay. Cost and time overruns are jeopardizing the viability of the projects themselves. M G Korgaonker reviews and analyses the Indian experience as to why there are such heavy overruns. Based on a survey of current practices in project management, he concludes that project management practices can be improved considerably. He cites instances where effective management practic
APA, Harvard, Vancouver, ISO, and other styles
5

Leu, Sou-Sen, Yanni Liu, and Pei-Lin Wu. "Project Cost Overrun Risk Prediction Using Hidden Markov Chain Analysis." Buildings 13, no. 3 (2023): 667. http://dx.doi.org/10.3390/buildings13030667.

Full text
Abstract:
Construction project cost overrun is a common problem in the construction industry. The cost of construction projects is thought to have increased by approximately 33% on average. Several types of research on construction project cost overrun have been conducted and these generally rely on historical data. However, whilst each project has its own project characteristics and cost trend, real-time project cost data are more reliable to forecast its own cost trend. This paper proposes a real-time hidden Markov chain (HMM) model to predict cost overrun risk based on project-owned cost performance
APA, Harvard, Vancouver, ISO, and other styles
6

Isfahani, Muhammad Nafhan, Eri Setia Romadhon, and Muhammad Imany Romadhon. "Cost Overrun Factor of Toll Road Project Construction." IOP Conference Series: Earth and Environmental Science 1321, no. 1 (2024): 012025. http://dx.doi.org/10.1088/1755-1315/1321/1/012025.

Full text
Abstract:
Abstract Results in more than 45 studies of infrastructure projects in 20 countries that ran overestimate. For rail projects, they predict average cost increases of 45%, for fixed-line projects (tunnels and bridges), of 34%, and for highway projects, of 30%. Indonesia is one of the 20 nations on 5 continents where cost overruns are a common occurrence. Cost overruns are one of the problems faced by most construction projects in Indonesia. Unexpected budget cost overruns can create many problems in the project. Therefore, every stakeholder in the project needs to have a good understanding of fa
APA, Harvard, Vancouver, ISO, and other styles
7

Segbedzi, Philip Kofi Asiwome. "Investigation of Construction Cost Overrun Issues and Management: Evidence from a Public University in Ghana." International Journal of Research and Innovation in Applied Science VIII, no. VII (2023): 76–81. http://dx.doi.org/10.51584/ijrias.2023.8708.

Full text
Abstract:
This study investigated the issues and management of construction cost overruns in a public university in Ghana. Specifically, the study answered the following research questions: (1) What types of project experience construction cost overrun? (2) What are the causes of project construction cost overruns? (3) How are project construction cost overruns managed? The study used the qualitative research approach. Documentary reviews and participant observation were the research methods employed for the data collection. The study showed that all types of construction project irrespective of the sou
APA, Harvard, Vancouver, ISO, and other styles
8

M, Chandrabose, and Balaji B. "ANALYTICAL SOLUTION TO MITIGATE THE RISK ARISING OUT OF TIME OVERRUN IN THE CONSTRUCTION PROJECTS VIA FORECASTING." International Journal of Engineering Applied Sciences and Technology 7, no. 7 (2022): 86–91. http://dx.doi.org/10.33564/ijeast.2022.v07i07.016.

Full text
Abstract:
Construction industry is getting affected by cost overruns, time overruns, poor budgeting & planning. Currently there is no analytical tool available which can act as a benchmarking system to measure the performance of a project based on the historical data of past projects. This is an effort to predict time overrun and cost overrun in projects for taking precautionary measures to minimize or reduce the impact.
APA, Harvard, Vancouver, ISO, and other styles
9

Saidu, Ibrahim, W. Shakantu, A. Adamu, and I. Anugwo. "A BESPOKE APPROACH FOR RELATING MATERIAL WASTE TO COST OVERRUN IN THE CONSTRUCTION INDUSTRY." Journal of Construction Business and Management 1, no. 1 (2017): 39–52. http://dx.doi.org/10.15641/jcbm.1.1.63.

Full text
Abstract:
The problems of material waste and cost overruns are common in the construction industry. These problems occur at different stages of a construction project, from planning, design to project completion. The argument on how to eliminate cost overrun has been on-going for the past 70 years as on-site wastage of materials leads to increase in the final project cost. This paper examines the relationship between the causes of material waste and those of cost overrun at the pre-contract and post-contract stages of a project. The desktop methodological approach was firstly adopted in comparing the ca
APA, Harvard, Vancouver, ISO, and other styles
10

Aje, Olaniyi Isaac, Oluwole Alfred Olatunji, and Olanrewaju Augustine Olalusi. "Overrun causations under advance payment regimes." Built Environment Project and Asset Management 7, no. 1 (2017): 86–98. http://dx.doi.org/10.1108/bepam-06-2015-0028.

Full text
Abstract:
Purpose Evidence suggests project owners could use advance payments to prevent cost escalations. The purpose of this paper is to elicit the relationships between causations of overruns when advance payments are issued to contractors. Design/methodology/approach In total, 97 responses from a questionnaire survey were analysed. Additional data on 51 projects, completed between 2000 and 2014 under different advance payments regimes, were also obtained and analysed. Findings Project owners issue advance payments to contractors so as to avoid delays. However, statistical correlation between advance
APA, Harvard, Vancouver, ISO, and other styles
More sources

Dissertations / Theses on the topic "Project overrun"

1

Ojo, Emmanuel Opeyemi. "Project Managers' Capacity-Planning Practices for Infrastructure Projects in Qatar." ScholarWorks, 2019. https://scholarworks.waldenu.edu/dissertations/7320.

Full text
Abstract:
Infrastructure project delays and cost overrun are caused by ineffective use of organizational skills, processes, and resources by project managers in the construction industry. Cost overrun and schedule delay in Qatari infrastructure projects have had damaging effects on the national economy by way of claims and litigation, contractual disputes, delays in dependent projects, and project abandonment. The purpose of this qualitative case study was to explore the perceptions of project managers regarding how they utilize capacity-planning practices to mitigate project schedule delay and cost ove
APA, Harvard, Vancouver, ISO, and other styles
2

Ahiaga-Dagbui, Dominic Doe. "Rethinking construction cost overruns : an artificial neural network approach to construction cost estimation." Thesis, University of Edinburgh, 2014. http://hdl.handle.net/1842/10454.

Full text
Abstract:
The main concern of a construction client is to procure a facility that is able to meet its functional requirements, of the required quality, and delivered within an acceptable budget and timeframe. The cost aspect of these key performance indicators usually ranks highest. In spite of the importance of cost estimation, it is undeniably neither simple nor straightforward because of the lack of information in the early stages of the project. Construction projects therefore have routinely overrun their estimates. Cost overrun has been attributed to a number of sources including technical error in
APA, Harvard, Vancouver, ISO, and other styles
3

Han, Sedat. "Estimation Of Cost Overrun Risk In Interrnational Project By Using Fuzzy Set Theory." Master's thesis, METU, 2005. http://etd.lib.metu.edu.tr/upload/12606032/index.pdf.

Full text
Abstract:
In the global construction market, most construction companies are willing to undertake international projects in order to maximise their profitability by taking advantage of attractive emerging markets and minimise dependence on unfavorable domestic market conditions. In order to be awarded a contract in highly competitive global construction market, companies should excel in choosing the most attractive markets and prepare winning bids for the selected construction projects in those markets. While preparing bids, the major concern of companies is to offer an optimum price that will enable th
APA, Harvard, Vancouver, ISO, and other styles
4

Gozleveli, Farideh V. "An Investigation of Project Dependencies and Risks in Project Schedule Slippage and Effort Overrun in the Engineering Computing Organization." NSUWorks, 2002. http://nsuworks.nova.edu/gscis_etd/543.

Full text
Abstract:
The purpose of the author in this dissertation was to investigate relationships between project dependencies and risks and the project schedule slippage and effort overrun in the Engineering Computing Organization of a leading electronic communication company. The rationale for this study was to provide a simple mechanism for the project leaders enabling them to follow their project plan more closely. Engineering Computing (EC) provides support services for all workstations, servers, Computer Aided Design (CAD) applications, and Computer Aided Engineering (CAE) applications in a leading electr
APA, Harvard, Vancouver, ISO, and other styles
5

Creedy, Garry D. "Risk factors leading to cost overrun in the delivery of highway construction projects." Thesis, Queensland University of Technology, 2006. https://eprints.qut.edu.au/16399/1/Garry_Creedy_Thesis.pdf.

Full text
Abstract:
Accurate client budget estimates are critical to the initial decision-to-build process for the highway construction projects. This decision-to-build point in a project's development is seen as the international standard for measuring any subsequent cost estimate inaccuracies involved (National Audit Office/Department of Transport, 1992; World Bank, 1994; Nijkamp and Ubbels, 1999), with accuracy being defined as the difference between the initial project estimate at the decision-to-build stage and the real, accounted project cost determined at the time of project completion. Expressed as a perc
APA, Harvard, Vancouver, ISO, and other styles
6

Creedy, Garry D. "Risk factors leading to cost overrun in the delivery of highway construction projects." Queensland University of Technology, 2006. http://eprints.qut.edu.au/16399/.

Full text
Abstract:
Accurate client budget estimates are critical to the initial decision-to-build process for the highway construction projects. This decision-to-build point in a project's development is seen as the international standard for measuring any subsequent cost estimate inaccuracies involved (National Audit Office/Department of Transport, 1992; World Bank, 1994; Nijkamp and Ubbels, 1999), with accuracy being defined as the difference between the initial project estimate at the decision-to-build stage and the real, accounted project cost determined at the time of project completion. Expressed as a perc
APA, Harvard, Vancouver, ISO, and other styles
7

Mitra, John Paul, Joseph Shrestha, Jeremy Ross, and Jinseok Hong. "Analysis of Construction Cost Variation of Construction Manager General Contractor (CM/GC) Project." Digital Commons @ East Tennessee State University, 2019. https://dc.etsu.edu/etsu-works/5472.

Full text
Abstract:
Cost overrun is prevalent in the construction industry. Usually, an owner sets a budget at the preliminary phase of a project which changes over time. Past studies are focused on analyzing the cost growth of design-bid-build projects during construction. Limited efforts have been made to analyze details of projects delivered with the Construction Manager General Contractor (CM/GC) method. This study tracks and analyzes the construction cost variation of a project from the conceptual phase to the design completion phase. The analysis is presented with a case study of a new stadium construction
APA, Harvard, Vancouver, ISO, and other styles
8

Saad, Lina. "Omfattningsändringar i infrastrukturprojekt : En fallstudie med fokus på ett tunnelbaneprojekt i tidiga skeden." Thesis, KTH, Fastigheter och byggande, 2021. http://urn.kb.se/resolve?urn=urn:nbn:se:kth:diva-298311.

Full text
Abstract:
Transportinfrastruktursystem spelar en viktig roll i stadsutvecklingen. Nyttjandet av underjordiska utrymmen för transportsystem ökar alltmer och används som potentiella lösningar för att lösa urbaniseringsproblem. För att möta den snabba befolkningstillväxt som Stockholm står inför initierade regeringen Stockholmsöverenskommelsen 2013 som innebar en omfattande utbyggnad av tunnelbanenätet samt en ökad bostadsbebyggelse. Tunnelbaneutbyggnaden är i Sverige den första att genomföras på trettio år och projektet har i det tidiga skedet redan ändrats i omfattning i två etapper.  Syftet med studien
APA, Harvard, Vancouver, ISO, and other styles
9

Kriebel, Matilda, and Emma Wolgsjö. "Proaktiv ändringshantering i uppstart av byggprojekt : En fallstudie om hur projektledare kan förebygga kostnader för tillägg i mindre byggprojekt." Thesis, Högskolan i Gävle, Industriell ekonomi, 2019. http://urn.kb.se/resolve?urn=urn:nbn:se:hig:diva-30309.

Full text
Abstract:
A project can be defined as a temporary work that is within the scope of time and budget in terms of achieving a project goal. Due to the fact that construction projects are unique and usually very complex, project management therefore requires a working method that is adapted to the prerequisites of the project. The project manager's responsibility to follow up on the budget and ensure that resources such as working hours and consulting services are distributed correctly, is becoming increasingly challenging as the change paradox shows that flexibility decreases and costs for changes increase
APA, Harvard, Vancouver, ISO, and other styles
10

Perovic, Miljenka. "Overcoming the challenges of building heritage projects: Improvements to time, scope and cost performance." Thesis, Queensland University of Technology, 2015. https://eprints.qut.edu.au/91544/1/Miljenka_Perovic_Thesis.pdf.

Full text
Abstract:
This research was undertaken to encompass and identify challenges and impact factors that affect the successful outcomes of heritage building projects, especially those related to finding major causes of delays and cost overruns across projects in all Australian states. This project determined and analysed the causes of such delays and programme issues emanating from the planning and execution phases, whilst also analysing the requirements for management of multiple stakeholder relationships and the influence of unforeseen technical factors. The research proposes "call for action" guidance and
APA, Harvard, Vancouver, ISO, and other styles
More sources

Books on the topic "Project overrun"

1

Hinze, Jimmie. Analysis of WSDOT construction cost overruns: Final report, Research Project GC8719, Task 12, Construction Cost Overruns. Washington State Dept. of Transportation, Planning, Research and Public Transportation Division, in cooperation with the U.S. Dept. of Transportation, Federal Highway Administration, 1991.

Find full text
APA, Harvard, Vancouver, ISO, and other styles
2

Arvan, Lanny. A sequential equilibrium model of cost overruns in long term project. University of Illinois at Urbana-Champaign, 1988.

Find full text
APA, Harvard, Vancouver, ISO, and other styles
3

Leite, António Nogueira. Cost overruns in long-term projects: Competing or complementary explanations? Universidade Nova de Lisboa, Faculdade de Economia, 1992.

Find full text
APA, Harvard, Vancouver, ISO, and other styles
4

Patty, Robert M. The end of project overruns: Lean and beyond for engineering, procurement, and construction. Universal Publishers, 2010.

Find full text
APA, Harvard, Vancouver, ISO, and other styles
5

Patty, Robert M. The end of project overruns: Lean and beyond for engineering, procurement, and construction. Universal Publishers, 2010.

Find full text
APA, Harvard, Vancouver, ISO, and other styles
6

Park, Jung Eun. Cost Overruns and Schedule Delays of Major Projects: Why We Need Reference Class Forecasting. [publisher not identified], 2021.

Find full text
APA, Harvard, Vancouver, ISO, and other styles
7

United States. Dept. of Energy. Office of Inspections, ed. Report on inspection of Los Alamos National Laboratory's system for controlling cost overruns on work-for-others projects. U.S. Dept. of Energy, Office of Inspector General, Office of Inspections, 1995.

Find full text
APA, Harvard, Vancouver, ISO, and other styles
8

New Jersey. Legislature. General Assembly. Light Rail Transit Legislative Panel. Panel meeting of Assembly Light Rail Transit Legislative Panel: To provide further clarification and testimony on the status of the rail car design, the status of project funds and cost overruns, and the overall project status : [February 27, 1998, Jersey City, New Jersey]. The Unit, 1998.

Find full text
APA, Harvard, Vancouver, ISO, and other styles
9

Project Cost Overrun: Decision-Making, Overruns, and Their Consequences. Cambridge University Press, 2017.

Find full text
APA, Harvard, Vancouver, ISO, and other styles
10

Segelod, Esbjörn. Project Cost Overrun: Causes, Consequences, and Investment Decisions. Cambridge University Press, 2017.

Find full text
APA, Harvard, Vancouver, ISO, and other styles
More sources

Book chapters on the topic "Project overrun"

1

Mahind, V. D., and B. M. Dawari. "Factors Leading to Cost Overrun and Time Overrun in Pune Metro Project." In Lecture Notes in Civil Engineering. Springer Nature Switzerland, 2023. http://dx.doi.org/10.1007/978-3-031-39663-2_50.

Full text
APA, Harvard, Vancouver, ISO, and other styles
2

Tsunoda, Masateru, Akito Monden, Kenichi Matsumoto, Ryosuke Hatano, Toshihiko Nakano, and Yutaka Fukuchi. "Analyzing Risk Factors Affecting Project Cost Overrun." In Studies in Computational Intelligence. Springer Berlin Heidelberg, 2013. http://dx.doi.org/10.1007/978-3-642-32172-6_14.

Full text
APA, Harvard, Vancouver, ISO, and other styles
3

Abonassrya, M., M. Alam, and A. Saifullah. "Analysis of Categories That Delay Global Construction Projects." In Lecture Notes in Civil Engineering. Springer Nature Singapore, 2023. http://dx.doi.org/10.1007/978-981-99-3330-3_15.

Full text
Abstract:
AbstractDelay in construction projects is a significant issue and concern for most construction companies. Many studies have addressed this issue by identifying the top-ranked causes, which vary according to project type, location, and the research method used. The combined factors of delay/time overrun need further analysis to understand the top-ranked factors considering the project context. We identified 360 delay/time overrun factors of construction projects from articles published in the past 10 years in top-quality journals ranked as per scientific journal ranking (SJR). The factors were
APA, Harvard, Vancouver, ISO, and other styles
4

Sihombing, Lukas Beladi, and Ari Tiandaru Baskoro. "Analysing Cost Overrun in Building a Construction Project Using Building Information Modeling." In Project Management in the Digital Transformation Era. Springer Nature Switzerland, 2023. http://dx.doi.org/10.1007/978-3-031-34629-3_16.

Full text
APA, Harvard, Vancouver, ISO, and other styles
5

Diallo, Amadou Thierno, and Ahmet Suayb Gundogdu. "Islamic Versus Conventional Infrastructure Project Finance vis-à-vis Time-Overrun Issues." In Sustainable Development and Infrastructure. Springer International Publishing, 2021. http://dx.doi.org/10.1007/978-3-030-67094-8_2.

Full text
APA, Harvard, Vancouver, ISO, and other styles
6

Ezzat, Karwan Akram. "Investigating the Impact of Risk Factors on Cost Estimate Inaccuracy Caused by Project Cost Overrun in the Kurdistan Region’s Public Sector Construction Projects." In Perspectives on Development in the Middle East and North Africa (MENA) Region. Springer Nature Singapore, 2024. https://doi.org/10.1007/978-981-97-7725-9_11.

Full text
APA, Harvard, Vancouver, ISO, and other styles
7

Omotayo, Temitope, Udayangani Kulatunga, and Bankole Awuzie. "Continuous Improvement and Cost Overrun in Construction Projects." In Continuous Cost Improvement in Construction. Routledge, 2022. http://dx.doi.org/10.1201/9781003176077-10.

Full text
APA, Harvard, Vancouver, ISO, and other styles
8

Youssefi, Iman, and Tolga Celik. "Cost Overrun Analysis in Road Projects: Insights from ADB’s Funded Projects." In Lecture Notes in Civil Engineering. Springer Nature Singapore, 2024. http://dx.doi.org/10.1007/978-981-97-1781-1_9.

Full text
APA, Harvard, Vancouver, ISO, and other styles
9

Ika, Lavagnon, Peter Love, and Jeffrey K. Pinto. "Before You Start Managing that Major Project, What You Should Know about Cost Overruns and Benefit Shortfalls1." In Mastering Project Leadership. Auerbach Publications, 2024. http://dx.doi.org/10.1201/9781003502654-4.

Full text
APA, Harvard, Vancouver, ISO, and other styles
10

Ibrahim, Jimoh, Christoph Loch, and Kishore Sengupta. "Insights from the Analysis of the Questionnaires." In How Megaprojects Are Damaging Nigeria and How to Fix It. Springer International Publishing, 2022. http://dx.doi.org/10.1007/978-3-030-96474-0_5.

Full text
Abstract:
AbstractThis chapter presents the statistical (econometric) identification of the most important success drivers of the projects in the sample. The chapter first compresses the 41 questionnaire variables (which contain duplication for robustness sake) into 5 success factors. Then, regressions identify which success factors drive the probability of project completion and which factors drive budget and schedule overruns (for the completed projects).The economic levers are huge—the regressions identify that moderately improving the success factors can double completion chances and save hundreds o
APA, Harvard, Vancouver, ISO, and other styles

Conference papers on the topic "Project overrun"

1

Mittlesteadt, Douglas, and David Morton. "Lifetime Corrosion Control Cost Minimization." In Coatings+ 2020. SSPC, 2020. https://doi.org/10.5006/s2020-00039.

Full text
Abstract:
Abstract Most capital projects in the energy market face significant cost overrun issues. There is a real need for innovation to improve productivity; reduce the need for completion on site and to minimise the annual operations maintenance budget. By optimising the coating specification we can increase the likelihood of paint completion during the project while increasing productivity and quality. Thus the chances of the project being completed in time are increased and the lifetime maintenance costs reduced. This paper will show the cost reduction benefits of using an optimised two coat paint
APA, Harvard, Vancouver, ISO, and other styles
2

Kumarathunga, Janani Uvasara, W. M. C. L. K. Wijekoon, and Chanuri Kalugala. "Effect of Project Duration Decision at the Bidding Process on Cost Overruns of Sri-Lankan Building Projects." In SLIIT 2nd International Conference on Engineering and Technology. SLIIT, 2023. http://dx.doi.org/10.54389/kjke1371.

Full text
Abstract:
Cost overruns are a significant issue in the construction industry, particularly from the standpoint of clients. Many studies have been interested in the unpredictable situations that lead to cost overruns, with the primary goal of pinpointing the precise causative factors. There is a knowledge gap about whether cost overruns could be prevented through effective decision-making at a project’s earliest phases. Therefore, the aim of this research was to critically review if the impact of the project duration decision taken at the bidding process could lead to cost overruns of Sri Lankan building
APA, Harvard, Vancouver, ISO, and other styles
3

Bohórquez-Castellanos, Jherson Jhadir, and Guillermo Mejía. "Relationship between cost overruns and complexity in engineering projects: a mixed approach." In XI SIMPÓSIO BRASILEIRO DE GESTÃO E ECONOMIA DA CONSTRUÇÃO. Antac, 2021. http://dx.doi.org/10.46421/sibragec.v11i00.59.

Full text
Abstract:
Currently, cost overrun is a worldwide phenomenon in engineering projects. Severals studies have quantified cost overruns in projects, while others have determined the leading factors of cost overruns. Among these factors, researchers and practitioners have taken an interest in construction complexity. Some authors suggest further analysis of the relationship between project complexity and project success because construction complexity influences decision-making and produces adverse effects on project cost performance. This study aimed at both an alternative mixed analysis of project complexi
APA, Harvard, Vancouver, ISO, and other styles
4

Akinradewo, Opeoluwa, Clinton Aigbavboa, Matthew Ikuabe, Peter Adekunle, Wellington Didibhuku Thwala, and Shola Olatunji. "Project Planning: A Determinant of Project Delivery to Time and Cost." In 13th International Conference on Applied Human Factors and Ergonomics (AHFE 2022). AHFE International, 2022. http://dx.doi.org/10.54941/ahfe1001623.

Full text
Abstract:
Planning is not only the most basic of all the managerial functions, it also determines how the other functions will be implemented. With efficient project planning, utilisation of administrations, and hierarchical strategies, proper project operations can be sequenced to achieve a successful project delivery. This research study set out to appraise the project planning impact on project delivery. To achieve this, a qualitative research method was adopted in which archival data was obtained for public building projects executed between January and December 2021 within Lagos State, Nigeria. Ana
APA, Harvard, Vancouver, ISO, and other styles
5

"Analysis of Overturns in Real Estate Project Using Artificial Network." In The International Conference on scientific innovations in Science, Technology, and Management. International Journal of Advanced Trends in Engineering and Management, 2023. http://dx.doi.org/10.59544/adlw6471/ngcesi23p82.

Full text
Abstract:
Cost overrun is one of the most important problem that encounter Real Estate projects success, since it reduces the contractor’s profit and sometimes lead to enormous losses. Cost overruns occur in every real estate project while the magnitude varies significantly from project to project. Throughout this research we tried to gather and analyze the main factors which cause cost overruns in real estate projects such as the factors determining percentage overrun include the financial condition of the owner ,the cash flow of the contractor, material cost increase, competition at tender stage, the
APA, Harvard, Vancouver, ISO, and other styles
6

Britton, Christopher. "Better Predictions, Better Outcomes: How Integrated Cost & Schedule Risk Analysis (iCSRA) Reduces Costly Consequences of Project Delays." In ADIPEC. SPE, 2024. http://dx.doi.org/10.2118/221836-ms.

Full text
Abstract:
The success of any major capital project within the upstream E&P sector is ultimately determined by the difference between revenue gained from selling the product to the market (money in) versus the associated expenditure (money out) to design, build and operate the field development project. Economists are acutely aware of how the time-phasing of CapEx and revenue can impact the NPV and other economic KPIs due to discounting and inflation/ escalation effects. Time is a critical factor in both sides of the value equation as the project start-up date marks the point at which capital is most
APA, Harvard, Vancouver, ISO, and other styles
7

Krishna Padmanabhan, K. Vipin, and P. Amal Balachandran. "Analyzing Different Contracting Strategies for Oil & Gas Operator: A Comprehensive Study for Subsea Development Projects." In Offshore Technology Conference. OTC, 2025. https://doi.org/10.4043/35811-ms.

Full text
Abstract:
The development of oil and gas fields has reached unprecedented levels of innovation in technologies, installation vessels etc. which assisted in driving exploration and field developments into increasingly deeper waters and difficult terrains. These advancements in deep-water developments requires significant investments, as it involves complex logistics, and the collaboration of multiple stakeholders which includes the operators, contractors, and the government etc. This intricate ecosystem of partners works collectively towards achieving common objectives, making the execution of these proj
APA, Harvard, Vancouver, ISO, and other styles
8

Chamikara, K. L., B. A. K. S. Perera, and I. N. Kurukulasooriya. "Use of building information modelling to mitigate cost overruns in design and build projects." In World Construction Symposium - 2023. Ceylon Institute of Builders - Sri Lanka, 2023. http://dx.doi.org/10.31705/wcs.2023.88.

Full text
Abstract:
Cost overrun in the design and build (D&B) procurement method is a significant obstacle in achieving the project goals. Therefore, it has become critical consideration over its numerous benefits when selecting this procurement method. However, applying new technologies, such as Building Information Modelling (BIM), can significantly minimise this issue. Thus, this study aims to investigate the use of BIM to manage the cost overrun issues in D&B projects. A qualitative approach based on two rounds of interviews was conducted to collect the data. The study findings revealed ten highly im
APA, Harvard, Vancouver, ISO, and other styles
9

Mejía, Guillermo, Jherson Bohórquez, and Tulia E. Rivera. "Benefits of Using Confidence Intervals in Reports of Project Cost Overrun." In Construction Research Congress 2020. American Society of Civil Engineers, 2020. http://dx.doi.org/10.1061/9780784482889.075.

Full text
APA, Harvard, Vancouver, ISO, and other styles
10

Shah, Fakhar Hassan, Omer Shujat Bhatti, and Shehryar Ahmed. "A Review of the Effects of Project Management Practices on Cost Overrun in Construction Projects." In CSCE 2023. MDPI, 2023. http://dx.doi.org/10.3390/engproc2023044001.

Full text
APA, Harvard, Vancouver, ISO, and other styles

Reports on the topic "Project overrun"

1

Padhye, Suyash, Aishwarya Sharma, Hesam Arefkhani, et al. INDOT Project Change Orders: Root Causes and Recommendations. Purdue University, 2024. https://doi.org/10.5703/1288284317747.

Full text
Abstract:
This study analyzed the historical trends in change orders (COs) associated with the Indiana Department of Transportation (INDOT) highway contracts. It also investigated correlations between COs and base factors (district, project type, contract type, award amount, geographical area (rural vs. urban)), and sought to understand the effect of the root causes but not to predict CO based on root causes. Unlike the base factors, the root causes are unknown prior to construction. The study developed models that forecasted CO characteristics—CO likelihood, CO frequency (count), and CO severity (magni
APA, Harvard, Vancouver, ISO, and other styles
2

Bordat, Claire, Bob McCullouch, and Kumares Sinha. An Analysis of Cost Overruns and Time Delays of INDOT Projects. Purdue University, 2004. http://dx.doi.org/10.5703/1288284313134.

Full text
APA, Harvard, Vancouver, ISO, and other styles
3

Nasr, Elhami, Tariq Shehab, Nigel Blampied, and Vinit Kanani. Estimating Models for Engineering Costs on the State Highway Operation and Protection Program (SHOPP) Portfolio of Projects. Mineta Transportation Institute, 2024. http://dx.doi.org/10.31979/mti.2024.2365.

Full text
Abstract:
The State Highway Operation and Protection Program (SHOPP) is crucial for maintaining California’s 15,000-mile state highway system, which includes projects like pavement rehabilitation, bridge repair, safety enhancements, and traffic management systems. Administered by Caltrans, SHOPP aims to preserve highway efficiency and safety, supporting economic growth and public safety. This research aimed to develop robust cost-estimating models to improve budgeting and financial planning, aiding Caltrans, the California Transportation Commission (CTC), and the Legislature. The research team collected
APA, Harvard, Vancouver, ISO, and other styles
4

Mitchell, Corey, Linda Allison, Corey Mitchell, and Linda Allison. Desert tortoise inventory at Lake Mead National Recreation Area: 2022 line distance sampling surveys. National Park Service, 2024. http://dx.doi.org/10.36967/2304840.

Full text
Abstract:
The Mojave desert tortoise (Gopherus agassizii) inhabits the Mojave and Colorado Deserts in the southwestern United States. The Lake Mead National Recreation Area (NRA) spans the Colorado River corridor in Arizona and Nevada and sits at an ecologically important intersection of the listed and unlisted Mojave tortoise populations. A large portion of the Lake Mead NRA contains suitable desert tortoise habitat, but no contemporary estimates of population densities exist for different areas of the recreation area. Three of the long-term range-wide monitoring strata overlap the Lake Mead NRA: Eldor
APA, Harvard, Vancouver, ISO, and other styles
5

Menuz, Diane, and Rebekah Downard. Opportunity for Improved Wetland Mitigation in Utah - In-Lieu Fee Mitigation Potential in Utah. Utah Geological Survey, 2023. http://dx.doi.org/10.34191/ofr-756.

Full text
Abstract:
Wetlands play a crucial role in watersheds and provide critical ecosystem functions, most notably, water quality improvement, fish and wildlife habitat, flood attenuation, drought mitigation, and carbon sequestration. Wetlands in Utah are regulated primarily by the federal government under the Clean Water Act (CWA), which requires mitigation to replace ecological services that are lost to permitted activities. Utah House Bill 118 (2022) directed the Utah Geological Survey to explore the potential for an In-Lieu Fee (ILF) mitigation program to improve wetland resources in Utah. An ILF program w
APA, Harvard, Vancouver, ISO, and other styles
6

Roberts, Tony, and Kevin Hernandez. Open Data for Agriculture and Nutrition: A Literature Review and Proposed Conceptual Framework. Institute of Development Studies (IDS), 2021. http://dx.doi.org/10.19088/ids.2021.018.

Full text
Abstract:
This paper begins by locating the Global Open Data for Agriculture and Nutrition project (GODAN) in the context of wider debates in the open data movement by first reviewing the literature on open data and open data for agriculture and nutrition (ODAN). The review identifies a number of important gaps and limitations in the existing literature. There has been no independent evaluation of who most benefits or who is being left behind regarding ODAN. There has been no independent evaluation of gender or diversity in ODAN or of the development outcomes or impacts of ODAN. The existing research on
APA, Harvard, Vancouver, ISO, and other styles
7

Guidance for Decision Quality for Multicompany Upstream Projects. SPE, 2016. http://dx.doi.org/10.2118/181246-tr.

Full text
Abstract:
Recent large projects in the upstream oil and gas industry underperformed 80% of the time compared with the outcome expected at project sanction. Approximately 30% of the projects had either significant cost overruns or schedule slippage, and 64% of the projects experienced enduring production-attainment problems following initial production. Smaller projects performed somewhat better, but significant improvement could be realized in projects of all sizes, most of which involve multiple companies working as co-owners. Focusing on decision quality (DQ) is a natural outcome of the realization th
APA, Harvard, Vancouver, ISO, and other styles
8

Report on inspection of Los Alamos National Laboratory`s system for controlling cost overruns on work-for-others projects. Office of Scientific and Technical Information (OSTI), 1995. http://dx.doi.org/10.2172/46684.

Full text
APA, Harvard, Vancouver, ISO, and other styles
We offer discounts on all premium plans for authors whose works are included in thematic literature selections. Contact us to get a unique promo code!