To see the other types of publications on this topic, follow the link: Project planning stages.

Journal articles on the topic 'Project planning stages'

Create a spot-on reference in APA, MLA, Chicago, Harvard, and other styles

Select a source type:

Consult the top 50 journal articles for your research on the topic 'Project planning stages.'

Next to every source in the list of references, there is an 'Add to bibliography' button. Press on it, and we will generate automatically the bibliographic reference to the chosen work in the citation style you need: APA, MLA, Harvard, Chicago, Vancouver, etc.

You can also download the full text of the academic publication as pdf and read online its abstract whenever available in the metadata.

Browse journal articles on a wide variety of disciplines and organise your bibliography correctly.

1

Mityakova, O. I., and A. V. Chernenko. "Tools for planning research and development projects." Economy in the industry 11, no. 1 (2018): 29–36. http://dx.doi.org/10.17073/2072-1633-2018-1-29-36.

Full text
Abstract:
. Realization of R&D projects is one of the factors of the enterprise’s competitiveness. Under the policy of import substitution in the domestic market, enterprises should pay great attention to planning R&D projects, assessing possible risks and minimizing development costs. A detailed development plan for R&D allows you to achieve the main criteria for the effectiveness of the R&D project: cost, timing, quality. To increase the efficiency of planning R&D projects, it was proposed to introduce new aspects of planning. The first aspect is the formation of the project portfo
APA, Harvard, Vancouver, ISO, and other styles
2

Egorov, G. G., and E. Y. Dubovikova. "Project planning in modern education." Proceedings of the Voronezh State University of Engineering Technologies 84, no. 1 (2022): 356–64. http://dx.doi.org/10.20914/2310-1202-2022-1-356-364.

Full text
Abstract:
The conducted research is devoted to the analysis of the process of formation of the qualification level of specialists in the field of economic relations, based on the specialized skills of preparation and work with projects. Based on the analyzed sources, the authors analyze the design process of any nature (socio-economic, physical, technical, technological, etc.), as a result of which the material, consumer (functional), social, and other properties of the system change. The purpose of the work is to carry out a scientific analysis of student project activities and the design process itsel
APA, Harvard, Vancouver, ISO, and other styles
3

Uzukwu, P.U. "AQUACUALTURE PROJECT PLANNING AND APPRAISAL." Continental J. Applied Sciences 8, no. 2 (2013): 40–47. https://doi.org/10.5281/zenodo.2573197.

Full text
Abstract:
This study reviews the role of aquaculture project planning and appraisal in Nigeria’s fisheries   and aquaculture sub-sector as part of the larger effort in the quest for food fish security in Nigeria. The focus was on human capacity building in the subject matter. There is a great need for the development of local capacity on small-scale, medium-scale and large-scale project formulation and appraisal even at undergraduate level to realize and sustain the set target in the fishery sub sector of the Agricultural Transformation Agenda (ATA) of present administration in view of t
APA, Harvard, Vancouver, ISO, and other styles
4

Bin Mahmoud, Abdulrahman, Abdullah Alrashdi, Salman Akhtar, Ayman Altuwaim, and Abdulmohsen Almohsen. "Development of a Predictive Model Based on the Alignment Tool in the Early Stages of Projects: The Case of Saudi Arabia Infrastructure Projects." Sustainability 16, no. 18 (2024): 8122. http://dx.doi.org/10.3390/su16188122.

Full text
Abstract:
The construction industry plays a substantial role in shaping the economies of many countries. Construction management faces various challenges that can lead to project failures, particularly in infrastructure projects struggling to meet cost and time requirements. Inadequate project planning and the intricate nature of construction projects can cause participants’ project goals to not align. It is crucial to address these challenges early in the planning stages to ensure project success. This research involved investigating previous studies to understand current practices for improving infras
APA, Harvard, Vancouver, ISO, and other styles
5

Shulgan, О. "PROJECT MANAGEMENT TOOLS THROUGH LIFE CYCLE STAGES." THEORETICAL AND APPLIED ISSUES OF ECONOMICS, no. 50 (2025): 202–14. https://doi.org/10.17721/tppe.2025.50.18.

Full text
Abstract:
The modern methods and tools of project management at different stages of the project lifecycle have been considered. These tools help to structure processes, enhance decision-making efficiency, and ensure the achievement of goals. The project lifecycle is typically divided into the following stages: initiation, planning, execution, monitoring and control, and closure. It has been proven that for each stage of the project, it is advisable to use appropriate methods and tools that address different tasks. Special attention is given to identifying the relationship between tools and stages of the
APA, Harvard, Vancouver, ISO, and other styles
6

Orlov, I. V., and S. A. Pryadko. "THE MODEL OF ADAPTIVE PLANNING OF DESIGN WORKS." Issues of radio electronics, no. 5 (May 20, 2018): 70–73. http://dx.doi.org/10.21778/2218-5453-2018-5-70-73.

Full text
Abstract:
The task of planning work while the implementation of the project, where you can separate several stages, is discussed in the article. Dependent stages are allowed, the fulfillment of which is possible only after the successful completion of a particular stage or group of stages. The approach for receiving the maximum mean income under planning for the period under review is offered, positive or negative income is associated with the fulfillment or non-fulfillment of certain stages of the project. The basis of approach and Markov chain theory are the method of dynamic programming. All the vari
APA, Harvard, Vancouver, ISO, and other styles
7

ABBAS M. ABD. "RESOURCES SUAINABILITY PLANNING MODEL USING HIERARCHICAL APPROACH FOR CONSTRUCTION PROJECT." Diyala Journal of Engineering Sciences 5, no. 2 (2012): 1–19. http://dx.doi.org/10.24237/djes.2012.05201.

Full text
Abstract:
Within the early stages of construction project planning, resources restrictions are often neglected. Usually this leads to cost and schedule overruns. Moreover, the adoption of resources restricted project planning may lead to a complex optimization problem. Thus engineers should focus on resources-based project planning for more schedule efficiency. Nevertheless, the integration with traditional methods as the PERT (program evaluation and review technique) or the CPM (critical path method), can improve schedule reliability significantly in project failures due to insufficient resource alloca
APA, Harvard, Vancouver, ISO, and other styles
8

Mihir, S. Lakdawala* Bhavin K. Kashiyani Vyom B. Pathak. "COST INFLUENCING FACTOR IN ESTIMATING AT PLANNING STAGE." INTERNATIONAL JOURNAL OF ENGINEERING SCIENCES & RESEARCH TECHNOLOGY 5, no. 5 (2016): 346–50. https://doi.org/10.5281/zenodo.51436.

Full text
Abstract:
The objective of this study is to determine the critical cost influencing factors of building construction projects. The importance of accurate estimates during the early stages of capital projects has been widely recognized for many years. Early project estimates represent a key ingredient in business unit decisions and often become the basis for a project’s ultimate funding. Identification of cost-determinant variables and evaluation of their degree of influence play an essential role in construction building. The objective of this research is to extract the key cost-influencing factor
APA, Harvard, Vancouver, ISO, and other styles
9

Rzempała, Joanna, Daniel Borkowski, and Artur Piotr Rzempała. "Risk Identification in Cogeneration (Combined Heat and Power) Projects: A Polish Case Study." Energies 15, no. 1 (2021): 42. http://dx.doi.org/10.3390/en15010042.

Full text
Abstract:
The purpose of the article is to define the risk factors in cogeneration projects and to demonstrate that a lack of sufficient identification of risks in different phases affects project implementation. A theoretical study is conducted, which aims to identify risk factors in cogeneration projects, based on case studies of such projects in Poland. The study offers a view at CHP (combined heat and power) projects as extremely dependent on the external environment of the organisation. These projects are subject to many external regulations due to their environmental impact and dynamically changin
APA, Harvard, Vancouver, ISO, and other styles
10

Gusakova, Elena. "Sustainable modeling the life cycle of a real estate development project." E3S Web of Conferences 135 (2019): 04041. http://dx.doi.org/10.1051/e3sconf/201913504041.

Full text
Abstract:
The most well-thought-out strategic planning of real estate development projects is an extremely urgent task. A real estate development project affects the building area throughout the life cycle. The modern concept of the planning horizon of a development project should be based on the analysis of its full life cycle and the consideration of various positive and negative external effects in design decisions. For this purpose, the accumulated representative experience has been studied, the most relevant and demanded areas of forecast analysis have been identified and analyzed, which determine
APA, Harvard, Vancouver, ISO, and other styles
11

BROVKOVA, Olena. "Financial planning of investment project implementation." Economics. Finances. Law 2, no. - (2022): 12–16. http://dx.doi.org/10.37634/efp.2022.2.2.

Full text
Abstract:
The paper considers the main problems and features of financial planning of the investment project. This topic is relevant because the efficiency of the use of invested funds dictates the need to form an investment policy based on the development of effective investment projects. The paper analyzes the classifications of investment projects, the project cycle, which has the stages of project formulation, project preparation, project examination, project implementation, evaluation of results. The basic schemes of financing of investment projects are offered. In the context of economic globaliza
APA, Harvard, Vancouver, ISO, and other styles
12

Larsen, Jesper Kranker, Lene Faber Ussing, Thomas Ditlev Brunoe, and Søren Munch Lindhard. "The Project Management Process of Planning and Budgeting in Public Construction Projects." International Journal of Information Technology Project Management 6, no. 4 (2015): 20–33. http://dx.doi.org/10.4018/ijitpm.2015100102.

Full text
Abstract:
Budgeting and scheduling are central elements in all projects through diverse estimates that are defining the level of project outcome success. It is therefore relevant to study how large public construction agencies apply cost and time scheduling in their projects. The study objective is firstly, to comprehend the process of cost and time scheduling in the initial phases of a project. Secondly, to discover which factors stimulate budget and deadline increases in publicly funded construction projects. Applied data collection is based on semi-structured interviews with publicly agency employed
APA, Harvard, Vancouver, ISO, and other styles
13

Wali, Alaka. "When Planning Fails." Practicing Anthropology 12, no. 3 (1990): 12–19. http://dx.doi.org/10.17730/praa.12.3.m183t5417233v178.

Full text
Abstract:
Documented accounts of forced resettlement associated with economic development projects often relate the disastrous social consequences for the affected population. Often, the blame is laid to the lack of well-developed plans and policies during the early stages of the project. The implication is that if resettlement is considered early on as a fully integrated component of the project, problems for the local residents can be avoided. The experience with forced resettlement associated with the construction of the Bayano Hydroelectric Complex in Eastern Panama proves otherwise. In this instanc
APA, Harvard, Vancouver, ISO, and other styles
14

Роман, Н. П. "Analysis of stages of the project control and management system." Экономика и предпринимательство, no. 7(120) (July 9, 2020): 707–10. http://dx.doi.org/10.34925/eip.2020.120.7.146.

Full text
Abstract:
Необходимость в выполнении капитальных проектов при надлежащем планировании на различных этапах требует применения системы контроля и управления проектами (СКУП). Надлежащая СКУП имеет жизненно важное значение для успеха строительного проекта, оптимизируя затраты при повышении эффективности. СКУП включает в себя все необходимые ресурсы, инструменты и методы, необходимые для планирования и выполнения проекта, и охватывает все связанные с этим процессы, включая, но не ограничиваясь этим, планирование, контроль затрат и графиков, прогнозирование и управление изменениями. В статье рассмотрены и пр
APA, Harvard, Vancouver, ISO, and other styles
15

Leena C, Gawale, Patil Tejas, Tonde Manoj, and Pinjarkar Sampada. "ACTIVITIES OF RAILWAY INFRASTRUCTURE WORK IN SEQUENCE BY USING WORK BREAK DOWN STRUCTURE." International Journal of Engineering Applied Sciences and Technology 7, no. 9 (2023): 64–66. http://dx.doi.org/10.33564/ijeast.2023.v07i09.010.

Full text
Abstract:
Railway infrastructure is complicated to organize due to its numerous challenging planning problems. It is crucial to understand stage by stage approach in project planning. The aim of this paper is to give an overview of railway infrastructure planning through work breakdown structure. Railway based projects using several methods from domestic experiences. It is necessary to standardize work activities implemented for high speed railway project. Work breakdown structure [WBS] can be useful in future rail and rail based construction project. This also minimize the risks, cost and time. Project
APA, Harvard, Vancouver, ISO, and other styles
16

Wuni, Ibrahim Yahaya, and Geoffrey Qiping Shen. "Critical success factors for management of the early stages of prefabricated prefinished volumetric construction project life cycle." Engineering, Construction and Architectural Management 27, no. 9 (2020): 2315–33. http://dx.doi.org/10.1108/ecam-10-2019-0534.

Full text
Abstract:
PurposeFor many types of buildings, prefabricated prefinished volumetric construction (PPVC) is increasingly becoming a preferred alternative construction approach. Empirical evidence of project performance has consistently demonstrated that the ultimate success of PPVC projects is directly linked to the key decisions made at the outset of the PPVC project life cycle. However, there is limited knowledge of how to successfully manage these early stages. This research identified and evaluated the critical success factors (CSFs) required for the management of the conception, planning and design s
APA, Harvard, Vancouver, ISO, and other styles
17

D. A. Kunanbaeva, and L. B. Baizhanova. "DESIGN BUSINESS MODELS AS A TOOL FOR INNOVATIVE MANAGEMENT OF COMPANIES." Bulletin of the National Engineering Academy of the Republic of Kazakhstan 3, no. 77 (2020): 185–90. http://dx.doi.org/10.47533/2020.1606-146x.12.

Full text
Abstract:
This article discusses the management activities of the organization using the project approach. The role of open and closed innovations in a project-oriented business is indicated. Two main forms of business projects have been identified and studied: development projects and contract projects (also called project production). The innovative management of companies in the food industry by the example of “Rakhat” and “Foodmaster” is shown. The business model of the enterprise shows the distribution of results and costs by stages of implementation. It serves as a resource support tool and is the
APA, Harvard, Vancouver, ISO, and other styles
18

Fageha, Mohammed K., and Ajibade A. Aibinu. "Prioritising Project Scope Definition Elements in Public Building Projects." Construction Economics and Building 14, no. 3 (2014): 18–33. http://dx.doi.org/10.5130/ajceb.v14i3.4155.

Full text
Abstract:
A complete definition of the scope of a project upfront during early stages ensures smooth and successful implementation during the project execution. This research identifies and prioritises project scope definition elements for public buildings in Saudi Arabia. Elements that could significantly contribute to complete project scope definition package at pre-project planning stage are identified and their interrelationship determined and prioritised. Using the Project Definition Rating Index (PDRI) as a basis, the study uses analytical network process (ANP) technique based on data obtained fro
APA, Harvard, Vancouver, ISO, and other styles
19

Gomes, Carlos F., Michael H. Small, and Mahmoud M. Yasin. "Towards excellence in managing the public-sector project cycle: a TQM context." International Journal of Public Sector Management 32, no. 2 (2019): 207–28. http://dx.doi.org/10.1108/ijpsm-11-2017-0315.

Full text
Abstract:
Purpose The purpose of this paper is to assess the management of public-sector projects in Portugal paying particular attention to the extent to which total quality management (TQM) principles are being utilized in such projects. Design/methodology/approach Based on an extensive review of the literature, nine propositions are advanced about the interrelationships among seven factors that were identified, in a previous study, as having some influence on the management process in the planning and implementation of public-sector projects in Portugal. Structural equation modeling was used to inves
APA, Harvard, Vancouver, ISO, and other styles
20

Maag, Trond, Sven Anderson, and Arnthrudur Gisladottir. "Transferring sound-related expertise into urban planning and design practice on a project-by-project basis." INTER-NOISE and NOISE-CON Congress and Conference Proceedings 268, no. 4 (2023): 4609–16. http://dx.doi.org/10.3397/in_2023_0657.

Full text
Abstract:
This article explores the transfer of sound-related expertise from academic and research contexts into urban design and planning practice. This is a complex task, and even in projects with a specific focus on sound and noise, good design intentions are difficult to sustain through multiple project stages, from strategic definition and master planning through to the building permit. Planners and developers must adhere to their interpretation of best practice, while such knowledge is rarely on hand. Similarly, noise regulations provide little assurance that unfavourable decisions made in early p
APA, Harvard, Vancouver, ISO, and other styles
21

Elsanema, Oktri, Taufika Ophiyandri, and Benny Hidayat. "Implications of The Increase In The Government's Project Budget Ceiling For Construction Managerial In Small Qualified Contractors." CIVED 11, no. 3 (2024): 999–1007. http://dx.doi.org/10.24036/cived.v11i3.642.

Full text
Abstract:
The government has issued LKPP regulation No. 11 of 2021 which states that small qualification contractors may handle projects up to 15 billion, which before this regulation came out small contractors could only handle projects with a maximum value of 2,5 billion. The government hopes positively for this restriction, because the gap between large and small construction companies is quite high. In order to compete for large project values, small contractors must be able to reorganize the four managerial stages of construction project implementation, namely Planning, Organizing, Actuating, and C
APA, Harvard, Vancouver, ISO, and other styles
22

Kulaeva, Olga Aleksandrovna, and Alena Igorevna Zolotukhina. "A method of projects as a means of developing a linguistic and cultural competence in high school English classes." Samara Journal of Science 11, no. 4 (2022): 308–12. http://dx.doi.org/10.55355/snv2022114313.

Full text
Abstract:
This paper considers a linguoculturological approach to teaching a foreign language, a method of projects as one of the most effective methods in the process of developing a linguocultural competence among secondary school students. The authors consider the stages of work on short-term projects or lesson projects. The authors propose to comply with four stages: preparation, planning, research, presentation and assessment of the results of project activities. The analysis of the Spotlight 8 educational and methodological complex allowed the authors to propose a transformation of the tasks of th
APA, Harvard, Vancouver, ISO, and other styles
23

Фролкина, Екатерина, and Ekaterina Frolkina. "Peculiarities of managing a development program in the pharmaceutical company: formation and monitoring." Scientific Research and Development. Russian Journal of Project Management 6, no. 3 (2017): 37–48. http://dx.doi.org/10.12737/article_59e8ac5131e131.96648923.

Full text
Abstract:
The paper is devoted to a new approach to project planning and programme planning in the pharmaceutical industry that allows to simplify and standardize the process of project selection and program formation by introducing clear evaluation criteria, establishing several consecutive selection stages, optimizing and balancing the composition of projects. The proposed approach is build considering the peculiarities of the pharmaceutical industry, business processes in companies and existing projects. New two-level system for monitoring and control was developed to integrate tactical and strategic
APA, Harvard, Vancouver, ISO, and other styles
24

Бондарєва, Тетяна Іванівна. "СТРУКТУРУВАННЯ ФУНКЦІЇ ЯКОСТІ ЯК ІНСТРУМЕНТ ПЛАНУВАННЯ ПРОЄКТУ". TIME DESCRIPTION OF ECONOMIC REFORMS, № 2 (24 червня 2025): 113–21. https://doi.org/10.32620/cher.2025.2.13.

Full text
Abstract:
In the context of increasing project complexity and growing demands from stakeholders, there is a need to use tools that enable effective integration of customer requirements into project planning and implementation processes. One such tool is the Quality Function Deployment (QFD) method. The aim of the article is to develop an approach to applying the QFD method in project planning to enhance the efficiency and effectiveness of project implementation by more accurately considering stakeholder requirements at all stages of the project cycle. The object of the study is the process of structurin
APA, Harvard, Vancouver, ISO, and other styles
25

Tazhitdinov, Ilshat Azamatovich, and Nina Ivanovna Mak. "STAGES OF THE FORMATION OF A PROJECT-ORIENTED APPROACH IN AUTHORITIES." Scientific Review: Theory and Practice 12, no. 5 (2022): 825–35. http://dx.doi.org/10.35679/2226-0226-2022-12-5-825-835.

Full text
Abstract:
At present, there are a large number of international and national project management standards around the world, and the corresponding methodology has been prepared in sufficient detail. However, in practice, during the implementation and further development of project activities in the public sector, there were some shortcomings, including the incomplete application of certain provisions of the methodology for one reason or another. In this regard, it became necessary to analyze the development of a project-oriented approach in government structures. A retrospective analysis made it possible
APA, Harvard, Vancouver, ISO, and other styles
26

Al-Asadi, Laith S. M., Hussein A. M. S. Al-Juboori, and Mukhammet A. Fakhratov. "Importance of Using Artificial Intelligence into Iraqi Construction Projects." E3S Web of Conferences 457 (2023): 02012. http://dx.doi.org/10.1051/e3sconf/202345702012.

Full text
Abstract:
Construction projects in Iraq suffer from weakness in several respects, starting from feasibility studies and planning until the end of construction lifespan. Therefore, a study was required to demonstrate the importance of using artificial intelligence in the construction of infrastructure projects and sustainable development to reduce costs, errors, time, and to conserve energy and natural resources as much as possible. The benefits of artificial intelligence in the construction industry have been explained through the stages of the project that have been carefully selected, which represent
APA, Harvard, Vancouver, ISO, and other styles
27

Dedy, Sandi Waskita, and Hariadi DP Agustinus. "Project Performance Improvement Through Project Maturity Level, Planning, Implementation, Monitoring and Controlling." International Journal of Innovative Science and Research Technology 7, no. 7 (2022): 1453–67. https://doi.org/10.5281/zenodo.7008302.

Full text
Abstract:
Project is an activity that produces a unique deliverable that is bound by certain constraints in terms of cost, time and scope. This research was conducted at a company in Indonesia that is engaged in EPC (Engineering, Procurement & Construction) where the products produced are pharmaceutical, cosmetic and food industrial equipment through the process of project management stages. In its implementation, there are project completion times that are not according to the specified schedule and financing that exceeds the initial plan. This study aims to determine the effect of project maturity
APA, Harvard, Vancouver, ISO, and other styles
28

Milojković, Danka, Nevena Stanisavljević, Miloš Jovanović, and Nebojša Stojković. "LEDIB CLUSTER HOUSE ESTABLISHING PROJECT MANAGEMENT THROUGH MS PROJECT SOFTWARE APPLICATION." Nauka+Praksa 15 (October 10, 2012): 83–94. http://dx.doi.org/10.62683/nip15.83-94.

Full text
Abstract:
Establishing of LEDIB Cluster House Project is a business development project consisting of the small-scale construction works, interior design and staff recruitment. The project management was enabled through application of the basic concept implemented in 6 stages: Project Objective and Description; Identification of the Project Manager and Team; Project Implementation Timeline Planning; Identification of the Required Resources and Finances; Implementation Monitoring and Necessary Interventions and Project Closeout. The basic objective of the Project is the closeout (completion) in the short
APA, Harvard, Vancouver, ISO, and other styles
29

Kosov, Mikhail Evgenievich, Gevorg Tevosovich Malashenko, Olga Alekseevna Grishina, Sergey Yuryevich Popkov, and Vladimir Mikhailovich Smirnov. "FPA evaluation of digital projects using IFPUG Method." Laplage em Revista 6, Extra-A (2020): 230–38. http://dx.doi.org/10.24115/s2446-622020206extra-a658p.230-238.

Full text
Abstract:
This article considers Function Point Analysis (FPA) as a tool for price substantiation and specification of liabilities for development of digital project, since each new project in the company is analyzed. Information acquired during the analysis forms basis for adoption of critical decisions regarding complexity, resources, frames, terms, expenses, etc. Even strictly defined projects may fall out at later stages without accurate analytical method. Reducing risks of software projects is the most important issue. In general, this starts from definition of exact measures regarding scale, produ
APA, Harvard, Vancouver, ISO, and other styles
30

Zhdanova, Mariya, and Azariy Lapidus. "Life cycle requirement time optimization of a construction project." Construction and Architecture 12, no. 4 (2024): 6. https://doi.org/10.29039/2308-0191-2024-12-4-6-6.

Full text
Abstract:
Due to the fact that currently there are no regulated stages of the life cycle of the construction project, in the article we propose a model of 3 stages: pre-design, design and execution stage of construction-installation works. Each of the stages is considered step by step, identified reasons that may affect the time of completion. The importance of linkages between project life cycle stages is noted: reducing the time gap between phases and working in parallel on different phases affect project completion times and costs. Planning and project management allows to optimize work.
APA, Harvard, Vancouver, ISO, and other styles
31

Lapidus, Azariy, Dmitriy Topchiy, Tatyana Kuzmina, and Polina Bolshakova. "Modelling the Stages of Pre-Project Preparation and Design Development in the Life-Cycle of an Investment and Construction Project." Applied Sciences 12, no. 23 (2022): 12401. http://dx.doi.org/10.3390/app122312401.

Full text
Abstract:
The stages of pre-project preparation and design development are the fundamentals to the further implementation of an investment and construction project. The success of construction and commissioning of facilities depends on the smooth completion of these stages. The duration of stages depends on the competence and coordination of interaction between participants of an investment and construction project, rational decision making by the project manager and a number of other factors. Identifying these factors and finding rational planning options in terms of the stages of pre-project preparati
APA, Harvard, Vancouver, ISO, and other styles
32

Nur Salsabila, Malsya Debrina, Ika Arum Puspita, and Sandhy Widyasthana. "The Project Performance Evaluation of PLBN Project Using Earned Value Management Method." International Journal of Innovation in Enterprise System 6, no. 01 (2021): 61–73. http://dx.doi.org/10.25124/ijies.v6i01.139.

Full text
Abstract:
Process of monitoring and controlling projects requires data evaluation activities in the order to find out whether the project is in accordance with the plan to avoid an incompatibility between the planning and the actual time. The failure of construction project almost reached the figure of 20% - 40% which occurred in the project monitoring and controlling process. The purpose of this research is analysis project performance with earned value management method at PLBN Project. This research was carried out by several stages: data collection, data processing and analysis. From the results of
APA, Harvard, Vancouver, ISO, and other styles
33

Yudhistira, Aditya Septian, Nova Noor Kamala Sari, and Ressa Priskila. "Rancang Bangun Sistem Enterprise Resource Planning Construction Sebagai Solusi Manajemen Proyek Konstruksi." Journal of Information Technology and Computer Science 3, no. 2 (2023): 116–25. https://doi.org/10.47111/jointecoms.v3i2.10821.

Full text
Abstract:
Construction management is a professional service that uses special project management techniques to oversee the course of construction projects from the initiation stage to project closure. Enterprise Resource Planning (ERP) is an information technology solution that enables businesses and their suppliers to manage large projects effectively and efficiently throughout the project life cycle. Proper utilization of internal and external resources is very important if a construction company wants to make the best business decisions, maximize business goals, and survive in a competitive environme
APA, Harvard, Vancouver, ISO, and other styles
34

Ibragimova, Elina I. "RESEARCH ON KNOWLEDGE MANAGEMENT IN REAL ESTATE PROJECT PLANNING." EKONOMIKA I UPRAVLENIE: PROBLEMY, RESHENIYA 5/4, no. 158 (2025): 121–26. https://doi.org/10.36871/ek.up.p.r.2025.05.04.014.

Full text
Abstract:
With the advent of the knowledge economy, real estate companies urgently need to accumulate knowledge, use it, and update it. Knowledge management of real estate project plans is not only necessary, but also quite possible. As market competition becomes increasingly fierce, real estate companies urgently need to improve their management and development efficiency in order to cope with market changes. The domestic real estate industry has developed rapidly over the past few years. A large number of residential and commercial projects have been developed and significant development experience ha
APA, Harvard, Vancouver, ISO, and other styles
35

Choudhari, Sanjay, and Amit Tindwani. "Logistics optimisation in road construction project." Construction Innovation 17, no. 2 (2017): 158–79. http://dx.doi.org/10.1108/ci-03-2016-0014.

Full text
Abstract:
Purpose This study aims to assist the project manager in minimising the material logistics cost of road project by planning the optimal movement of aggregate across three stages of supply chain: sourcing, processing and distribution. Design/methodology/approach The paper conceptualises the raw material consumption in a road project as a logistics network distribution problem. A linear programming (LP) formulation is constructed with appropriate decision variables by integrating the three stages of material movement. The series of LP scenarios are solved using an LP solver to decide the optimal
APA, Harvard, Vancouver, ISO, and other styles
36

Ridha Satria, Rahayu Setiawati Arifin, and Emelia Sari. "Proposed Project Selection & Prioritization Framework during Front-End Planning (FEP) for Revitalization Project Portfolio at Indonesian Oil Refinery Plant." JURNAL TEKNIK INDUSTRI 13, no. 1 (2023): 1–15. http://dx.doi.org/10.25105/jti.v13i1.17510.

Full text
Abstract:
Abstract— Due to their aging, refinery facilities face the threat of suffering from incidents and accidents. Even fatal injury may be caused if running without proper maintenance planning. The revitalization project is performed intended to replace, repair, or increase production capacity at an existing refinery. Like other projects in the construction sector, the revitalization project tends to experience the same common flaws in their performance; project delay, cost overrun, scope creeping, operational mishaps, and canceled or stopped. The best time for a project to experience idea developm
APA, Harvard, Vancouver, ISO, and other styles
37

Fedyna-Darmokhval, Volodymyra. "Content and structural components of project implementation." Visnyk of Lviv University. Series Pedagogics, no. 42 (May 30, 2025): 173–78. https://doi.org/10.30970/vpe.2025.42.13467.

Full text
Abstract:
The article is devoted to the analysis and definition of the principles of project management, the study of project management efficiency criteria, and the structural process of project design. The organization of projects is a complex process that requires a clearly defined structure and content. The content and structural components of the project play a key role in its successful implementation, ensuring effective coordination of all stages and resources. They cover a set of measures necessary for planning, implementation and control of project activities. The main components of project imp
APA, Harvard, Vancouver, ISO, and other styles
38

Levine, Edwin A., Debra Payton, Robert Pavia, Caryn Houck, and Shuying Chen. "JOINT CHINA-NOAA PORT AREA CONTINGENCY PLANNING PROJECT." International Oil Spill Conference Proceedings 1995, no. 1 (1995): 838–39. http://dx.doi.org/10.7901/2169-3358-1995-1-838.

Full text
Abstract:
ABSTRACT As part of a World Bank-funded Ship Waste Disposal Project, the China Academy of Transportation Sciences (CATS) developed a model for port oil spill emergency plans. The National Oceanic and Atmospheric Administration was asked to participate in three stages of the model's development: 1. a review of information collected from four major ports and identification of additional data needed to develop the plan, 2. work to finalize the plan's format and develop a prototype plan for Guangzhou, and 3. in-country training and a test of the prototype plan. After these efforts, CATS will revis
APA, Harvard, Vancouver, ISO, and other styles
39

Hwang, Jae-Hong, Jeong-Kyu Kim, and Myeong-Hun Lee. "Study on the Impact of Initial Inhibitory Factors on Quick Integrated Planning and Public Maintenance Projects on Business Satisfaction." Korean Association of Urban Policies 15, no. 1 (2024): 87–111. http://dx.doi.org/10.21447/jusre.2024.15.1.5.

Full text
Abstract:
In order to revitalize the housing improvement project, it is necessary to study the effect on business satisfaction of union members from the beginning of the project. This study analyzed the impact of legal, financial, and operational obstacles on project satisfaction in the early stages of the housing improvement project. In addition, the purpose is to provide basic data for revitalizing housing supply by analyzing the impact of the recently implemented rapid integrated planning and public maintenance projects on business satisfaction. The method of this study was to conduct analysis by app
APA, Harvard, Vancouver, ISO, and other styles
40

Ratih Wulandari. "PENJADWALAN PROYEK PEMBUATAN ROLLING MACHINE MENGGUNAKAN METODE JALUR KRITIS." Jurnal Ilmiah Teknik 2, no. 1 (2023): 43–48. http://dx.doi.org/10.56127/juit.v2i1.480.

Full text
Abstract:
Scheduling is very important in the basis of project planning so that it can run smoothly and can be completed on time. Before the project is carried out, it is necessary to have a project management stage which includes the planning stage, the scheduling stage and the coordination of these stages. Estimation of completion time for the production of rolling machine projects scheduled by PT. X is 36 days, the actual time in working on the rolling machine project is 32 days, then the estimated time for completing the iron rolling machine project using Microsoft Project is 27 days. The sequence o
APA, Harvard, Vancouver, ISO, and other styles
41

Kukade, Ms H. R. "The Prioritization of Different Stages of PPP Project Using AHP Technique: In Context to Indian Road Project." International Scientific Journal of Engineering and Management 04, no. 05 (2025): 1–7. https://doi.org/10.55041/isjem03315.

Full text
Abstract:
ABSTRACT Public-Private Partnerships (PPPs) have become a critical approach for delivering infrastructure projects across the globe, particularly in the construction industry. However, the successful execution of PPP projects requires effective decision-making at various stages, from planning through to operation. One of the challenges faced by decision-makers is the prioritization of these stages, which is often subjective and leads to delays, cost overruns, and misalignment with stakeholder interests. The Analytic Hierarchy Process (AHP) has been increasingly applied to address this issue by
APA, Harvard, Vancouver, ISO, and other styles
42

Djurayev, Xolmurod Akramovich. "ANALYSIS OF INVESTMENT PROJECT MANAGEMENT METHODS AND STAGES OF ITS PRACTICAL APPLICATION." GOLDEN BRAIN 1, no. 31 (2023): 192–99. https://doi.org/10.5281/zenodo.10139842.

Full text
Abstract:
<i>The development performance literature has traditionally focused on post-project analysis. Although this is a valid way to measure benefits, a good evaluation requires a preliminary step: measuring the effectiveness of the implementation of investment projects. This paper aims to identify the factors of good performance. Unlike previous studies, the current study analyzes performance using a project life cycle approach.&nbsp; The main condition is that the duration of the investment project, that is, the days from its approval to the final payment - factors related to preparation and implem
APA, Harvard, Vancouver, ISO, and other styles
43

Pokshivanova, Olga P. "METHODS FOR PLANNING AN INNOVATION AND INVESTMENT PROJECT, INCLUDING SOURCES OF FINANCING, PROJECT INCOME AND EXPENSES." EKONOMIKA I UPRAVLENIE: PROBLEMY, RESHENIYA 6/2, no. 126 (2022): 18–23. http://dx.doi.org/10.36871/ek.up.p.r.2022.06.02.003.

Full text
Abstract:
The innovation process is the consistent transformation of new ideas and knowledge into an economic result. In order to manage the innovation process as efficiently as possible, especially at the planning stage, it is necessary to clearly understand where it starts and ends. Therefore, the methods of planning an innovation-investment project largely depend on the stages that are determined during the management process. Depending on the selected sequence, methods are selected with the help of which the entire process of creating the development and implementation of an innovative idea is built
APA, Harvard, Vancouver, ISO, and other styles
44

Godin, Gaston, Hélène Gagnon, Michel Alary, Joseph J. Levy, and Joanne Otis. "The Degree of Planning: An Indicator of the Potential Success of Health Education Programs." Promotion & Education 14, no. 3 (2007): 138–42. http://dx.doi.org/10.1177/175797590701400301.

Full text
Abstract:
Evaluation is a major challenge in the field of health promotion and health education. Since the degree to which a project is planned often guarantees its potential success, the evaluation process should make it possible to answer different questions related to stages of project implementation. The goal of this study was to develop a planning tool to help health professionals and community workers judge the potential success of health education interventions based on the extent to which they are planned and to test the tool in real intervention evaluations. Educational interventions examined i
APA, Harvard, Vancouver, ISO, and other styles
45

Fedorovich, О., and L. Malieiev. "MATRIX MODEL OF STRATIFIED REPRESENTATION OF THE HIGH-TECH PRODUCTS MODERNIZATION PROJECT BASED ON COMPONENT AND RISK-ORIENTED APPROACHES." Системи управління, навігації та зв’язку. Збірник наукових праць 1, no. 79 (2025): 55–61. https://doi.org/10.26906/sunz.2025.1.55-61.

Full text
Abstract:
The subject of research in this article is the projects of modernization of high-tech products (HTP). The aim is to improve the quality of the HTP modernization processes by developing a stratified project representation based on the component and risk-based approaches. The methods of system decomposition, stratification, component approach and risk identification are used. The article analyzes the features of the modernization projects of the HTP, forms a model of the life cycle of the modernization project, that separates the stages of design and technological preparation of production, logi
APA, Harvard, Vancouver, ISO, and other styles
46

Inayati, Nurul Latifatul, and Haning Tyas Pratiwi. "Learning Islamic Education with the Project Based Learning (PjBL) Method." JIE (Journal of Islamic Education) 10, no. 1 (2025): 174–90. https://doi.org/10.52615/jie.v10i1.603.

Full text
Abstract:
This study aims to analyze Islamic Education learning with project-based learning methods and identify obstacles and solutions faced in learning. The research approach used is qualitative with a phenomenological type. Data were collected through interviews, non-participatory observation, and documentation. The data analysis technique in this study follows the steps of Data Reduction, Data Presentation, and Conclusion Drawing. The study results indicate that implementing Islamic Education learning with the project-based learning method is carried out in stages based on the principles of project
APA, Harvard, Vancouver, ISO, and other styles
47

Chigona, W., D. Roode, N. Nazeer, and B. Pinnock. "Investigating the impact of stakeholder management on the implementation of a public access project: The case of Smart Cape." South African Journal of Business Management 41, no. 2 (2010): 39–50. http://dx.doi.org/10.4102/sajbm.v41i2.517.

Full text
Abstract:
This paper reports on a study that uses the Stakeholder Management Theory to analyse the implementation of a pilot phase of public access project, the Smart Cape Access Initiative, a Cape Town City Council e-government initiative. Data for the study was gathered through in-depth interviews with individuals who were involved, influenced and were affected by the implementation of the pilot project. The study identified the major stakeholders of the project and assessed their importance and influence on the project. Numerous interactions between the stakeholders were identified. It was further no
APA, Harvard, Vancouver, ISO, and other styles
48

TEGLAȘ, Mălina Paula, and Roxana Carmen CORDOȘ. "APPLIED STUDY ON THE INITIATION AND PLANNING OF A CULTURAL PROJECT." Review of Management and Economic Engineering 23, no. 4 (2024): 295–308. https://doi.org/10.71235/rmee.188.

Full text
Abstract:
In this paper, a simple and comprehensive theoretical framework on the management ofa cultural event and a practical implementation is provided, by carrying out a tour in Italy of achildren's choir. The aim is to provide a realistic and modest vision of the management of a culturalevent and to demonstrate how the application of theory works. The objective of the projectdeveloped in this work is to organize two concerts held by the Junior Vip Children's Choir from ClujNapoca on the stages of the Romanian Embassy and the Accademia di Romania in Italy. The ideaswill be identified, the objectives
APA, Harvard, Vancouver, ISO, and other styles
49

Kopishynska, Olena, Yurii Utkin, Oleksandr Galych, Hanlar Makhmudov, Alla Svitlychna, and Viktor Lyashenko. "Case Method in the Study of Information Technologies and IT Project Management." Journal of Systemics, Cybernetics and Informatics 19, no. 8 (2021): 198–211. http://dx.doi.org/10.54808/jsci.19.08.198.

Full text
Abstract:
The paper shows the features of the application of the case method in the study of the discipline of IT project management for students majoring in the field of Information Technology. This work analyzes some of the difficulties associated with the limited use of case studies in the field of IT. An original solution to the problem of combining flexible technologies for the development of the project itself on the basis of a case study and methods of studying and applying special software for IT project management presented by authors. The conceptual scheme of the main stages of work with a cas
APA, Harvard, Vancouver, ISO, and other styles
50

Alraie, Ameer A., Asaad M. Ali Kadhum, and Rana Shabbar. "Causes of change orders in the cycle of construction project: A case study in Al-Najaf province." Open Engineering 12, no. 1 (2022): 799–807. http://dx.doi.org/10.1515/eng-2022-0340.

Full text
Abstract:
Abstract In construction projects, the nature of the construction process is complicated, and many factors and variables have a significant role at any stage of the project. Thus, when change orders (COs) occur, the project’s function is strongly affected. This study aims at identifying and evaluating the causes of COs in Al-Najaf province projects based on project cycle (stages), to initiate proactive measures to reduce changes during the construction process. This research reviews the previous literature to identify factors causing the COs to develop a categorized questionnaire based on proj
APA, Harvard, Vancouver, ISO, and other styles
We offer discounts on all premium plans for authors whose works are included in thematic literature selections. Contact us to get a unique promo code!