Journal articles on the topic 'Schedule Monitoring and Microsoft project'
Create a spot-on reference in APA, MLA, Chicago, Harvard, and other styles
Consult the top 50 journal articles for your research on the topic 'Schedule Monitoring and Microsoft project.'
Next to every source in the list of references, there is an 'Add to bibliography' button. Press on it, and we will generate automatically the bibliographic reference to the chosen work in the citation style you need: APA, MLA, Harvard, Chicago, Vancouver, etc.
You can also download the full text of the academic publication as pdf and read online its abstract whenever available in the metadata.
Browse journal articles on a wide variety of disciplines and organise your bibliography correctly.
Khalid, Mohiuddin Khan, and Masoom Reza Mr. "Earned Value Management for Design and Construction Project." International Journal of Trend in Scientific Research and Development 2, no. 5 (2018): 1482–502. https://doi.org/10.31142/ijtsrd17029.
Full textKurniawan, Andhika Dwi, Arief Rachmansyah, and Yatnanta Padma Devia. "Evaluation of Project Work in a Public Service Building in East Java." Rekayasa Sipil 17, no. 3 (2023): 237–42. http://dx.doi.org/10.21776/ub.rekayasasipil.2023.017.03.1.
Full textTirkey, Pragati, and Shubham Dashore. "Understanding GIS in visualization and evaluation of construction schedule." YMER Digital 21, no. 08 (2022): 749–56. http://dx.doi.org/10.37896/ymer21.08/62.
Full textDigma Pratama, Irwansyah, Laksono Djoko Nugroho, and Haris Muhammadun. "Measurement of Project Cost and Time Efficiency with Earned Value Approach In The Implementation of Baggage Handling System at Sultan Hasanuddin International Airport Makassar." Asian Journal of Social and Humanities 3, no. 4 (2025): 741–58. https://doi.org/10.59888/ajosh.v3i4.478.
Full textSánchez Gómez, Juan Sebastián, Edwin Andres Arevalo Herrera, and Cristian Camilo Torres Puentes. "Business intelligence for decision-making in royalties project management." Transactions on Energy Systems and Engineering Applications 6, no. 1 (2025): 1–25. https://doi.org/10.32397/tesea.vol6.n1.718.
Full textBhattara, Subash Kumar. "Analysis of Key Performance Indicators in Health Building Construction in Nepal." Journal of Advanced Research in Civil and Environmental Engineering 08, no. 3&4 (2021): 18–30. http://dx.doi.org/10.24321/2393.8307.202107.
Full textKim, Kyunghwan. "Generalized Resource-Constrained Critical Path Method to Improve Sustainability in Construction Project Scheduling." Sustainability 12, no. 21 (2020): 8918. http://dx.doi.org/10.3390/su12218918.
Full textNdungu, Jane Njoki, and Janesther Karugu. "Community Participation and Performance of Donor Funded Youth Projects in Korogocho, Nairobi City County, Kenya." International Journal of Current Aspects 3, no. III (2019): 227–40. http://dx.doi.org/10.35942/ijcab.v3iiii.42.
Full textMuttaqin, Muhammad Zainal, and Farida Hardaningrum. "ANALYSIS OF PROJECT IMPLEMENTATION SCHEDULE USING MICROSOFT PROJECT (Case Study: Trenggalek City Square Area)." IJEEIT : International Journal of Electrical Engineering and Information Technology 2, no. 1 (2020): 25–32. http://dx.doi.org/10.29138/ijeeit.v2i1.1148.
Full textGAZALBA, ZAEDAR, I. GEDE PUTU WARKA, and LALU WIRAHMAN W. "EVALUASI KEWAJARAN SCHEDULE KONTRAKTOR MENGGUNAKAN WORK BREAKDOWN STRUCTURE (WBS) DAN MICROSOFT PROJECT (STUDI PADA PROYEK PEMBANGUNAN SDN 5 SOKONG, TANJUNG, LOMBOK UTARA)." GANEC SWARA 16, no. 1 (2022): 1285. http://dx.doi.org/10.35327/gara.v16i1.264.
Full textFirdasari, Firdasari. "KAJIAN PERENCANAAN APLIKASI ANALISIS VARIANS DAN KONSEP NILAI HASIL MENGGUNAKAN MICROSOFT ACCESS DALAM PENGENDALIAN PROYEK KONSTRUKSI." Jurnal Teknik Sipil Unaya 3, no. 2 (2019): 39–53. http://dx.doi.org/10.30601/jtsu.v3i2.25.
Full textGunaga, Prajna Ganesh, and Geena George. "Planning, Scheduling and Cost Estimation Of Villa Project Using Microsoft Project." International Journal for Research in Applied Science and Engineering Technology 10, no. 9 (2022): 1779–92. http://dx.doi.org/10.22214/ijraset.2022.46885.
Full textPurwantoro, Almuntofa, Attie Wawey Lagi To’unni, and Subrata Aditama K. A. Uda. "Optimalisasi Alokasi Tenaga Kerja Menggunakan Resource Leveling." JURNAL SAINTIS 23, no. 02 (2023): 19–26. http://dx.doi.org/10.25299/saintis.2023.vol23(02).14478.
Full textPraganingrum, Tjokorda Istri, Ni Luh Made Ayu Mirayani Pradnyadari, and I. Kadek Krisna Dwipayana. "Analisis Pengaruh Percepatan Waktu Pelaksanaan Terhadap Biaya (Time Cost Trade Off) Berbasis Microsoft Project." Jurnal Ilmiah Kurva Teknik 12, no. 1 (2023): 21–28. http://dx.doi.org/10.36733/jikt.v12i1.6585.
Full textPangestika Oirala Kawuri and Moch. Tutuk Safirin. "Evaluasi Pelaksanaan Proyek Kapal X Di Perusahaan Galangan Kapal Menggunakan Software Microsoft Project dan S-Curve." Globe: Publikasi Ilmu Teknik, Teknologi Kebumian, Ilmu Perkapalan 2, no. 2 (2024): 182–98. http://dx.doi.org/10.61132/globe.v2i2.329.
Full textTryus, Yurii, and Yehor Tkachenko. "Features of team management in conditions of remote work." Management of Development of Complex Systems, no. 60 (November 29, 2024): 105–12. https://doi.org/10.32347/2412-9933.2024.60.105-112.
Full textJajang Atmaja. "Analisa Perbandingan Percepatan Penyelesaian Proyek Dengan Metode (Studi Kasus : Proyek Mercu Suar,Yogyakarta)." Jurnal Ilmiah Poli Rekayasa 14, no. 2 (2019): 49. http://dx.doi.org/10.30630/jipr.14.2.128.
Full textHERMAWAN, I. PUTU YANA, I. GEDE NGURAH SUNATHA, ANAK AGUNG RATU RITAKA WANGSA, and KADEK ANDY SADEWA. "ANALISIS PERCEPATAN WAKTU PELAKSANAAN PROYEK DENGAN PENAMBAHAN JAM KERJA (STUDI KASUS PEMBANGUNAN LAHAN PARKIR RUMAH SAKIT BANGLI MEDIKA CANTI)." GANEC SWARA 17, no. 2 (2023): 638. http://dx.doi.org/10.35327/gara.v17i2.467.
Full textMaulana Putra, Muhammad Andi. "ANALYSIS OF ACCELERATION OF STRUCTURE WORK TIME USING CPM METHOD IN THE 57 NGANJUK HOTEL DEVELOPMENT PROJECT." SONDIR 7, no. 2 (2023): 118–25. http://dx.doi.org/10.36040/sondir.v7i2.6570.
Full textDiah, Ahyar M., Prapdopo ., Wafiq Delfina, Surahman ., and Arnold Eka Striel Boyong. "Time Control Analysis on a Single-Story Type 91 House Construction Project Using Microsoft Project." International Journal of Management and Organizational Research 4, no. 4 (2025): 16–21. https://doi.org/10.54660/ijmor.2025.4.4.16-21.
Full textMayo-Alvarez, Luis, Aldo Alvarez-Risco, Shyla Del-Aguila-Arcentales, M. Chandra Sekar, and Jaime A. Yañez. "A Systematic Review of Earned Value Management Methods for Monitoring and Control of Project Schedule Performance: An AHP Approach." Sustainability 14, no. 22 (2022): 15259. http://dx.doi.org/10.3390/su142215259.
Full textDubrovskaya, T. A., I. N. Kravchenya, and A. I. Strizhak. "Features of using Microsoft Project software when calculating the construction schedule." Modern Technologies. System Analysis. Modeling, no. 4 (2021): 212–24. http://dx.doi.org/10.26731/1813-9108.2021.4(72).212-224.
Full textTahrir, Muhammad, Fajar Ramadhani, and Dewi Astuti Baco. "Critical Path Analysis Using Microsoft Project 2016 on the Implementation Schedule of Residential House Construction Projects." TEPIAN 4, no. 4 (2023): 196–206. http://dx.doi.org/10.51967/tepian.v4i4.2969.
Full textSUNATHA, I. GEDE NGURAH, TJOKORDA ISTRI PRAGANINGRUM, and I. PUTU SAI CANDRA PREMA NATA. "ANALISIS PERCEPATAN WAKTU PELAKSANAAN PROYEK BERBASIS MICROSOFT PROJECT (STUDI KASUS: PEMBANGUNAN RENOVASI HOTEL LAGUNA RESORT AND SPA NUSA DUA)." GANEC SWARA 17, no. 2 (2023): 594. http://dx.doi.org/10.35327/gara.v17i2.461.
Full textLi, Xiao Guang, and Li Xia Wang. "Research on Important Process of Project Monitoring and Control." Advanced Materials Research 919-921 (April 2014): 1489–93. http://dx.doi.org/10.4028/www.scientific.net/amr.919-921.1489.
Full textBin, Zeng, and Jing Zhang. "Design of a Resource Scheduling Tool for Production Project Management." Applied Mechanics and Materials 220-223 (November 2012): 165–68. http://dx.doi.org/10.4028/www.scientific.net/amm.220-223.165.
Full textDelgoshaei, Aidin, Mohd Khairol Mohd Ariffin, and B. T. Hang Tuah Baharudin. "Pre-emptive resource-constrained multimode project scheduling using genetic algorithm: A dynamic forward approach." Journal of Industrial Engineering and Management 9, no. 3 (2016): 732. http://dx.doi.org/10.3926/jiem.1522.
Full textHuang, Jian Wen, Hui Min Pan, Yan Li, Yi Ting Zhu, and Zai Yi Liao. "Cost/Schedule Monitoring and Forecasting for Project Based on Earned Value Management (EVM)." Advanced Materials Research 919-921 (April 2014): 1437–40. http://dx.doi.org/10.4028/www.scientific.net/amr.919-921.1437.
Full textNuriardani, Gati, and Zetta Rasullia Kamandang. "Comparison of Additional Working Hours and Additional Labor Based on the Output Value of Construction Projects." CIVED 10, no. 3 (2023): 945–58. http://dx.doi.org/10.24036/cived.v10i3.18.
Full textWahyuddin, Wahyuddin, and Asmar Saputra. "Aplikasi schedule pengerjaan proyek online dinas PU Kab. Sidrap." Jurnal Sintaks Logika 1, no. 2 (2021): 54–61. http://dx.doi.org/10.31850/jsilog.v1i2.769.
Full textOttaviani, Filippo Maria, Alberto De Marco, Timur Narbaev, Massimo Rebuglio, and Simone Preziosa. "A Review and Mapping of Project Schedule Monitoring Methods." Procedia Computer Science 256 (2025): 1788–95. https://doi.org/10.1016/j.procs.2025.02.319.
Full textJasim, Nidal Adnan, Abdulrahman Adnan Ibrahim, and Wadhah Amer Hatem. "Evaluation Performance for Iraqi Oil Projects Using Earned Value Analysis." Tikrit Journal of Engineering Sciences 31, no. 3 (2024): 32–43. http://dx.doi.org/10.25130/tjes.31.3.4.
Full textRahma, Isnani Nur, Fadjar Purnomo, and Sumardi Sumardi. "PROJECT PLANNING PEMBANGUNAN GEDUNG ATTIC SHOWROOM SURABAYA." Jurnal JOS-MRK 2, no. 1 (2021): 111–16. http://dx.doi.org/10.55404/jos-mrk.2021.02.01.111-116.
Full textTami Fadhilah, Choiriza, and Amsuardiman Amsuardiman. "Evaluasi Perencanaan dan Pengendalian Waktu pada Proyek Pembangunan Jalan Tol Medan – Kualanamu – Tebing Tinggi Seksi 3: Parbarakan – Lubuk Pakam." JOURNAL OF CIVIL ENGINEERING, BUILDING AND TRANSPORTATION 2, no. 1 (2019): 1. http://dx.doi.org/10.31289/jcebt.v2i1.1954.
Full textMeng, Fanmin, Shaozhi Yu, and Jianying Xue. "Construction Schedule Management System for Large-Scale Construction Projects Based on Multisensor Network." Computational Intelligence and Neuroscience 2022 (September 14, 2022): 1–10. http://dx.doi.org/10.1155/2022/3003552.
Full textBichaiah, Sindhu. "A Study on the Scheduling Management based on Advertisement." December 2023 2, no. 2 (2023): 414–24. http://dx.doi.org/10.36548/rrrj.2023.2.012.
Full textMochtar, Benny. "ANALISA PENERAPAN MANAJEMEN WAKTU PADA PROYEK KONSTRUKSI JALAN LINGKUNGAN (Studi Kasus : Perumahan Komplek Teratai Putih Kalimantan Selatan)." Jurnal Kacapuri : Jurnal Keilmuan Teknik Sipil 2, no. 1 (2019): 44. http://dx.doi.org/10.31602/jk.v2i1.2063.
Full textKeskiniva, Kimmo, Arto Saari, and Juha-Matti Junnonen. "Takt Production Monitoring and Control in Apartment Renovation Projects." Buildings 11, no. 3 (2021): 92. http://dx.doi.org/10.3390/buildings11030092.
Full textKapuganti, Chitti Babu, K. V. G. D. Balaji, T. Santhosh Kumar, and Sudhakar Mogili. "Grey Earned Duration Management." IOP Conference Series: Earth and Environmental Science 1326, no. 1 (2024): 012153. http://dx.doi.org/10.1088/1755-1315/1326/1/012153.
Full textAkbar, Mohammad Dzikril, Suhariyanto Suhariyanto, and Agus Sugiarto. "PROJECT PLANNING PROYEK PEMBANGUNAN APARTEMEN CAMBIO LOFTS TANGERANG SELATAN." Jurnal JOS-MRK 2, no. 3 (2021): 227–32. http://dx.doi.org/10.55404/jos-mrk.2021.02.03.227-232.
Full textAli, Mahardi Kamalika Khusna, Hanie Teki Tjendani, and Budi Witjaksana. "Identifying Critical Tasks in the Kadiri University 4 Floor Building Construction Project Using the Critical Path Method." International Journal of Science, Technology & Management 5, no. 3 (2024): 650–54. http://dx.doi.org/10.46729/ijstm.v5i3.1110.
Full textChang, Jun, Bo Cui, and Deng Hua Zhong. "Research on Construction Schedule Real-Time Control of High Core Rock-Fill Dam Based on Digital Monitoring." Advanced Materials Research 588-589 (November 2012): 1062–67. http://dx.doi.org/10.4028/www.scientific.net/amr.588-589.1062.
Full textPatel, Bhavya, Nisarg Patel, Akash Patel, and Sameer Patel. "4D Schedule Optimization for Project Monitoring of Existing Educational Building." Proceedings of the 12th Structural Engineering Convention, SEC 2022: Themes 1-2 1, no. 1 (2022): 1671–79. http://dx.doi.org/10.38208/acp.v1.704.
Full textAl- Qordhowi, Andrian Firdaus Yusuf, Muaffaq A. Jani, and Hary Moetriono. "INTEGRATED CONTROL PROJECT BASED ON COST AND TIME." International Journal on Advanced Technology, Engineering, and Information System (IJATEIS) 2, no. 1 (2023): 52–73. http://dx.doi.org/10.55047/ijateis.v2i1.695.
Full textKumar, A. Chaitanya, and T. Reshma. "4D Applications of GIS in Construction Management." Advances in Civil Engineering 2017 (2017): 1–9. http://dx.doi.org/10.1155/2017/1048540.
Full textFarok, G. M. G., and Jose A. Garcia. "DEVELOPING GROUP LEADERSHIP AND COMMUNICATION SKILLS FOR MONITORING EVM IN PROJECT MANAGEMENT." Journal of Mechanical Engineering 45, no. 1 (2015): 53–60. http://dx.doi.org/10.3329/jme.v45i1.24385.
Full textBolotin, Sergey, Haitham Bohan, Aldyn-kys Dadar, and Khenzig Biche-ool. "SCHEDULING WORK UNDER INTEGRATED URBAN DEVELOPMENT USING THE METHOD OF UNCERTAIN RESOURCE COEFFICIENTS." Architecture and Engineering 6, no. 4 (2021): 34–41. http://dx.doi.org/10.23968/2500-0055-2021-6-4-34-41.
Full textAnwar, Saiful, and Julistyana Tistogondo. "Making Use of the Fast-Track Method for Project Work Control Analysis." ADRI International Journal of Sciences, Engineering and Technology 7, no. 1 (2022): 18–27. http://dx.doi.org/10.29138/ijset.v7i1.109.
Full textMahendra, Muhammad Oka, Teguh Eko Saputro, and Al Fiillian Sah Putra. "Penerapan Microsoft Project dalam Metode Crashing Terhadap Waktu dan Biaya." Jurnal Teknik Industri Terintegrasi 8, no. 2 (2025): 1908–18. https://doi.org/10.31004/jutin.v8i2.44080.
Full textTaflin S. Raj. "A Study on The Scheduling Management Based on Advertisement." Recent Research Reviews Journal 2, no. 1 (2023): 160–70. http://dx.doi.org/10.36548/rrrj.2023.1.14.
Full text