To see the other types of publications on this topic, follow the link: Project overrun.

Books on the topic 'Project overrun'

Create a spot-on reference in APA, MLA, Chicago, Harvard, and other styles

Select a source type:

Consult the top 24 books for your research on the topic 'Project overrun.'

Next to every source in the list of references, there is an 'Add to bibliography' button. Press on it, and we will generate automatically the bibliographic reference to the chosen work in the citation style you need: APA, MLA, Harvard, Chicago, Vancouver, etc.

You can also download the full text of the academic publication as pdf and read online its abstract whenever available in the metadata.

Browse books on a wide variety of disciplines and organise your bibliography correctly.

1

Hinze, Jimmie. Analysis of WSDOT construction cost overruns: Final report, Research Project GC8719, Task 12, Construction Cost Overruns. Washington State Dept. of Transportation, Planning, Research and Public Transportation Division, in cooperation with the U.S. Dept. of Transportation, Federal Highway Administration, 1991.

Find full text
APA, Harvard, Vancouver, ISO, and other styles
2

Arvan, Lanny. A sequential equilibrium model of cost overruns in long term project. University of Illinois at Urbana-Champaign, 1988.

Find full text
APA, Harvard, Vancouver, ISO, and other styles
3

Leite, António Nogueira. Cost overruns in long-term projects: Competing or complementary explanations? Universidade Nova de Lisboa, Faculdade de Economia, 1992.

Find full text
APA, Harvard, Vancouver, ISO, and other styles
4

Patty, Robert M. The end of project overruns: Lean and beyond for engineering, procurement, and construction. Universal Publishers, 2010.

Find full text
APA, Harvard, Vancouver, ISO, and other styles
5

Patty, Robert M. The end of project overruns: Lean and beyond for engineering, procurement, and construction. Universal Publishers, 2010.

Find full text
APA, Harvard, Vancouver, ISO, and other styles
6

Park, Jung Eun. Cost Overruns and Schedule Delays of Major Projects: Why We Need Reference Class Forecasting. [publisher not identified], 2021.

Find full text
APA, Harvard, Vancouver, ISO, and other styles
7

United States. Dept. of Energy. Office of Inspections, ed. Report on inspection of Los Alamos National Laboratory's system for controlling cost overruns on work-for-others projects. U.S. Dept. of Energy, Office of Inspector General, Office of Inspections, 1995.

Find full text
APA, Harvard, Vancouver, ISO, and other styles
8

New Jersey. Legislature. General Assembly. Light Rail Transit Legislative Panel. Panel meeting of Assembly Light Rail Transit Legislative Panel: To provide further clarification and testimony on the status of the rail car design, the status of project funds and cost overruns, and the overall project status : [February 27, 1998, Jersey City, New Jersey]. The Unit, 1998.

Find full text
APA, Harvard, Vancouver, ISO, and other styles
9

Project Cost Overrun: Decision-Making, Overruns, and Their Consequences. Cambridge University Press, 2017.

Find full text
APA, Harvard, Vancouver, ISO, and other styles
10

Segelod, Esbjörn. Project Cost Overrun: Causes, Consequences, and Investment Decisions. Cambridge University Press, 2017.

Find full text
APA, Harvard, Vancouver, ISO, and other styles
11

Segelod, Esbjö. Project Cost Overrun: Causes, Consequences, and Investment Decisions. Cambridge University Press, 2017.

Find full text
APA, Harvard, Vancouver, ISO, and other styles
12

Gray, Carol. Overrun Edition: O/R Project Management+ Cd+Ms. McGraw-Hill Education, 2002.

Find full text
APA, Harvard, Vancouver, ISO, and other styles
13

Farrell, Mike. Avoiding Project Construction Overruns: Manpower Planning for Multi-Discipline Construction Projects. Independently Published, 2016.

Find full text
APA, Harvard, Vancouver, ISO, and other styles
14

Bell, Clive. Project appraisal: A revival is long overdue. UNU-WIDER, 2017. http://dx.doi.org/10.35188/unu-wider/2017/335-6.

Full text
APA, Harvard, Vancouver, ISO, and other styles
15

What are the determinants of cost overruns in projects? SAGE Publications, Ltd., 2023. http://dx.doi.org/10.4135/9781529668902.

Full text
APA, Harvard, Vancouver, ISO, and other styles
16

Saeed, Muhammad Sajid. Role of Project Management Practices in Avoiding Time and Cost Overruns. GRIN Verlag GmbH, 2016.

Find full text
APA, Harvard, Vancouver, ISO, and other styles
17

John, Dewar, and Irwin Oliver. 4 Project Risks. Oxford University Press, 2015. http://dx.doi.org/10.1093/law/9780198715559.003.0005.

Full text
Abstract:
This chapter considersthe identification, assessment, allocation, negotiation, and management of the risks associated with a particular project(such as delay risk, cost overruns, technology risk, off-take risk, revenue risk, operating risk, supply risk, currency risk, political risk and environmental and social risk). A project’s value is based principally on its ability to generate revenue during its operating phase. Both the sponsors and the lenders need to be able to effectively identify and manage the risks associated with that project. This chapter also identifies how those risks can be m
APA, Harvard, Vancouver, ISO, and other styles
18

Agrawal, Kushal. Study Investigating the Factors That Cause Delays and Cost Overruns in Construction Projects in India. Anchor Academic Publishing. ein Imprint der Diplomica Verlag GmbH, 2014.

Find full text
APA, Harvard, Vancouver, ISO, and other styles
19

Agrawal, Kushal. Study Investigating the Factors That Cause Delays and Cost Overruns in Construction Projects in India. GRIN Verlag GmbH, 2013.

Find full text
APA, Harvard, Vancouver, ISO, and other styles
20

This Book Is Overdue: How Librarians and Cybrarians Can Save Us All. Harper, 2010.

Find full text
APA, Harvard, Vancouver, ISO, and other styles
21

77 Sure-Fire Ways to Kill a Software Project: Destructive Tactics That Cause Budget Overruns, Late Deliveries, and Massive Personnel Turnover. Authors Choice Press, 2000.

Find full text
APA, Harvard, Vancouver, ISO, and other styles
22

Rambsy, Kenton. The Geographies of African American Short Fiction. University Press of Mississippi, 2022. http://dx.doi.org/10.14325/mississippi/9781496838728.001.0001.

Full text
Abstract:
A history of short stories by Black writers is long overdue. The Geographies of African American Short Stories reveals the importance of thinking about character situated in locales and key cultural settings when engaging short fiction by Black writers. In the process of composing multiple brief narratives, Charles Chesnutt, Zora Neale Hurston, Richard Wright, Ralph Ellison, James Baldwin, Toni Cade Bambara, Alice Walker, Edward P. Jones, and more plotted a diverse range of characters across multiple locations—small towns, a famous metropolis, city sidewalks, rural wooded areas, apartment buil
APA, Harvard, Vancouver, ISO, and other styles
23

Spoormans, Lidwine, Wessel de Jonge, and John Stevenson-Brown, eds. ANNE LACATON: Visiting Professor 2016-2017/ Chair of Heritage & Architecture. TU Delft Bouwkunde, 2018. http://dx.doi.org/10.47982/bookrxiv.6.

Full text
Abstract:
Anne Lacaton has been a visiting professor at the TU Delft Faculty of Architecture and the Built Environment during the Fall Semester 2016-2017, hosted by the Chair of Heritage & Design. In the professional field of Heritage & Design the starting point for design is not just a functional brief and a blank sheet of paper but the challenge of an existing spatial setting and cultural-historical context. It is a dynamic and innovative field in architecture that deals with the architectural re-interpretation, adaptive reuse and restoration of historic buildings. This book reports on her wor
APA, Harvard, Vancouver, ISO, and other styles
24

Information Technology (IT) Investment Oversight Enhancement and Waste Prevention Act of 2009: Report of the Committee on Homeland Security and Governmental Affairs, United States Senate to accompany S. 920, to amend section 11317 of title 40, United States Code, to improve the transparency of the status of information technology investments, to require greater accountability for cost overruns on federal information technology investment projects, to improve the processes agencies implement to manage information technology investments, to reward excellence in information technology acquisition,and for other purposes. U.S. G.P.O., 2010.

Find full text
APA, Harvard, Vancouver, ISO, and other styles
We offer discounts on all premium plans for authors whose works are included in thematic literature selections. Contact us to get a unique promo code!