To see the other types of publications on this topic, follow the link: Rework risk.

Journal articles on the topic 'Rework risk'

Create a spot-on reference in APA, MLA, Chicago, Harvard, and other styles

Select a source type:

Consult the top 50 journal articles for your research on the topic 'Rework risk.'

Next to every source in the list of references, there is an 'Add to bibliography' button. Press on it, and we will generate automatically the bibliographic reference to the chosen work in the citation style you need: APA, MLA, Harvard, Chicago, Vancouver, etc.

You can also download the full text of the academic publication as pdf and read online its abstract whenever available in the metadata.

Browse journal articles on a wide variety of disciplines and organise your bibliography correctly.

1

Syahputri, Khalida, Jelly Leviza, Rahmi M. Sari, T. Indah Rizkya, Ikhsan Siregar, and Mangara M. Tambunan. "Quality engineering of crumb rubber by minimizing rework using fuzzy FMEA." MATEC Web of Conferences 197 (2018): 14007. http://dx.doi.org/10.1051/matecconf/201819714007.

Full text
Abstract:
The quality of crumb rubber has several grades according to Indonesian Rubber Standard (SIR). In crumb rubber process production, lots of products need to rework because it does not match with specified specifications. The types of rework product based on SIR that cause of defects such as hard, soft and dirt. However, the reworked products will produce crumb rubber with lower grade quality. This certainly affects the selling price of the crumb rubber. Also rework will incur additional production costs. Efforts that can be used to minimize the number of rework is to identify the factors that ca
APA, Harvard, Vancouver, ISO, and other styles
2

Eze, Emmanuel Chidiebere, John Ebhohimen Idiake, and Bashir Olanrewaju Ganiyu. "Analysis of Rework Risk Triggers in the Nigerian Construction Industry." Organization, Technology and Management in Construction: an International Journal 10, no. 1 (2018): 1778–93. http://dx.doi.org/10.2478/otmcj-2018-0008.

Full text
Abstract:
Abstract The construction industry plays a significant role in the infrastructure development of many countries. Construction projects suffer from a lot of setbacks despite sophistication and advancement in technology and pro­fessionalism. This study, therefore, assessed the factors that triggered the emergence of rework and the benefits derived from eliminating such triggers in the Nigerian construction industry. The study adopted a quantitative survey approach in which a structured questionnaire was adopted as the research instrument. Factor analysis using principal component analysis was ad
APA, Harvard, Vancouver, ISO, and other styles
3

Asok, Kumar Ajay, and Kazuhiro Aoyama. "Evaluation and Management of the Cost and Risk of Weld Deformations in Modular Ship Construction." Journal of Ship Production 21, no. 01 (2005): 8–13. http://dx.doi.org/10.5957/jsp.2005.21.1.8.

Full text
Abstract:
The weld deformations of construction blocks are a major problem affecting productivity and quality in modular ship construction. Therefore, proper evaluation and management of the weld deformations is necessary. In this paper, a system that predicts the cost and risk associated with weld deformations is proposed. Using this system, for different block division plans, the designer can calculate the weld deformations of each block, deformation variation with the variation in weld parameters for different assembly sequences, rework cost due to deformations, and the variation of rework cost. Base
APA, Harvard, Vancouver, ISO, and other styles
4

Yim, Rachel L., Jason M. Castaneda, Toni L. Doolen, Irem Y. Tumer, and Richard Malak. "Exploring the Relationship between Rework Projects and Risk Indicators." Project Management Journal 46, no. 4 (2015): 63–75. http://dx.doi.org/10.1002/pmj.21509.

Full text
APA, Harvard, Vancouver, ISO, and other styles
5

Love, Peter E. D., Jane Matthews, and Weili Fang. "Reflections on the Risk and Uncertainty of Rework in Construction." Journal of Construction Engineering and Management 147, no. 4 (2021): 06021001. http://dx.doi.org/10.1061/(asce)co.1943-7862.0002030.

Full text
APA, Harvard, Vancouver, ISO, and other styles
6

Zhou, Yong Quan, and Xu Tan. "Mould Risk Assessment Based on RST-BN Approach." Advanced Materials Research 601 (December 2012): 611–17. http://dx.doi.org/10.4028/www.scientific.net/amr.601.611.

Full text
Abstract:
Mould industry is crucial to all manufacturing fields, but there has been very little research work of mould project risk assessment in the world so far, it doesn’t match with mould’s important role in all industries. Mould project risks often became issues, made over 8% rework rate after mould delivery and 20% process rework rate in average. This paper summarized the disadvantage of FTA-BN approach to quantitative risk assessment of mould project, which is widely used in other industry fields, and proposed RST-BN approach instead, The attribute selection and fault diagnosis was developed base
APA, Harvard, Vancouver, ISO, and other styles
7

Rizal, Muhammad, Mochammad Isya, and Sofyan M. Saleh. "EVALUASI PEKERJAAN ULANG (REWORK) PADA PROYEK KONSTRUKSI JALAN DI KOTA BANDA ACEH." Jurnal Arsip Rekayasa Sipil dan Perencanaan 1, no. 2 (2018): 102–12. http://dx.doi.org/10.24815/jarsp.v1i2.10949.

Full text
Abstract:
The construction project has a target of either completion time or cost, as well as road construction projects. Projects that are delayed due to rework are at risk both to the owner and beneficiary if the project is a means and infrastructure used by the community. Rework greatly affects the performance and productivity of workers in the field. Therefore, the purpose of this study is to determine what dominant factors that cause the occurrence of rework and know the work that often the occurrence of rework. The research method is descriptive with quantitative technique. Samples were taken from
APA, Harvard, Vancouver, ISO, and other styles
8

Dambhare, Sunil, Siddhant Aphale, Kiran Kakade, Tejas Thote, and Atul Borade. "Productivity Improvement of a Special Purpose Machine Using DMAIC Principles: A Case Study." Journal of Quality and Reliability Engineering 2013 (September 12, 2013): 1–13. http://dx.doi.org/10.1155/2013/752164.

Full text
Abstract:
Six Sigma is one of the popular methodologies used by the companies to improve the quality and productivity. It uses a detailed analysis of the process to determine the causes of the problem and proposes a successful improvement. Various approaches are adopted while following Six Sigma methodologies and one of them is DMAIC. The successful implementation of DMAIC and FTA is discussed in this paper. In this study, the major problem was of continuous rework up to 16%, which was leading to wastage of man hours and labor cost. Initially, fault tree analysis (FTA) was used to detect the key process
APA, Harvard, Vancouver, ISO, and other styles
9

Hao, Zhifeng, Wei-Chang Yeh, Zhenyao Liu, and Majid Forghani-elahabad. "General multi-state rework network and reliability algorithm." Reliability Engineering & System Safety 203 (November 2020): 107048. http://dx.doi.org/10.1016/j.ress.2020.107048.

Full text
APA, Harvard, Vancouver, ISO, and other styles
10

Maitimu, Nil Edwin, and Marcy L. Pattiapon. "Penerapan Lean Constructon Pada Proyek PT. Pesona Graha Mandiri Ambon Guna Mereduksi Non Added Value Activity." ALE Proceeding 1 (July 18, 2021): 168–75. http://dx.doi.org/10.30598/ale.1.2018.168-175.

Full text
Abstract:
Abstrak Setiap pelaksanaan proyek konstruksi tidak lepas dari berbagai kendala ataupun kegagalan konstruksi, yang disebabkan oleh rendahnya kinerja ataupun produktivitas para tenaga kerja, perencanaan proyek yang kurang matang, anggaran yang membengkak, dan juga spesifikasi yang tidak sesuai.Walaupun kegagalan tersebut tidak dapat dilihat secara nyata, namun jika berlangsung dengan intensitas yang besar dan terus-menerus maka kegagalan tersebut dapat terakumulasi dan dampaknya akan terlihat pada akhir proyek. Tujuan dari penelitian ini adalah untuk mengidentifikasi aktivitas yang tergolong dal
APA, Harvard, Vancouver, ISO, and other styles
11

DEIBEL, KURT, TOM TRAUTMAN, TOM DeBOOM, et al. "A Comprehensive Approach to Reducing the Risk of Allergens in Foods." Journal of Food Protection 60, no. 4 (1997): 436–41. http://dx.doi.org/10.4315/0362-028x-60.4.436.

Full text
Abstract:
The control of food allergens in a food-processing plant presents numerous challenges. An allergen prevention plan must determine potential sources of contaminating allergens and appropriate controls to prevent their introduction into food products. These controls may include scheduling production of allergen-containing products at the end of manufacturing runs, appropriate labeling and use of rework, equipment and system-design considerations, and thorough cleaning of lines after running allergen-containing food products. Proper labeling of food products, effective management of label invento
APA, Harvard, Vancouver, ISO, and other styles
12

Ullah, Inayat, Dunbing Tang, Qi Wang, Leilei Yin, and Ishfaq Hussain. "Managing engineering change requirements during the product development process." Concurrent Engineering 26, no. 2 (2017): 171–86. http://dx.doi.org/10.1177/1063293x17735359.

Full text
Abstract:
Product redesign is not a straightforward task, specifically for complex commodities. Engineering change requirements can be evoked in any phase of the product development process, thus making engineering change management a challenging task. The motive of this study is to explore the best possible way of managing engineering change requirements taking execution sequence of change requirements into consideration. In this article, a new approach supporting engineering change requirements implementation sequence, by considering the risk associated with engineering changes, is presented. The risk
APA, Harvard, Vancouver, ISO, and other styles
13

Knoth, G., D. Jackson, and N. Sorbo. "Automated CO2 Composite Spray Cleaning System for HDD Rework Parts." Journal of the IEST 52, no. 1 (2009): 43–51. http://dx.doi.org/10.17764/jiet.52.1.8u25474r4w871265.

Full text
Abstract:
Many advanced assemblies require high-volume and cost-effective selective cleaning during various stages of assembly or rework operations. Due to component compatibility problems and drying challenges, partially assembled devices cannot be immersed in or sprayed with aqueous cleaners or solvents. Newer dry cleaning techniques such as carbon dioxide (CO2) aerosol spray cleaning processes (snow cleaning) have proven to be challenging to implement in automated high-volume manufacturing operations. Issues associated with conventional snow cleaning include high costs of operation, lack of process c
APA, Harvard, Vancouver, ISO, and other styles
14

Ma, Guofeng, and Tiancheng Zhu. "Application of DSM in process management of a PE commercial real estate development project." Property Management 36, no. 1 (2018): 20–36. http://dx.doi.org/10.1108/pm-11-2016-0066.

Full text
Abstract:
Purpose After the drawbacks in the process management of China PE commercial real estate development project are analyzed, it is necessary to introduce a more integrated and advanced tool to solve them. The paper aims to discuss this issue. Design/methodology/approach A standard process model was proposed first. Based on the model, a coupled activity dependency model was also built by structural tool design structure matrix (DSM), the detailed matrix involving 119 activities and 322 information dependencies. Next, two large processes coupled blocks were generated by the sequencing algorithm an
APA, Harvard, Vancouver, ISO, and other styles
15

MITSUYUKI, Taiga, Hiroyuki YAMATO, Kazuo HIEKATA, et al. "A study on designing task priority rule considering rework risk of system development project." Transactions of the JSME (in Japanese) 82, no. 835 (2016): 15–00474. http://dx.doi.org/10.1299/transjsme.15-00474.

Full text
APA, Harvard, Vancouver, ISO, and other styles
16

NAKANO, Sachito. "Schedule and Cost risk analysis considering rework in automotive design and development by DSM." Proceedings of Design & Systems Conference 2023.33 (2023): 1108. http://dx.doi.org/10.1299/jsmedsd.2023.33.1108.

Full text
APA, Harvard, Vancouver, ISO, and other styles
17

Garg, Sahil, and Sudhir Misra. "Distribution of Rework Issues in Various Reinforced Concrete Building Components." Journal of Performance of Constructed Facilities 35, no. 4 (2021): 04021033. http://dx.doi.org/10.1061/(asce)cf.1943-5509.0001596.

Full text
APA, Harvard, Vancouver, ISO, and other styles
18

Mo, John PT, and Bathmarajah Suparayan. "Failure mode–driven quality analysis of operational risks for composite fiber-reinforced plastic assembly." Proceedings of the Institution of Mechanical Engineers, Part B: Journal of Engineering Manufacture 233, no. 1 (2017): 267–77. http://dx.doi.org/10.1177/0954405417711733.

Full text
Abstract:
Composite fiber-reinforced plastic products have many failure modes in the manufacturing stage. The cost of rework is high. To ensure a reliable manufacturing process and outcome, this article presents a new method to prioritize assembly process errors according to a risk-based cost of poor quality. The method combines a range of reliability techniques including cause–effect diagram, fault tree, and analytic hierarchy process to achieve multiple failure mode assessment. The outcome of this research provides direct links to develop risk mitigation plans to treat the prioritized risks of product
APA, Harvard, Vancouver, ISO, and other styles
19

ECKERT, CLAUDIA, and ADRIAN DEMAID. "CLASSIFYING DESIGN AND DESIGN MANAGEMENT IN SEASONAL INDUSTRIES." International Journal of Innovation Management 05, no. 04 (2001): 401–25. http://dx.doi.org/10.1142/s1363919601000439.

Full text
Abstract:
This paper classifies design processes in seasonal industries, where designs of consumer products have to be delivered to tight deadlines, from the viewpoint of the relationship between the design company, the retailer and the final customers. The paper looks specifically at the risk that designers and retailers carry, the design rework required by the retailer and the communication between the retailer and the designer. We employ a motoring metaphor to show six models of design.
APA, Harvard, Vancouver, ISO, and other styles
20

Mahamid, Ibrahim. "Risk Management in Construction Projects in Palestine: Contractors' Perspective." Revista Ingeniería de Construcción 39, no. 2 (2024): 140–50. http://dx.doi.org/10.7764/ric.00109.21.

Full text
Abstract:
This study is conducted to identify the main risks in construction projects in Palestine from contractors’ perspective. Questionnaire survey is the tool used to achieve the objectives of the study. 41 critical risk factors in projects associated with project duration were identified and classified as external and internal factors. The risk map for the investigated causes created based on their perceived severity and frequency of occurrence. The findings revealed 29 causes in the red zone of the risk map, 11 in the yellow zone and 1 in the green zone. The top severe risk factors are: delayed pa
APA, Harvard, Vancouver, ISO, and other styles
21

Yu-Lun, Chao, Lin Yi-Kuei, and Yeh Cheng-Ta. "AMC-Based Algorithm for Network Reliability Evaluation of a Manufacturing System with Scrapping and Rework." International Journal of Performability Engineering 18, no. 4 (2022): 231. http://dx.doi.org/10.23940/ijpe.22.04.p1.231240.

Full text
APA, Harvard, Vancouver, ISO, and other styles
22

Teeling, SeÁn Paul, Heather Coetzee, Maeve Phillips, Mary McKiernan, ÉidÍn NÍ ShÉ, and Aileen Igoe. "Reducing risk of development or exacerbation of nutritional deficits by optimizing patient access to mealtime assistance." International Journal for Quality in Health Care 31, Supplement_1 (2019): 6–13. http://dx.doi.org/10.1093/intqhc/mzz060.

Full text
Abstract:
Abstract Objective Optimize patient access to mealtime assistance, decrease missed meal incidence, risk of malnutrition, reduce food waste and staff rework. Design Lean Six Sigma methodology informed a pre/post intervention design. Setting 31 bed ward including Specialist Geriatric services and Acute Stroke Unit within an Irish University teaching hospital. Participants Clinical and non-clinical staff including catering, nursing, speech and language therapy, dietetics and nutrition; patients, relatives. Interventions An interdisciplinary team used the structured Define/Measure/Analyse/Improve/
APA, Harvard, Vancouver, ISO, and other styles
23

Spigarelli, Donald, and William Drislane. "4832250 Electronic circuit board rework and repair system." Microelectronics Reliability 30, no. 2 (1990): i. http://dx.doi.org/10.1016/0026-2714(90)90702-o.

Full text
APA, Harvard, Vancouver, ISO, and other styles
24

Garg, Sahil, and Sudhir Misra. "Causal model for rework in building construction for developing countries." Journal of Building Engineering 43 (November 2021): 103180. http://dx.doi.org/10.1016/j.jobe.2021.103180.

Full text
APA, Harvard, Vancouver, ISO, and other styles
25

Kotze, P. N., F. NS Vermaak, and E. Kirsten. "Including risk in the balanced scorecard: Adoption rate and implementation methods of Johannesburg Stock Exchange listed organisations." Southern African Business Review 19 (February 26, 2019): 99–117. http://dx.doi.org/10.25159/1998-8125/5808.

Full text
Abstract:
It has been suggested in previous research that it might be worthwhile to include risk measures in the balanced scorecard (BSC) or to rework it in order to manage risk. The literature review in this study indicated that some conceptual and case study research has been done to investigate how an organisation could go about accomplishing this. A number of researchers noted that including risk measures on the face of the scorecard might lead to a problem of over-complexity. Using content analysis as the method of inquiry, this study explored how organisations are currently adding risk to their sc
APA, Harvard, Vancouver, ISO, and other styles
26

Paruchuru, Venkata Vijay Krishna, Aneeshkumar Perukilakattunirappel Sundareswaran, and Prof (Dr) Ajay Shriram Kushwaha. "The Importance of Integrating Regulatory Compliance into the Early Stages of WMS Design and Deployment." International Journal of Research in Humanities and Social Sciences 13, no. 3 (2025): 255–70. https://doi.org/10.63345/ijrhs.net.v13.i3.14.

Full text
Abstract:
The inclusion of compliance at design and implementation stages of Warehouse Management System (WMS) assumes a vital importance in providing conformity with legal, environmental, and industry-related needs. Recent studies have highlighted the serious lack of proactive incorporation of compliance programs at the design stage, which tend to result in expensive rework, delays, and legal issues. The previous literature is largely confined to compliance matters at the backend, with no regard to the need to incorporate regulatory factors onboard from the design stage. Such practical restriction resu
APA, Harvard, Vancouver, ISO, and other styles
27

Winarso, Kukuh, and Moh Jufriyanto. "Rework Reduction and Quality Cost Analysis of Furniture Production Processes Using the House of Risk (HOR)." Journal of Physics: Conference Series 1569 (July 2020): 032022. http://dx.doi.org/10.1088/1742-6596/1569/3/032022.

Full text
APA, Harvard, Vancouver, ISO, and other styles
28

Nafisah, Laila, Nabilla Clara Devi Maharani, Yuli Dwi Astanti, and Muhammad Shodiq Abdul Khannan. "Multi-item inventory policy with time-dependent pricing and rework cost." International Journal of Industrial Optimization 2, no. 2 (2021): 99. http://dx.doi.org/10.12928/ijio.v2i2.4370.

Full text
Abstract:
The price of broiler chickens at the consumer level varies daily. The price can be very low or otherwise. The price has resulted from the imbalance between the availability of chicken from suppliers and the market demand. As a result, demand will also fluctuate because it is influenced by consumer purchasing power. When the price of live chickens is low, the carcass company will usually buy in large quantities and expect to sell them at a higher price. The problem arises when the chicken overstock company will risk product damage due to product buildup in the refrigerated warehouse, so rework
APA, Harvard, Vancouver, ISO, and other styles
29

Hao, Zhifeng, Wei-Chang Yeh, and Shi-Yi Tan. "One-batch preempt deterioration-effect multi-state multi-rework network reliability problem and algorithms." Reliability Engineering & System Safety 215 (November 2021): 107883. http://dx.doi.org/10.1016/j.ress.2021.107883.

Full text
APA, Harvard, Vancouver, ISO, and other styles
30

Alhammadi, Shabbab Ajami, Bassam A. Tayeh, Wesam S. Alaloul, and Tareq J. Salem. "Risk Management Strategies in Construction Organizations." Open Civil Engineering Journal 15, no. 1 (2021): 406–13. http://dx.doi.org/10.2174/1874149502115010406.

Full text
Abstract:
Background: Construction projects are among the riskiest businesses due to the number of factors involved that are difficult to control; hence, the popularity of risk management as part of the decision-making process in construction organizations is increasing. Despite the advancements, there are various risks involved that lead to project failure. Aim: Thus, this study aims to assess the risk management strategies in construction organizations in the Gaza Strip, Palestine. Methods: Seventy questionnaires were distributed after subjecting them to pretesting and pilot study that confirmed the v
APA, Harvard, Vancouver, ISO, and other styles
31

Ajayi, Babatunde Oluwaseun, and Thanwadee Chinda. "Dynamics of Pertinent Project Delay Variables in the Thai Construction Sector: Mathematical Analysis." Engineering Management in Production and Services 14, no. 2 (2022): 26–45. http://dx.doi.org/10.2478/emj-2022-0014.

Full text
Abstract:
Abstract Project completion behind schedule is a struggle for the construction sector, affecting time, cost, and quality. This investigation has been necessitated by the lingering nature of project delay risks despite many extant analyses. This study collated expert opinions from the Thai construction sector on salient construction delay variables and their influence on each other for DEMATEL-SD analysis. The collated data were analysed and found consistent with a Cronbach’s alpha of 0.939. Then, the DEMATEL technique was used to establish the influence weight of factors for the System dynamic
APA, Harvard, Vancouver, ISO, and other styles
32

Albayrak, Emrah, and Semih Önüt. "Energy-efficient scheduling for a flexible job shop problem considering rework processes and new job arrival." International Journal of Industrial Engineering Computations 15, no. 4 (2024): 871–86. http://dx.doi.org/10.5267/j.ijiec.2024.7.004.

Full text
Abstract:
Sustainable production is not limited to environmental concerns only; It also provides economic benefits for businesses. Businesses that adopt sustainability principles can gain advantages in matters such as cost savings, competitive advantage, risk management, legal compliance and corporate reputation. Therefore, sustainability is no longer an option but a strategic imperative for businesses. For this reason, studies on energy-sensitive scheduling have started to increase recently. Another important factor in sustainable manufacturing is the reduction of scrap. Rework operations are required
APA, Harvard, Vancouver, ISO, and other styles
33

Maghsoudlou, Hamidreza, Behrouz Afshar-Nadjafi, and Seyed Taghi Akhavan Niaki. "Multi-skilled project scheduling with level-dependent rework risk; three multi-objective mechanisms based on cuckoo search." Applied Soft Computing 54 (May 2017): 46–61. http://dx.doi.org/10.1016/j.asoc.2017.01.024.

Full text
APA, Harvard, Vancouver, ISO, and other styles
34

Priyan, S., and R. Uthayakumar. "Setup cost reduction EMQ inventory system with probabilistic defective and rework in multiple shipments management." International Journal of System Assurance Engineering and Management 8, no. 2 (2016): 223–41. http://dx.doi.org/10.1007/s13198-016-0418-2.

Full text
APA, Harvard, Vancouver, ISO, and other styles
35

Browning, Tyson R. "Planning, Tracking, and Reducing a Complex Project’s Value at Risk." Project Management Journal 50, no. 1 (2018): 71–85. http://dx.doi.org/10.1177/8756972818810967.

Full text
Abstract:
Uncertainty, risk, and rework make it extremely challenging to meet goals and deliver anticipated value in complex projects, and conventional techniques for planning and tracking earned value do not account for these phenomena. This article presents a methodology for planning and tracking cost, schedule, and technical performance (or quality) in terms of a project’s key value attributes and threats to them. It distinguishes four types of value and two general types of risks. The “high jumper” analogy helps to consider how high the “bar” is set for a project (its set goals) and therefore how ch
APA, Harvard, Vancouver, ISO, and other styles
36

Palaneeswaran, Ekambaram, Peter E. D. Love, and Jeong Tai Kim. "Role of Design Audits in Reducing Errors and Rework: Lessons from Hong Kong." Journal of Performance of Constructed Facilities 28, no. 3 (2014): 511–17. http://dx.doi.org/10.1061/(asce)cf.1943-5509.0000450.

Full text
APA, Harvard, Vancouver, ISO, and other styles
37

Moshtaghian, Farzaneh, Mahmood Golabchi, and Esmatullah Noorzai. "A framework to dynamic identification of project risks." Smart and Sustainable Built Environment 9, no. 4 (2020): 375–93. http://dx.doi.org/10.1108/sasbe-09-2019-0123.

Full text
Abstract:
PurposeMerging and updating project information and recording changes can give dynamic risk identification at all stages of the project. The main purpose of this research is to create an integration in construction information.Design/methodology/approachIn this research, the 5D model was prepared and then all model information was entered into the database designed in SQL Server, the project report tables were coded, and finally, a database with four groups of information was ready for risk identification.FindingsCreating an integrated risk identification platform reduced rework and time and c
APA, Harvard, Vancouver, ISO, and other styles
38

Giri, Om Prakash. "Assessment of Key Risk Factors Impacting Construction Project Performance." International Journal of Multidisciplinary Research and Growth Evaluation 6, no. 1 (2025): 1231–41. https://doi.org/10.54660/.ijmrge.2025.6.1.1231-1241.

Full text
Abstract:
Risk management is essential for achieving project objectives, particularly in construction projects, which involve complex processes and multiple stakeholders. This study examines the key risk factors affecting construction projects in developing countries, based on a review of various studies. Price inflation identified as the most significant risk, consistently ranked as the top factor due to its impact on material costs and project budgets. Design changes and errors are also prominent, contributing to project delays, rework, and cost escalations. Poor construction management ranks fourth,
APA, Harvard, Vancouver, ISO, and other styles
39

Liu, Shunuan, Wangdong Guan, Xingyuan Zhang, et al. "Localized differential pressure-helium mass spectrometry sealing detection technology for aircraft integral fuel tank leakage risk locations." Journal of Physics: Conference Series 3043, no. 1 (2025): 012122. https://doi.org/10.1088/1742-6596/3043/1/012122.

Full text
Abstract:
Abstract The sealing performance of aircraft integral fuel tanks is typically tested after tank assembly. Due to the confined and complex spatial structure of the fuel tank, it becomes challenging to locate and repair leakage points at risk locations, leading to significant rework and severely impacting production efficiency. This paper proposes a combined differential pressure-helium mass spectrometry detection method. The sealing detection hoods were designed for local risk areas to create sealed cavities, transforming the sealability assessment of risk locations into leakage rate determinat
APA, Harvard, Vancouver, ISO, and other styles
40

Utomo, Prastyo, and Endang Pudji. "Analysis of Waste in the Production System with the Approach Lean Manufacturing Method." Journal La Multiapp 6, no. 2 (2025): 270–86. https://doi.org/10.37899/journallamultiapp.v6i2.1999.

Full text
Abstract:
Improving the production process needs to be done continuously and continuously in order to minimize all activities that consume time but do not contribute directly to the value of the products produced. PT Cipta Oggi is a manufacturing company that makes furniture products which has a major problem, namely the low value of Process Cycle Efficiency, which the company should have a PCE value of at least 50%. The use of lean manufacturing methods with the help of VSM is used to reduce waste in order to increase the PCE value. There are 22 non-added value activities with a time range of 427 minut
APA, Harvard, Vancouver, ISO, and other styles
41

Love, Peter E. D., and Jane Matthews. "When ‘less is more’: The rationale for an adaptive toolbox to manage the risk and uncertainty of rework." Developments in the Built Environment 12 (December 2022): 100084. http://dx.doi.org/10.1016/j.dibe.2022.100084.

Full text
APA, Harvard, Vancouver, ISO, and other styles
42

Love, Peter E. D., David J. Edwards, Jim Smith, and Derek H. T. Walker. "Divergence or Congruence? A Path Model of Rework for Building and Civil Engineering Projects." Journal of Performance of Constructed Facilities 23, no. 6 (2009): 480–88. http://dx.doi.org/10.1061/(asce)cf.1943-5509.0000054.

Full text
APA, Harvard, Vancouver, ISO, and other styles
43

Hine, Sam. "Integrating structural elements in complex facade designs." Structural Engineer 103, no. 6 (2025): 30–34. https://doi.org/10.56330/arlc2191.

Full text
Abstract:
Buildings are becoming increasingly complex in their facade designs and, as part of this evolution, the challenge of integrating various structural elements within the slab edge zone intensifies. This narrow but critical area is where masonry support systems and other components, such as post-tensioning pockets, balcony connections and cavity fire barriers, often compete for the same space, creating significant design challenges. Addressing these interactions early in the project design phase can prevent costly delays and rework, ensuring all components work harmoniously together. With the int
APA, Harvard, Vancouver, ISO, and other styles
44

Lanz, Luciano Quinto, and Patricia Amelia Tomei. "Managing Risks and Stakeholders in the Design of a new Financial Product." International Journal of Innovation 4, no. 2 (2016): 59–70. http://dx.doi.org/10.5585/iji.v4i2.89.

Full text
Abstract:
This article analyses risk’ and stakeholders’ management in the project to establish a product created by BNDES to provide partial credit guarantees for micro, small and medium enterprises (MSMEs), the Investment Guarantee Fund (FGI). The project went through several adjustments during its development to adapt it to changes in the credit market, the demands of financial agents and credit access’ public policy. For this analysis were used risk management models, stakeholder management in projects and guarantee systems. The methodology used was the single case study with the fund manager, with d
APA, Harvard, Vancouver, ISO, and other styles
45

Shafi, Imran, Muhammad Fawad Mazhar, Anum Fatima, et al. "Deep Learning-Based Real Time Defect Detection for Optimization of Aircraft Manufacturing and Control Performance." Drones 7, no. 1 (2023): 31. http://dx.doi.org/10.3390/drones7010031.

Full text
Abstract:
Monitoring tool conditions and sub-assemblies before final integration is essential to reducing processing failures and improving production quality for manufacturing setups. This research study proposes a real-time deep learning-based framework for identifying faulty components due to malfunctioning at different manufacturing stages in the aerospace industry. It uses a convolutional neural network (CNN) to recognize and classify intermediate abnormal states in a single manufacturing process. The manufacturing process for aircraft factory products comprises different phases; analyzing the comp
APA, Harvard, Vancouver, ISO, and other styles
46

Saeful Rizal, Yusep, and Agustinus Hariadi DP. "THE IMPROVEMENT OF COMPANY PERFORMANCE THROUGH RISK MANAGEMENT PROCESS, PERSONNEL CAPABILITY AND THE APPLICATION OF TQM (CASE STUDY: LUBRICANT MANUFACTURING COMPANY PT X)." Dinasti International Journal of Education Management And Social Science 3, no. 4 (2022): 577–86. http://dx.doi.org/10.31933/dijemss.v3i4.1182.

Full text
Abstract:
Performance management is one of the process to achieve a company's vision and mission. The good achievement of company performance is an indicator of the achievement of the company's strategic goals. This research was conducted at a lubricant manufacturing company. The issues faced by the company were a declining market share of sales related to the risk of highly competitive market competition, high levels of losses and rework, and failing to achieve production costs target related to process control methods and resource management. This study aims to determine the effect of risk management
APA, Harvard, Vancouver, ISO, and other styles
47

Berawi, Mohammed Ali, Aryartha Soepardi, and Mustika Sari Sayuti. "Risk Analysis on the Equipment and Material Procurement Process of Engineering, Procurement, and Construction (EPC) Projects." International Journal of Real Estate Studies 14, no. 1 (2020): 78–90. http://dx.doi.org/10.11113/intrest.v14n1.137.

Full text
Abstract:
Equipment and material non-compliance with the project requirements is one of the issues causing delay in large EPC projects as rework actions are inevitable. Detecting and controlling the potential risks at the procurement process of equipment and material can be done to anticipate this issue. This study aims to identify the major risks and recommend the response strategies to the equipment and material non-compliance by adopting a quantitative method through expert validation using Delphi method, questionnaire surveys, and risk analysis, as well as qualitative method through benchmarking stu
APA, Harvard, Vancouver, ISO, and other styles
48

Yusuf, Muhammad, Yusuf Latief, Ayomi Dita Rarasati, Bambang Trigunarsyah, and Naufal Budi Laksono. "Fuzzy Bayesian Belief Networks Method on Risk Assessment of EPC Pipeline Project." Civil Engineering Journal 11, no. 3 (2025): 1050–71. https://doi.org/10.28991/cej-2025-011-03-013.

Full text
Abstract:
Subsea gas pipeline projects are experiencing significant technical and managerial challenges across Engineering, Procurement, and Construction (EPC) phases. To address the challenges, effective risk management in the early project phases is essential to mitigating cascading failures that cause significant schedule delay and cost overrun. Therefore, this study aimed to apply the Fuzzy Bayesian Belief Networks (FBBNs) method to model risk assessment during EPC phases. The findings showed that FBBNs made it possible for a new way to evaluate risks, find interdependencies, and guess what would ha
APA, Harvard, Vancouver, ISO, and other styles
49

Wu, Mengyao, Wei Dai, Zhiyuan Lu, Yu Zhao, and Meiqing Wang. "The Method for Risk Evaluation in Assembly Process based on the Discrete-Time SIRS Epidemic Model and Information Entropy." Entropy 21, no. 11 (2019): 1029. http://dx.doi.org/10.3390/e21111029.

Full text
Abstract:
In the past decade years, much attention has been attached on assembly process reliability in manufacturing system, because the quality and cost of product are highly determined by assembly process. However, existing research on reliability in assembly are mainly focused on study of size deviation propagation. In this paper, the method for risk evaluation in assembly process based on the discrete-time SIRS epidemic model and information entropy was proposed. Firstly, aiming at the issue of assembly process optimization, innovative solutions are proposed from the perspectives of reliability and
APA, Harvard, Vancouver, ISO, and other styles
50

Lapidus, Azariy, Aleksandr Makarov, and Anastasiia Kozlova. "A Decision Support System for Organizing Quality Control of Buildings Construction during the Rebuilding of Destroyed Cities." Buildings 13, no. 9 (2023): 2142. http://dx.doi.org/10.3390/buildings13092142.

Full text
Abstract:
Natural disasters and warfare lead to the destruction of city buildings and infrastructure, leaving large numbers of people homeless. The rebuilding of destroyed cities needs to be carried out promptly while maintaining a balance between construction quality and duration. Rework due to defects and the lengthy approval of non-conformances significantly increases the duration of construction. This study aimed to develop a decision support system to fix or negotiate strategies to address construction defects, depending on their level of risk. The paper addresses the following objectives: classify
APA, Harvard, Vancouver, ISO, and other styles
We offer discounts on all premium plans for authors whose works are included in thematic literature selections. Contact us to get a unique promo code!