To see the other types of publications on this topic, follow the link: Projektové management.

Journal articles on the topic 'Projektové management'

Create a spot-on reference in APA, MLA, Chicago, Harvard, and other styles

Select a source type:

Consult the top 50 journal articles for your research on the topic 'Projektové management.'

Next to every source in the list of references, there is an 'Add to bibliography' button. Press on it, and we will generate automatically the bibliographic reference to the chosen work in the citation style you need: APA, MLA, Harvard, Chicago, Vancouver, etc.

You can also download the full text of the academic publication as pdf and read online its abstract whenever available in the metadata.

Browse journal articles on a wide variety of disciplines and organise your bibliography correctly.

1

Řeháček, Petr. "Standards for Project Management." Acta Informatica Pragensia 1, no. 1 (2012): 41–49. http://dx.doi.org/10.18267/j.aip.4.

Full text
APA, Harvard, Vancouver, ISO, and other styles
2

Moskaliuk, Andrii, and Pavlo Teslenko. "Projektowe podejście do zarządzania systemem bezpieczeństwa przedsiębiorstwa przemysłowego." Prace Naukowe Akademii im. Jana Długosza w Częstochowie. Technika, Informatyka, Inżynieria Bezpieczeństwa 2 (2014): 191–97. http://dx.doi.org/10.16926/tiib.2014.02.16.

Full text
APA, Harvard, Vancouver, ISO, and other styles
3

Engelhardt, Nils. "COMPARISON OF AGILE AND TRADITIONAL PROJECT MANAGEMENT: SIMULATION OF PROCESS MODELS." Acta academica karviniensia 19, no. 2 (2019): 15–27. http://dx.doi.org/10.25142/aak.2019.011.

Full text
APA, Harvard, Vancouver, ISO, and other styles
4

Afshari, Ali, Vladimir Brtka, and Melita Ćoćkalo-Hronjec. "Project risk management in Iranian software projects." Journal of Engineering Management and Competitiveness 8, no. 2 (2018): 81–88. http://dx.doi.org/10.5937/jemc1802081a.

Full text
APA, Harvard, Vancouver, ISO, and other styles
5

Chobotová, Monika, and Žaneta Rylková. "MANAGEMENT OF A PROJECT MANAGER'S COMPETENCES IN PUBLIC ORGANIZATIONS." Acta academica karviniensia 15, no. 1 (2015): 70–81. http://dx.doi.org/10.25142/aak.2015.006.

Full text
APA, Harvard, Vancouver, ISO, and other styles
6

Lakusic, Stjepan. "Project management during construction of the cross-border Svilaj Bridge." Journal of the Croatian Association of Civil Engineers 71, no. 09 (2019): 781–90. http://dx.doi.org/10.14256/jce.2604.2019.

Full text
APA, Harvard, Vancouver, ISO, and other styles
7

Brutovský, Michal, and Jana Šimíčková. "Komparácia vybraných metód využiteľných v manažmente rizík projektov." Krízový manažment 19, no. 2 (2020): 53–59. http://dx.doi.org/10.26552/krm.c.2020.2.53-59.

Full text
Abstract:
The project Is effective if the goals and defined benefits of the project are appropriately set, the risks are assessed in detail with the subsequent implementation of measures to minimize them and the correction of project activities. Effective risk assessment and management requires the interaction of several factors and functions that will keep the implementation of the project in the right direction regardless of the problem addressed. During the project activity, project managers must follow appropriate methods and procedures in the field of risk assessment and management. The choice of a
APA, Harvard, Vancouver, ISO, and other styles
8

Yang, Li-Ren, Jieh-Haur Chen, and Chung-Fah Huang. "REQUIREMENTS DEFINITION AND MANAGEMENT PRACTICE TO IMPROVE PROJECT OUTCOMES / REIKALAVIMŲ APIBRĖŽIMAS IR VADYBA GERINANT PROJEKTO REZULTATUS." Journal of Civil Engineering and Management 18, no. 1 (2012): 114–24. http://dx.doi.org/10.3846/13923730.2012.657340.

Full text
Abstract:
Poor project requirements definition and management (RDM) is one of the major causes of project failure. However, many organizations do not adequately manage a project's requirements leading to a poor design basis. Thus, quality of requirements is critical to the success of any construction project. The primary purpose of this research was to investigate the mediating effect of requirements quality on the relationship between RDM practice and project performance. The second objective was to determine whether the impact of RDM practice on project performance was moderated by project characteris
APA, Harvard, Vancouver, ISO, and other styles
9

Chmiel, Pjotr, Juri Olenjuk, Yaroslav Pidgorodeckyi, and Evgen Martyn. "Metody reprezentacji modeli w zarządzaniu zorientowanym projektowo transgranicznych jednostek operacyjno-ratowniczych." Prace Naukowe Akademii im. Jana Długosza w Częstochowie. Technika, Informatyka, Inżynieria Bezpieczeństwa 2 (2014): 31–48. http://dx.doi.org/10.16926/tiib.2014.02.03.

Full text
APA, Harvard, Vancouver, ISO, and other styles
10

Pitaš, Jaromír, and Miroslav Mašlej. "Three Key Issues of Project Management in the Ministry of Defense Sector." Vojenské rozhledy 27, no. 3 (2018): 129–40. http://dx.doi.org/10.3849/2336-2995.27.2018.03.129-140.

Full text
APA, Harvard, Vancouver, ISO, and other styles
11

Siao, Fu-Cih, and Yu-Cheng Lin. "ENHANCING CONSTRUCTION INTERFACE MANAGEMENT USING MULTILEVEL INTERFACE MATRIX APPROACH / RYŠIŲ VADYBOS STATYBOJE GERINIMAS TAIKANT ĮVAIRIALYGIŲ RYŠIŲ MATRICOS METODĄ." Journal of Civil Engineering and Management 18, no. 1 (2012): 133–44. http://dx.doi.org/10.3846/13923730.2012.657368.

Full text
Abstract:
Many interfaces typically exist in the construction phase of a project. Since project participants usually fail to share interface information, most interfaces are difficult to solve effectively during that phase. Furthermore, future activities might not be implemented based on changes made by predecessors. In practice, failure to manage interfaces may result in additional work or in low project performance. In order to manage construction interfaces effectively, this study proposes the novel Multilevel Interface (MI) Matrix approach to enhance interface management during the construction phas
APA, Harvard, Vancouver, ISO, and other styles
12

Vávrová, Jitka. "APPLICATION OF THE PRINCIPLES OF PROJECT MANAGEMENT IN THE PROCESS OF ONLINE MARKETING OF ACCOMMODATION FACILITIES." Acta academica karviniensia 16, no. 2 (2016): 83–94. http://dx.doi.org/10.25142/aak.2016.016.

Full text
APA, Harvard, Vancouver, ISO, and other styles
13

Jiang, Aiyin, Raja R. A. Issa, and Maged Malek. "CONSTRUCTION PROJECT CASH FLOW PLANNING USING THE PARETO OPTIMALITY EFFICIENCY NETWORK MODEL / STATYBOS PROJEKTO PINIGŲ SRAUTŲ PLANAVIMAS, NAUDOJANT PARETO OPTIMUMO EFEKTYVUMO TINKLO MODELĮ." Journal of Civil Engineering and Management 17, no. 4 (2011): 510–19. http://dx.doi.org/10.3846/13923730.2011.604537.

Full text
Abstract:
Cash flow is crucial for ensuring the viability of a project. It consists of a complete history of all cash disbursement, cash shortage, loans, cost of money, and all earnings received. Although significant research work has been conducted on cash flow forecast, planning, and management, the objective is constantly the maximization of profit/final cash balance, or minimization of total project cost. Moreover, cash flow forecasting needs to be effective and fast. The paper develops multiple-objective cash flow planning model – Pareto optimality efficiency network model, which considers typical
APA, Harvard, Vancouver, ISO, and other styles
14

Kaklauskas, Artūras. "INTEGRATED MODEL AND SYSTEM FOR PASSIVE HOUSES MULTIPLE CRITERIA ANALYSIS / INTEGRUOTAS PASYVIŲJŲ NAMŲ DAUGIAKRITERINĖS ANALIZĖS MODELIS IR SISTEMA." International Journal of Strategic Property Management 15, no. 1 (2011): 74–90. http://dx.doi.org/10.3846/1648715x.2011.574903.

Full text
Abstract:
In order to design and implement a high-quality passive house project, it is neces sary to take care of its efficiency from the brief stage to the end of its life's service. The entire process should be planned and executed with a consideration of the goals that are aspired to by the participating and interested parties and the micro, meso and macro environment levels. In order to realize the above purposes, an original Model for an Integrated analysis of Passive Houses and Passive Houses Design Multiple Criteria Decision Support System was developedby the authors, enabling one to analyze a pa
APA, Harvard, Vancouver, ISO, and other styles
15

Petravičius, Tomas. "Projekto veiklos efektyvumo matavimas vertės metodais." Verslas: teorija ir praktika 9, no. 4 (2008): 295–305. http://dx.doi.org/10.3846/1648-0627.2008.9.295-305.

Full text
APA, Harvard, Vancouver, ISO, and other styles
16

Banaitienė, Nerija, Audrius Banaitis, and Artūras Norkus. "RISK MANAGEMENT IN PROJECTS: PECULIARITIES OF LITHUANIAN CONSTRUCTION COMPANIES / RIZIKOS VALDYMAS PROJEKTUOSE: LIETUVOS STATYBOS ĮMONIŲ SAVITUMAI." International Journal of Strategic Property Management 15, no. 1 (2011): 60–73. http://dx.doi.org/10.3846/1648715x.2011.568675.

Full text
Abstract:
Risk analysis and management is nowadays a critical factor to successful construction project management, as construction projects tend to be more complex, dynamic, always unique, and competition increasingly tougher. risk management helps the project participants—client, contractor or developer, consultant, and supplier—to meet their commitments and minimize negative impacts on construction project scope, cost, schedule (and quality, as a Result). The benefits of the risk management process include identifying and analyzing risks, and improvement of construction project management processes a
APA, Harvard, Vancouver, ISO, and other styles
17

Jun, Jaebum. "APPRAISAL OF COMBINED AGREEMENTS IN BOT PROJECT FINANCE: FOCUSED ON MINIMUM REVENUE GUARANTEE AND REVENUE CAP AGREEMENTS." International Journal of Strategic Property Management 14, no. 2 (2010): 139–55. http://dx.doi.org/10.3846/ijspm.2010.11.

Full text
Abstract:
Limited public funds for infrastructures have the government consider joining the private in a BOT project finance scheme. Generally, the BOT projects entail lots of managerial flexibilities that may induce the radical change of project's cash flows, an asymmetric payoff, when facing on the uncertainties due to the BOT project finance's unique characteristics. Among various managerial flexibilities in the BOT projects, the MRG (Minimum Revenue Guarantee) and the RCP (Revenue Cap) agreements are frequently used to protect the government and the developer from the operational risk. However, the
APA, Harvard, Vancouver, ISO, and other styles
18

Vaněk, Michal, Yveta Tomášková, Alena Straková, Kateřina Špakovská, and Petr Bora. "Risk Assessment in Mining-Related Project Management / Stanovení Rizika V Projektovém Řízení V Podmínkách Těžebního Podniku." GeoScience Engineering 59, no. 3 (2013): 48–54. http://dx.doi.org/10.2478/gse-2014-0057.

Full text
Abstract:
Abstract Risk assessment is an integral part of the assessment of an investment project. Underestimating risks may lead to erroneous conclusions with negative impacts on the economy of the project. With regard to the level of investments and the time factor under mining company conditions, the issue of risk gains importance. The evaluation of existing practical experience shows that managers of mining companies more often approach to the risk assessment based on intuition, than through exact methods. The article is devoted to the risk assessment itself whose procedure is illustrated on a model
APA, Harvard, Vancouver, ISO, and other styles
19

Ustinovichius, Leonas, Arunas Barvidas, Andzelika Vishnevskaja, and Ilya V. Ashikhmin. "MULTICRITERIA VERBAL ANALYSIS FOR THE DECISION OF CONSTRUCTION PROBLEMS." Technological and Economic Development of Economy 15, no. 2 (2009): 326–40. http://dx.doi.org/10.3846/1392-8619.2009.15.326-340.

Full text
Abstract:
The paper aims to analyse the construction contracts and to determine their effectiveness by verbal methods. Contractors of international construction projects are often faced with complicated situations working in the conditions of uncertainty in construction. One of the potential risk factors is associated with the requirements of contract conditions. A simple quantitative method for evaluating the requirements defined in specifications of the contract is presented. One of the major aspects is project or contract management. Project developers need various models of managing large and comple
APA, Harvard, Vancouver, ISO, and other styles
20

Abdul-Rahman, Hamzah, Chen Wang, and Norjuma’ah Binti Muhammad. "PROJECT PERFORMANCE MONITORING METHODS USED IN MALAYSIA AND PERSPECTIVES OF INTRODUCING EVA AS A STANDARD APPROACH / MALAIZIJOJE NAUDOJAMI PROJEKTŲ EFEKTYVUMO STEBĖJIMO METODAI IR GALIMYBĖS EVA NAUDOTI KAIP STANDARTINĘ METODIKĄ." Journal of Civil Engineering and Management 17, no. 3 (2011): 445–55. http://dx.doi.org/10.3846/13923730.2011.598331.

Full text
Abstract:
Earned value analysis (EVA) is a well-known project management tool for monitoring and forecasting the project performance such as time and cost. Despite the benefits found in the manufacturing industry, EVA has not been widely implemented in the Malaysian construction industry. This study is aimed to determine the advantages of EVA over other project control methods, to determine the suitability of implementing EVA in construction projects, and to develop a working flowchart as a guide in implementing EVA. Accordingly, qualitative approaches including the structured interview survey and the f
APA, Harvard, Vancouver, ISO, and other styles
21

Enshassi, Adnan, Sherif Mohamed, and Saleh Abushaban. "FACTORS AFFECTING THE PERFORMANCE OF CONSTRUCTION PROJECTS IN THE GAZA STRIP." JOURNAL OF CIVIL ENGINEERING AND MANAGEMENT 15, no. 3 (2009): 269–80. http://dx.doi.org/10.3846/1392-3730.2009.15.269-280.

Full text
Abstract:
Construction projects located in the Gaza Strip, Palestine suffer from many problems and complex issues. Consequently, the objective of this paper is to identify the factors affecting the performance of local construction projects; and to elicit perceptions of their relative importance. A comprehensive literature review was deployed to generate a set of factors believed to affect project performance. A total of 120 questionnaires were distributed to 3 key groups of project participants; namely owners, consultants and contractors. The survey findings indicate that all 3 groups agree that the mo
APA, Harvard, Vancouver, ISO, and other styles
22

Koo, Choong-Wan, TaeHoon Hong, Chang-Taek Hyun, Sang H. Park, and Joon-oh Seo. "A STUDY ON THE DEVELOPMENT OF A COST MODEL BASED ON THE OWNER'S DECISION MAKING AT THE EARLY STAGES OF A CONSTRUCTION PROJECT." International Journal of Strategic Property Management 14, no. 2 (2010): 121–37. http://dx.doi.org/10.3846/ijspm.2010.10.

Full text
Abstract:
Decision making at the early stages of a construction project has a significant impact on the project, and various scenarios created based on the owner's requirements should be considered for the decision making. At the early stages of a construction project, the information regarding the project is usually limited and uncertain. As such, it is difficult to plan and manage the project (especially cost planning). Thus, a cost model that could be varied according to the owner's requirements was developed. The cost model that was developed in this study is based on the case‐based reasoning (CBR)
APA, Harvard, Vancouver, ISO, and other styles
23

Turskis, Zenonas. "MULTI‐ATTRIBUTE CONTRACTORS RANKING METHOD BY APPLYING ORDERING OF FEASIBLE ALTERNATIVES OF SOLUTIONS IN TERMS OF PREFERABILITY TECHNIQUE / DAUGIATIKSLIS RANGOVŲ PARINKIMO METODAS TAIKANT ĮMANOMŲ SPRENDINIŲ ALTERNATYVŲ RANGAVIMO PRIORITETO POŽIŪRIU BŪDĄ." Technological and Economic Development of Economy 14, no. 2 (2008): 224–39. http://dx.doi.org/10.3846/1392-8619.2008.14.224-239.

Full text
Abstract:
Contractor evaluation is a vital part of the project management cycle and deals with risk and risk management. One of the most important phases in the construction industry is the bidding process. In order to select the most appropriate contractor for the project and prepare the most realistic and accurate bid proposal, stakeholders have to know all financial, technical and general information about these contractors. The information can be determined as qualitative, quantitative or verbal data. This paper presents the multi‐attribute contractors ranking method bay applying Ordering of feasibl
APA, Harvard, Vancouver, ISO, and other styles
24

Parasonis, Josifas. "FORMULATION OF PREREQUISITES FOR THE FORMATION OF QUALITY ASSURANCE SYSTEM FOR CONSTRUCTION PRODUCTION IN THE REPUBLIC OF LITHUANIA/STATYBOS KOKYBĖS KONTROLĖ LIETUVOS RESPUBLIKOJE." JOURNAL OF CIVIL ENGINEERING AND MANAGEMENT 3, no. 11 (1997): 82–89. http://dx.doi.org/10.3846/13921525.1997.10531358.

Full text
Abstract:
Straipsnyje nagrinėjama sztatybos produkcijos kokybės kontrolės būklė šakos restrūktūrizavimo laikotarpiu. Aptariamos pagrindinės avarinių ir dcfektinių situacijų priežastys įvairiose inveslicinio proceso stadijose (tikslai—projektavimas—statyba—eksploatavimas). Statybos produkcijos kokybės užtikrinimas nagrinėjamas taip pat pagal investicinio proceso stadijas. Aptariami kiekvienos stadijos dalyviai ir jų atsakomybė atliekant kokybės kontrolę. Tikslų nustatymo stadijoje galimi 3 pagrindiniai dalyviai: užsakovas, konsultantai ir valstybės institucijos. Pažymima, jog teisingam savo idėjos formul
APA, Harvard, Vancouver, ISO, and other styles
25

Liao, Pin-Chao, Stephen R. Thomas, William J. O’Brien, Jiukun Dai, Stephen P. Mulva, and Inho Kim. "BENCHMARKING PROJECT LEVEL ENGINEERING PRODUCTIVITY / INŽINERINĖS VEIKLOS NAŠUMO LYGINIMAS PROJEKTŲ LYGMENIU." Journal of Civil Engineering and Management 18, no. 2 (2012): 235–44. http://dx.doi.org/10.3846/13923730.2012.671284.

Full text
Abstract:
The benchmarking of engineering productivity can assist in the identification of inefficiencies and thus can be critical to cost control. Recognizing the importance of engineering productivity measurement, the Construction Industry Institute (CII) developed the Engineering Productivity Metric System (EPMS) composed of a series of hierarchical metrics with standard definitions suitable for measuring engineering productivity at various levels. While the EPMS can be used to assess engineering productivity at multiple levels within a discipline, it cannot produce an overall project level productiv
APA, Harvard, Vancouver, ISO, and other styles
26

Kaklauskas, Artūras. "ANALYSIS OF LIFE-TIME PROCESS OF A BUILDING/SUINTERESUOTŲ GRUPIŲ ANALIZĖ." JOURNAL OF CIVIL ENGINEERING AND MANAGEMENT 2, no. 6 (1996): 33–43. http://dx.doi.org/10.3846/13921525.1996.10531642.

Full text
Abstract:
Projektų efektyvumas labai priklauso nuo jame dalyvaujančių suinteresuotų grupių siekiamių tikslų sistemos. Keičiantis tikslams, keičiasi ir įsivaizduojamas to paties projekto naudingumo laipsnis. Todėl sudarant tikslų sistemą, suinteresuotos grupės labai tiksliai turi žinoti, ko jos siekia. Šiems poreikiams matematiškai aprašyti yra sudaroma kriterijų sistema pilnai atspindinti siekiamus tikslus bei apskaičiuojamos kriterijų reikšmes bei reikšmingumai. Šiame straipsnyje išnagrinėtos suinteresuotos grupės, jų tikslai bei projektų efektyvumą atspindinti kriterijų sistema.
APA, Harvard, Vancouver, ISO, and other styles
27

Šostak, Olga Regina, and Sigutė Vakrinienė. "MATHEMATICAL MODELLING OF DISPUTE PROCEEDINGS BETWEEN INVESTORS AND THIRD PARTIES ON ALLEGEDLY VIOLATED THIRD-PARTY RIGHTS / GINČO PROCESO TARP INVESTUOTOJŲ IR TREČIEJŲ ASMENŲ DĖL GALIMAI PAŽEISTŲ TREČIEJŲ ASMENŲ TEISIŲ MATEMATINIS MODELIAVIMAS." Journal of Civil Engineering and Management 17, no. 1 (2011): 126–36. http://dx.doi.org/10.3846/13923730.2011.560628.

Full text
Abstract:
The article analyses the possible influence of third-party rights infringed during construction planning on the implementation of an investment project. In a construction project, judicial disputes are an unwanted risk factor, which may disrupt the entire project. It is therefore necessary to plan and apply preventive measures for the mitigation of such risk in the initial planning stage of a construction project. The article, for that purpose, presents modelling a dispute between investors and third persons on allegedly violated third-party rights with the help of a tree that illustrates the
APA, Harvard, Vancouver, ISO, and other styles
28

Juozapavičius, Algimantas, Kazimieras Mickus, Gediminas Mikaliūnas, Mindaugas Pelanis, and Evaldas Urbonas. "Informacinių technologijų rinkos analizė automatizuotų organizacinių procesų valdymo požiūriu." Informacijos mokslai 48 (January 1, 2009): 100–116. http://dx.doi.org/10.15388/im.2009.0.3328.

Full text
Abstract:
Mažoms ir vidutinio dydžio įmonėms aktuali problema yra pasirinkti ir įdiegti integruotą, lanksčią ir atvirą automatizuotų organizacinių procesų valdymo sistemą. Siekiant tai padaryti efektyviai, reikalingi adekvatūs moksliniai taikomieji tyrimai ir programinės įrangos produkto parinkimo etapai. Bendras skirtingų organizacinių procesų valdymas yra būtina prielaida šių įmonių konkurencingumui didėti. Straipsnyje pateikiama informacinių technologijų rinkos analizė ne tik atskleidžia veiksnius, nusakančius poreikį įmonėms įdiegti veiklos procesus automatizuojančias sistemas, bet ir vertina inform
APA, Harvard, Vancouver, ISO, and other styles
29

Park, Moonseo, Yongsik Chu, Hyun-Soo Lee, and Wooyoung Kim. "EVALUATION METHODS FOR CONSTRUCTION PROJECTS." JOURNAL OF CIVIL ENGINEERING AND MANAGEMENT 15, no. 4 (2009): 349–59. http://dx.doi.org/10.3846/1392-3730.2009.15.349-359.

Full text
Abstract:
Financial evaluation methods such as Net Present Value (NPV) and Internal Rate of Return (IRR) are not fully adequate for accounting three practical aspects of construction projects: reinvestment rate, actual amount of required investment, and firm available funds. In a certain type of projects, this inadequacy often results in the inapplicability of NPV, multiple or no IRR problem, systematic bias of IRR, and inconsistent decision signal and ranking between NPV and IRR. Many modified methods have been developed, but hardly succeeded in reflecting construction market reality in an integrated m
APA, Harvard, Vancouver, ISO, and other styles
30

Sonmez, Rifat, and Bahadir Ontepeli. "PREDESIGN COST ESTIMATION OF URBAN RAILWAY PROJECTS WITH PARAMETRIC MODELING." JOURNAL OF CIVIL ENGINEERING AND MANAGEMENT 15, no. 4 (2009): 405–9. http://dx.doi.org/10.3846/1392-3730.2009.15.405-409.

Full text
Abstract:
This paper presents a parametric modeling method for predesign cost estimation of urban railway systems. Data of 13 light rail and metro projects located in Turkey were compiled for quantification of the impacts of parameters on the project costs. Parametric models have been developed using regression analysis and neural networks techniques. Ten linear regression models were used for determination of the parameters significantly impacting cost of urban railway projects. Two neural networks were considered as an alternative to regression models, particularly for the identification of the non‐li
APA, Harvard, Vancouver, ISO, and other styles
31

Lawther, Peter M. "COMMUNITY INVOLVEMENT IN POST DISASTER RE‐CONSTRUCTION ‐ CASE STUDY OF THE BRITISH RED CROSS MALDIVES RECOVERY PROGRAM." International Journal of Strategic Property Management 13, no. 2 (2009): 153–69. http://dx.doi.org/10.3846/1648-715x.2009.13.153-169.

Full text
Abstract:
Community involvement in post disaster re‐construction is an important ingredient to the overall success of housing and infrastructure redevelopment. Implementing Agencies and governments need to design post disaster re‐construction programs which promote the involvement of beneficiaries and communities in post disaster re‐construction programs, to the extent allowed by the scale and context of any given situation. By extension, the management and organisational capacities which enable community involvement in a post disaster re‐construction project need to be identified and developed to facil
APA, Harvard, Vancouver, ISO, and other styles
32

Bartkutė, Simona, and Eligijus Toločka. "RISK MANAGEMENT IMPROVEMENT OF ENGINEERING PROJECTS IN WOODWORKING INDUSTRY / MEDŽIO APDIRBIMO PRAMONĖS ŠAKOJE VYKDOMŲ INŽINERINIŲ PROJEKTŲ RIZIKOS VALDYMO TOBULINIMAS." Mokslas - Lietuvos ateitis 5, no. 6 (2013): 605–8. http://dx.doi.org/10.3846/mla.2013.98.

Full text
Abstract:
Risk is a complex phenomenon that has physical, monetary, cultural and social dimensions. Every company wants to save money, time, increase quality, optimise manufacturing, but each factor may involve different risks with different influence to company, its reputation. The aim of the research is to find better risk management improvement decisions, using techniques that could help to reduce risk impact in wood-based nonstandard production with shorter project time, smoother design process, lower costs, better project coordination, increased ability to manage problems, technical solutions. Sant
APA, Harvard, Vancouver, ISO, and other styles
33

Balčytienė, Auksė, and Aušra Vinciūnienė. "Politinės komunikacijos kultūra su europietišku potepiu: Briuselio atvejis." Sociologija. Mintis ir veiksmas 23 (April 4, 2015): 71–85. http://dx.doi.org/10.15388/socmintvei.2008.3.6070.

Full text
Abstract:
Straipsnyje, remiantis nauju požiūriu, analizuojami Europos Komisijos finansuoto 6 BP tarptautinio mokslinio projekto „Adekvati informacijos vadyba“ (Adequate Information Management: (AIM) [2004-2007]) rezultatai. Tyrimo, kurį atliko mokslininkai iš vienuolikos Europos šalių, tikslas buvo atskleisti ES politinės komunikacijos specifiką bei europinių naujienų vadybos procesus, kurie lemia ES aktualijų – informacijos atrankos, analizės, naujienų redagavimo ir paskelbimo – pateikimą Europos žiniasklaidoje. Pagrindinis šio straipsnio analizės dalykas – Briuselio politinės komunikacijos kultūra, ki
APA, Harvard, Vancouver, ISO, and other styles
34

Enshassi, Adnan, Faisal Arain, and Sadi Al-Raee. "CAUSES OF VARIATION ORDERS IN CONSTRUCTION PROJECTS IN THE GAZA STRIP." JOURNAL OF CIVIL ENGINEERING AND MANAGEMENT 16, no. 4 (2010): 540–51. http://dx.doi.org/10.3846/jcem.2010.60.

Full text
Abstract:
The maximum project performance would be achieved if the work invariably flows smoothly within time limits and anticipated budget. Variation orders result in time delay, cost overrun, quality defects, and other negative impacts. This is common in construction projects in Gaza Strip. The main objective of this study was to analyze the causes of variation orders in construction projects in Gaza Strip. The causes of variation orders in construction process in Gaza Strip were investigated through questionnaire survey of 36 classified construction companies, 25 consultants and 15 owners. 64 causes
APA, Harvard, Vancouver, ISO, and other styles
35

Amšiejus, Jonas, Linas Gabrielaitis, and Rimantas Gruodis. "APPLICATION OF COMPUTER AIDED DESIGN SYSTEMS IN GEOTECHNICAL ENGINEERING/AUTOMATIZUOTO PROJEKTAVIMO SISTEMŲ NAUDOJIMAS GEOTECHNIKOJE." JOURNAL OF CIVIL ENGINEERING AND MANAGEMENT 3, no. 11 (1997): 70–75. http://dx.doi.org/10.3846/13921525.1997.10531356.

Full text
Abstract:
Kuriant automatizuoto projektavimo sistemas ypač svarbu atkreipti dėmesį į tą. duomenų bei informacijos dalį, kuri dėl jai būdingų savitumų negali būti unifikuota. Ryškiausias pavyzdys šiuo požiūriu galėtų būti inžinerinėsgeologinės sąlygos, kurios įvairiuose pasaulio regionuose yra gana skirtingos. Pasitaiko ir taip, kad dėl to gali skirtis net pati gruntų klasifikacija. Panaši situacija yra ir Lietuvos teritorijoje, kur kai kurių grunto tipų spektras pasirodė platesnis, negu numato kitų valstybių gruntų klasifikacijos sistemos. Jau vien dėl šios priežasties kitose šalyse sukurtos programinės
APA, Harvard, Vancouver, ISO, and other styles
36

Pan, Nai-Hsin, Ming-Li Lee, and Sheng-Quan Chen. "CONSTRUCTION MATERIAL SUPPLY CHAIN PROCESS ANALYSIS AND OPTIMIZATION / PROCESŲ ANALIZĖ IR OPTIMIZACIJA STATYBINIŲ MEDŽIAGŲ TIEKIMO GRANDINĖJE." Journal of Civil Engineering and Management 17, no. 3 (2011): 357–70. http://dx.doi.org/10.3846/13923730.2011.594221.

Full text
Abstract:
This paper provides a systematic approach for the analysis and design of construction supply chain operation models. Based on the Supply Chain Operations Reference Model of the Supply Chain Council, this research studies sup- ply and demand behavior, using a bridge superstructure construction process as a case study. This paper uses the SCOR Model and applies Dynamic Simulation software, namely, “SIMPROCESS”, to assist in establishing a hierarchical model to explore the behavior of the construction supply chain process and develop a performance evaluation method that can help improve the suppl
APA, Harvard, Vancouver, ISO, and other styles
37

Alinaitwe, Henry Mwanaki. "AN ASSESSMENT OF CLIENTS’ PERFORMANCE IN HAVING AN EFFICIENT BUILDING PROCESS IN UGANDA/UŽSAKOVO DALYVAVIMO EFEKTYVIAME STATYBOS PROCESE ĮVERTINIMAS UGANDOJE." JOURNAL OF CIVIL ENGINEERING AND MANAGEMENT 14, no. 2 (2008): 73–78. http://dx.doi.org/10.3846/1392-3730.2008.14.1.

Full text
Abstract:
Over the years researchers have paid little attention to the performance of the clients in the building industry. Much of the research on improvement of performance of the construction industry has mainly focused on contractors and the supply chain. The performance of a client is important because any decision made will affect project success. Failure on the part of the client might lead to stress factors causing significant problems in successive stages of the project. This research is an investigation into the roles of the client to find out whether clients in the building industry in Uganda
APA, Harvard, Vancouver, ISO, and other styles
38

Xia, Bo, and Albert P. C. Chan. "IDENTIFICATION OF SELECTION CRITERIA FOR OPERATIONAL VARIATIONS OF THE DESIGN-BUILD SYSTEM: A DELPHI STUDY IN CHINA / ATRANKOS KRITERIJŲ PROJEKTAVIMO IR STATYBOS SISTEMOS DARBINIAMS VARIANTAMS NUSTATYMAS: DELPHI TYRIMAS KINIJOJE." Journal of Civil Engineering and Management 18, no. 2 (2012): 173–83. http://dx.doi.org/10.3846/13923730.2012.657417.

Full text
Abstract:
The design-build (DB) system has been demonstrated as an effective delivery method and has gained popularity worldwide. However it is observed that a number of operational variations of DB system have emerged since the last decade to cater for different client's requirements. After the client decides to procure his project through the DB system, he still has to choose an appropriate configuration to deliver their projects optimally. However, there is little research on the selection of DB operational variations. One of the main reasons for this is the lack of evaluation criteria for determinin
APA, Harvard, Vancouver, ISO, and other styles
39

Chen, Jieh-Haur, and Wei-Hsiang Chen. "CONTRACTOR COSTS OF FACTORING ACCOUNT RECEIVABLES FOR A CONSTRUCTION PROJECT / RANGOVO SĄNAUDOS, STATYBŲ PROJEKTO GAUTINAS SUMAS PERDAVUS FAKTORINGO ĮMONEI." Journal of Civil Engineering and Management 18, no. 2 (2012): 227–34. http://dx.doi.org/10.3846/13923730.2012.671272.

Full text
Abstract:
Literature reveals that approximately 66% of construction project funds are raised from financial institutions. The burden of capital costs on contractors is heavy and financial alternatives for the reduction of capital costs are always desired. The objective of this study is to derive a mathematical way of defining the contractor's costs for factoring account receivables, which is a form of commercial finance whereby a business sells its account receivables at a discount. Factoring can be thus considered as a contractor selling his/her accounts receivable to a factor, a financial institution
APA, Harvard, Vancouver, ISO, and other styles
40

Tam, Vivian W. Y., Khoa N. Le, and S. X. Zeng. "REVIEW ON WASTE MANAGEMENT SYSTEMS IN THE HONG KONG CONSTRUCTION INDUSTRY: USE OF SPECTRAL AND BISPECTRAL METHODS / ATLIEKŲ TVARKYMO SISTEMŲ HONKONGO STATYBŲ SEKTORIUJE APŽVALGA: SPEKTRINIO IR BISPEKTRINIO METODŲ TAIKYMAS." Journal of Civil Engineering and Management 18, no. 1 (2012): 14–23. http://dx.doi.org/10.3846/13923730.2011.619326.

Full text
Abstract:
The Hong Kong government has implemented various measures to reduce waste, including a waste disposal ordinance, a green manager scheme, a waste reduction framework plan, a pilot concrete recycling plant, waste management systems and a landfill charging scheme. However, there are difficulties in implementing the waste management systems for contractors. This paper examines the existing implementation of waste management systems in the Hong Kong construction industry. Major sources of construction waste, awareness to install environment-friendly activities, benefits, difficulties and recommenda
APA, Harvard, Vancouver, ISO, and other styles
41

Šarka, Vaidolas. "A DECISION SUPPORT SYSTEM APPLYING MULTICRITERIA SYNTHESIS METHODS IN CONSTRUCTION/SPRENDIMŲ PARAMOS SISTEMA, TAIKANT DAUGIAKRITERINIUS SINTEZĖS METODUS STATYBOJE." JOURNAL OF CIVIL ENGINEERING AND MANAGEMENT 6, no. 6 (2000): 464–68. http://dx.doi.org/10.3846/13921525.2000.10531632.

Full text
Abstract:
Autorius savo mokslinių tyrimų pagrindu pasirinko daugiakriterinių sprendimų priėmimo metodiką, šios metodikos Problematiką ir tyrimo metodų plėtrą. Nagrinėjami esami vienpakopiai daugiakriterinių sprendimų priėmimo būdai statybos technologijos srityje bei autoriaus siūlomi daugiapakopiai daugiakriterinių sprendimų sintezės metodai. Atskirų struktūrų sujungimo į bendrą sistemą kartu sprendžiant skirtingose pakopose esančių alternatyvų tarpusavio ryšių suderinamumo problemas nagrinėjimas yra labai svarbus daugiakriterinių sprendimų srityje. Sprendimo šiais metodais tikslas yra nagrinėjamame sta
APA, Harvard, Vancouver, ISO, and other styles
42

Leung, Barbara Y. P., and Eddie C. M. Hui. "EVALUATION APPROACH ON PUBLIC‐PRIVATE PARTNERSHIP (PPP) URBAN REDEVELOPMENTS." International Journal of Strategic Property Management 9, no. 1 (2005): 1–16. http://dx.doi.org/10.3846/1648715x.2005.9637522.

Full text
Abstract:
Urban redevelopments in recent years tend to follow a pragmatic market‐led partnership approach with involvement of both public and private sectors. However, it has been evidenced that this approach suffers from a number of deficiencies. These include over‐reliance on private investments which make the project vulnerable to financial risks and over‐emphases on creating a place of opportunity rather than improving the social environment in the deprived areas. This paper proposes an approach encompassing Cost‐Benefit Analysis (CBA) and Option Pricing concepts (OP) into urban renewal projects whi
APA, Harvard, Vancouver, ISO, and other styles
43

Jensen, Per Anker. "STRATEGY AND SPACE: A LONGITUDINAL CASE STUDY OF BROADCASTING FACILITIES / STRATEGIJA IR ERDVĖ: RADIJO IR TELEVIZIJOS TRANSLIAVIMO PASLAUGŲ LONGITUDINIS TYRIMAS." International Journal of Strategic Property Management 15, no. 1 (2011): 35–47. http://dx.doi.org/10.3846/1648715x.2011.565868.

Full text
Abstract:
The article is based on results from a research project on space strategies and building values, which included a major case study of the development of facilities for the Danish Broadcasting Corporation over time. The focus is to identify, how different space strategies have been implemented in different periods and how these strategies can be related to the general conditions of the corporation. The strategic uncertainty of the corporation is investigated as a main determining factor for changes in space strategy based on theories of the relations between strategy and place. These theories i
APA, Harvard, Vancouver, ISO, and other styles
44

Šaparauskas, Jonas, Edmundas Kazimieras Zavadskas, and Zenonas Turskis. "SELECTION OF FACADE'S ALTERNATIVES OF COMMERCIAL AND PUBLIC BUILDINGS BASED ON MULTIPLE CRITERIA / KOMERCINĖS IR VIEŠOSIOS PASKIRTIES PASTATŲ FASADO ALTERNATYVŲ DAUGIAKRITERINĖ ATRANKA." International Journal of Strategic Property Management 15, no. 2 (2011): 189–203. http://dx.doi.org/10.3846/1648715x.2011.586532.

Full text
Abstract:
An appropriate mechanism for supporting design management practices at an early stage of project is crucial in terms of adding value over scope, time and total investment strategic decisions. The clients are not only interested in value for money in relation to the investment in project development but costs associated in operation and maintenance over project life cycle as well. These criteria make possible to evaluate design solutions which can be characterized by quantitative and qualitative criteria which possibly have different weight, dimension and direction of optimization (maximisation
APA, Harvard, Vancouver, ISO, and other styles
45

Rasiulis, Konstantin, and Kęstutis Gurkšnys. "ANALYSES OF THE STRESS INTENSITY OF THE CYLINDRICAL TANK WALL AT THE PLACE OF THE GEOMETRICAL DEFECT." JOURNAL OF CIVIL ENGINEERING AND MANAGEMENT 16, no. 2 (2010): 209–15. http://dx.doi.org/10.3846/jcem.2010.23.

Full text
Abstract:
Major repair or regular inspection of the large capacity thin‐walled tankages is very expensive. Steel cylindrical tanks are an individual case of the thin‐walled tankages. The common calculation of the tanks by analytical and numerical methods is not difficult. Strengthening the places, where a perfect calculated form is disturbed, that is, at the spots of in‐cuts, hatches, defects etc. is a responsible part of the design of such constructions. The problems of prevention of defects during the operation period and repairs, as well as possibility to assure quickly the safety of defective places
APA, Harvard, Vancouver, ISO, and other styles
46

Lin, Ming-Chiao, Hui Ping Tserng, Shih-Ping Ho, and Der-Liang Young. "DEVELOPING A CONSTRUCTION-DURATION MODEL BASED ON A HISTORICAL DATASET FOR BUILDING PROJECT / STATYBŲ PROJEKTO REALIZAVIMO TRUKMĖS MODELIO, PAGRĮSTO ISTORINIAIS DUOMENIMIS, KŪRIMAS." Journal of Civil Engineering and Management 17, no. 4 (2011): 529–39. http://dx.doi.org/10.3846/13923730.2011.625641.

Full text
Abstract:
The delay of vast building projects is still a common problem. This situation is extraordinarily severe to steel reinforced concrete (SRC) building projects that keep going to promote a new structure system in Taiwan's construction industry. The aim of this study is to develop a feasible contract duration model based upon few SRC building cases. A logical approach is employed to select and assure the “good” regression model identified when project characteristics were known and external uncertainties were reasonably estimated. Different necessary diagnostics had been adopted to examine the apt
APA, Harvard, Vancouver, ISO, and other styles
47

Meidutė, Ieva, and Narimantas Kazimieras Paliulis. "FEASIBILITY STUDY OF PUBLIC-PRIVATE PARTNERSHIP / VIEŠOJO IR PRIVAČIOJO SEKTORIŲ PARTNERYSTĖS GALIMYBIŲ ANALIZĖ." International Journal of Strategic Property Management 15, no. 3 (2011): 257–74. http://dx.doi.org/10.3846/1648715x.2011.617860.

Full text
Abstract:
Public-private partnership may cover various forms of partnership, viz. as the property of the private sector in the state of municipal activities or information and consultations between the public and private sectors, also as an unconventional method of public procurement when the public and private sectors enter into a long-term contract on the establishment of public infrastructure or the provision of public services. The most important thing in implementing PPP projects is to properly draw up the contract between the public and private partners, which should explicitly state all terms and
APA, Harvard, Vancouver, ISO, and other styles
48

Straub, Ad. "COST SAVINGS FROM PERFORMANCE‐BASED MAINTENANCE CONTRACTING." International Journal of Strategic Property Management 13, no. 3 (2009): 205–17. http://dx.doi.org/10.3846/1648-715x.2009.13.205-217.

Full text
Abstract:
New procurement approaches combined with performance‐based building approaches should reduce costs, but empirical qualitative and quantitative studies are lacking. Performance‐based maintenance contracts give maintenance suppliers incentives to improve their way of working. Innovative, cost‐effective solutions that meet the performance criteria can be achieved, especially if the principle of whole‐life costing is being adopted. Indirect cost savings are expected as well. It enables maintenance contractors to assume responsibility for certain activities for which they are better equipped to per
APA, Harvard, Vancouver, ISO, and other styles
49

Yan, Min-Ren. "A FUZZY LOGIC ENHANCED BARGAINING MODEL FOR BUSINESS PRICING DECISION SUPPORT IN JOINT VENTURE PROJECTS / FUZZY LOGINIO PASIKEITIMŲ VERTINIMO METODO TAIKYMAS JUNGTINĖS VEIKLOS PROJEKTŲ VERTEI NUSTATYTI." Journal of Business Economics and Management 12, no. 2 (2011): 234–47. http://dx.doi.org/10.3846/16111699.2011.573281.

Full text
Abstract:
Project businesses are increasingly emerging and many companies cooperatively participate in various projects by the manner of joint venture (JV) for creating synergistic competitiveness. In a project-based short-term JV, the project tasks of JV parties can be properly allocated based on complementary specialties but the rewards sharing is always a challenge in the bargaining process. For improving the manager's reasoning process of pricing decisions, this paper incorporates game theory and fuzzy set theory for the development of a bargaining model, which can be used to estimate acceptable pri
APA, Harvard, Vancouver, ISO, and other styles
50

Lashgari, Ali, Mohamad Majid Fouladgar, Abdolreza Yazdani-Chamzini, and Miroslaw J. Skibniewski. "USING AN INTEGRATED MODEL FOR SHAFT SINKING METHOD SELECTION / KOMPLEKSINIO MODELIO NAUDOJIMAS GRĘŽINIŲ ĮRENGIMO METODUI PARINKTI." Journal of Civil Engineering and Management 17, no. 4 (2011): 569–80. http://dx.doi.org/10.3846/13923730.2011.628687.

Full text
Abstract:
Shafts have critical importance in deep mines and underground constructions. There are several traditional and mechanized methods for shaft sinking operations. Using mechanized excavation technique is an applicable alternative to improve project performance, although impose a huge capital cost. There are a number of key parameters for this selection which often are in conflict with each other and decision maker should seek a balance between these parameters. Therefore, shaft sinking method selection is a multi criteria decision making problem. This paper intends to use the combination of analy
APA, Harvard, Vancouver, ISO, and other styles
We offer discounts on all premium plans for authors whose works are included in thematic literature selections. Contact us to get a unique promo code!