Journal articles on the topic 'Project overrun'
Create a spot-on reference in APA, MLA, Chicago, Harvard, and other styles
Consult the top 50 journal articles for your research on the topic 'Project overrun.'
Next to every source in the list of references, there is an 'Add to bibliography' button. Press on it, and we will generate automatically the bibliographic reference to the chosen work in the citation style you need: APA, MLA, Harvard, Chicago, Vancouver, etc.
You can also download the full text of the academic publication as pdf and read online its abstract whenever available in the metadata.
Browse journal articles on a wide variety of disciplines and organise your bibliography correctly.
Mohammad, Karukh Hassan, Noori Sadiq Ali, and Basira Majeed Najm. "Assessment of the Cost and Time Impact of Variation Orders on Construction Projects in Sulaimani Governorate." Journal of Engineering 27, no. 2 (February 1, 2021): 106–25. http://dx.doi.org/10.31026/j.eng.2021.02.08.
Full textKorgaonker, M. G. "Project Management: A Survey of Current Practices and Implications." Vikalpa: The Journal for Decision Makers 12, no. 4 (October 1987): 11–28. http://dx.doi.org/10.1177/0256090919870402.
Full textAje, Olaniyi Isaac, Oluwole Alfred Olatunji, and Olanrewaju Augustine Olalusi. "Overrun causations under advance payment regimes." Built Environment Project and Asset Management 7, no. 1 (February 6, 2017): 86–98. http://dx.doi.org/10.1108/bepam-06-2015-0028.
Full textSaidu, Ibrahim, W. Shakantu, A. Adamu, and I. Anugwo. "A BESPOKE APPROACH FOR RELATING MATERIAL WASTE TO COST OVERRUN IN THE CONSTRUCTION INDUSTRY." Journal of Construction Business and Management 1, no. 1 (April 18, 2017): 39–52. http://dx.doi.org/10.15641/jcbm.1.1.63.
Full textAmeh, Oko, and Emeka Osegbo. "Study of relationship between time overrunand productivity on construction sites." International Journal of Construction Supply Chain Management 1, no. 1 (December 31, 2011): 56–67. http://dx.doi.org/10.14424/ijcscm101011-56-67.
Full textEden, Colin, Fran Ackermann, and Terry Williams. "The Amoebic Growth of Project Costs." Project Management Journal 36, no. 2 (June 2005): 15–27. http://dx.doi.org/10.1177/875697280503600203.
Full textAsiedu, Richard Ohene, and Ebenezer Adaku. "Cost overruns of public sector construction projects: a developing country perspective." International Journal of Managing Projects in Business 13, no. 1 (May 6, 2019): 66–84. http://dx.doi.org/10.1108/ijmpb-09-2018-0177.
Full textChadee, Aaron, Salisha R. Hernandez, and Hector Martin. "The Influence of Optimism Bias on Time and Cost on Construction Projects." Emerging Science Journal 5, no. 4 (August 1, 2021): 429–42. http://dx.doi.org/10.28991/esj-2021-01287.
Full textIdrees, Shehryar, and Muhammad Tariq Shafiq. "Factors for Time and Cost Overrun in Public Projects." Journal of Engineering, Project, and Production Management 11, no. 3 (May 21, 2021): 243–54. http://dx.doi.org/10.2478/jeppm-2021-0023.
Full textSahid, Muhammad Nur, Anto Budi Listyawan, Abdul Rochman, and Rim Dzaky Haidar Rim. "Analisis Faktor Dominan yang Mengakibatkan Pembengkakan Biaya oleh Kontraktor pada Proyek Jalan Kabupaten Wonogiri APBD Tahun 2017 dan 2018." CANTILEVER 8, no. 2 (January 28, 2020): 51–57. http://dx.doi.org/10.35139/cantilever.v8i2.8.
Full textAsiedu, Richard Ohene, Nana Kena Frempong, and Hans Wilhelm Alfen. "Predicting likelihood of cost overrun in educational projects." Engineering, Construction and Architectural Management 24, no. 1 (January 16, 2017): 21–39. http://dx.doi.org/10.1108/ecam-06-2015-0103.
Full textLing, Florence Yean Yng. "International comparison of performance of public projects." Built Environment Project and Asset Management 8, no. 3 (July 9, 2018): 281–92. http://dx.doi.org/10.1108/bepam-08-2017-0059.
Full textAlfraidi, Y., S. M. Alzahrani, M. H. H. Abdelhafez, and H. Boussabaine. "Impact of Endogenous Risk Factors on Risk Cost in PPP Projects in Saudi Arabia." Engineering, Technology & Applied Science Research 10, no. 4 (August 16, 2020): 6087–91. http://dx.doi.org/10.48084/etasr.3462.
Full textAndrić, Jelena M., Abdul-Majeed Mahamadu, Jiayuan Wang, Patrick X. W. Zou, and Ruoyu Zhong. "THE COST PERFORMANCE AND CAUSES OF OVERRUNS IN INFRASTRUCTURE DEVELOPMENT PROJECTS IN ASIA." JOURNAL OF CIVIL ENGINEERING AND MANAGEMENT 25, no. 3 (March 1, 2019): 203–14. http://dx.doi.org/10.3846/jcem.2019.8646.
Full textFamiyeh, Samuel, Charles Teye Amoatey, Ebenezer Adaku, and Collins Sena Agbenohevi. "Major causes of construction time and cost overruns." Journal of Engineering, Design and Technology 15, no. 2 (April 3, 2017): 181–98. http://dx.doi.org/10.1108/jedt-11-2015-0075.
Full textAmoatey, Charles Teye, and Alfred Nii Okanta Ankrah. "Exploring critical road project delay factors in Ghana." Journal of Facilities Management 15, no. 2 (May 15, 2017): 110–27. http://dx.doi.org/10.1108/jfm-09-2016-0036.
Full textEgila, Ashem Emmanuel, Oluwaseun Abdulakeem Balogun, and Saheed Olanrewaji Yusuf. "Assessment of delay and cost-overrun in federal road construction project in Abuja." Independent Journal of Management & Production 11, no. 4 (August 1, 2020): 1184. http://dx.doi.org/10.14807/ijmp.v11i4.1065.
Full textAl Zadjali, Zahra A., Hamdi A. Bashir, and Ali A. Maqrashi. "Factors Causing Project Cost Overrun in the Telecommunications Industry in Oman." International Journal of Information Technology Project Management 5, no. 3 (July 2014): 84–95. http://dx.doi.org/10.4018/ijitpm.2014070105.
Full textManiar, H. "Contingency Management in Indian Construction Projects." Journal of Construction Business and Management 4, no. 2 (December 4, 2020): 11–24. http://dx.doi.org/10.15641/jcbm.4.2.840.
Full textGbahabo, Paul Terna, and Oluseye Samuel Ajuwon. "Effects of Project Cost Overruns and Schedule Delays in Sub-Saharan Africa." European Journal of Interdisciplinary Studies 3, no. 2 (January 21, 2017): 46. http://dx.doi.org/10.26417/ejis.v3i2.p46-59.
Full textGb, Paul Terna, and Oluseye Samuel Ajuwon. "Effects of Project Cost Overruns and Schedule Delays in Sub-Saharan Africa." European Journal of Interdisciplinary Studies 7, no. 2 (January 21, 2017): 46. http://dx.doi.org/10.26417/ejis.v7i2.p46-59.
Full textAmadi, Alolote Ibim, and Anthony Higham. "Latent geotechnical pathogens inducing cost overruns in highway projects." Journal of Financial Management of Property and Construction 22, no. 3 (November 6, 2017): 269–85. http://dx.doi.org/10.1108/jfmpc-03-2017-0008.
Full textLouzolo-Kimbembé, Paul, Chrispin Pettang, and Thomas Tamo Tatiétsé. "Minimisation des surcoûts dans un contexte hors délai : cas des projets de construction dans les pays en développement." Canadian Journal of Civil Engineering 34, no. 9 (September 1, 2007): 1180–91. http://dx.doi.org/10.1139/l07-089.
Full textIrfan, Muhammad, Muhammad Sohail Anwar Malik, and Syyed Sami Ul Haq Kaka Khel. "Effect of factors of organizational structure influencing nonphysical waste in road projects of developing countries." Engineering, Construction and Architectural Management 27, no. 10 (May 28, 2020): 3135–53. http://dx.doi.org/10.1108/ecam-06-2019-0327.
Full textHerrera, Rodrigo F., Omar Sánchez, Karen Castañeda, and Hernán Porras. "Cost Overrun Causative Factors in Road Infrastructure Projects: A Frequency and Importance Analysis." Applied Sciences 10, no. 16 (August 9, 2020): 5506. http://dx.doi.org/10.3390/app10165506.
Full textOthman, I., Nasir Shafiq, and M. F. Nuruddin. "Time Overrun in Construction Project." IOP Conference Series: Materials Science and Engineering 291 (December 2017): 012016. http://dx.doi.org/10.1088/1757-899x/291/1/012016.
Full textChadee, Aaron Anil, Xsitaaz Twinkle Chadee, Indrajit Ray, Abrahams Mwasha, and Hector Hugh Martin. "When Parallel Schools of Thought Fail to Converge: The Case of Cost Overruns in Project Management." Buildings 11, no. 8 (July 27, 2021): 321. http://dx.doi.org/10.3390/buildings11080321.
Full textParaskevopoulou, Chrysothemis, and Georgios Boutsis. "Cost Overruns in Tunnelling Projects: Investigating the Impact of Geological and Geotechnical Uncertainty Using Case Studies." Infrastructures 5, no. 9 (September 8, 2020): 73. http://dx.doi.org/10.3390/infrastructures5090073.
Full textKarami, Hamidreza, and Oluwole Alfred Olatunji. "Critical overrun causations in marine projects." Engineering, Construction and Architectural Management 27, no. 7 (April 19, 2020): 1579–94. http://dx.doi.org/10.1108/ecam-09-2019-0477.
Full textAsiedu, Richard Ohene, Nana Kena Frempong, and Gabriel Nani. "Parametric time overrun estimation of building projects." Journal of Financial Management of Property and Construction 21, no. 3 (November 7, 2016): 253–68. http://dx.doi.org/10.1108/jfmpc-10-2015-0037.
Full textShehu, Zayyana, Gary D. Holt, Intan R. Endut, and Akintola Akintoye. "Analysis of characteristics affecting completion time for Malaysian construction projects." Built Environment Project and Asset Management 5, no. 1 (February 2, 2015): 52–68. http://dx.doi.org/10.1108/bepam-10-2013-0056.
Full textM.karim, Karukh Hassan, Noori Ali, and Basira Majeed. "The Causes of Variation Orders and Their Effects on Cost and Time of Projects in Sulaimani Governorate." Kurdistan Journal of Applied Research 5, no. 1 (June 30, 2020): 218–35. http://dx.doi.org/10.24017/science.2020.1.16.
Full textLiu, Huimin, Canhui Jiang, Yan Liu, Marcel Hertogh, and Xue Lyu. "Optimism Bias Evaluation and Decision-Making Risk Forecast on Bridge Project Cost Based on Reference Class Forecasting: Evidence from China." Sustainability 10, no. 11 (October 31, 2018): 3981. http://dx.doi.org/10.3390/su10113981.
Full textShehu, Zayyana, Intan R. Endut, and Akintola Akintoye. "Factors contributing to project time and hence cost overrun in the Malaysian construction industry." Journal of Financial Management of Property and Construction 19, no. 1 (April 7, 2014): 55–75. http://dx.doi.org/10.1108/jfmpc-04-2013-0009.
Full textRoslan, Nadzirah, Noor Yasmin Zainun, and Aftab Hameed Memon. "Relevancy of Factors and Mitigation Measures in Controlling Time and Cost Overrun towards Malaysian Environment." Applied Mechanics and Materials 773-774 (July 2015): 1007–11. http://dx.doi.org/10.4028/www.scientific.net/amm.773-774.1007.
Full textSohu, Samiullah, Abd Halid Abdullah, Sasitharan Nagapan, Ashfaque Ahmed Jhatial, and Muhammed Tahir. "Contributing Cost Variation Factors in Highway Projects." Civil Engineering Journal 4, no. 8 (August 26, 2018): 1793. http://dx.doi.org/10.28991/cej-03091115.
Full textAl-Hazim, Nabil, and Zaydoun Abusalem. "Delay and cost overrun in road construction projects in Jordan." International Journal of Engineering & Technology 4, no. 2 (April 2, 2015): 288. http://dx.doi.org/10.14419/ijet.v4i2.4409.
Full textAfzal, Farman, Shao Yunfei, Muhammad Sajid, and Fahim Afzal. "Integrated priority decision index for risk assessment in chaos: cost overruns in transport projects." Engineering, Construction and Architectural Management 27, no. 4 (October 24, 2019): 825–49. http://dx.doi.org/10.1108/ecam-02-2019-0079.
Full textDe Marco, Alberto, and Timur Narbaev. "Factors of Schedule and Cost Performance of Tunnel Construction Megaprojects." Open Civil Engineering Journal 15, no. 1 (April 13, 2021): 38–49. http://dx.doi.org/10.2174/1874149502115010038.
Full textRoumeissa, Salhi. "Impact of Delay on Cost Overrun in Construction Projects in Algeria." European Journal of Interdisciplinary Studies 5, no. 2 (May 31, 2019): 25. http://dx.doi.org/10.26417/ejis-2019.v5i2-281.
Full textRoumeissa, Salhi. "Impact of Delay on Cost Overrun in Construction Projects in Algeria." European Journal of Interdisciplinary Studies 5, no. 2 (May 31, 2019): 25. http://dx.doi.org/10.26417/ejis.v5i2.p25-30.
Full textDERAKHSHANALAVIJEH, Roya, and Jose Manuel Cardoso TEIXEIRA. "COST OVERRUN IN CONSTRUCTION PROJECTS IN DEVELOPING COUNTRIES, GAS-OIL INDUSTRY OF IRAN AS A CASE STUDY." JOURNAL OF CIVIL ENGINEERING AND MANAGEMENT 23, no. 1 (July 13, 2016): 125–36. http://dx.doi.org/10.3846/13923730.2014.992467.
Full textAfzal, Farman, Shao Yunfei, Danish Junaid, and Muhammad Shehzad Hanif. "Cost-risk contingency framework for managing cost overrun in metropolitan projects: using fuzzy-AHP and simulation." International Journal of Managing Projects in Business 13, no. 5 (May 15, 2020): 1121–39. http://dx.doi.org/10.1108/ijmpb-07-2019-0175.
Full textMathew, Anue Marry, and Neena S. Lal. "Identification of risk factors leading to cost and time overrun in B-O-T projects." Sustainability, Agri, Food and Environmental Research 10, no. 1 (March 12, 2021): 10. http://dx.doi.org/10.7770/safer-v10n1-art2466.
Full textSeddeeq, Abdulaziz Bin, Sadi Assaf, Abdullatif Abdallah, and Mohammad A. Hassanain. "Time and Cost Overrun in the Saudi Arabian Oil and Gas Construction Industry." Buildings 9, no. 2 (February 8, 2019): 41. http://dx.doi.org/10.3390/buildings9020041.
Full textLeach, Larry. "Schedule and Cost Buffer Sizing: How to Account for the Bias between Project Performance and Your Model." Project Management Journal 34, no. 2 (June 2003): 34–47. http://dx.doi.org/10.1177/875697280303400205.
Full textShaikh, F. A. "Financial Mismanagement: A Leading Cause of Time and Cost Overrun in Mega Construction Projects in Pakistan." Engineering, Technology & Applied Science Research 10, no. 1 (February 3, 2020): 5247–50. http://dx.doi.org/10.48084/etasr.3271.
Full textAbu El-Maaty, Ahmed Ebrahim, Amr M. El-Kholy, and Ahmed Yousry Akal. "Modeling schedule overrun and cost escalation percentages of highway projects using fuzzy approach." Engineering, Construction and Architectural Management 24, no. 5 (September 18, 2017): 809–27. http://dx.doi.org/10.1108/ecam-03-2016-0084.
Full textAbusafiya, Hedaya A. M., and Saad M. A. Suliman. "Causes and Effects of Cost Overrun on Construction Project in Bahrain: Part I (Ranking of Cost Overrun Factors and Risk Mapping)." Modern Applied Science 11, no. 7 (May 27, 2017): 20. http://dx.doi.org/10.5539/mas.v11n7p20.
Full textSoomro, F. A., M. J. Memon, A. F. Chandio, S. Sohu, and R. Soomro. "Causes of Time Overrun in Construction of Building Projects in Pakistan." Engineering, Technology & Applied Science Research 9, no. 1 (February 16, 2019): 3762–64. http://dx.doi.org/10.48084/etasr.2449.
Full text