Academic literature on the topic 'Study plan'
Create a spot-on reference in APA, MLA, Chicago, Harvard, and other styles
Consult the lists of relevant articles, books, theses, conference reports, and other scholarly sources on the topic 'Study plan.'
Next to every source in the list of references, there is an 'Add to bibliography' button. Press on it, and we will generate automatically the bibliographic reference to the chosen work in the citation style you need: APA, MLA, Harvard, Chicago, Vancouver, etc.
You can also download the full text of the academic publication as pdf and read online its abstract whenever available in the metadata.
Journal articles on the topic "Study plan"
Andrew, Bottomley. "‘;It’s not what you study, it’s how you benefit from your study that interests us’." Planet 2, no. 1 (June 2001): 24–25. http://dx.doi.org/10.11120/plan.2001.00020024.
Full textLestari, Sri, Iwan Rijayana, Rae Virgana, Murnawan, Ucu Nugraha, Rosalin Samihardjo, and Siti Mardiana. "E-Gov Master Plan (Case Study: XYZ City)." International Journal of Psychosocial Rehabilitation 24, no. 02 (February 12, 2020): 3180–85. http://dx.doi.org/10.37200/ijpr/v24i2/pr200625.
Full textBurlingame, Harold W., and Michael J. Gulotta. "Case Study." Compensation & Benefits Review 30, no. 6 (November 1998): 25–31. http://dx.doi.org/10.1177/088636879803000605.
Full textHargrave, Emma. "Why study Geography, Earth and Environmental Sciences?" Planet 22, no. 1 (September 2009): 6–7. http://dx.doi.org/10.11120/plan.2009.00220006.
Full textWheeler, Anne, Chris Young, Ken Oliver, and John Smith. "Study skills enhancement through geography and environmental fieldwork." Planet 24, no. 1 (June 2011): 14–20. http://dx.doi.org/10.11120/plan.2011.00240014.
Full textGedye, Sharon. "Competition compilation: Why study Geography, Earth or Environmental Sciences?" Planet 22, no. 1 (September 2009): 8–9. http://dx.doi.org/10.11120/plan.2009.00220008.
Full textRoberts, S., J. Keane, C. Ward, and LJ Restrick. "Plan, Do, Study, Act." Physiotherapy 88, no. 12 (December 2002): 769. http://dx.doi.org/10.1016/s0031-9406(05)60736-5.
Full textBelt, Simon. "Problem Based Learning (PBL) - A Case Study From Environmental Sciences." Planet 4, no. 1 (November 2001): 17–18. http://dx.doi.org/10.11120/plan.2001.00040017.
Full textMcCarthy, John. "Overseas fieldwork and learning for spatial planning: a case study." Planet 10, no. 1 (June 2003): 10–12. http://dx.doi.org/10.11120/plan.2003.00100010.
Full textAnn, Worsley. "A pilot study using the mini-conference to externalise geo-assessment." Planet 2, no. 1 (June 2001): 25–26. http://dx.doi.org/10.11120/plan.2001.00020025.
Full textDissertations / Theses on the topic "Study plan"
Martins, Ana Virginia Feitosa. "COST HEALTH PLAN OPERATORS MANAGEMENT:CASE STUDY." Universidade Federal do CearÃ, 2009. http://www.teses.ufc.br/tde_busca/arquivo.php?codArquivo=16661.
Full textO serviÃo pÃblico de saÃde do Brasil fornece um atendimento precÃrio e nÃo eficaz à populaÃÃo, que, em muitos casos, opta pelos planos privados de saÃde. O setor à regulamentado pela AgÃncia Nacional de SaÃde que impÃe normas rÃgidas para o funcionamento das operadoras, aumentando as exigÃncias quanto ao nÃmero de procedimentos obrigatÃrios pelos planos, mas os reajustes das mensalidades, quando liberados, nÃo acompanham o crescimento dos custos. Com o intuito de investigar que estratÃgias poderÃo contribuir para a reduÃÃo de custos em operadoras de planos de saÃde, mantendo ou mesmo melhorando a qualidade dos serviÃos, dentro de uma metodologia qualitativa de estudo de casos Ãnico, o instrumento de coleta de dados e entrevista semiestruturada, alÃm da pesquisa bibliogrÃfica e documental. A anÃlise dos indicadores do estudo aponta que as estratÃgias principais para a reduÃÃo de custos das operadoras sÃo a utilizaÃÃo da Medicina preventiva terciÃria, denominada Home care, bem como a coparticipaÃÃo dos usuÃrios, com valores somados Ãs mensalidades, quando utilizam exames e consultas. Pode-se concluir que a anÃlise das estratÃgias aplicadas a operadoras de planos de saÃde, com resultados positivos, à um importante instrumento gerencial.
陽作軍 and Zuojun Yang. "A comparative study of structure plan in the UK and master plan in China." Thesis, The University of Hong Kong (Pokfulam, Hong Kong), 1998. http://hub.hku.hk/bib/B31259844.
Full textYang, Zuojun. "A comparative study of structure plan in the UK and master plan in China /." Hong Kong : University of Hong Kong, 1998. http://sunzi.lib.hku.hk/hkuto/record.jsp?B19907060.
Full textFoltýnová, Marie. "Podnikatelský plán." Master's thesis, Vysoká škola ekonomická v Praze, 2016. http://www.nusl.cz/ntk/nusl-262152.
Full textNorin, Petter. "Integration study for maintenance plan JAS 39 Gripen." Thesis, Mälardalen University, School of Innovation, Design and Engineering, 2008. http://urn.kb.se/resolve?urn=urn:nbn:se:mdh:diva-1063.
Full textTo be able to have control over the maintenance with today’s advanced fighter airplanes a durable system for technical publications is a must. This thesis is focused on problem areas when implementing PumaX for developing the maintenance plan for the Gripen fighter. Experience with PumaX as a tool exists and these have been analyzed to define specific problem areas. Because of too great extent four items were selected – customization, faulty data, quality assurance and serial status. Through examination of previous experiences theoretical solution suggestions has been developed. Schematics for corrective actions and a separate application were done to take care of the customization. In the application it was revealed that possible faulty data could also be corrected. An already existing web application within SAAB could be used for the review process. In this way any document in PumaX is quality assured and no new application has to be introduced for the task. After an analysis of how the serial status concept could be implemented it was revealed that not all functions in PumaX could be used when applying the serial status.
För att ha kontroll över underhållet med dagens avancerade stridsflygplan ett hållbart system för tekniska publikationer är ett måste. Denna uppsatts har fokuserats på problemområden vid införande av PumaX vid framtagande av underhållsplan till Gripen. Erfarenheter med PumaX som verktyg finns och dessa har analyserats för att definiera specifika problemområden. På grund av omfattningen valdes fyra punkter ut - kundanpassning, feldatahantering, kvalitetssäkring och seriestatus. Genom att undersöka tidigare erfarenheter har teoretiska lösningsförslag arbetats fram. Scheman för avhjälpande åtgärder och en separat applikation gjordes som tar hand om kundanpassningen. I samma applikation kom det fram att eventuell feldata likaså kunde korrigeras. En redan existerande web-applikation inom SAAB kunde användas för kvalitetssäkring. På detta sätt kan vilket dokument som helst i PumaX kvalitetssäkras och ingen ny applikation behövdes introduceras för uppgiften. Efter en analys av hur seriestatuskonceptet kunde implementeras kom det fram att inte alla funktioner i PumaX kunde användas vid applicering av seriestatus.
Kablitz, Antje Silke. "Grande Avenue Transportation Design Study: A Corridor Plan." Thesis, The University of Arizona, 2005. http://hdl.handle.net/10150/190219.
Full textLilley, Keith Douglas. "Medieval Coventry : a study in town-plan analysis." Thesis, University of Birmingham, 1994. http://ethos.bl.uk/OrderDetails.do?uin=uk.bl.ethos.402503.
Full textBonoldi, Aurelio Vittorio. "Distressed situation and renegotiation plan: a case study." reponame:Repositório Institucional do FGV, 2014. http://hdl.handle.net/10438/13111.
Full textRejected by Luana Rodrigues (luana.rodrigues@fgv.br), reason: Boa tarde Aurelio, Por gentileza, faça as seguintes alterações e depois poste o seu trabalho novamente: 1) O título do trabalho postado é "Distressed Situation and Renegotiation Plan: a Case Study Single case study of PlywoodCo", porém na ata o título foi escrito como "Distressed Situation and Renegotiation Plan: a Case Study". de acordo com as regras da FGV, o título deverá permanecer como escrito na ata. 2) O campo de concentração é relacionado ao professor, e também deve conter a mesma informação da ata. No caso do professor Lauro é ECONOMIA E FINANÇAS INTERNACIONAIS. Qualquer dúvida, estou a disposição. Atenciosamente, Luana de Assis Rodrigues Cursos de Pós-Graduação – Post Graduate Program (55 11) 3799-3492 SRA - Secretaria de Registros Acadêmicos on 2015-01-12T18:31:04Z (GMT)
Submitted by Aurelio Bonoldi (avbonoldi@gmail.com) on 2015-01-12T18:50:48Z No. of bitstreams: 1 Distressed Situation and Renegotiation Plan. a Case Study (Aurelio Bonoldi).pdf: 2123633 bytes, checksum: 1a6b2e1e321a967f0e8c4f5fabe6fcb3 (MD5)
Rejected by Luana Rodrigues (luana.rodrigues@fgv.br), reason: Olá Aurelio, Desculpe se não escrevi o título corretamente. O título que o seu trabalho deve ter é o seguinte: DISTRESSED SITUATION AND RENEGOTIATION PLAN: A CASE STUDY. Peço gentilmente, que retire o restante adicionado: Single case study of PlywoodCo. Desculpe o trantorno. Atenciosamente, Luana de Assis Rodrigues Cursos de Pós-Graduação – Post Graduate Program (55 11) 3799-3492 SRA - Secretaria de Registros Acadêmicos on 2015-01-12T20:15:36Z (GMT)
Submitted by Aurelio Bonoldi (avbonoldi@gmail.com) on 2015-01-12T21:23:04Z No. of bitstreams: 1 Distressed Situation and Renegotiation Plan. a Case Study (Aurelio Bonoldi).pdf: 2123633 bytes, checksum: 1a6b2e1e321a967f0e8c4f5fabe6fcb3 (MD5)
Rejected by Luana Rodrigues (luana.rodrigues@fgv.br), reason: Olá Aurelio, Desculpe a insistência, porém reparei que o título não foi alterado em nenhuma página. O título que o seu trabalho deve ter é o seguinte: DISTRESSED SITUATION AND RENEGOTIATION PLAN: A CASE STUDY. Peço gentilmente, que retire o restante adicionado: Single case study of PlywoodCo. Lamento pelo trantorno. Atenciosamente, Luana de Assis Rodrigues Cursos de Pós-Graduação – Post Graduate Program (55 11) 3799-3492 SRA - Secretaria de Registros Acadêmicos on 2015-01-13T19:42:16Z (GMT)
Submitted by Aurelio Bonoldi (avbonoldi@gmail.com) on 2015-01-13T20:03:52Z No. of bitstreams: 1 Distressed Situation and Renegotiation Plan. a Case Study (Aurelio Bonoldi).pdf: 2123291 bytes, checksum: b57b3da3dac34f2a5695b1b001ceeece (MD5)
Approved for entry into archive by Luana Rodrigues (luana.rodrigues@fgv.br) on 2015-01-14T11:21:26Z (GMT) No. of bitstreams: 1 Distressed Situation and Renegotiation Plan. a Case Study (Aurelio Bonoldi).pdf: 2123291 bytes, checksum: b57b3da3dac34f2a5695b1b001ceeece (MD5)
Made available in DSpace on 2015-01-14T11:29:00Z (GMT). No. of bitstreams: 1 Distressed Situation and Renegotiation Plan. a Case Study (Aurelio Bonoldi).pdf: 2123291 bytes, checksum: b57b3da3dac34f2a5695b1b001ceeece (MD5) Previous issue date: 2014-12-19
This work presents a real case of a company in a distressed situation: PlywoodCo. The objective of this work is to understand why PlywoodCo. got in its current distressed situation and, based on that, propose a financial renegotiation plan compatible to that situation in order to turn PlywoodCo. into a viable company. An introduction is made, in order to put the reader in touch with PlywoodCo., presenting its activities, main products, market position as well as briefly introducing the company’s current situation. Following the introduction, the literature review is displayed, describing the theory related to and applied in this work. Later, the methodology is presented, followed by further information on PlywoodCo.’s operations and financials, highlighting the company’s relationship with stakeholders, operational indexes, financial statements, debt schedule and depreciation schedule. Than the assumptions, analysis and projections are presented, consisting of two parts: (1) a diagnose section addressing PlywoodCo.’s current situation; and (2) a projections section, which will be divided in two further micro parts: (a) PlywoodCo.’s financial projections in the current debt schedule it is in; and finally (b) the financial situation of PlywoodCo. under the new proposed plan. Finally, it is concluded that PlywoodCo. will need further efforts besides the debt renegotiation in order to overcome its distress situation. After renegotiating the debt, the company will need R$ 23 MM until the end of 2013.
Este trabalho apresenta um caso real de uma empresa em situação de estresse financeiro: a PlywoodCo. O objetivo deste trabalho é de entender porque a PlywoodCo. chegou na atual situação de estresse e, baseado nisso, propor um plano de renegociação de passivos compatível com esta situação com o objetivo de tornar a PlywoodCo. em uma empresa viável. Uma introdução é feita, a fim de colocar o leitor em contato com a PlywoodCo., apresentado as suas atividades, principais produtos, posição de mercado, bem como brevemente introduzindo sua atual situação. Após a introdução, a revisão bibliográfica é apresentada, descrevendo a teoria relacionada e utilizada neste trabalho. Mais adiante, a metodologia é apresentada, seguida por mais informações a respeito das operações da PlywoodCo., informações financeiras, relacionamento com stakeholders, índices operacionais, demonstrações financeiras, cronograma de pagamento da dívida e depreciação. Depois, as premissas, analises e projeções não apresentadas, consistindo de duas partes: (1) uma seção de diagnóstico endereçando a atual situação da empresa; e (2) uma seção de projeção, que será dividida em duas partes: (a) projeções financeiras da PlywoodCo. na atual situação; e (b) projeções financeiras da PlywoodCo. no novo plano proposto. Finalmente, se conclui que a empresa precisará de esforços além da renegociação de passivos a fim de superar sua situação de estresse financeiro. Após a renegociação da dívida, a empresa precisará de R$ 23 MM até o fim de 2013.
JIASHEN, HAN, and JING NING. "Study on wedding photography and Strategic business plan for wedding photography Studi." Thesis, Högskolan i Borås, Institutionen Textilhögskolan, 2010. http://urn.kb.se/resolve?urn=urn:nbn:se:hb:diva-20170.
Full textProgram: Magisterutbildning i fashion management med inriktning modemarknadsföring
Swendsén, Susanne. "La influencia del Lgr11 en los libros de estudio, la enseñanza y la evaluación del ELE." Thesis, Linnéuniversitetet, Institutionen för utbildningsvetenskap (UV), 2014. http://urn.kb.se/resolve?urn=urn:nbn:se:lnu:diva-34267.
Full textBooks on the topic "Study plan"
Washington (State). Legislature. Joint Legislative Audit and Review Committee. Basic health plan study. Olympia, WA: Joint Legislative Audit and Review Committee, 2006.
Find full textWashington (State). Legislature. Joint Legislative Audit and Review Committee. Basic health plan study. Olympia, WA: Joint Legislative Audit and Review Committee, 2006.
Find full textInternational, KM. National transportation master plan study. [Windhoek]: Govt. of the Republic Namibia, Ministry of Works, Transport, and Communication, Dept. of Transport, 1998.
Find full textPacelli, Jane D. Study of coordinated retirement plan. New York, N.Y: Permanent Commission on Public Employee Pension and Retirement Systems, Executive Dept., State of New York, 1987.
Find full textUnited States. NOAA Estuarine Programs Office. NOAA Chesapeake Bay study plan. Washington, D.C: U.S. Dept. of Commerce, National Oceanic and Atmospheric Administration, NOAA Estuarine Programs Office, 1985.
Find full textRegion, Environment Agency Southern. EA Solent study pre-plan review. Swindon: Halcrow Maritime, 2000.
Find full textBook chapters on the topic "Study plan"
Nahler, Gerhard. "study plan." In Dictionary of Pharmaceutical Medicine, 177. Vienna: Springer Vienna, 2009. http://dx.doi.org/10.1007/978-3-211-89836-9_1348.
Full textvan der Ham, Vanessa. "Developing an action plan." In Analyzing a Case Study, 94–96. London: Macmillan Education UK, 2016. http://dx.doi.org/10.1007/978-1-137-56621-8_18.
Full textCasey, Francis. "How to Plan Your Study." In How to Study: A Practical Guide, 12–19. London: Macmillan Education UK, 1993. http://dx.doi.org/10.1007/978-1-349-13279-9_3.
Full textPreston, Samuel H., Irma T. Elo, Mark E. Hill, and Ira Rosenwaike. "Background and Plan of Study." In The Springer Series on Demographic Methods and Population Analysis, 1–8. Dordrecht: Springer Netherlands, 2003. http://dx.doi.org/10.1007/978-94-017-0325-3_1.
Full textBraithwaite, Jeffrey. "Plan, Do, Study, Act (PDSA)." In Implementation Science, 83–84. London: Routledge, 2022. http://dx.doi.org/10.4324/9781003109945-23.
Full textBlum, Dinur. "“The Importance of Having a Plan B”: Academic Personnel Who Work with Student-Athletes." In Sports, Study, or Sleep, 105–27. Cham: Springer International Publishing, 2020. http://dx.doi.org/10.1007/978-3-030-61326-6_6.
Full textSemenza, Gregory M. Colón. "The Structure of Your Graduate Career: An Ideal Plan." In Graduate Study for the Twenty-First Century, 31–45. New York: Palgrave Macmillan US, 2005. http://dx.doi.org/10.1057/9781403979346_3.
Full textSemenza, Gregory M. Colón. "The Structure of Your Graduate Career: An Ideal Plan." In Graduate Study for the Twenty-First Century, 39–53. New York: Palgrave Macmillan US, 2010. http://dx.doi.org/10.1057/9780230105805_3.
Full textAnjana, G. Nair, and B. R. Beena. "Study of Plan Irregularity on Different Seismic Zones." In Lecture Notes in Civil Engineering, 373–78. Cham: Springer International Publishing, 2021. http://dx.doi.org/10.1007/978-3-030-80312-4_33.
Full textComan, Alexandra, and Héctor Muñoz-Avila. "Diverse Plan Generation by Plan Adaptation and by First-Principles Planning: A Comparative Study." In Case-Based Reasoning Research and Development, 32–46. Berlin, Heidelberg: Springer Berlin Heidelberg, 2012. http://dx.doi.org/10.1007/978-3-642-32986-9_5.
Full textConference papers on the topic "Study plan"
Yu, Xinshuo, and Yun Jiang. "Study on the Construction Plan of Wuqiangxi Intelligent Hydropower Plant." In 2018 China International Conference on Electricity Distribution (CICED). IEEE, 2018. http://dx.doi.org/10.1109/ciced.2018.8592107.
Full textHerrera, David, Jose Avelino, Joaquin Sanchez, Oscar Diaz, Abraham Galan, Cesar E. Bravo, Jose Rodriguez, and Mario Torre. "Automation Master Plan Framework: Case Study." In SPE Latin America and Caribbean Petroleum Engineering Conference. Society of Petroleum Engineers, 2012. http://dx.doi.org/10.2118/152675-ms.
Full textNessy, Errine, and Ning Rahayu. "Analysis of BEPS Action Plan 2 Recommendations in Indonesia." In Journal of Contemporary Accounting and Economics Symposium 2018 on Special Session for Indonesian Study. SCITEPRESS - Science and Technology Publications, 2018. http://dx.doi.org/10.5220/0007018005470557.
Full textTsai, Tzong-Ru, and Y. L. Lio. "Study for Reaching a Degradation Test Plan." In International Conference on Industrial Application Engineering 2016. The Institute of Industrial Applications Engineers, 2016. http://dx.doi.org/10.12792/iciae2016.010.
Full textHuang, Zhenkan. "Study in Estimation of Course Teaching Plan." In The International Symposium on the Analytic Hierarchy Process. Creative Decisions Foundation, 1988. http://dx.doi.org/10.13033/isahp.y1988.061.
Full textJian, Chen, and Teng Zhe. "Study on Operational Plan by Case-Based-Reasoning." In 2016 International Conference on Robots & Intelligent System (ICRIS). IEEE, 2016. http://dx.doi.org/10.1109/icris.2016.85.
Full textChakraborti, Tathagata, Sarath Sreedharan, Sachin Grover, and Subbarao Kambhampati. "Plan Explanations as Model Reconciliation -- An Empirical Study." In 2019 14th ACM/IEEE International Conference on Human-Robot Interaction (HRI). IEEE, 2019. http://dx.doi.org/10.1109/hri.2019.8673193.
Full textLee, Chang-Seop, Jang Ho Bae, and Dae Hie Hong. "A Study on Working Plan of Intelligent Excavator." In 28th International Symposium on Automation and Robotics in Construction. International Association for Automation and Robotics in Construction (IAARC), 2011. http://dx.doi.org/10.22260/isarc2011/0183.
Full textWang, Jiading. "Study on the construction progress plan in Urumqi." In 2017 3rd International Forum on Energy, Environment Science and Materials (IFEESM 2017). Paris, France: Atlantis Press, 2018. http://dx.doi.org/10.2991/ifeesm-17.2018.317.
Full textLu, Yan, and Jianjun Dong. "Urban Rail Transit Plan System Study in China." In Second International Conference on Transportation Engineering. Reston, VA: American Society of Civil Engineers, 2009. http://dx.doi.org/10.1061/41039(345)400.
Full textReports on the topic "Study plan"
Norris, A. E. Study plan for water movement test: Site Characterization Plan Study 8.3.1.2.2.2. Office of Scientific and Technical Information (OSTI), September 1989. http://dx.doi.org/10.2172/137509.
Full textSommer, D. J., D. L. Flyckt, V. G. Johnson, A. G. Law, and J. C. Sonnichsen. Liquid effluent study project plan. Office of Scientific and Technical Information (OSTI), June 1989. http://dx.doi.org/10.2172/6110566.
Full textFreeman, H. D., G. W. Gee, and J. F. Relyea. Field study plan for alternate barriers. Office of Scientific and Technical Information (OSTI), May 1989. http://dx.doi.org/10.2172/5988559.
Full textShrestha, Prateek, Mark Ternes, and Jason DeGraw. Experimental Plan for the Vermiculite Study. Office of Scientific and Technical Information (OSTI), December 2020. http://dx.doi.org/10.2172/1843722.
Full textCharboneau, B. L., and J. L. Landon. In Situ Vitrification Treatability Study Work Plan. Office of Scientific and Technical Information (OSTI), March 1989. http://dx.doi.org/10.2172/6302984.
Full textBerry, L. G., M. A. Brown, T. Wright, and D. L. White. Experimental plan for the Single-Family Study. Office of Scientific and Technical Information (OSTI), September 1991. http://dx.doi.org/10.2172/5297870.
Full textTernes, M. P., W. P. Levins, and M. A. Brown. Experimental plan for the fuel-oil study. Office of Scientific and Technical Information (OSTI), January 1992. http://dx.doi.org/10.2172/5664455.
Full textGarfield, J. Single-shell tank systems engineering study work plan. Office of Scientific and Technical Information (OSTI), January 1990. http://dx.doi.org/10.2172/7172927.
Full textMousseau, J. D. Pad A Treatability Study long-range project plan. Office of Scientific and Technical Information (OSTI), August 1991. http://dx.doi.org/10.2172/6081317.
Full textWard, Anderson L., and Glendon W. Gee. Vadose Zone Transport Field Study FY 2003 Test Plan. Office of Scientific and Technical Information (OSTI), April 2003. http://dx.doi.org/10.2172/15010200.
Full text