To see the other types of publications on this topic, follow the link: RTPS III.

Books on the topic 'RTPS III'

Create a spot-on reference in APA, MLA, Chicago, Harvard, and other styles

Select a source type:

Consult the top 50 books for your research on the topic 'RTPS III.'

Next to every source in the list of references, there is an 'Add to bibliography' button. Press on it, and we will generate automatically the bibliographic reference to the chosen work in the citation style you need: APA, MLA, Harvard, Chicago, Vancouver, etc.

You can also download the full text of the academic publication as pdf and read online its abstract whenever available in the metadata.

Browse books on a wide variety of disciplines and organise your bibliography correctly.

1

PT, Maptechadhi Planindo. Proyek transmigrasi rencana teknis satuan pemukiman (RTSP) tahap IIIA dan rencana teknis jalan (RTJ): Pola hutan tanaman industri (HTI-Trans), Propinsi Maluku, lokasi Bula, WPP/SKP XIIa/D, SP1 : RTSP tahap IIIA laporan. Maptechadhi Planindo, 1993.

Find full text
APA, Harvard, Vancouver, ISO, and other styles
2

Rencana teknis satuan pemukiman (RTSP III A), laporan akhir (final report): Lokasi Hanjalipan/Kuala Kuayan, WPP/SKP VI b/B, Propinsi Kalimantan Tengah. Direktorat Bina Program, Direktorat Jenderal Penyiapan Pemukiman, Departemen Transmigrasi, 1987.

Find full text
APA, Harvard, Vancouver, ISO, and other styles
3

Penyusunan perwujudan manfaat tata ruang (RTSP III B), paket K.3, lokasi Nanga Mau, WPP/SKP XIX c/C, SP 2, Propinsi Kalimantan Barat. Direktorat Bina Program, Direktorat Jenderal Penyiapan Pemukiman, Departemen Transmigrasi, 1987.

Find full text
APA, Harvard, Vancouver, ISO, and other styles
4

Final report, rencana teknis satuan pemukiman (RTSP) tahap III A, lokasi Diatmamunu, WPP SKP I B/SP I, Propinsi Sulawesi Tengah, paket A 55. Republik Indonesia, Departemen Transmigrasi, Direktorat Jenderal Penyiapan Pemukiman, Direktorat Bina Program, 1988.

Find full text
APA, Harvard, Vancouver, ISO, and other styles
5

Penyusunan perwujudan tata ruang RTSP, tahap III B, 1986/1987: Laporan akhir sementara : paket K 1, Propinsi Bengkulu, WPP/SKP II/C, lokasi Ipuh, SP 5. Departemen Transmigrasi, Direktorat Jenderal Penyiapan Pemukiman, Direktorat Bina Program, 1987.

Find full text
APA, Harvard, Vancouver, ISO, and other styles
6

Laporan proyek transmigrasi rencana teknis satuan pemukiman (RTSP) tahap III A, program 1986/1987, paket F 24, lokasi Resak, WPP/SKP XVI d/G2, SP 2 (Penawai), Propinsi Kalimantan Timur. Direktorat Bina Program, Direktorat Jenderal Penyiapan Pemukiman, Departemen Transmigrasi, 1987.

Find full text
APA, Harvard, Vancouver, ISO, and other styles
7

Laporan akhir, rencana teknis satuan pemukiman (RTSP) tahap III A, tahun anggaran 1985/1986, paket E 10, Propinsi Sumatera Selatan, lokasi Sriguna, WPP/SKP XXIII/F, SP 2 dan 3. Direktorat Bina Program, Direktorat Jenderal Penyiapan Pemukiman, Departemen Transmigrasi, 1987.

Find full text
APA, Harvard, Vancouver, ISO, and other styles
8

Rencana teknis satuan pemukiman (RTSP) tahap III A, tahun anggaran 1985/1986, paket E 2, Propinsi Sumatera Selatan, WPP/SKP XX c/I (XXII c/I) SP 1, 2, 3, 4, 5, lokasi Kumbang Padang: Laporan akhir. Direktorat Bina Program, Direktorat Jenderal Penyiapan Pemukiman, Departemen Transmigrasi, 1988.

Find full text
APA, Harvard, Vancouver, ISO, and other styles
9

PT, Trans Intra Asia, ed. Rencana teknis satuan pemukiman (RTSP-III A) WPP. XI, Pasahari, SKP D: Laporan akhir. Trans Intra Asia, 1985.

Find full text
APA, Harvard, Vancouver, ISO, and other styles
10

Proyek transmigrasi rencana teknis satuan pemukiman (RTSP III A) Propinsi Kalimantan Timur lokasi Bone Baru. Adya Graha Samarinda, 1989.

Find full text
APA, Harvard, Vancouver, ISO, and other styles
11

Inc, BIEC International, ed. Phase III A RTSP pendahuluan Kumai, WPP IX a, SKP O: Perencanaan teknis satuan pemukiman transmigrasi th. 1984-1985. BIEC International, Inc., 1988.

Find full text
APA, Harvard, Vancouver, ISO, and other styles
12

PT, Astron Polaris, ed. Proyek pembuatan rencana teknik satuan pemukiman (RTSP III A) lokasi Seruyan Ulu XII/D, Propinsi Kalimantan Tengah: Laporan akhir. Astron Polaris, 1988.

Find full text
APA, Harvard, Vancouver, ISO, and other styles
13

(Firm), Gitarencana Multiplan, ed. Studi tahap III A/RTSP, WPP/SKP/SP IX a/B/2, 3, lokasi Toari Oko-Oko: Laporan akhir. Departemen Transmigrasi, Direktorat Jenderal Penyiapan Pemukiman, Direktorat Bina Program, Proyek Pengembangan Pemukiman Transmigrasi, 1988.

Find full text
APA, Harvard, Vancouver, ISO, and other styles
14

PT, Baterka Wahuna Engineering, ed. Phase III A RTSP pendahuluan Tungkal Ulu, WPP XII b SKP D: Perencanaan teknis satuan pemukiman transmigrasi th. 1983-1984. Departemen Transmigrasi, Direktorat Jenderal Penyiapan Pemukiman, Direktorat Bina Program, Proyek Perencanaan Pemukiman Transmigrasi Propinsi Jambi, 1987.

Find full text
APA, Harvard, Vancouver, ISO, and other styles
15

T, Saeti Engineering P., ed. Phase III A, RTSP pendahuluan, Ambau-Salimbatu WPP V a, SKP A Kelubir: Perencanaan teknis satuan pemukiman transmigrasi, 1982/1983. Saeti Engineering, 1989.

Find full text
APA, Harvard, Vancouver, ISO, and other styles
16

T, Saeti Engineering P., ed. Phase III A RTSP pendahuluan Ambau-Salimbatu WPP-V a, SKP B-Ansam: Perencanaan teknis satuan pemukiman transmigrasi, 1982/1983. Saeti Engineering, 1989.

Find full text
APA, Harvard, Vancouver, ISO, and other styles
17

Phase III A RTSP pendahuluan Tungkal Ulu, WPP XII b SKP E: Perencanaan teknis satuan pemukiman transmigrasi th. 1983-1984. Departemen Transmigrasi, Direktorat Jenderal Penyiapan Pemukiman, Direktorat Bina Program, Proyek Perencanaan Pemukiman Transmigrasi Propinsi Jambi, 1987.

Find full text
APA, Harvard, Vancouver, ISO, and other styles
18

Rencana teknis satuan pemukiman (RTSP) tahap III A, lokasi Liquisa, WPP/SKP IV/C, SP 1, Propinsi Timor Timur: Laporan akhir. Departemen Transmigrasi, Direktorat Jenderal Penyiapan Pemukiman, Direktorat Bina Program, 1988.

Find full text
APA, Harvard, Vancouver, ISO, and other styles
19

Consultants, Pisga Engineering, ed. Proyek transmigrasi rencana teknik satuan pemukiman tahap III A dan rencana teknik jalan, paket A, Propinsi Jambi, lokasi Penyabungan, Merlung, WPP/SKP XII c/C, SP 2: RTSP tahap IIIA PIR trans. Pisga Engineering Consultants, 1989.

Find full text
APA, Harvard, Vancouver, ISO, and other styles
20

T, Bhumi Prasaja P., ed. Proyek transmigrasi rencana teknis satuan pemukiman tahap III A dan rencana teknik jalan (lahan kering), Propinsi Bengkulu, lokasi Ipuh, WPP/SKP II/E, SP 3: RTSP tahap III A, laporan 1989/1990. Bhumi Prasaja, 1989.

Find full text
APA, Harvard, Vancouver, ISO, and other styles
21

Mondeal Development Consultant, P.T., ed. Laporan akhir rencana teknis satuan pemukiman (RTSP) tahap III A, paket A 17, lokasi Jangkang, WPP/SKP IX b/A, Propinsi Kalimantan Barat. Direktorat Bina Program, Direktorat Jenderal Penyiapan Pemukiman Transmigrasi, Departemen Transmigrasi, 1988.

Find full text
APA, Harvard, Vancouver, ISO, and other styles
22

Metrica Bhuana Raya, P.T., ed. Rencana teknis satuan pemukiman (RTSP) tahap III A, lokasi Lumea, WPP/SKP IX/E, SP 3, 4 & 5, Propinsi Timor Timur: Laporan akhir. Departemen Transmigrasi, Direktorat Jenderal Penyiapan Pemukiman, Direktorat Bina Program, 1988.

Find full text
APA, Harvard, Vancouver, ISO, and other styles
23

PT, Arplan Geo Encon, ed. Proyek transmigrasi rencana teknik satuan pemukiman tahap III A dan rencana teknik jalan (irigasi), paket D, Propinsi Kalimantan Tengah, lokasi Paduran-sebangau, WPP/SKP XIII d/c, SP 1: RTSP tahap IIIA, laporan. Arplan Geo Encon, 1989.

Find full text
APA, Harvard, Vancouver, ISO, and other styles
24

Kerabat Karsa Kreasi Consulting Engineers., ed. Penyusunan perwujudan manfaat tata ruang (RTSP III B) paket K 2, lokasi Nanga Mau, WPP SKP XIX c/C, SP 1, Propinsi Kalimantan Barat. Kerabat Karsa Kreasi Consulting Engineers, 1989.

Find full text
APA, Harvard, Vancouver, ISO, and other styles
25

Mondeal Development Consultant, P.T., ed. Laporan akhir rencana teknis satuan pemukiman (RTSP) tahap III A, paket A 17, lokasi Kendawangan II, WPP/SKP XIV b/D, Propinsi Kalimantan Barat. Mondeal Development Consultant, 1988.

Find full text
APA, Harvard, Vancouver, ISO, and other styles
26

PT, Cipta Paripurindo Semesta, ed. Rencana teknis satuan pemukiman (RTSP III A): Laporan akhir = final report : lokasi Armopa/Bonggo, WPP SKP XII/E (XIV c/B) Propinsi Irian Jaya. Direktorat Bina Program, Direktorat Jenderal Penyiapan Pemukiman, Departemen Transmigrasi, 1988.

Find full text
APA, Harvard, Vancouver, ISO, and other styles
27

Fincode International & Associates., ed. Rencana teknis satuan pemukiman (RTSP III A), lokasi Armopa/Bonggo, WPP SKP XII/E (XIV c/A), Propinsi Irian Jaya: Laporan akhir = final report. Fincode International & Associates, 1985.

Find full text
APA, Harvard, Vancouver, ISO, and other styles
28

Consultant, Mondeal Development, ed. Rencana teknis satuan pemukiman (RTSP) tahap III A, paket A 17, lokasi Sei Bulan, WPP/SKP IX b/C, Propinsi Kalimantan Barat: Laporan akhir. Mondeal Development Consultant, 1989.

Find full text
APA, Harvard, Vancouver, ISO, and other styles
29

Mondeal Development Consultant, P.T., ed. Laporan akhir rencana teknis satuan pemukiman (RTSP) tahap III A, paket A 17, lokasi Sei Radak, WPP/SKP IX c/A, Propinsi Kalimantan Barat. Direktorat Bina Program, Direktorat Jenderal Penyiapan Pemukiman Transmigrasi, Departemen Transmigrasi, 1988.

Find full text
APA, Harvard, Vancouver, ISO, and other styles
30

T, Bina Karya P., ed. Rencana teknis satuan pemukiman (RTSP III A) lokasi Sibabangun, WPP/SKP XIII a/H, SP 2, paket E 15, Propinsi Sumatera Utara: Laporan akhir. Bina Karya, 1988.

Find full text
APA, Harvard, Vancouver, ISO, and other styles
31

PT, Pengging, ed. Proyek transmigrasi rencana teknis satuan pemukiman (RTSP) tahap III A, paket F 19, Propinsi Maluku, WPP/SKP X b/A, lokasi Bemu, SP 2. Pengging, 1988.

Find full text
APA, Harvard, Vancouver, ISO, and other styles
32

Rencana teknis satuan pemukiman (RTSP III A) lokasi Rawa Kolang, WPP/SKP XV b/L, SP 1, paket E 15, Propinsi Sumatera Utara: Laporan akhir. Bina Karya, 1988.

Find full text
APA, Harvard, Vancouver, ISO, and other styles
33

PT, Indeso Utama Kencana, ed. Penyusunan perwujudan manfaat tata ruang (RTSP III B), laporan, paket K.3, lokasi Nanga Mau, WPP/SKP XIX c/C, SP 2, Propinsi Kalimantan Barat. Indeso Utama Kencana, 1986.

Find full text
APA, Harvard, Vancouver, ISO, and other styles
34

T, Deserco P., ed. Perencanaan teknis satuan pemukiman transmigrasi tahun 1983/1984, tahap III A: RTSP pendahuluan WPP XXIV d, SKP A (SP 4 SP 5) Kaliki, Irian Jaya. Departemen Transmigrasi, Direktorat Jenderal Penyiapan Pemukiman, Direktorat Bina Program, 1987.

Find full text
APA, Harvard, Vancouver, ISO, and other styles
35

PT, Interdas Purna Media, ed. Laporan akhir, studi tahap III A/RTSP, paket E 3, WPP/SKP/SP XXII c/F/1,2, lokasi Nanga Sahui, Propinsi Kalimantan Barat: Laporan utama. Departemen Transmigrasi, Direktorat Jenderal Penyiapan Pemukiman, Direktorat Bina Program, Proyek Pengembangan Pemukiman Transmigrasi, 1987.

Find full text
APA, Harvard, Vancouver, ISO, and other styles
36

Ditori Geo Karya Teknik, PT., ed. Laporan akhir pekerjaan rencana teknis satuan pemukiman (RTSP) tahap III A skala 1 : 2.000, pola pemukiman transmigrasi nelayan, lokasi Kuala Penet/XIV/D Labuhan Maringgai. Ditori Geo Karya Teknik, 1990.

Find full text
APA, Harvard, Vancouver, ISO, and other styles
37

T, Deserco P., ed. Perencanaan teknis satuan pemukiman transmigrasi tahun 1983/1984 tahap III A, RTSP pendahuluan WPP XXIV d, SKP B (SP 4, SP 5), Kaliki, Irian Jaya. Deserco Development Services, 1988.

Find full text
APA, Harvard, Vancouver, ISO, and other styles
38

Anima Rekayasa Perkasa P.T., ed. Proyek transmigrasi rencana teknis satuan pemukiman (RTSP) tahap III A, paket F 13, Propinsi Nusa Tenggara Barat, WPP/SKP V/C, lokasi Pekat, SP 2. Anima Rekayasa Perkasa, 1988.

Find full text
APA, Harvard, Vancouver, ISO, and other styles
39

Laporan akhir RTSP tahap III A: Tahun 1983/1984, paket B. 17, Propinsi Sumatera Selatan, lokasi Babat (Betung II), WPP/SKP XVI/C, SP 6, 7. Geojaya Tehnik, 1989.

Find full text
APA, Harvard, Vancouver, ISO, and other styles
40

(Firm), Gitarencana Multiplan, ed. Laporan akhir studi tahap III A/RTSP, WPP/SKP/SP XV f/B/1, 2, 3, 4, lokasi Tanjung Aru/Bangkung, Prop. Kalimantan Timur: Laporan utama. Departemen Transmigrasi, Direktorat Jenderal Penyiapan Pemukiman, Direktorat Bina Program, Proyek Pengembangan Pemukiman Transmigrasi, 1987.

Find full text
APA, Harvard, Vancouver, ISO, and other styles
41

PT, IHE Cendekia Jasa, ed. Rencana teknis satuan pemukiman pendahuluan (RTSP pendahuluan) Propinsi Kalimantan Timur, WPP/SKP/SP XVI c/C/I & II, lokasi Muara Lawa, phase III A: Laporan akhir. IHE Cendekia Jasa, 1988.

Find full text
APA, Harvard, Vancouver, ISO, and other styles
42

Qodharwan Wirasta Konsultan, P.T., ed. Proyek pengembangan pemukiman transmigrasi, studi tahap IIIA/RTSP, WPP/SKP/SP I/A/1, lokasi Leok Bokat, Sulawesi Tengah: Laporan akhir. Qodharwan Wirasta Konsultan, 1987.

Find full text
APA, Harvard, Vancouver, ISO, and other styles
43

T, Tricon Jaya P., ed. Proyek transmigrasi rencana teknis satuan pemukiman tahap III A dan rencana teknis Jalan (PIR-Trans) Propinsi Kalimantan Barat, lokasi Kembayan, WPP/SKP VII a/E, SP 4 dan 5: RTSP tahap III A, laporan akhir, 1990/1991. Tricon Jaya, 1991.

Find full text
APA, Harvard, Vancouver, ISO, and other styles
44

PT, Asana Citra Yasa, ed. Proyek transmigrasi rencana teknis satuan pemukiman (RTSP) tahap III A, program 1986/1987, paket F 9, lokasi Bula, Propinsi Maluku, WPP/SKP XII a/E, SP 3. Asana Citra Yasa, 1988.

Find full text
APA, Harvard, Vancouver, ISO, and other styles
45

CV, Geodeco, ed. Proyek transmigrasi rencana teknis satuan pemukiman (RTSP) tahap III A, program 1986/1987, paket F 7, lokasi Bula, Propinsi Maluku, WPP/SKP XII a/E, SP 1. Geodeco, 1988.

Find full text
APA, Harvard, Vancouver, ISO, and other styles
46

Daya Tata Matra P.T., ed. Proyek transmigrasi rencana teknis satuan pemukiman (RTSP) tahap III A program 1986/1987, paket F 8, lokasi Bula, Propinsi Maluku, WPP/SKP XII a/E, SP 2. Daya Tata Matra, 1988.

Find full text
APA, Harvard, Vancouver, ISO, and other styles
47

Qodharwan Wirasta Konsultan, P.T., ed. Proyek transmigrasi rencana teknis satuan pemukiman (RTSP) tahap III A, program 1986/1987, paket F 27, lokasi P. Enggano, Propinsi Bengkulu, WPP/SKP, SP 1 (500 KK). Qodharwan Wirasta Konsultan, 1988.

Find full text
APA, Harvard, Vancouver, ISO, and other styles
48

Five Engineering Consultant, P.T., ed. Penyusunan perwujudan tata ruang RTSP tahap III B, lokasi Karang Agung, WPP/SKP XX b/H, Propinsi Sumatera Selatan, paket H 3 tahun 1985/1986: Laporan akhir. Five Engineering Consultant, 1988.

Find full text
APA, Harvard, Vancouver, ISO, and other styles
49

Laporan akhir studi tahap III A/RTSP, paket E 3, WPP/SKP/SP XXII c/C/1, 2, lokasi Nanga Sahui, Propinsi Kalimantan Barat: Laporan utama, 1986. IPM, 1989.

Find full text
APA, Harvard, Vancouver, ISO, and other styles
50

Proyek transmigrasi rencana teknis satuan pemukiman (RTSP) tahap III A, program 1986/1987, paket F 11, lokasi Bula, Propinsi Maluku, WPP/SKP XII a/E, SP 5. Bimaseta Cipta Optimal, 1988.

Find full text
APA, Harvard, Vancouver, ISO, and other styles
We offer discounts on all premium plans for authors whose works are included in thematic literature selections. Contact us to get a unique promo code!