Contents
Academic literature on the topic 'Resource constraint project scheduling'
Create a spot-on reference in APA, MLA, Chicago, Harvard, and other styles
Consult the lists of relevant articles, books, theses, conference reports, and other scholarly sources on the topic 'Resource constraint project scheduling.'
Next to every source in the list of references, there is an 'Add to bibliography' button. Press on it, and we will generate automatically the bibliographic reference to the chosen work in the citation style you need: APA, MLA, Harvard, Chicago, Vancouver, etc.
You can also download the full text of the academic publication as pdf and read online its abstract whenever available in the metadata.
Journal articles on the topic "Resource constraint project scheduling"
Gao, Yan, Xin Zhang, and Jian Zhong Xu. "An Improved Production Scheduling Algorithm Based on Resource Constraints." Applied Mechanics and Materials 455 (November 2013): 619–24. http://dx.doi.org/10.4028/www.scientific.net/amm.455.619.
Full textChen, Junjie, Shurong Tong, Hongmei Xie, Yafei Nie, and Jingwen Zhang. "Model and Algorithm for Human Resource-Constrained R&D Program Scheduling Optimization." Discrete Dynamics in Nature and Society 2019 (April 3, 2019): 1–13. http://dx.doi.org/10.1155/2019/2320632.
Full textJu, Chun Hua, and Yi Xie. "An Extended CPM for Resource-Constrained Project Scheduling." Advanced Materials Research 69-70 (May 2009): 695–99. http://dx.doi.org/10.4028/www.scientific.net/amr.69-70.695.
Full textULUSOY, G., and L. ÖZDAMAR. "A constraint-based perspective in resource constrained project scheduling." International Journal of Production Research 32, no. 3 (1994): 693–705. http://dx.doi.org/10.1080/00207549408956961.
Full textLiu, Shu Shun, and Wei Tong Chen. "Construction Multi-Project Scheduling Model Considering Different Resource Allocation Behavior." Applied Mechanics and Materials 174-177 (May 2012): 2815–19. http://dx.doi.org/10.4028/www.scientific.net/amm.174-177.2815.
Full textKannimuthu, Marimuthu, Benny Raphael, Palaneeswaran Ekambaram, and Ananthanarayanan Kuppuswamy. "Comparing optimization modeling approaches for the multi-mode resource-constrained multi-project scheduling problem." Engineering, Construction and Architectural Management 27, no. 4 (2019): 893–916. http://dx.doi.org/10.1108/ecam-03-2019-0156.
Full textWikarek, Jarosław, and Paweł Sitek. "A Constraint-Based Declarative Programming Framework for Scheduling and Resource Allocation Problems." Vietnam Journal of Computer Science 06, no. 01 (2019): 69–90. http://dx.doi.org/10.1142/s2196888819500027.
Full textQu, Chang Zheng, Hong Qiang Gu, Hui Song, and Guang Yu Liu. "Maintenance Project Scheduling Model Considered Flexible Resource with Capability Difference." Advanced Materials Research 791-793 (September 2013): 1566–69. http://dx.doi.org/10.4028/www.scientific.net/amr.791-793.1566.
Full textXie, Linlin, Yajiao Chen, and Ruidong Chang. "Scheduling Optimization of Prefabricated Construction Projects by Genetic Algorithm." Applied Sciences 11, no. 12 (2021): 5531. http://dx.doi.org/10.3390/app11125531.
Full textDang Quoc, Huu, Loc Nguyen The, Cuong Nguyen Doan, and Toan Phan Thanh. "A NEW ALGORITHM FOR MULTI-SKILL RESOURCE CONSTRAINED PROJECT SCHEDULING PROBLEM BASED ON CUCKOO SEARCH STRATEGY." Journal of Science Natural Science 65, no. 6 (2020): 98–109. http://dx.doi.org/10.18173/2354-1059.2020-0034.
Full text