To see the other types of publications on this topic, follow the link: Project time schedule.

Dissertations / Theses on the topic 'Project time schedule'

Create a spot-on reference in APA, MLA, Chicago, Harvard, and other styles

Select a source type:

Consult the top 50 dissertations / theses for your research on the topic 'Project time schedule.'

Next to every source in the list of references, there is an 'Add to bibliography' button. Press on it, and we will generate automatically the bibliographic reference to the chosen work in the citation style you need: APA, MLA, Harvard, Chicago, Vancouver, etc.

You can also download the full text of the academic publication as pdf and read online its abstract whenever available in the metadata.

Browse dissertations / theses on a wide variety of disciplines and organise your bibliography correctly.

1

Möller, Antony John. "Time / schedule control of engineering projects in the South Western Cape." Master's thesis, University of Cape Town, 1990. http://hdl.handle.net/11427/18304.

Full text
Abstract:
Bibliography: pages 109-113.
In the evolution of project management as a distinct field of management, there seems to have developed greatly disjointed theory on project control. As a result, the modern practitioner is often faced with contradictory and confusing advice on project time/schedule control requirements. This research integrates and extends present time/schedule control theory. It includes a review of the literature, in which the fragmented theory is pieced together in a model describing the operation of a control system. It uses an industrial survey of engineering projects in the South Western Cape to highlight current time/schedule control trends and to establish the existence and form of relationships between project success, project characteristics and time/schedule control methods. The broad scope of the research has made it possible to set rough guidelines for the practising project manager, in the selection of time/schedule control requirements, and to highlight areas for further research in this area of project management.
APA, Harvard, Vancouver, ISO, and other styles
2

Abdulahad, Mumtaz. "A Comparison Of Earned Value Analysis Method To Earned Schedule As Of Time Duration." Digital WPI, 2015. https://digitalcommons.wpi.edu/etd-theses/518.

Full text
Abstract:
Earned Value Analysis (EVA) is a well- known planning and control management system that integrates cost, schedule and technical performance. It allows for the calculation of cost and schedule variances, and performance indices as well as forecasting project final cost and schedule duration. The Earned Value Analysis method provides timely assessment of project performance highlighting the need for eventual corrective action. Earned Value Analysis method (EVA) was originally developed for cost management and has not been widely used for forecasting project duration. EVA typically calculate the Schedule Efficiency through the Schedule Performance Index (SPI) based on budgeted cost and not on the time of work(s) accomplished. Therefore, it may not accurately determine the time - base schedule efficiency, particularly for late completion projects, and it makes it difficult to correlate the final duration with project planned duration determined through critical path network (CPM) calculation. The purpose of this study is to compare the classic Earned Value Performance Indicators with the time dependent Earned Schedule Performance Indicators to help a program manager(s) to estimate / predict a more realistic /reliable time duration of project that can better correlate with CPM. It also explores how Building Information Modeling (BIM) tools simulation could be incorporated with Base-line or S-curve to reflect the timely phased physical progress synthesis during the development of project as opposed to the traditional use of cash flow analysis.
APA, Harvard, Vancouver, ISO, and other styles
3

Zvolenská, Dominika. "Návrh projektu a aplikace metodiky projektového managementu v podniku." Master's thesis, Vysoké učení technické v Brně. Fakulta podnikatelská, 2018. http://www.nusl.cz/ntk/nusl-378341.

Full text
Abstract:
The master thesis focuses on the project design of hackathon and application of project management methods in the selected company. The first part is devoted to theoretical background in the area of project management, the second part contains the analysis of the current situation in the company. The output and third part of the thesis is devoted to the project itself.
APA, Harvard, Vancouver, ISO, and other styles
4

Zápotocký, Eduard. "Návrh projektu a aplikace metodiky projektového managementu ve firmě." Master's thesis, Vysoké učení technické v Brně. Fakulta podnikatelská, 2019. http://www.nusl.cz/ntk/nusl-402031.

Full text
Abstract:
The master thesis fouses on the practical use of project management methods and project proposal with the aim to propose a new content strategy for the content website of the company. The first part deals with the theoretical background of the project management, in the second part the current state of the company is analyzed. In the last part of the thesis the project proposal itself is processed.
APA, Harvard, Vancouver, ISO, and other styles
5

Dayi, Songul. "Schedule Delay Analysis In Construction Projects: A Case Study Using Time Impact Analysis Method." Master's thesis, METU, 2010. http://etd.lib.metu.edu.tr/upload/12612823/index.pdf.

Full text
Abstract:
Inadequate or weak preparatory work before starting construction of any structure may cause serious problems during the construction period. For example, projects without sufficient detailed drawings or construction schedules and a disorganized building site can create many problems in the management and completion of the construction works. Consequently, the cost of construction increases digressively, the construction duration of the project extends and the quality of construction is affected adversely. This study dwells on the importance of construction schedules in achieving the aim of producing good quality construction work within the specified duration. Monitoring continuously the interactive relation concerning delays in construction schedules and contractor demands is a complicated process. Here the simplest and basic approach is that, both for owner and contractor, time is money and for this reason construction schedule delays should be analyzed and corrective measures should be taken in a timely manner. The main purpose of this study is to investigate the causes of construction schedule delays and the methods of schedule delay analyses. In this context completion construction works of a covered swimming pool building in Ankara was selected as a case study for analyzing project scheduling and the delays therein. The &ldquo
Time Impact Analysis Method&rdquo
(TIA) was applied to the case study project using PRIMAVERA®
software in order to determine the construction schedule delays
to measure the impacts of these delays on the project completion duration
and to allocate responsibility amongst the project participants for preventing delay claims. After the application of the delay analysis it was observed that the delays in the critical activities extended the project duration by 57 days in total i.e. by 15.4 % of the estimated construction period. Fines should have been paid by the contractor because of 31-days non-excusable delays. Also, the contractor should have been given a time extension of 26-days due to 22-days excusable compensable delays and 4-days excusable non-compensable delays which were beyond the control of the contractor. These delays were caused due to organizational deficiencies of the owner, the bureaucracy of the provincial municipality, the lack of detail drawings during the municipality application, the lack of experience of the contractor, problems in material procurement, unforeseeable weather conditions and shortages of qualified employees of the subcontractors. It was observed that of these all except one correspond to the important causes of delays as reported in literature concerning public projects in Turkey.
APA, Harvard, Vancouver, ISO, and other styles
6

Kováčik, Viktor. "Návrh projektu zavedení internetových stránek." Master's thesis, Vysoké učení technické v Brně. Fakulta podnikatelská, 2013. http://www.nusl.cz/ntk/nusl-224157.

Full text
Abstract:
Diploma thesis deal with design of project which is designed for creation of websites. There are included fundamental terms and issue of project management. The company, where this project will be applied, has dealt with language education.
APA, Harvard, Vancouver, ISO, and other styles
7

Hlavinka, Roman. "Návrh projektu a aplikace metodiky projektového managementu v podniku." Master's thesis, Vysoké učení technické v Brně. Fakulta podnikatelská, 2015. http://www.nusl.cz/ntk/nusl-224987.

Full text
Abstract:
The master thesis deals with the design of a project creating an electronic business for a company with the help of the application of project management methodologies . The selected firm to which the project will be applied does business in the trucking and retail sales.
APA, Harvard, Vancouver, ISO, and other styles
8

Lněnička, Martin. "Řízení developerských projektů." Master's thesis, Vysoké učení technické v Brně. Fakulta stavební, 2012. http://www.nusl.cz/ntk/nusl-225625.

Full text
Abstract:
The thesis analyses a development project of 21 houses in the village of Podolí u Brna, which was carried out by Kaláb – stavební firma, spol. s r.o. It provides a description of the company structure and focuses on some of their processes, such as risk analysis, investment decisions in the pre-investment project phase, project funding, planning, and time management based on time schedules. The text also takes a close look at all the steps that were taken during the implementation of the Podolí project, and zooms in on regular on-site records monitoring how much work has been actually done. Furthermore, the thesis brings an analysis of the current developer market in Brno, focusing in particular on latest developments in logistics, and office & residential construction. And last but not least, the thesis also observes how prices in the real estate market have developed over the last decade and how new residential units in the Czech Republic have been lately built.
APA, Harvard, Vancouver, ISO, and other styles
9

Berger, Patrik. "Řízení stavební zakázky." Master's thesis, Vysoké učení technické v Brně. Fakulta stavební, 2016. http://www.nusl.cz/ntk/nusl-240069.

Full text
Abstract:
This thesis deals with preparation and management of construction order. In the theoretical part there is described the definition of the term project, then management of project and leadership. In the practical part the investor and the contractor of the construction order will be introduced. This construction order is evaluated, then an organization structure, costs plan, time schedule and site accommodation are made. In the final part the thesis deals with evaluation of results and its comparison with the building company.
APA, Harvard, Vancouver, ISO, and other styles
10

Kočíbová, Markéta. "Smluvní podmínky FIDIC v projektovém řízení staveb." Master's thesis, Vysoké učení technické v Brně. Fakulta stavební, 2020. http://www.nusl.cz/ntk/nusl-409890.

Full text
Abstract:
The thesis focuses on the contract´s terms and conditions of FIDIC in project management. Especially, the processing of time reserves in the project schedule. The aim of the thesis is to answer questions related to time reserves. Who owns them in the construction project. Who and in what conditions the time reserves can be drawn in case of project delay. The output of the thesis is a summary of these findings and recommen-dations for other projects.
APA, Harvard, Vancouver, ISO, and other styles
11

Ringys, Tadas. "Statybos darbų laiko valdymo sistema ir jos tyrimas." Master's thesis, Lithuanian Academic Libraries Network (LABT), 2008. http://vddb.library.lt/obj/LT-eLABa-0001:E.02~2008~D_20080924_182013-00903.

Full text
Abstract:
Magistriniame darbe išanalizuoti projektų valdymo metodai ir algoritmai, išnagrinėti darbų kalendorinio grafiko sudarymo principai, sukurtas statybos darbų grupavimo ir darbo laiko paskaičiavimo konceptualus modelis ir išreikštiniai algoritmai dviems grupavimo scenarijams. Išvestos formulės darbo kiekiui sąmatoje, objekte ir komplekse apskaičiuoti. Pasitelkus projektų valdymo teoriją, sukurtas MS Project COM programinis priedas SDKG, leidžiantis statybos vadovui modeliuoti statomo objekto kalendorinį darbų grafiką. COM priedo programavimo darbai atlikti Microsoft Visual Studio Profesional 2005 aplinkoje, pasinaudojus Visual Basic 2005 programavimo galimybėmis. Atlikti duomenų iš sąmatos nuskaitymo, išsaugojimo, projekto duomenų įkėlimo, grafiko nubrėžimo laikų priklausomybės nuo sąmatos apimties tyrimai. Išvesta formulė minimalaus pelės paspaudimų skaičiaus radimui, priklausomai nuo darbų ir grupių skaičiaus. Darbo rezultatai įdiegti statybos įmonėse UAB “Armobetas” ir UAB “Merko statyba”.
Project management methods and algorithms have been analysed in this master paper. Schedule making principles have been considered. Construction work grouping and work time conceptual model and explicit algorithms for two grouping scenarios have been developed. Using project management theory, MS Project COM add-in called SDKG has been developed. This add-in allows the construction supervisor to model the schedule of the object under construction. The add-in has been developed in MS Visual Stuodio 2005 environment using Visual Basic 2005. An investigation to study data retrieval from an estimate, saving, project data deploying and plotting time dependencies on the estimate volume has been carried out. A formula to find the minimal number of mouse clicks depending on the number of works and groups has been derived. The results obtained have been applied in construction companies UAB „Armobetas“ and UAB „Merko statyba“.
APA, Harvard, Vancouver, ISO, and other styles
12

Szarka, Tamás. "Návrh projektu na zavedení elektronického obchodu společnosti." Master's thesis, Vysoké učení technické v Brně. Fakulta podnikatelská, 2020. http://www.nusl.cz/ntk/nusl-433316.

Full text
Abstract:
This diploma thesis designs a project for implementing an e-shop for the chosen company using the tools and methodologies of project management. Based on the theretical knowledge about project management and the analysis of the business environment it creates a draft of a project for the company to implement in the future.
APA, Harvard, Vancouver, ISO, and other styles
13

Rozbořil, Radek. "Využití nástrojů projektového managementu v praxi." Master's thesis, Vysoké učení technické v Brně. Fakulta podnikatelská, 2017. http://www.nusl.cz/ntk/nusl-318299.

Full text
Abstract:
Diploma thesis deals with project design of an e-commerce creation with using tools and methods of project management in a non-profit organization. The first part of the thesis focuses on the theoretical basis of project management. The analytical part deals with the description of the organization and his current situation. The last part contains the main project proposal.
APA, Harvard, Vancouver, ISO, and other styles
14

Pírková, Hana. "Návrh projektu implementace elektronického obchodu ve společnosti." Master's thesis, Vysoké učení technické v Brně. Fakulta podnikatelská, 2015. http://www.nusl.cz/ntk/nusl-224990.

Full text
Abstract:
Diploma thesis creates the project design for e-commerce implementation in the selected company together using the tools and methodologies of project management. Based on an analysis of the business environment and key theoretical background of project management, it brings in the draft plan project, usable for its future company‘s implementation.
APA, Harvard, Vancouver, ISO, and other styles
15

Chadima, Zdeněk. "Multifunkční sportovní hala - stavebně technologický projekt." Master's thesis, Vysoké učení technické v Brně. Fakulta stavební, 2016. http://www.nusl.cz/ntk/nusl-240063.

Full text
Abstract:
The diploma thesis is based on building technological solution of multifunctional sports hall's construction as form of construction technology project. The project also include the implementation of a comprehensive study including site plans, time and financial plans, project of site equipment, design tools, time schedule, resource planning and selected technological processes.
APA, Harvard, Vancouver, ISO, and other styles
16

Hartenberger, Lukáš. "Soukromá klinika Slavkov - stavebně technologický projekt." Master's thesis, Vysoké učení technické v Brně. Fakulta stavební, 2016. http://www.nusl.cz/ntk/nusl-240161.

Full text
Abstract:
The subject of my thesis is the construction and technological project of the new private clinics in Slavkov near Brno in South Moravia. The main goal of my work is a study of implementation of major technological stages of building. These technological steps will cover the main building. This study will be established timetable. Furthermore, the project will be processed construction site, the design of the main building machines and mechanisms, with the budget bill of quantities for the main building structure. Technological specification and control plan is prepared for the realization of construction scaffolding, flat roofs and implementation envelope. Re-entering the occupational health and safety plan for the aforementioned works.
APA, Harvard, Vancouver, ISO, and other styles
17

Štefaňák, Jan. "Stavebně technologický projekt výrobní haly Rokycany." Master's thesis, Vysoké učení technické v Brně. Fakulta stavební, 2012. http://www.nusl.cz/ntk/nusl-225511.

Full text
Abstract:
Master´s Thesis describes the realization setup procedure of factory building in Rokycany. Building has precast concrete skeleton based on in-situ concrete piles. Document consists of concept of site accommodation, sizing of building machines, time schedule, technological rules and constraints for the chosen technological processes and plan of workplace safety and health.
APA, Harvard, Vancouver, ISO, and other styles
18

Vavřinka, Pavel. "Řízení stavební zakázky ve stavebním podniku." Master's thesis, Vysoké učení technické v Brně. Fakulta stavební, 2020. http://www.nusl.cz/ntk/nusl-409910.

Full text
Abstract:
The aim of diploma thesis is to describe and analyze organization of construction contract at the specific construction company. Introduction contains summary of theoretical knowledge, followed by construction order preparation on general level. The practical part contains application on specific construction contract.
APA, Harvard, Vancouver, ISO, and other styles
19

Škarka, Jan. "Bytová výstavba jako developerský projekt." Master's thesis, Vysoké učení technické v Brně. Fakulta stavební, 2015. http://www.nusl.cz/ntk/nusl-227628.

Full text
Abstract:
This thesis is concerned with developer project Rezidence Austerlitz in Slavkov u Brna realized by KALÁB company. It describes managing this project from buying the grounds to selling the real estate to clients. At the same time the thesis deals with the project's financing, time schedule and assesses market and construction risks. Part of the work is also analyzing the estate market which adverts to evolution of housing construction across the whole Czech Republic in the past ten years. Progress of real estate construction in Jihomoravský kraj is described in detail, including the progress of estate valuation.
APA, Harvard, Vancouver, ISO, and other styles
20

Kadeřávková, Jitka. "Řízení stavební zakázky." Master's thesis, Vysoké učení technické v Brně. Fakulta stavební, 2019. http://www.nusl.cz/ntk/nusl-392254.

Full text
Abstract:
This thesis is devoted to management of construction contract and the thesis is divided into two parts – theoretical and practical. The theoretical part is focused on familiarizing with some concepts of project management, cost control, time management and risk management. At the end of the theoretical part, there are described types of construction of a family house. Practical part involves applying these principles on the example of the particular construction work contract. It also describes and analyzes organization of construction contract and together with risk management meets the appointed target. The desired output of theses is processing of necessary documents for the management of specific construction contract by house raising.
APA, Harvard, Vancouver, ISO, and other styles
21

Niesnerová, Dita. "Příprava a řízení stavební zakázky z pohledu investora." Master's thesis, Vysoké učení technické v Brně. Fakulta stavební, 2018. http://www.nusl.cz/ntk/nusl-372116.

Full text
Abstract:
The thesis statement is focused on construction order planning and management from investor point of view. The theoretical part consists of particular project phases including financing and public orders problematics. The theoretical knowledge is applied on specific public order. The town Nové Město na Moravě was asked for cooperation as an investor and the town provided the project Community retirement home for this thesis purposes. Whole practical part is focused on this public order preparation and management. All documentation related to this topic is contained in the thesis and the investor can use this documentation as a background for further projects. Last part of the practical part concerns the order funding, the financial plan is attached.
APA, Harvard, Vancouver, ISO, and other styles
22

Horáková, Kateřina. "Příprava a řízení stavební zakázky." Master's thesis, Vysoké učení technické v Brně. Fakulta stavební, 2014. http://www.nusl.cz/ntk/nusl-226811.

Full text
Abstract:
This thesis explains a theme of construction order preparation and management. The theoretical section describes common definition the term of project and then this section explains process of the project management. This is followed by a practical section where a construction company is introduced, this construction company provided a particular contruction order. This construction order is valued, then its processed an organizational structure, costs plan, time schedule and site accommodation for this construction order. The last part is the evaluation of the results and comparing with the results of construction company.
APA, Harvard, Vancouver, ISO, and other styles
23

Hřiba, Jiří. "Obytný soubor Sadová – stavebně technologický projekt." Master's thesis, Vysoké učení technické v Brně. Fakulta stavební, 2016. http://www.nusl.cz/ntk/nusl-240369.

Full text
Abstract:
At master´s thesis is the construction and technological project of a residential building Sadova. In this work are addressing major technological specification of the building foundations, site equipment, time schedule of structural work, safety and health in work and financial.
APA, Harvard, Vancouver, ISO, and other styles
24

Petrík, Tomáš. "Stavebně technologický projekt skladovací haly." Master's thesis, Vysoké učení technické v Brně. Fakulta stavební, 2013. http://www.nusl.cz/ntk/nusl-226501.

Full text
Abstract:
In this diploma thesis is processed build-up organization of logistics centre in Ostrava. The build-up organization covers the implementation of ground works, foundation constructions and precast concrete framework. Storage hall of logistics centre is based on drilled concrete piles and precast concrete framework makes up main structure. Construction technology project contains time-schedule and financial plan for whole project, time-schedule of construction works, budget, technological standard for precast concrete framework, design of building site accessories, design of machine group, safety plan, check and test plan.
APA, Harvard, Vancouver, ISO, and other styles
25

Cimflová, Lucie. "Přístavba školy - stavebně technologický projekt." Master's thesis, Vysoké učení technické v Brně. Fakulta stavební, 2016. http://www.nusl.cz/ntk/nusl-240080.

Full text
Abstract:
Diploma thesis deals with construction technological project for extension of school. Contents of construction technological project are project engineering report, study of realization of main technological stages, engineering report of site equipment, proposal of construction machines, etc. In detail thesis deals with load-bearing structure of cross laminated timber and the technological note, inspection and testing plan.
APA, Harvard, Vancouver, ISO, and other styles
26

Sedlák, Petr. "Přístavba výrobní haly - stavebně technologický projekt." Master's thesis, Vysoké učení technické v Brně. Fakulta stavební, 2018. http://www.nusl.cz/ntk/nusl-371981.

Full text
Abstract:
The subject of this diploma thesis is a building construction project for industrial building Rieder Beton in Jihlava. It contains an engineering report, a time schedule, a site equipment report, a design of machine assembly, a technological project together with a quality and test plan for the precast prefabricated frame and an itemized budget.
APA, Harvard, Vancouver, ISO, and other styles
27

Rozsypal, Patrik. "Stavebně technologický projekt sportovní haly Svojsíkova v Českém Těšíně." Master's thesis, Vysoké učení technické v Brně. Fakulta stavební, 2019. http://www.nusl.cz/ntk/nusl-392011.

Full text
Abstract:
This diploma thesis focuses on the construction technology project of sports hall Svojsíkova in Český Těšín. The aim of this diploma thesis is to process main documents related to construction of the solved sports hall. This means, in particular, to design the construction site facilities and main construction machinery, to process time schedule, budget and technological prescription of floor structures together with control and test plan and construction details.
APA, Harvard, Vancouver, ISO, and other styles
28

Salaj, Tomáš. "Aplikace metodiky Projektového managementu na projektu v podniku." Master's thesis, Vysoké učení technické v Brně. Fakulta podnikatelská, 2011. http://www.nusl.cz/ntk/nusl-223241.

Full text
Abstract:
Diploma thesis focuses on the development of parking building with commercial premises Rychtářka in Plzeň, which is realized in the form of public and private sector partnership. The thesis deals with effective application of project management methods in light of the general contractor Hermosa Parking Plzeň a.s. Information and knowledge gained in the theoretical part of the thesis are then used in the practical part for the design of project management methodics on development project Rychtářka. The outcome of practical part of the thesis is project management methodic, which should help to secure the optimal solution for complex structured process that leads to the realization of parking building Rychtářka and the compliance with all the specific characteristics of development projects.
APA, Harvard, Vancouver, ISO, and other styles
29

Krčmář, Vít. "Využití nástrojů projektového managementu v praxi." Master's thesis, Vysoké učení technické v Brně. Fakulta podnikatelská, 2015. http://www.nusl.cz/ntk/nusl-224900.

Full text
Abstract:
Dissertation deals with a draft of the system for monitoring and planning of attendance of promoters on the stores of the Slovakian store chain NAY, where the project management is used for securing of versatilely effective project. PEST, SWOT, RIPRAN of analysis and analysis of risks are used in this draft. It contains the plan of solution from the schematic imaging to the graphic previews and time schedule of realization. This is the real project from practice which should be realized based on this dissertation and commercially spread and innovated.
APA, Harvard, Vancouver, ISO, and other styles
30

Vojtek, Ondřej. "Stavebně technologický projekt bytového domu v Brně - Slatině." Master's thesis, Vysoké učení technické v Brně. Fakulta stavební, 2018. http://www.nusl.cz/ntk/nusl-372271.

Full text
Abstract:
This diploma thesis deals with construction and technological project of apartment building in Brno – Slatina, Kigginsova street. Thesis focus on technological phase of monolithic rough superstructure and masonry work. For this phases were processed technogical specifications and controlling ad testing schedules. Within this thesis was also compiled technical report, solution of transport roads, technical report and drawings of site equipmet. For main object was compiled itemized budget, which was foundation for completing time schedule. In diploma thesis are further processed safety requirements and chosen construction details.
APA, Harvard, Vancouver, ISO, and other styles
31

Bartoš, Miroslav. "Příprava a řízení stavební zakázky." Master's thesis, Vysoké učení technické v Brně. Fakulta stavební, 2015. http://www.nusl.cz/ntk/nusl-227510.

Full text
Abstract:
This thesis focuses on the theme of preparation and management of construction work contract in its theoretical and empirical level. Theoretical part deals with the description of contractor’s preparation for construction in the form of supply, pre-production and production preparation. It also deals with the issues of planning in the form of structuring of a building project and its duration, including the description of schedule planning methods. Theoretical part ends with a passage about automated preparation and construction implementation, together with a definition of basic terms concerning private and public procurement. Practical part answers the question of description, analysis and organization of particular construction contract and together with contractor’s administrative treatment of construction preparation meets the appointed target. Closing part consists of a suggestion of methodology for processing contractor’s preparation using Contec software.
APA, Harvard, Vancouver, ISO, and other styles
32

Foltánek, Jan. "Centrum polymerních systémů ve Zlíně - stavebně technologická příprava výstavby." Master's thesis, Vysoké učení technické v Brně. Fakulta stavební, 2017. http://www.nusl.cz/ntk/nusl-265715.

Full text
Abstract:
The thesis deals with a technological project of Polymer System Centre in Zlín. It focuses on financial documentation and a time schedule of the construction. The technological project in detail focuses on implementation of a fabric of the Polymer System Centre. The thesis includes a technical report which suggests procedure of the construction. The technological documentation includes a plan of the construction site arrangement, a time schedule, a financial plan for the construction, a budget, a technological report suggesting partitions made of magnesium slabs, a control plan, a test plan and health and safety plan.
APA, Harvard, Vancouver, ISO, and other styles
33

Krištof, Marek. "Stavebně technologický projekt Univerzity Tomáše Bati ve Zlíně." Master's thesis, Vysoké učení technické v Brně. Fakulta stavební, 2019. http://www.nusl.cz/ntk/nusl-392073.

Full text
Abstract:
The subject of my diploma thesis is selected parts of the construction technology project of Tomas Bata University in Zlín. The content of the work is mainly elaborated technological regulation for making the monolithic ceiling shell of the main aula of the building, processing of the control and test plan and drawings of the ceiling shell. Next, I worked on the design of suitable transport routes to the construction site, the processing of the studies of the implementation of the main technological stages, the design and the processing of the drawings of the construction site, which varies in time depending on the progress of the technological stages, the design and assessment of the lifting mechanisms and machines, time and financial plan, the timetable for the rough construction and the main technological stages, budget of the rough construction, health and safety at work.
APA, Harvard, Vancouver, ISO, and other styles
34

Kadlec, Michal. "Stavebně technologický projekt objektu v areálu Rotana." Master's thesis, Vysoké učení technické v Brně. Fakulta stavební, 2020. http://www.nusl.cz/ntk/nusl-409931.

Full text
Abstract:
The aim of the diploma thesis is to process a construction-technological project of the building in the area Rotana. The aim of the thesis is to propose a suitable implementation procedure of the building. The thesis deals with the time schedule of the main object, itemized budget, major building machines and mechanisms, project of site equipment, study of the main construction phase realization, plan for securing material resources, technical report, time and financial object plan. The thesis also focused on the comparison bracing of foundation with the slopes.
APA, Harvard, Vancouver, ISO, and other styles
35

Maléřová, Tereza. "Obchodní centrum Orlová - stavebně technologický projekt." Master's thesis, Vysoké učení technické v Brně. Fakulta stavební, 2016. http://www.nusl.cz/ntk/nusl-240066.

Full text
Abstract:
This Diploma thesis processes construction of a retail centre in Orlová Town, considering technology, finance and time aspects. Attention is focused mainly on the building process of the main premise – the structure of retail centre. Significant part of this dissertation consists of the technology study specifying readiness, proceedings and consequences of particular operations. In following chapters the main machine, substance and human resources and theire employment in place and time will be defined. More precise technology methods for chosen processes as well as quality standards in assesment and evaluation plan will be provided together with risk adjustment and risk management. In addition the Technical Report for equipment used in construction site will be submited, completed with sketches of construction-site equipment for chosen building stages. Financial and time schedule based on the technical and economy indicators will be provided for the complex of Retail centre, followed by precise time schedule. The impact of increased noise level caused by construction process will be evaluated in acoustic study and revelant precautions will be proposed and their effectivity verified.
APA, Harvard, Vancouver, ISO, and other styles
36

Pelc, Miloš. "Stavebně technologický projekt polyfunkčního objektu v Rosicích." Master's thesis, Vysoké učení technické v Brně. Fakulta stavební, 2017. http://www.nusl.cz/ntk/nusl-265318.

Full text
Abstract:
The thesis deals with construction technology project of polyfunctional building in Rosice. The parts of the thesis are the construction technology study, the assessment of transport realations, the proposition of mechanical composition and occupational health and safety (OHS/OH&S). The thesis also contains technological regulations for flat roof and white tank and control and test plans for them. There is also itemized budget with time schedule of structural work. Thesis also deals with comparison of damp proof membrane and waterproof concrete.
APA, Harvard, Vancouver, ISO, and other styles
37

Šemberková, Klára. "Stavebně technologický projekt bytového domu Fryčajova, Brno." Master's thesis, Vysoké učení technické v Brně. Fakulta stavební, 2018. http://www.nusl.cz/ntk/nusl-372232.

Full text
Abstract:
The subject of my master´s thesis is architectural and technological project of a residental building Fryčajova, Brno. My work contain engineering report of architectural and technological project, study of realization of the main stage, project of site equipment, design of building mechanization, time plans, technological note of floor structure, control and test plans, work safety plan, environment, budget of carcass, economic balance sheet and specialization on concrete structures.
APA, Harvard, Vancouver, ISO, and other styles
38

Labudová, Martina. "Stavebně technologický projekt laboratorně administrativního objektu." Master's thesis, Vysoké učení technické v Brně. Fakulta stavební, 2017. http://www.nusl.cz/ntk/nusl-265526.

Full text
Abstract:
This thesis deals construction technology project of laboratory administration building at the University Hospital Ostrava. Attention will be focused on the construction of the main building. The author focusses on the main technological stages of construction, time and financial planning. Selected construction processes are elaborated in terms of the execution of works, quality control and occupational health and safety. The thesis is supplemented by attachments.
APA, Harvard, Vancouver, ISO, and other styles
39

Vopršalová, Tereza. "Stavebně technologický projekt bytových domů Nad Městem, Nové Město na Moravě." Master's thesis, Vysoké učení technické v Brně. Fakulta stavební, 2018. http://www.nusl.cz/ntk/nusl-372308.

Full text
Abstract:
The diploma thesis deals with construction and technological preparation of apartment buildings in „Nad Městěm“ locality in Nové Město na Moravě. The buildings have four above-ground floors and one underground floor with garages. This work contains a technical report of a construction project, a coordination situation with broader transport routes, a time and financial plan, a study of the implementation of the main technological stages, a project of the building site, the design of the main building machines and mechanisms, the cross building budget, the technological regulations, the control and test plans and specialized assignment of the noise study.
APA, Harvard, Vancouver, ISO, and other styles
40

Prachař, David. "Stavebně technologický projekt výrobní haly s administrativní budovou." Master's thesis, Vysoké učení technické v Brně. Fakulta stavební, 2018. http://www.nusl.cz/ntk/nusl-372267.

Full text
Abstract:
This diploma thesis solves the construction and technological project of the production hall with an administrative building in the Vsetín industrial zone Bobrky I. This building technology project contains a technical report on the building technological project, the cordination situation with wider transport routes, the time and financial plan of the construction, the study of the implementation of the main technological stages, project of building site equipment, selection of main building machines and mechanisms, time plan of rough construction of solved objects, plan of material resources for rough building of objects, technological regulation for pilot, including heads. Control and test plan for the pilot, including heads, safety measures for the construction and items of the budget of the objects.
APA, Harvard, Vancouver, ISO, and other styles
41

Šmíd, Radim. "Stavebně technologický projekt stanice Integrovaného záchranného systému." Master's thesis, Vysoké učení technické v Brně. Fakulta stavební, 2019. http://www.nusl.cz/ntk/nusl-392135.

Full text
Abstract:
The subject of this diploma thesis is construction-technological project of the integrated rescue system station. The building is situated in the village of Týn nad Vltavou and will be used to perform the service of fire protection of the population. The thesis is focused on the design of the construction site equipment, the time and financial plan, the design of the main building machines and mechanisms, the technological specification, the control and test plan, and also the occupational safety and health protection.
APA, Harvard, Vancouver, ISO, and other styles
42

Sikora, Marek. "Mateřská škola v Čelákovicích, příprava realizace stavby." Master's thesis, Vysoké učení technické v Brně. Fakulta stavební, 2020. http://www.nusl.cz/ntk/nusl-409945.

Full text
Abstract:
The topic of this diploma thesis is the elaboration of the construction and technology project of the kindergarden in Čelákovice. Diploma thesis contain technical report of construction and technology projet, design mechanical assembley with transportation route, design of construction site equipment, time schedule and the budget of the main building, technological prescription of the flat roof and control and test plan.
APA, Harvard, Vancouver, ISO, and other styles
43

Volf, Miroslav. "Bytový dům "Za Pivovarem" Lázně Bohdaneč - stavebně technologický projekt." Master's thesis, Vysoké učení technické v Brně. Fakulta stavební, 2018. http://www.nusl.cz/ntk/nusl-371962.

Full text
Abstract:
The aim of this diploma thesis is to process a building construction project for the apartment building “Za Pivovarem” in Lázně Bohdaneč. The building is designed as a four-floor object which has a flat roof, 24 apartments, 24 cellars, 10 garage stalls, 3 terraces that belong to the apartments on the 1st floor and enclosed balconies or balconies for the apartments in the above floors. The thesis focuses on the organization and preparation of the construction process. It contains a technological project for the cast-in-place reinforced concrete floors, which includes also drawings of formwork, a technical-economic balance sheet of the formwork costs and a calculation of the time for formwork removal, a technological project for anhydrite floors and inspection and test plans for both of the above mentioned building procedures, which are dealt with in a more detailed way. The implementation of other construction procedures is described in the preliminary design of implementation. Concerning the work safety, the plan of health and safety at work, focusing on work at heights and other dangers connected to work on the floor constructions, has been processed. Furthermore, there is a time and finance schedule for the whole construction, a construction site project, a set of main machines and mechanisms which includes a comparison of a mobile crane and a tower crane. In addition, broader transport relations have been assessed. The thesis also contains an instruction manual on the main object.
APA, Harvard, Vancouver, ISO, and other styles
44

Fejfar, Michal. "Bytový dům Ivančice - stavebně technologický projekt." Master's thesis, Vysoké učení technické v Brně. Fakulta stavební, 2018. http://www.nusl.cz/ntk/nusl-371839.

Full text
Abstract:
The subject of the master´s thesis technological project of the Ivančice residential building in Ivančice. The building has one underground and four aboveground floors. The master´s thesis contains a technical report for the building technology project, broader transport routes, a timetable, a financial plan, time schedule, design of construction site installations, design of mechanical assemblies, technological prescription for construction of celling white tank, inspection and test plan, crane and design.
APA, Harvard, Vancouver, ISO, and other styles
45

Sedláček, Lukáš. "Řízení stavební zakázky při správě a údržbě silnic." Master's thesis, Vysoké učení technické v Brně. Fakulta stavební, 2016. http://www.nusl.cz/ntk/nusl-240355.

Full text
Abstract:
This diploma thesis deals with the topic of preparation and management of a construction contract to manage and maintain roads. The aim is to analyze the management of the selected construction contract, the suggestion of my own solution to the problem and the generalization of the knowledge for managing similar projects.
APA, Harvard, Vancouver, ISO, and other styles
46

Malina, Marek. "Centrální požární stanice Hradec Králové - stavebně technologický projekt." Master's thesis, Vysoké učení technické v Brně. Fakulta stavební, 2018. http://www.nusl.cz/ntk/nusl-372056.

Full text
Abstract:
The diploma thesis deals with the formation of a constructive-technological project for the building of the Central Fire Station in Hradec Králové - 1. Phase. The building consists of five floors and one underground. The aim of the thesis is to choose and process suitable solution of the building in terms of financial, time and technical requirements based on the project documentation provided by the designer. The thesis deals with the time and financial plan of the construction, the design of the main machines and mechanisms, the planning of the material supply and its transport routes, the design of the construction site equipment, the technological regulations, the control and testing plan for the monolithic and steel constructions of the building and the time schedule of the building with the technological norm.
APA, Harvard, Vancouver, ISO, and other styles
47

Otrusina, Ondřej. "Stavebně technologický projekt rekonstrukce silničního mostu v obci Vlkoš." Master's thesis, Vysoké učení technické v Brně. Fakulta stavební, 2019. http://www.nusl.cz/ntk/nusl-392248.

Full text
Abstract:
This masters dissertation deals with the preparation and realization of a road bridge recontruction in the Vlkoš village. The introduction of this thesis contains basic information about the structures of the construction. Execution of main technological stages is addressed in construction technological study. The thesis also includes a coordinational site-layout of the construction, design of site equipment, design of the main construction machines and mechanisms, time and financial schedule, construction workers deployment plan, plan of achines usage. In my thesis I deal mainly with the supporting construction of the bridge. For these stages i implemented technological directives in addition of Inspection and check plan. Safety and protection of health durink work is also addressed. I also worked out the technical report of the constuction sites facilities including the needed drawings.
APA, Harvard, Vancouver, ISO, and other styles
48

Šmeidler, Jakub. "Stavebně technologický projekt zdravotnické záchranné stanice v Brně." Master's thesis, Vysoké učení technické v Brně. Fakulta stavební, 2017. http://www.nusl.cz/ntk/nusl-265288.

Full text
Abstract:
The thesis is focused on building and technological project of medical rescue station on the street Kamenice in Brno. The building and technological project includes technology report, study the implementation of major technological stages, coordination situation buildings with wider relationships roadways, object-oriented time and financial plan ,construction project site equipment, design of building machines and mechanisms, the timetable of the main building structure, balance resources, technological note for design of the outer building cladding, inspection and test plan for the exterior cladding of the building, environmental and safety risks, the draft contract for work and itemized budget.
APA, Harvard, Vancouver, ISO, and other styles
49

Hlinšťák, Filip. "Přístavba výrobní haly Simandl v Petrovicích, příprava realizace a řízení stavby." Master's thesis, Vysoké učení technické v Brně. Fakulta stavební, 2020. http://www.nusl.cz/ntk/nusl-409927.

Full text
Abstract:
The master’s thesis is planning selected parts of preparation and realization of the extension of production hall with warehouses in Petrovice u Karviné. The thesis contains technical reports, solution of wider traffic relations, study of main technological stages, design of building site, design of construction machinery, the technology solutions for installation of roofing including HSF and CTP, design of anchors for roofing, time and financial planning of construction.
APA, Harvard, Vancouver, ISO, and other styles
50

Dejmalová, Hana. "Bytový komplex LIVE UP v Brně - příprava realizace stavby." Master's thesis, Vysoké učení technické v Brně. Fakulta stavební, 2017. http://www.nusl.cz/ntk/nusl-265703.

Full text
Abstract:
The subject of the master´s thesis are selected parts construction technology project apartment house LIVE UP in Brno – Bohunice. It is a new building with one underground floor and six overground floors. Construction of the house is monolithic and upper floors are bearing masonry walls. The work includes technical reports, study the implementation of major construction phases, organization of the construction, technological regulation of flat single-roof, itemized budget with the statement of measurements, time schedule, inventory of machines.
APA, Harvard, Vancouver, ISO, and other styles
We offer discounts on all premium plans for authors whose works are included in thematic literature selections. Contact us to get a unique promo code!

To the bibliography