Academic literature on the topic 'Resource constraint project scheduling'

Create a spot-on reference in APA, MLA, Chicago, Harvard, and other styles

Select a source type:

Consult the lists of relevant articles, books, theses, conference reports, and other scholarly sources on the topic 'Resource constraint project scheduling.'

Next to every source in the list of references, there is an 'Add to bibliography' button. Press on it, and we will generate automatically the bibliographic reference to the chosen work in the citation style you need: APA, MLA, Harvard, Chicago, Vancouver, etc.

You can also download the full text of the academic publication as pdf and read online its abstract whenever available in the metadata.

Journal articles on the topic "Resource constraint project scheduling"

1

Gao, Yan, Xin Zhang, and Jian Zhong Xu. "An Improved Production Scheduling Algorithm Based on Resource Constraints." Applied Mechanics and Materials 455 (November 2013): 619–24. http://dx.doi.org/10.4028/www.scientific.net/amm.455.619.

Full text
Abstract:
For resource-constrained project scheduling problems, with aircraft assembly as its background, we established its mathematics model as constraint satisfaction problem. An improved critical path scheduling algorithm is proposed, considering the constraints of precedence relations, resource constraints and space constraints, through the two stages of planning, reaching for aircraft assembly task scheduling optimization objectives. Through the given numerical example results show that, when the objective consists in minimizing the project duration, the algorithm has better performance.
APA, Harvard, Vancouver, ISO, and other styles
2

Chen, Junjie, Shurong Tong, Hongmei Xie, Yafei Nie, and Jingwen Zhang. "Model and Algorithm for Human Resource-Constrained R&D Program Scheduling Optimization." Discrete Dynamics in Nature and Society 2019 (April 3, 2019): 1–13. http://dx.doi.org/10.1155/2019/2320632.

Full text
Abstract:
In resource-constrained project scheduling problems, renewable resources can be expanded into human resources with competency differences. A flexible resource-constrained project scheduling problem with competency differences is proposed, which is a practical extension close to Research and Development (R&D) program management, from the traditional multimode resource-constrained project scheduling problem. A parameter and estimation formula to measure staff competency is presented, and a mixed-integer programming model is established for the problem. The single-objective optimization probl
APA, Harvard, Vancouver, ISO, and other styles
3

Ju, Chun Hua, and Yi Xie. "An Extended CPM for Resource-Constrained Project Scheduling." Advanced Materials Research 69-70 (May 2009): 695–99. http://dx.doi.org/10.4028/www.scientific.net/amr.69-70.695.

Full text
Abstract:
In order to apply traditional CPM in resource-constrained project scheduling, the activity network is firstly formalized for resource-constrained project scheduling. Then Resource constraint in project is presented and an algorithm of the extended CPM is developed for resource-constrained project scheduling. Finally a case is conducted, which shows the accuracy and effectiveness of the extend CPM.
APA, Harvard, Vancouver, ISO, and other styles
4

ULUSOY, G., and L. ÖZDAMAR. "A constraint-based perspective in resource constrained project scheduling." International Journal of Production Research 32, no. 3 (1994): 693–705. http://dx.doi.org/10.1080/00207549408956961.

Full text
APA, Harvard, Vancouver, ISO, and other styles
5

Liu, Shu Shun, and Wei Tong Chen. "Construction Multi-Project Scheduling Model Considering Different Resource Allocation Behavior." Applied Mechanics and Materials 174-177 (May 2012): 2815–19. http://dx.doi.org/10.4028/www.scientific.net/amm.174-177.2815.

Full text
Abstract:
According to previous researches, an investigation through small to mid-size construction contractors showed that 84% of construction contractors execute their projects in a multi-project environment. In a multi-project environment, scheduling problems with resource constraints are much more complicated than those in a single project. One of the most important factors that influence multi-project scheduling problems is resource allocation policy, depending on the types of resources, which can be defined by the way of resource acquisition and sharing behavior. This paper discusses resource allo
APA, Harvard, Vancouver, ISO, and other styles
6

Kannimuthu, Marimuthu, Benny Raphael, Palaneeswaran Ekambaram, and Ananthanarayanan Kuppuswamy. "Comparing optimization modeling approaches for the multi-mode resource-constrained multi-project scheduling problem." Engineering, Construction and Architectural Management 27, no. 4 (2019): 893–916. http://dx.doi.org/10.1108/ecam-03-2019-0156.

Full text
Abstract:
Purpose Construction firms keep minimal resources to maintain productive working capital. Hence, resources are constrained and have to be shared among multiple projects in an organization. Optimal allocation of resources is a key challenge in such situations. Several approaches and heuristics have been proposed for this task. The purpose of this paper is to compare two approaches for multi-mode resource-constrained project scheduling in a multi-project environment. These are the single-project approach (portfolio optimization) and the multi-project approach (each project is optimized individua
APA, Harvard, Vancouver, ISO, and other styles
7

Wikarek, Jarosław, and Paweł Sitek. "A Constraint-Based Declarative Programming Framework for Scheduling and Resource Allocation Problems." Vietnam Journal of Computer Science 06, no. 01 (2019): 69–90. http://dx.doi.org/10.1142/s2196888819500027.

Full text
Abstract:
Scheduling and resource allocation problems are widespread in many areas of today’s technology and management. Their different forms and structures appear in production, logistics, software engineering, computer networks, project and human resources management, services, etc. The literature (problem classification, scheduling and resource allocation models, solutions) is vast and exhaustive. In practice, however, classical scheduling problems with fixed structures and standard constraints (precedence, disjoint, etc.) are rare. Practical scheduling problems include also logical and nonlinear co
APA, Harvard, Vancouver, ISO, and other styles
8

Qu, Chang Zheng, Hong Qiang Gu, Hui Song, and Guang Yu Liu. "Maintenance Project Scheduling Model Considered Flexible Resource with Capability Difference." Advanced Materials Research 791-793 (September 2013): 1566–69. http://dx.doi.org/10.4028/www.scientific.net/amr.791-793.1566.

Full text
Abstract:
Maintenance task scheduling during mission break is described as flexible resource constraint project scheduling problem, and flexible resource constraint maintenance task scheduling model is established. Since capability level of flexible resource is different, the thesis establishes maintenance task scheduling model considering capability difference. To resolve the model, a particle swarm optimization (PSO) algorithm based on activity list is presented. At last, a case study is present.
APA, Harvard, Vancouver, ISO, and other styles
9

Xie, Linlin, Yajiao Chen, and Ruidong Chang. "Scheduling Optimization of Prefabricated Construction Projects by Genetic Algorithm." Applied Sciences 11, no. 12 (2021): 5531. http://dx.doi.org/10.3390/app11125531.

Full text
Abstract:
Prefabricated buildings are the direction of the future development of the construction industry and have received widespread attention. The effective execution of prefabricated construction project scheduling should consider resource constraints and the supply arrangement of prefabricated components. However, the traditional construction resource-constrained project scheduling implementation method cannot simultaneously consider the characteristics of the linkage between component production and on-site assembly construction. It cannot also fully adapt to the scheduling implementation method
APA, Harvard, Vancouver, ISO, and other styles
10

Dang Quoc, Huu, Loc Nguyen The, Cuong Nguyen Doan, and Toan Phan Thanh. "A NEW ALGORITHM FOR MULTI-SKILL RESOURCE CONSTRAINED PROJECT SCHEDULING PROBLEM BASED ON CUCKOO SEARCH STRATEGY." Journal of Science Natural Science 65, no. 6 (2020): 98–109. http://dx.doi.org/10.18173/2354-1059.2020-0034.

Full text
Abstract:
The purpose of this paper is to consider the project scheduling problem under such limited constraint, called Multi-Skill Resource-Constrained Project Scheduling Problem or MS-RCPSP. The algorithm proposed in this paper is to find the optimal schedule, determine the start time for each task so that the execution time (also called makespan) taken is minimal. At the same time, our scheduling algorithm ensures that the given priority relationships and constraints are not violated. Our scheduling algorithm is built based on the Cuckoo Search strategy. In order to evaluate the proposed algorithm, e
APA, Harvard, Vancouver, ISO, and other styles
More sources
We offer discounts on all premium plans for authors whose works are included in thematic literature selections. Contact us to get a unique promo code!