To see the other types of publications on this topic, follow the link: Software Schedule management.

Journal articles on the topic 'Software Schedule management'

Create a spot-on reference in APA, MLA, Chicago, Harvard, and other styles

Select a source type:

Consult the top 50 journal articles for your research on the topic 'Software Schedule management.'

Next to every source in the list of references, there is an 'Add to bibliography' button. Press on it, and we will generate automatically the bibliographic reference to the chosen work in the citation style you need: APA, MLA, Harvard, Chicago, Vancouver, etc.

You can also download the full text of the academic publication as pdf and read online its abstract whenever available in the metadata.

Browse journal articles on a wide variety of disciplines and organise your bibliography correctly.

1

Kumar, A. Chaitanya, and T. Reshma. "4D Applications of GIS in Construction Management." Advances in Civil Engineering 2017 (2017): 1–9. http://dx.doi.org/10.1155/2017/1048540.

Full text
Abstract:
Construction industries broadly involve different set of construction activities which are to be executed as per schedule and the major software used for scheduling is PRIMAVERA and Microsoft Project (MSP). But the software still lacks a feature of providing spatial aspects of information in construction schedule. Recently, advanced technology like 4D GIS plays a major role in overcoming the limitation of the software. 4D GIS technology includes integration of 2D drawings from AutoCAD and schedules prepared in PRIMAVERA software. In the present study, a multistair residential building has been
APA, Harvard, Vancouver, ISO, and other styles
2

Jensen, Randall W. "Management Impact on Software Cost and Schedule." Journal of Parametrics 19, no. 1 (1999): 53–67. http://dx.doi.org/10.1080/10157891.1999.10462580.

Full text
APA, Harvard, Vancouver, ISO, and other styles
3

Jensen, Randall W. "Management Impact on Software Cost and Schedule." Journal of Parametrics 21, no. 1 (2001): 1–15. http://dx.doi.org/10.1080/10157891.2001.10462601.

Full text
APA, Harvard, Vancouver, ISO, and other styles
4

Anurag, Mahure *1 Amitkumar Ranit 2. "EFFECTIVE SCHEDULE DEVELOP USING PRIMAVERA P6 REVIEW." INTERNATIONAL JOURNAL OF ENGINEERING SCIENCES & RESEARCH TECHNOLOGY 7, no. 4 (2018): 384–86. https://doi.org/10.5281/zenodo.1218626.

Full text
Abstract:
Construction project shall employ the latest and the best available project planning and management software Primavera project management, one of the most usable software package employed by a large group of industries. The planning process for a building construction with some alternative schemes such as execution schedule, activities relationship, resource allocation etc. has been attempted to examine the consequence of overall implementation in terms of scope and time to the project. Effective time planning is very important in determining a success of any project, poor planning and control
APA, Harvard, Vancouver, ISO, and other styles
5

SUN, Rui-Zhi. "Schedule of Activity Instances in Workflow Management System." Journal of Software 16, no. 3 (2005): 400. http://dx.doi.org/10.1360/jos160400.

Full text
APA, Harvard, Vancouver, ISO, and other styles
6

Latifah, Ayu, Asep Deddy Supriatna, and Imam Saputra. "Rancang Bangun Sistem Pengelolaan Ruangan Berbasis Website." Jurnal Sistem Cerdas 5, no. 3 (2022): 147–54. http://dx.doi.org/10.37396/jsc.v5i3.248.

Full text
Abstract:
Abstract— Currently the benefits of using information technology affect the human environment, one of which is organizational performance on campus, which has rooms for lectures, student activities and other parties. One of the problems faced in the university environment is the management of the room, when the room is being used or will be borrowed. Room management, which is still done manually, makes it difficult to borrow rooms and get information on the schedule for the use of the room used. Therefore we need a room management system that can make it easier to borrow according to the room
APA, Harvard, Vancouver, ISO, and other styles
7

Priyanka, Prajapati, K. Sreekala Dr., and Sultana Ms.N.Musrat. "RetailSphere: Real-Time Retail House Management Software." Journal of Network Security and Data Mining 7, no. 3 (2024): 20–30. https://doi.org/10.5281/zenodo.12526844.

Full text
Abstract:
<em>This abstract introduces a Rental House Management System, designed to streamline the process of managing rental properties for landlords and property managers. The system aims to automate various tasks involved in property management, enhancing efficiency, accuracy, and overall tenant satisfaction. </em><em>The Rental House Management System offers a comprehensive suite of features including property listing management, tenant management, rent collection, maintenance tracking, and financial reporting. Landlords and property managers can easily add new properties to the system, upload prop
APA, Harvard, Vancouver, ISO, and other styles
8

Bolotin, Sergey, Haitham Bohan, Aldyn-kys Dadar, and Khenzig Biche-ool. "SCHEDULING WORK UNDER INTEGRATED URBAN DEVELOPMENT USING THE METHOD OF UNCERTAIN RESOURCE COEFFICIENTS." Architecture and Engineering 6, no. 4 (2021): 34–41. http://dx.doi.org/10.23968/2500-0055-2021-6-4-34-41.

Full text
Abstract:
Introduction: Planning integrated development of a residential area involves determining the composition of the objects to be built and creating an appropriate integration mechanism, backed up by a generalized work schedule. The existing methods of forming integrated work schedules do not use a systemic approach, based on a universal mathematical model, to describe the organizational and technological aspects of construction. Methods: The present study uses the method of uncertain resource coefficients to demonstrate a mechanism for systemically describing organizational and technological cons
APA, Harvard, Vancouver, ISO, and other styles
9

Snehal, Sajannavar, and Dharwad Jabina. "Conceptual Study of Agile Processes and Methodologies." International Journal of Multidisciplinary Research Transactions 4, no. 9 (2022): 66–73. https://doi.org/10.5281/zenodo.7111630.

Full text
Abstract:
This paper deals with the comparative study of agile processes. The paper will serve as guide to other software development process models. Agile processes have important applications in the areas of software project management, software schedule management, etc. In particular the aim of agile processes is to satisfy the customer, faster development times with lower defects rate. This paper compares the agile processes with other software development life cycle models. Agile processes are not always advantageous, they have some drawbacks as well; the advantages and disadvantages of agile proce
APA, Harvard, Vancouver, ISO, and other styles
10

Maravas, Alexander, and John-Paris Pantouvakis. "Schedula Anima: Dynamic Visualization of Gantt Charts and Resource Usage Graphs in Project Scheduling." Buildings 15, no. 3 (2025): 393. https://doi.org/10.3390/buildings15030393.

Full text
Abstract:
Scheduling is essential in managing projects. ‘Schedula Anima’ is a new software designed to provide a comprehensive view of schedules between early and late dates for construction project managers. Capturing the dynamic nature of projects, it offers improved visualization through an animation process that creates incremental frames of bar charts and the corresponding resource graphs. As activity delays are simulated, it is observed that delays earlier in the schedule have more significant effects on project completion. A new prioritization method is introduced to evaluate the ease of reschedu
APA, Harvard, Vancouver, ISO, and other styles
11

Haghsheno, Saeid. "AI-driven Project Management in Software Engineering." International Journal of Scientific Development and Research 6, no. 1 (2021): 299–308. https://doi.org/10.5281/zenodo.11423519.

Full text
Abstract:
<em>Abstract</em>&mdash;The management of software projects is a complicated process involving many moving parts. It needs good planning of resources like money, people, and technology. Also, need to watch potential risks and keep the project on schedule. Artificial Intelligence (AI) can help make this process more efficient. This paper explores how AI systems can be utilized in software project management. It focuses on three key areas: resource allocation, timeline prediction, and risk identification. For resource, AI analyzes data to decide the best way to assign people, money, and computer
APA, Harvard, Vancouver, ISO, and other styles
12

Riantini, Leni Sagita, Mohammad Ichsan, Bambang Trigunarsyah, Ayomi Dita Rarasati, Nuraziz Handika, and Chrys Adrian Lolo. "Optimization of completion schedule forecasting in case study of double-double track development project (Package A) using the probabilistic pert method." Journal of Infrastructure, Policy and Development 8, no. 9 (2024): 7798. http://dx.doi.org/10.24294/jipd.v8i9.7798.

Full text
Abstract:
This study aims to identify the risk factors causing the delay in the completion schedule and to determine an optimization strategy for more accurate completion schedule prediction. A validated questionnaire has been used to calculate a risk rating using the analytical hierarchy process (AHP) method, and a Monte Carlo simulation on @RISK 8.2 software was employed to obtain a more accurate prediction of project completion schedules. The study revealed that the dominant risk factors causing project delays are coordination with stakeholders and changes in the scope of work/design review. In addit
APA, Harvard, Vancouver, ISO, and other styles
13

Matveikin, V. G., B. S. Dmitrievsky, A. A. Terekhova, M. V. Lemkina, S. N. A. Al Knfer, and M. A. D. Al Amidi. "Schedule Management of a Multi-Connected Production System." Vestnik Tambovskogo gosudarstvennogo tehnicheskogo universiteta 27, no. 1 (2021): 050–61. http://dx.doi.org/10.17277/vestnik.2021.01.pp.050-061.

Full text
Abstract:
The development of a digital control system is considered, which makes it possible to form a multi-connected production schedule at the intrashop level, to quickly track changes in the production environment and make timely adjustments to the production schedule. The requirements for the system being developed are given; the functions performed by it are disclosed, for the implementation of which the study of information flows between the divisions of the enterprise participating in the formation of the production schedule is carried out. A description of the input and output information of th
APA, Harvard, Vancouver, ISO, and other styles
14

Chen, Jennifer, and Xin Qian. "Smart Scheduling: A Pilot Project of Workforce Scheduling in Radiation Oncology." Journal of Scientific Innovation in Medicine 7, no. 1 (2024): 2. http://dx.doi.org/10.29024/jsim.202.

Full text
Abstract:
Introduction: In the case of the radiation oncology department, the large number of visits faced by patients illuminates the critical need for optimal time management. Focused on three central themes: daily waiting times, diagnosis-to-treatment waiting times, and appropriate staffing for the present workload, the research highlights the impact of inefficient time management on patient satisfaction and overall operational efficiency. The time and energy invested in a schedule are high and frequently many scheduling conflicts occur even after the schedule is made. The ability to schedule differe
APA, Harvard, Vancouver, ISO, and other styles
15

Dobrynin, Alexey Sergeyevich, Stanislav Matveevich Kulakov, and Alexander Sergeyevich Koynov. "BUILDING UP SCHEDULES IN MULTIPROJECT DESIGN MANAGEMENT SYSTEMS." Vestnik of Astrakhan State Technical University. Series: Management, computer science and informatics 2021, no. 3 (2021): 105–14. http://dx.doi.org/10.24143/2072-9502-2021-3-105-114.

Full text
Abstract:
The article focuses on the problem of algorithmizing the process of building schedules in various spheres of human activity by using the modern mathematical apparatus, as well as achievements in the field of systems analysis, game theory, and graph theory. Nowadays, there have been analyzed and determined the boundaries of the effective application of many well-known heuristic and metaheuristic algorithms, which have shown good results in practice. However, despite the achievements in the discrete optimization, scheduling and network planning, the new problems of drawing up so-called coordinat
APA, Harvard, Vancouver, ISO, and other styles
16

Et.al, Rozi Nor Haizan Nor. "Project Scheduling Management in the Software Industry." Turkish Journal of Computer and Mathematics Education (TURCOMAT) 12, no. 3 (2021): 2136–45. http://dx.doi.org/10.17762/turcomat.v12i3.1156.

Full text
Abstract:
Project scheduling is the next step once project planning is completed. This requires knowledge and the depth of the activities, the dependencies between activities and, duration of the activities. Creating and designing a realistic project schedule is the biggest challenges a project manager faces. There are some common problems that can be impact towards project delay or performance: Assigning Resource or Resource Constraint, Managing the Unknown or Managing Change and Estimating Task Duration. These 3 factors and causes are contributing to project scheduling problem. The impact of resource
APA, Harvard, Vancouver, ISO, and other styles
17

Chilton, Michael A. "Resource allocation in IT projects: using schedule optimization." International Journal of Information Systems and Project Management 2, no. 3 (2022): 47–59. http://dx.doi.org/10.12821/ijispm020303.

Full text
Abstract:
Resource allocation is the process of assigning resources to tasks throughout the life of a project. Despite sophisticated software packages devoted to keeping track of tasks, resources and resource assignments, it is often the case that project managers find some resources over-allocated and therefore unable to complete the assigned work in the allotted amount of time. Most scheduling software has provisions for leveling resources, but the techniques for doing so simply add time to the schedule and may cause delays in tasks that are critical to the project in meeting deadlines. This paper pre
APA, Harvard, Vancouver, ISO, and other styles
18

Meng, Fanmin, Shaozhi Yu, and Jianying Xue. "Construction Schedule Management System for Large-Scale Construction Projects Based on Multisensor Network." Computational Intelligence and Neuroscience 2022 (September 14, 2022): 1–10. http://dx.doi.org/10.1155/2022/3003552.

Full text
Abstract:
As an important task of construction project management, construction schedule management is related to the realization of project period, cost, quality, and other objectives. However, in actual construction, problems such as difficulties in plan implementation and management are often encountered, and schedule delays often occur. Moreover, with the increase in the scale and complexity of modern buildings, the management of construction schedules has brought about larger issues and higher requirements have been put forward for the management level of the construction schedule. The traditional
APA, Harvard, Vancouver, ISO, and other styles
19

Baruah, Nomi, and Kaushik Das. "Software Project Management and SMEs of India." International Journal of Advanced Research in Computer Science and Software Engineering 7, no. 12 (2018): 11. http://dx.doi.org/10.23956/ijarcsse.v7i12.492.

Full text
Abstract:
Software Project Management refers to managing a software project effectively as to have a clear understanding of what the software developers are trying to achieve. Software project management is ever changing, ever evolving and never ending process. Since the market demand for software product changes, new project management methodologies and techniques need to be implemented with rapid change in time and market demand. This paper discusses the result of a survey which is conducted in 10 small and medium software enterprises of India. The purpose of the survey is to get an idea about the typ
APA, Harvard, Vancouver, ISO, and other styles
20

Pranavraj, Zambare1 Arun Dhawale2. "PROJECT MANAGEMENT INFORMATION SYSTEM IN CONSTRUCTION INDUSTRY." INTERNATIONAL JOURNAL OF ENGINEERING SCIENCES & RESEARCH TECHNOLOGY 6, no. 7 (2017): 54–60. https://doi.org/10.5281/zenodo.822964.

Full text
Abstract:
Project management information systems (PMIS) are widely regarded as an important building block and today’s project management. The nature of these systems has changed considerably during the last decade they are in fact still developing from single-user single-project management systems to complex, distributed, multi-functional systems that no longer only cover project planning. Information systems research has to date only partly reflected this PMIS evolution. Typical fields of research are algorithms in respect of operation research problems related to project management, the assessment an
APA, Harvard, Vancouver, ISO, and other styles
21

Zhang, Jing Yang, and Song Jiang Wang. "The Application of Earned Value Management in Small and Medium-Sized Hydropower Stations Project." Applied Mechanics and Materials 357-360 (August 2013): 2371–78. http://dx.doi.org/10.4028/www.scientific.net/amm.357-360.2371.

Full text
Abstract:
Earned value management is a prerequisite for the wide range of applications in the practice of project management at home and abroad. In this paper, As to the quality of the target cost and schedule goal, To the project cost and schedule performance evaluation, On the basis of reading the relevant literature and researching at home and abroad. Using theory and method, which cost and schedule performance evaluation of earned value management as the research object. Application of project management software, It is greatly meaningful to applying earn value management model to small and medium-s
APA, Harvard, Vancouver, ISO, and other styles
22

Matsveichuk, Natalja M., Yuri N. Sotskov, and Liangliang Sun. "Optimal Scheduling Works for Two Employees with Ordered Criteria." WSEAS TRANSACTIONS ON BUSINESS AND ECONOMICS 21 (November 22, 2024): 2302–13. http://dx.doi.org/10.37394/23207.2024.21.189.

Full text
Abstract:
The number of users of time management in the world is increasing due to the need for remote work (at home), study, teaching, and service. This requires the improvement of time-management models, methods, and the development of new optimization algorithms and software tools that will take into account the characteristics and needs of new time-management users. This article presents the necessary and sufficient conditions for schedule optimality, algorithms, and results of computational experiments conducted on the optimal selection and planning of interrelated jobs for two performers (a superv
APA, Harvard, Vancouver, ISO, and other styles
23

Siekkinen, GiGi, and Philip L. Carpenter. "PROTOTYPE COMPUTER SYSTEM FOR LANDSCAPE SITE MANAGEMENT CONTROLLED BY PHENOLOGICAL OBSERVATIONS." HortScience 25, no. 9 (1990): 1157d—1157. http://dx.doi.org/10.21273/hortsci.25.9.1157d.

Full text
Abstract:
Use of the computer and specialized software can provide flexibility needed to develop management schedules for landscape sites that differ in geographic location, size, and maintenance level. The major problem faced in developing this software is accommodating different climates and year-to-year variations in weather, which influence the optimum timing of many management activities. Using phenological observations of common plants to time maintenance activities rather than relying entirely upon calendar dates was investigated as a solution t this problem. A program that used a combination of
APA, Harvard, Vancouver, ISO, and other styles
24

Moe, Nils Brede, Torgeir Dingsøyr, and Knut Rolland. "To schedule or not to schedule? An investigation of meetings as an inter-team coordination mechanism in largescale agile software development." International Journal of Information Systems and Project Management 6, no. 3 (2022): 45–59. http://dx.doi.org/10.12821/ijispm060303.

Full text
Abstract:
Coordination of teams is critical when managing large programmes that involve multiple teams. In large-scale software development, work is carried out simultaneously by many developers and development teams. Results are delivered frequently and iteratively, which requires coordination on different levels, e.g., the programme, project, and team levels. Prior studies of knowledge work indicate that such work relies heavily on coordination through "personal" modes such as mutual adjustment between individuals or through scheduled or unscheduled meetings. In agile software development processes, p
APA, Harvard, Vancouver, ISO, and other styles
25

BANNACH, Daniel Gauloski, Robson de Faria SILVA, and Cleonice WITT. "APPLICATION OF QFD IN A PROJECT DEVELOPMENT OF ACADEMIC TIMETABLE SOFTWARE." Boletim de Conjuntura (BOCA) 16, no. 47 (2023): 504–16. https://doi.org/10.5281/zenodo.10211388.

Full text
Abstract:
The introduction of new technologies is transforming production management, impacting consumption patterns, and consequently, product requirements. This study explores the application of Quality Function Deployment (QFD) in the development of academic scheduling software at a university. The mixed-method research involved proposing requirements through meetings with the information technology team and the academic scheduling management team. Managing academic schedules in a digitized university requires defining parameters that harmonize events throughout the educational process, focusing on b
APA, Harvard, Vancouver, ISO, and other styles
26

Varajão, João, António Trigo, José Luís Pereira, and Isabel Moura. "Information systems project management success." International Journal of Information Systems and Project Management 9, no. 4 (2022): 62–74. http://dx.doi.org/10.12821/ijispm090404.

Full text
Abstract:
This paper aims to provide new insights into information systems (IS) project management success. Even though many studies found in the literature show results of software development projects, few studies address the success of IS (socio-technical) projects. Responses to an international survey, regarding 472 projects in total, showed that IS project management is achieving high levels of success; yet, only a minority of projects end without changes in scope, schedule or cost. Furthermore, the results show that changes in scope, schedule or cost are frequent in this kind of project and do not
APA, Harvard, Vancouver, ISO, and other styles
27

Mezentsev, Yu A., Yu L. Korotkova, and I. V. Estraich. "An Efficient Algorithm for Solving the Applied Problem Scheduling Optimization of a Parallel-Sequential System." Informacionnye Tehnologii 27, no. 12 (2021): 642–50. http://dx.doi.org/10.17587/it.27.642-650.

Full text
Abstract:
The problem of optimal regulation of airline fleet schedules by reassigning aircraft to flights is considered. The optimal regulation of schedules is to create or change them in such a way that minimizes system losses due to current violations. As an estimate of losses, the total deviation of the adjusted schedule from the spetified departure schedules of aircraft is used. It is shown that the described technological system belongs to the category of parallel-sequential systems. Accordingly, the considered system control problem is NP-hard and does not have effective algorithms for exact solut
APA, Harvard, Vancouver, ISO, and other styles
28

Dasović, Borna, and Uroš Klanšek. "Integration of Mixed-Integer Nonlinear Program and Project Management Tool to Support Sustainable Cost-Optimal Construction Scheduling." Sustainability 13, no. 21 (2021): 12173. http://dx.doi.org/10.3390/su132112173.

Full text
Abstract:
This paper presents the integration of mixed-integer nonlinear program (MINLP) and project management tool (PMT) to support sustainable cost-optimal construction scheduling. An integrated structure of a high-level system for exact optimization and PMT was created. To ensure data compatibility between the optimization system and PMT and to automate the process of obtaining a cost-optimal schedule, a data transformation tool (DTT) was developed within a spreadsheet application. The suggested system can determine: (i) an optimal project schedule with associated network diagram and Gantt chart in
APA, Harvard, Vancouver, ISO, and other styles
29

Lee, Gi-Ho, Jae-Young Park, Seung-Jun Ham, and Young-Jin Kim. "Comparative Study on Optimization Solvers for Implementation of a Two-Stage Economic Dispatch Strategy in a Microgrid Energy Management System." Energies 13, no. 5 (2020): 1096. http://dx.doi.org/10.3390/en13051096.

Full text
Abstract:
A microgrid energy management system (MEMS) optimally schedules the operation of dispatchable distributed energy resources to minimize the operation costs of microgrids (MGs) via an economic dispatch (ED). Actual ED implementation in the MEMS relies on an optimization software package called an optimization solver. This paper presents a comparative study of optimization solvers to investigate their suitability for ED implementation in the MEMS. Four optimization solvers, including commercial as well as open-source-based ones, were compared in terms of their computational capability and optimiz
APA, Harvard, Vancouver, ISO, and other styles
30

Pagadala, Srivyshnavi, Sony Bathala, and B. Uma. "An Efficient Predictive Paradigm for Software Reliability." Asian Journal of Computer Science and Technology 8, S3 (2019): 114–16. http://dx.doi.org/10.51983/ajcst-2019.8.s3.2051.

Full text
Abstract:
Software Estimation gives solution for complex problems in the software industry which gives estimates for cost and schedule. Software Estimation provides a comprehensive set of tips and heuristics that Software Developers, Technical Leads, and Project Managers can apply to create more accurate estimates. It presents key estimation strategies and addresses particular estimation challenges. In the planning of a software development project, a major challenge faced by project managers is to predict the defects and effort. The Software defect plays critical role in software product development. T
APA, Harvard, Vancouver, ISO, and other styles
31

Radkevych, Oleksandr. "PROJECT MANAGEMENT SOFTWARE IN THE FIELD OF PROFESSIONAL (VOCATIONAL) EDUCATION." Науковий вісник Інституту професійно-технічної освіти НАПН України Професійна педагогіка, no. 2(19) (November 25, 2019): 124–32. http://dx.doi.org/10.32835/2223-5752.2019.19.124-132.

Full text
Abstract:
Relevance. The digitalization of society and education has changed approaches to management behaviour, which is noticeable in terms of project management in professional (vocational) education schools. It has led to the allocation of resources to ensure the effective functioning of professional (vocational) education schools and enhance their competitiveness by improving their internal processes and expanding the range of educational services provided to students and the adult population.&#x0D; Aim: the study aims to clarify the characteristics of project management in the field of professiona
APA, Harvard, Vancouver, ISO, and other styles
32

Ramadaniah, Dedeh, and Muhammad Reza Romahdoni. "SISTEM INFORMASI PEMESANAN DAN PENJADWALAN SRI KADARSIH WEDDING ORGANIZER MENGGUNAKAN METODE AGILE SOFTWARE DEVELOPMENT." Jurnal SIMADA (Sistem Informasi dan Manajemen Basis Data) 7, no. 2 (2024): 117–27. https://doi.org/10.30873/simada.v7i2.586.

Full text
Abstract:
The advancement of information technology is currently growing very rapidly. Various sectors have taken advantage of this technological advancement, including the wedding organizer business. This is indicated by changes in the management of work, which was previously done manually, now using technology. This research aims to overcome the problems of the semi-manual system used by Sri Kadarsih Wedding Organizer, where customers must come directly to obtain booking information and data is recorded in a book, so that data can be lost or damaged and can cause redundancy of schedule data. In this s
APA, Harvard, Vancouver, ISO, and other styles
33

Ul'yanickaya, Viktoriya, Elizaveta Ivanova, Dar'ya Isakova, and Aleksandra Kishikova. "Creation of Automated Program for Calculating the Values of Target Indicators for Traffic Schedule Implementation." Proceedings of Petersburg Transport University 20, no. 1 (2023): 172–81. http://dx.doi.org/10.20295/1815-588x-2023-1-172-181.

Full text
Abstract:
Purpose: Achievement of the autonomy of calculations of target indicators for the implementation of passenger and suburb train schedule, decision-making and operational management, based on obtained calculations. Writing the program "Calculation of Target Indicator Values for Traffic Schedule Implementation" is due to the need to improve process implementation quality and to obtain maximal efficiency of planning and management system in a whole. Methods: Pascal programming language was used to automate the calculation of target indicators. Results: Creation and writing of independent software
APA, Harvard, Vancouver, ISO, and other styles
34

Wu, Jian Jun, Wei Wan та Da Hai Zhao. "Software Design of Aircraft Electrical Load Management Center Based on μC/OS-II". Advanced Materials Research 268-270 (липень 2011): 552–56. http://dx.doi.org/10.4028/www.scientific.net/amr.268-270.552.

Full text
Abstract:
This paper introduces that embedded real time operating system μC/OS-II is applied in software design of aircraft electrical load management center. Firstly, the μC/OS-II and its running on ARM are briefly presented. Then the method of two system running modes is given in details. And the tasks assignment, priority allocation and communication between tasks under both two modes are also provided. Results show that multitask schedule managements of real-time system has solved the problem of poor real-time in a single task system. And the reliability of the system has been greatly improved.
APA, Harvard, Vancouver, ISO, and other styles
35

Zhang, Yin Zi, Liang Cai Cai, and Min Fan. "Schedule Management of Airport Flying Area Construction Based on BIM." Applied Mechanics and Materials 584-586 (July 2014): 2653–58. http://dx.doi.org/10.4028/www.scientific.net/amm.584-586.2653.

Full text
Abstract:
Airport flying area construction is a complex dynamic process. Its typical features including: complex construction process, large construction area, underground pipe trench interwoven and so on. Traditional construction schedule management of airport flying area is based on Gantt charts and network diagrams, which is generated before the construction, not supporting real-time updates. A preliminary exploration of BIM-based schedule management in airport flying area engineering is conducted. Using Civil3D,Revit, Navisworks and MS Project software, the construction image progress model can be e
APA, Harvard, Vancouver, ISO, and other styles
36

Gatto, Laurent. "Data Management Plan for a Biotechnology and Biological Sciences Research Council (BBSRC) Tools and Resources Development Fund (TRDF) Grant." Research Ideas and Outcomes 3 (January 5, 2017): e11624. https://doi.org/10.3897/rio.3.e11624.

Full text
Abstract:
This Data Management Plan (DMP) was created for Laurent Gatto's BBSRC Tools and Resources Development Fund award (BB/N023129/1). The DMP describes the management and sharing of all data and code associated with the grant, including software dissemination and release schedule, source code development and open source licensing, software documentation, reproducible framework and data annotation and dissemination.
APA, Harvard, Vancouver, ISO, and other styles
37

Пургина, Марина Владимировна, Алексей Сергеевич Добрынин, and Роман Сергеевич Койнов. "Schedule formation in multi-project developments management systems." Вычислительные технологии, no. 4 (October 6, 2022): 118–26. http://dx.doi.org/10.25743/ict.2022.27.4.010.

Full text
Abstract:
Важный фактор повышения качества планирования - построение расписаний в проектной, производственной и экономической деятельности. Целесообразно использовать автоматизированные процедуры построения расписаний. Следует отметить, что некоторые теоретические и прикладные аспекты их формирования хорошо проработаны и описаны в литературе. Тем не менее в реальной практике деятельности человеческих коллективов очень распространен случай, когда проектные или производственные группы одновременно работают с несколькими проектами. Поэтому задача автоматизированного построения расписаний для мультипроектно
APA, Harvard, Vancouver, ISO, and other styles
38

Muritala Omeiza Umar, Azubuike Chukwudi Okwandu, and Dorcas Oluwajuwonlo Akande. "Impact of effective schedule management on high-rise building projects." International Journal of Applied Research in Social Sciences 6, no. 7 (2024): 1371–86. http://dx.doi.org/10.51594/ijarss.v6i7.1298.

Full text
Abstract:
Effective schedule management is a critical factor in the successful execution of high-rise building projects. This paper explores the impact of robust schedule management practices on project performance, highlighting the benefits, challenges, and strategies for optimizing timelines. High-rise construction presents unique complexities, including coordination of multiple trades, strict safety regulations, and logistical challenges related to vertical construction. Utilizing advanced scheduling methodologies such as Critical Chain Project Management (CCPM) and Building Information Modeling (BIM
APA, Harvard, Vancouver, ISO, and other styles
39

RYMAR, Pavlo, and Bogdan VOYTKO. "DEVELOPMENT OF AN AUTOMATED SYSTEM FOR FORMATION OF SCHEDULE OF EDUCATIONAL LESSONS USING 1C: «ENTERPRISE»." Herald of Khmelnytskyi National University 301, no. 5 (2021): 36–40. http://dx.doi.org/10.31891/2307-5732-2021-301-5-36-40.

Full text
Abstract:
This article is devoted to the development of complex software on the platform 1C Enterprise for automated scheduling of educational processes in higher education institutions. The developed system is designed to solve the problems of electronic document management and scheduling classes in educational institutions of the I-IV level of accreditation, as these problems are still one of the most pressing in the organization of the educational process. This automated system should reduce the time of operations, provide the easiest way to form and make changes to the schedule of the educational pr
APA, Harvard, Vancouver, ISO, and other styles
40

Zhang, Shuangxi, and Norriza Hussin. "Applied Research on Software Progress Measurement: Taking B2B Project of A Company as an Example." Business Administration and Management 2, no. 1 (2020): 4. http://dx.doi.org/10.18282/bam.v2i1.1081.

Full text
Abstract:
&lt;p&gt;Because of the limitations of Earned Value Management (EVM), there are great defects in managing software progress. Although Earned Schedule (ES) improves EVM, it is not reliable to utilize cost data to measure software progress. In 2014, Earned Duration Management (EDM), which is a new measurement method, was introduced. In this paper, via a practical case, the EDM method is used to measure the software progress.&lt;/p&gt;
APA, Harvard, Vancouver, ISO, and other styles
41

Nethravathi, P. S., and S. Aithal P. "A Study on Requirement Specifications and Modifications During the Software Development Life Cycle in M/S Kakunje Software Private Limited." International Journal of Case Studies in Business, IT, and Education (IJCSBE) 5, no. 2 (2021): 142–61. https://doi.org/10.5281/zenodo.5560269.

Full text
Abstract:
Background/Purpose: In order to face the challenge of optimization and allocation of necessary requirements to complete a project with in the allocated time period, the project manager must be efficient in applying different technical skills and managerial strategies to the project management process. In order to develop a software and mobile application product, a company schedules different process as per the specified order and unique requirements. As the history of project management reminds that most of the industries started to implement this concept by observing the success of mega engi
APA, Harvard, Vancouver, ISO, and other styles
42

Lu, Qiang, Longlong Mao, Bingjie Chai, and Jianbo Tan. "Visualization of Task Time Schedule Uncertainty in Project Management." Journal of Computer-Aided Design & Computer Graphics 30, no. 6 (2018): 1055. http://dx.doi.org/10.3724/sp.j.1089.2018.16718.

Full text
APA, Harvard, Vancouver, ISO, and other styles
43

Al-Gahtani, Khalid S., Ibrahim A. Al-Sulaihi, and Asif Iqupal. "Total float management: computerized technique for construction delay analysis." Canadian Journal of Civil Engineering 43, no. 5 (2016): 391–401. http://dx.doi.org/10.1139/cjce-2015-0434.

Full text
Abstract:
Developing a holistic and accurate delay analysis software is still challenging the current delay analysis practices. Most of the existing delay analysis techniques are not programmed and still depend on manual calculations. The currently available computerized delay analysis techniques are still limited, suffer from many drawbacks, and do not consider many of the delay analysis situations. This paper introduces web-based software called total float management (TFM) software for analyzing delay claim utilizing TFM delay analysis technique. The TFM technique depends on day-by-day analysis, whic
APA, Harvard, Vancouver, ISO, and other styles
44

Mishra, Debasisha, and Biswajit Mahanty. "The effect of onsite-offshore work division on project cost, schedule, and quality for re-engineering projects in Indian outsourcing software industry." Strategic Outsourcing: An International Journal 7, no. 3 (2014): 198–225. http://dx.doi.org/10.1108/so-06-2014-0010.

Full text
Abstract:
Purpose – The aim of this paper is to make an attempt to find good values of onsite–offshore team strength; number of hours of communication between business users and onsite team and between onsite and offshore team to reduce cost and improve schedule for re-engineering projects in global software development environment. Design/methodology/approach – The system dynamics technique is used for simulation model construction and policy run experimentation. The experts from Indian software outsourcing industry were consulted for model construction, validation and analysis of policy run results in
APA, Harvard, Vancouver, ISO, and other styles
45

Moon, Jayet. "An Investigation into the Use of Laney U Chart as a Visual Schedule Tracker to Graphically Monitor the Schedule Performance Index." Journal of Engineering, Project, and Production Management 10, no. 1 (2020): 35–41. http://dx.doi.org/10.2478/jeppm-2020-0005.

Full text
Abstract:
AbstractThe intent of this article is to explore a mathematically sound method to graphically monitor schedule performance index (SPI) such that it enables the project manager to take objective data based decisions regarding the progress of the project schedule. The article aims to leverage the theory and application of control charts, specifically the U chart and Laney U chart and test its applicability to earned value management by trending schedule performance index on a time series chart. Off the shelf software, MinitabTM was used to generate the control charts based on earned value and pl
APA, Harvard, Vancouver, ISO, and other styles
46

Et.al, Javed Iqbal. "The Effects of Agile Methodologies on Software Project Management in Pakistani Software Companies." Turkish Journal of Computer and Mathematics Education (TURCOMAT) 12, no. 3 (2021): 1717–27. http://dx.doi.org/10.17762/turcomat.v12i3.996.

Full text
Abstract:
Agile methodologies are always tends to increase the quality of software and also handling the complex software projects. However, the software companies in Pakistan have recently felt the disparity of producing successful software. In this context, an extensive survey has been conducted in 52 prominent software development companies of Pakistan to identify this remedy and the motivation behind this production discrepancy. It is revealed from the survey that there is a lack of empirical evidence in the relationship of agile methodologies with the effective and progressive management of softwar
APA, Harvard, Vancouver, ISO, and other styles
47

Zainab, Al-Hilali. "Expanding the functionality of learning management systems and analysis of the implementation results." Technology Audit and Production Reserves 1, no. 2(51) (2020): 40–43. https://doi.org/10.15587/2312-8372.2020.198855.

Full text
Abstract:
<em>An important function of the introduction of electronic learning systems and learning management is time management, or schedule. This function is undeservedly ignored by most systems of this class (LMS &ndash; Learning Management System), despite their relevance. This is especially true of systems of classical, full-time education in classes. So, the object of research is the learning management system, that is, the automation of the educational process management functions. One of the objectives of the learning planning process is scheduling. This work is dedicated to this very task.</em
APA, Harvard, Vancouver, ISO, and other styles
48

Abdulwahhab, Roa'a, Sepanta Naimi, and Raed Abdullah. "Managing Cost and Schedule Evaluation of a Construction Project via BIM Technology and Experts’ Points of View." Mathematical Modelling of Engineering Problems 9, no. 6 (2022): 1515–22. http://dx.doi.org/10.18280/mmep.090611.

Full text
Abstract:
This research examines the beneficial contributions of project management to manage the cost and schedule of construction projects providing higher accuracy and reliability levels. The study depended on two main research approaches quantitative (online survey questionnaires) and qualitative (interviews) research techniques. The questionnaires and interviews aim to predict the importance of BIM technology in managing the cost and schedule of construction projects. Also, a third research method is employed, which represents a case study of a building, to make a comparison in terms of accuracy, e
APA, Harvard, Vancouver, ISO, and other styles
49

Et al., Iqbal. "The Impact of Agile Methodologies and Cost Management Success Factors: An Empirical Study." Baghdad Science Journal 16, no. 2(SI) (2019): 0496. http://dx.doi.org/10.21123/bsj.2019.16.2(si).0496.

Full text
Abstract:
Software cost management is a significant feature of project management. As such, it needs to be employed in a project or line of work. Software cost management is integral to software development failures, which, in turn, cause software failure. Thus, it is imperative that software development professionals develop their cost management skills to deliver successful software projects. The aim of this study is to examine the impact of cost management success factors with project management factors and three agile methodologies – Extreme Programming (XP), Scrum and Kanban methodologies which are
APA, Harvard, Vancouver, ISO, and other styles
50

Lu, Zhou. "Construction of the 3D Reconstruction System of Building Construction Scene Based on Deep Learning." Scientific Programming 2021 (December 14, 2021): 1–9. http://dx.doi.org/10.1155/2021/5839391.

Full text
Abstract:
The increasing complexity and enormity of construction projects, as well as the fact that the actual operation of construction schedule management still mainly relies on traditional manual management methods, have led to low efficiency of construction schedule management and caused many construction projects to have cost overruns and legal disputes due to schedule delays. Existing 3D reconstruction algorithms often lead to significant voids, distortions, or blurred parts in the reconstructed 3D models, while the machine learning-based 3D reconstruction algorithms are often only to reconstruct