To see the other types of publications on this topic, follow the link: Systematic Layout Planning.Production process.

Journal articles on the topic 'Systematic Layout Planning.Production process'

Create a spot-on reference in APA, MLA, Chicago, Harvard, and other styles

Select a source type:

Consult the top 50 journal articles for your research on the topic 'Systematic Layout Planning.Production process.'

Next to every source in the list of references, there is an 'Add to bibliography' button. Press on it, and we will generate automatically the bibliographic reference to the chosen work in the citation style you need: APA, MLA, Harvard, Chicago, Vancouver, etc.

You can also download the full text of the academic publication as pdf and read online its abstract whenever available in the metadata.

Browse journal articles on a wide variety of disciplines and organise your bibliography correctly.

1

Sucahyo, Dito Samudera, and Rusindiyanto Rusindiyanto. "Redesign Of Machine Layout Using Systematic Layout Planning Method." Journal La Multiapp 5, no. 6 (2024): 910–22. https://doi.org/10.37899/journallamultiapp.v5i6.1701.

Full text
Abstract:
Optimizing the production process is one of the things that needs to be considered in a factory. Machines play an important role in the production process because they function as the main tool in the production process. Rearrangement is carried out to obtain the smallest distance in moving raw materials in the production process. By rearranging the machine using the systematic layout planning method. The latest distance value was obtained at 60,865, which was originally 63,905. Therefore, making a machine layout can be done using the proposed layout.
APA, Harvard, Vancouver, ISO, and other styles
2

Watanapa, Anucha, and Wisitsree Wiyaratn. "Systematic Layout Planning to Assist Plant Layout: Case Study Pulley Factory." Applied Mechanics and Materials 110-116 (October 2011): 3952–56. http://dx.doi.org/10.4028/www.scientific.net/amm.110-116.3952.

Full text
Abstract:
In this study, the application of a systematic plant layout planning (SLP) to assist the optimum design of process areas and locations is proposed. The number of machines and space requirement in pulley factory is determined. The operation process chart, flow of material and activity relationship chart have been investigated. The relationships between machines, operation sections and material flow are used to determine the suitable position of each activity. The SLP method has been employed to design the two alternative plant layouts and compare the performances between new layout and present
APA, Harvard, Vancouver, ISO, and other styles
3

Badharinath, E., V. Diwakar Reddy, P. Sravan Kumar, and A. K. Damodaram. "Optimization of Manufacturing Plant Layout Using Systematic Layout Planning (SLP) Method." MATEC Web of Conferences 393 (2024): 01005. http://dx.doi.org/10.1051/matecconf/202439301005.

Full text
Abstract:
The plant shop floor layout of a company manufactures gear bush is analysed in this study along with the application of the systematic layout planning (SLP) technique as a means of resolving the issue.The interaction between machines, operational tasks, and material flow is taken into consideration when deciding where each machine should be placed. The relationship between machines and plant area has looked into in detail, together with the activity relationship chart, process chart and plant layout. The proposed production shop floor plan was designed using the SLP technique, and the performa
APA, Harvard, Vancouver, ISO, and other styles
4

Wisnu Alfian Majid and Andung Jati Nugroho. "ANALISIS TATA LETAK ALAT PRODUKSI BUKU TAHUNAN MENGGUNAKAN SYSTEMATIC LAYOUT PLANNING (SLP) DAN BLOCPLAN (STUDI KASUS: CV RENJANA OFFSET)." JURNAL ILMIAH TEKNIK INDUSTRI DAN INOVASI 1, no. 3 (2023): 32–39. http://dx.doi.org/10.59024/jisi.v1i3.319.

Full text
Abstract:
A good facility layout will affect the smooth production process. Preliminary observations on CV Renjana Offset are still not good enough to apply because they do not take into account the degree of closeness. This can be seen from the location of the machine and work stations that look far apart and the existence of intersecting material flows resulting in backtracking, such as the printing work station to the coating work station, the material transfer distance is 12.4 m and has to pass through the garden and back of the CV Renjana Offset office with distances that are too long cause the pro
APA, Harvard, Vancouver, ISO, and other styles
5

Utomo, Disworo Prayogo, Setyo Adji, and Dwi Warni Wahyuningsih. "PENERAPAN LAYOUT DENGAN METODE SYSTEMATIC LAYOUT PLANNING DALAM MENINGKATKAN KELANCARAN PRODUKSI PADA UD.TEMON RAYA KABUPATEN PACITAN." Bussman Journal : Indonesian Journal of Business and Management 2, no. 3 (2022): 564–73. http://dx.doi.org/10.53363/buss.v2i3.80.

Full text
Abstract:
The purpose of this research is to determine the layout of the production facilities implemented by UD Temon Raya Pacitan Regency, and then Relayout is performed using the Systematic Layout Planning (SLP) method. This study employs descriptive quantitative methods or descriptive survey research, with data obtained through observations, documentation, and interviews with parties who understand the data required. Based on the results of UD's initial Layout effectiveness test. Temon Raya has a 29.9 % application effectiveness value, with a daily production capacity of 200 pcs and 11 main work sta
APA, Harvard, Vancouver, ISO, and other styles
6

Dresanala, Meiliza, Shanty Kusuma Dewi, and Dana Marsetiya Utama. "Sustainable Layout Design Based on Integrated Systematic Layout Planning and TOPSIS: A Case Study." Jurnal Teknik Industri 24, no. 1 (2023): 51–64. http://dx.doi.org/10.22219/jtiumm.vol24.no1.51-64.

Full text
Abstract:
This research applies the concept of sustainable layout in the manufacturing industry by incorporating social, environmental, and economic aspects in the production process. The main objective of this research is to design a sustainable layout for the plastic packaging manufacturing industry. The approach utilizes the TOPSIS method to select an Activity Relation Chart (ARC) integrated with a systematic Layout Planning procedure. A case study is presented on an industry that produces plastic packaging in Indonesia. The results show that the proposed sustainable layout design significantly reduc
APA, Harvard, Vancouver, ISO, and other styles
7

Ahmad Bayu Laksono and Joumil Aidil Saifuddin. "Perancangan Ulang Tata Letak Fasilitas Workshop Fabrikasi Dengan Metode Systematic Layout Planning Di PT ABC." Jurnal Kendali Teknik dan Sains 1, no. 3 (2023): 07–22. http://dx.doi.org/10.59581/jkts-widyakarya.v1i3.551.

Full text
Abstract:
PT. ABC is a manufacturing company whose production line is railroad components. In the production process, there is backtracking in the production process so that the production process is less efficient. The purpose of this research is to compare the initial material handling layout mileage with the proposed layout. This study uses the Systematic Layout Planning (SLP) method to determine the layout proposals that will be provided with the help of Blocplan software. From the proposed layout, the total distance traveled for the passenger seat production process is 402.8 meters and at 277.8 met
APA, Harvard, Vancouver, ISO, and other styles
8

Kholidasari, Inna, Yulia Sridewi Syahri, and Susanti Sundari. "PENERAPAN METODE SYSTEMATIC LAYOUT PLANNING UNTUK MEMINIMASI JARAK PERPINDAHAN MATERIAL PADA UKM X." Industrika : Jurnal Ilmiah Teknik Industri 7, no. 1 (2023): 93–102. http://dx.doi.org/10.37090/indstrk.v7i1.943.

Full text
Abstract:
Proper layout arrangements can have an impact on minimizing the distance and time of the production process. The research was conducted at UKM X which produces fish-based snacks in Jambi Province where there is a back and forth flow in work activities due to the placement of work stations that are not in the order of the process flow and the placement of each process in a different room resulting in an increase in both working time and distance required in the production process. The purpose of this research is to re-design the layout of production process facilities in minimizing the distance
APA, Harvard, Vancouver, ISO, and other styles
9

Gunawan, Akilla Alfrets Deanoffa, and Handy Febri Satoto. "Relayout Area Divisi Oven dengan Metode Systematic Layout Planning (SLP) PT. XYZ." Jurnal Surya Teknika 11, no. 2 (2024): 717–24. https://doi.org/10.37859/jst.v11i2.8303.

Full text
Abstract:
PT. XYZ is a manufacturing company engaged in the production of notebooks and chemicals. This study aims to improve production efficiency in the oven division of PT. XYZ, especially on the SS-29 oven machine, by implementing the Lean Manufacturing and Systematic Layout Planning (SLP) methods. This study begins with an analysis of initial conditions that show various wastes, including excess material transfer, waiting time, and inefficient operator movements. The SLP approach is used to analyze the initial layout and design alternative new layouts by considering the results of the Activity Rela
APA, Harvard, Vancouver, ISO, and other styles
10

Flessas, Milena, Vinicius Rizzardi, Guilherme Luz Tortorella, Diego Fettermann, and Giuliano Almeida Marodin. "Layout performance indicators and systematic planning." British Food Journal 117, no. 8 (2015): 2098–111. http://dx.doi.org/10.1108/bfj-01-2015-0012.

Full text
Abstract:
Purpose – The purpose of this paper is to plan the layout of the production area of an industrial kitchen of a theme restaurant through the application of the systematic layout planning (SLP) methodology and the establishment of layout indicators with a specific application in the restaurant business. Design/methodology/approach – The authors applied the SLP methodology in the industrial kitchen of a theme restaurant in order to plan and develop layout alternatives. Such layout alternatives were then evaluated according to a set of specific indicators consolidated based on a literature review.
APA, Harvard, Vancouver, ISO, and other styles
11

Nurkertamanda, Denny, Yusuf Widharto, and Lovena Oki Oktavian. "FACILITY LAYOUT DESIGN FOR CV. JULANG MARCHING WITH SYSTEMATIC LAYOUT PLANNING METHOD." International Journal of Applied Science and Engineering Review 04, no. 06 (2023): 35–44. http://dx.doi.org/10.52267/ijaser.2023.4603.

Full text
Abstract:
CV Julang Marching is one of the local companies engaged in the manufacture and service of drum band / marching band musical instruments. CV Julang Marching has not been able to fulfill Marching Bell and Carrier product orders in a timely manner because the layout of the production area is less effective according to interviews with company owners. This is caused by the material handling time is too long because of the distance between far areas. In addition, material handling costs have not been considered in the total operating costs at CV Julang Marching. Therefore, it is necessary to impro
APA, Harvard, Vancouver, ISO, and other styles
12

Galuh Meistuti Kusuma Prasasti, Febrina Agusti, and Garnet Filemon Waluyono. "Usulan Perancangan Tata Letak Fasilitas Bengkel Las Dengan Metode Systematic Layout Planning." Jurnal Rekayasa Proses dan Industri Terapan 1, no. 3 (2023): 262–75. http://dx.doi.org/10.59061/repit.v1i3.398.

Full text
Abstract:
Welding workshop is a business engaged in iron and mild steel welding services. The welding workshop, which has been established since 2000 until now, often produces flower pot racks of various shapes and sizes. In the initial observation, production activities were carried out less than optimally due to the inefficiency of moving material, the distance of movement, causing delays in product processing. In this study the method used by researchers is the systematic layout planning method with the aim of producing a more efficient flow through layout design by paying attention to the sequence o
APA, Harvard, Vancouver, ISO, and other styles
13

Anas Saifurrahman, Yun Prihantina Mulyani, Annisa Dewi Akbari, and Ahmad Arwyn Imamur Rozi. "Production Layout Design for Modified Cassava Flour-Based Product." Jurnal Inotera 8, no. 1 (2023): 187–97. http://dx.doi.org/10.31572/inotera.vol8.iss1.2023.id236.

Full text
Abstract:
Having an increasing trend in demand for healthy food and the government's support in meeting the cassava needs, this study aims to improve the scale of production of Modified Cassava Flour (MOCAF) by applying the systematic layout planning (SLP) method. This method is used to review the existing conditions of the production process and design a new layout for scaling up production. The result of the new layout is an ideal condition and a stable production target, but it is implemented gradually. By adopting systematic layout planning, it is expected to improve production efficiency and optimi
APA, Harvard, Vancouver, ISO, and other styles
14

Fadilah, Alif Radzaki, and Winarno Winarno. "Rekayasa Ulang Lantai Produksi PT. X dengan Metode Systematic Layout Planning." Industrika : Jurnal Ilmiah Teknik Industri 9, no. 2 (2025): 283–94. https://doi.org/10.37090/indstrk.v9i2.1612.

Full text
Abstract:
PT X is a company that can produce and engineer machine tools engaged as a manufacturer of agricultural, livestock, plantation, and fishery machine tools. The arrangement of the layout of the production facility from the work environment (production floor) greatly affects the production process activities to run well. The increase in productivity of the company is driven by every interested party in it. With the results of these improvements, it will certainly encourage the level of performance, productivity, and quality of the products produced with the minimum possible production costs expec
APA, Harvard, Vancouver, ISO, and other styles
15

Sekarningtyas, Hikmah, Iqbal Faza, Rohmad Kafidzin, and Iwan Prasetyo. "Redesign Layout of Production Facilities Using Systematic Layout Planning and ARC Methods at UMKM Bill Bakerykoe." Jurnal Logistik Indonesia 8, no. 1 (2024): 31–41. http://dx.doi.org/10.31334/logistik.v8i1.3602.

Full text
Abstract:
Bill Bakerykoe is one of the UMKM operating in the food sector in Kudus, with the main production being Donat and Roti Manis. Based on observations, UMKM do not yet have a good work area arrangement. In carrying out bread production activities, using the current layout of production facilities, it was found that the arrangement of the work areas was not in accordance with the sequence of the production process flow from the initial process to the final process. Thus, there was repetition in passing through production areas that should not have been time to pass. The work stations observed were
APA, Harvard, Vancouver, ISO, and other styles
16

Fajar Hafidin, Muhammad, and Asep Erik Nugraha. "Analisis Dan Usulan Perencanaan Tata Letak Pabrik Bagian Produksi Menggunakan Metode Systematic Layout Planning (SLP) Di PT.ABC." Industrika : Jurnal Ilmiah Teknik Industri 7, no. 2 (2023): 161–71. http://dx.doi.org/10.37090/indstrk.v7i2.964.

Full text
Abstract:
Good factory layout planning is one of the factors that can increase company productivity. Layout is a facility design, layout analysis, concept formation, as well as the embodiment of the system for making goods or services. Applying a good layout in a company can cut the time needed in a production process and also reduce the energy that must be expended by workers. This research was conducted at PT. ABC is part of the Drivetrain Unit Department located in the Bukit Indah City Industrial Area, Purwakarta, West Java. The object to be observed is the layout of the factory for the production of
APA, Harvard, Vancouver, ISO, and other styles
17

Kumar, Vijay, and V. Naga Malleswari. "Improvement of facility layout design using Systematic Layout planning methodology." Journal of Physics: Conference Series 2312, no. 1 (2022): 012089. http://dx.doi.org/10.1088/1742-6596/2312/1/012089.

Full text
Abstract:
Abstract A plant layout design is one of the essential tasks for improving industry performance and the wellbeing of the production process. Kharagpur railway station is one of the biggest railway stations in INDIA, and the motorcoach shop is one of the workshops for the maintenance and repairing of the coaches. This workshop consists of the various department for serving the purpose of repairing works. Around ninety employees work for maintenance which comes for repair and maintenance work. It observed that the working area spread through the space and did not utilize it to the maximum extent
APA, Harvard, Vancouver, ISO, and other styles
18

Ariel, G. Cabildo, Marie S. Figueroa Ayezza, John V. Angeles Emmanuel, B. Pajarillaga Jaypee, and E. Pascual Lorinda. "Productivity Improvement through the Systematic Application of Facility Layout Planning in a SmallScale Woodcraft Manufacturing Industry." International Journal of Engineering and Advanced Technology (IJEAT) 9, no. 4 (2020): 244–55. https://doi.org/10.35940/ijeat.D6793.049420.

Full text
Abstract:
the study’s goal is to help increase the productivity of the company by introducing a systematic layout plan in production department of VENRON Wood Home Craft Manufacturing Industry. Systematic Layout Planning application is the focus of the study to help improve productivity in the company an evaluation and workflow analysis to the current layout was used to identify the problems the company is experiencing using a fishbone diagram to represent it. A conceptual framework using IPO model was divided into several inputs and processes needed in proposing alternative layout. Process time s
APA, Harvard, Vancouver, ISO, and other styles
19

Meiliati, Herriyzka, Nazaruddin Nazaruddin, Muhammad Ihsan Hamdy, Muhammad Nur, and Suherman Suherman. "Facility Layout Design at ‘MIRASA’ Crackers SMEs Using Systematic Layout Planning Method and Blocplan Algorithm." INTECOMS: Journal of Information Technology and Computer Science 8, no. 1 (2025): 80–88. https://doi.org/10.31539/intecoms.v8i1.14239.

Full text
Abstract:
The cracker industry is a food processing industry that is spread across various regions in Indonesia, one of which is Small and Medium Industry (SMEs) Crackers ‘MIRASA’ Pekanbaru. At SMEs MIRASA Crackers there is a layout placement that is not in accordance with the production flow. This causes a decrease in productivity in SMEs where production activities become inefficient so that it takes a lot of time in the production process and there are bottlenecks at several stations. In designing the layout in this study, the Systematic Layout Planning (SLP) and BLOCPLAN methods were used to produce
APA, Harvard, Vancouver, ISO, and other styles
20

Winarno, Edi, and Putu Dana Karningsih. "OPTIMALISASI TATA LETAK PABRIK PADA PROSES PENGECATAN DI PT INKA (Persero) MENGGUNAKAN METODE SYSTEMATIC LAYOUT PLANNING (SLP)." CAPITAL: Jurnal Ekonomi dan Manajemen 8, no. 1 (2024): 130. http://dx.doi.org/10.25273/capital.v8i1.20527.

Full text
Abstract:
<p><em>PT INKA (Persero) has experienced significant product development but faces issues with delivery delays. One of the causes is waste in the transportation process related to the factory layout. Re-layout is needed to improve efficiency. This study uses the Systematic Layout Planning (SLP) method to identify and analyze company data and create the best layout alternatives. The results show that alternative layout 1 with rail is the most suitable for painted passenger/engine cars, unpainted passenger/engine cars, and freight wagons. Alternative layout 1 provides high efficiency
APA, Harvard, Vancouver, ISO, and other styles
21

Moengin, Parwadi, Rahmatika Renanda Riyadina, and Debbie Kemala Sari. "Perbaikan Tata Letak Lantai Produksi Menggunakan Metode Simulasi dan Systematic Layout Planning untuk Meminimasi Waktu Produksi di PT. Lestari Teknik Plastikatama." JURNAL TEKNIK INDUSTRI 9, no. 3 (2019): 136–44. http://dx.doi.org/10.25105/jti.v9i3.6566.

Full text
Abstract:
Intisari— PT. Lestari Teknik Plastikatama merupakan perusahaan industri fabrikasi yang bergerak pada bidang dies, press, welding serta pada bidang manufaktur dalam pembuatan spare part kendaraan bermotor di Indonesia. Permasalahan yang terdapat pada lantai produksi perusahaan adalah waktu proses produksi yang lama. Waktu proses produksi yang lama disebabkan oleh jarak perpindahan antar mesin yang jauh. Produk yang diteliti yaitu Arm Side Stand 2PH-F7331-00. Tujuan penelitian ini adalah diperolehnya evaluasi dan usulan perbaikan tata letak dengan pendekatan simulasi serta metode Systematic Layo
APA, Harvard, Vancouver, ISO, and other styles
22

Liao, Zhongqing, Ming Cong, Dong Liu, and Fanjie Meng. "Using simulation in layout verification of solar module assembly workshop." International Journal of Modeling, Simulation, and Scientific Computing 09, no. 02 (2018): 1850017. http://dx.doi.org/10.1142/s1793962318500174.

Full text
Abstract:
Facility layout problem (FLP) contemplates the optimization of space utilization, costs, and material flow. Commercial simulation softwares are commonly used to validate layouts by simulating the real world material flow and production process. To validate a layout scenario of a solar module assembly workshop, a 3D simulation model is presented which was designed on VisualComponents software. To begin with, we introduce the layout characteristics and use the systematic layout planning (SLP) method to design the block layout of workshop. Then, we built components library which contains all the
APA, Harvard, Vancouver, ISO, and other styles
23

Dos Reis, Gilmara, and Edinaldo José de S. Cunha. "Optimization Of the Manufacturing Process for School Portfolios Through the Implementation of The Cellular Layout." International Journal for Innovation Education and Research 9, no. 11 (2021): 515–27. http://dx.doi.org/10.31686/ijier.vol9.iss11.3544.

Full text
Abstract:
One of the most common problems encountered in the manufacturing process is improper layout. About 30% of production time is wasted on transporting materials and products. The causes of this waste are problems in the disposition of stock and machines in production, that is, in the factory layout production of school desks became more efficient with the use of the cell layout. The result found was that with the implementation of the cell layout, there was an increase in the number of wallets produced and a reduction in the waste of materials. It is concluded that the. In this context, the produ
APA, Harvard, Vancouver, ISO, and other styles
24

Erwanda, Rio. "Layout Design of Copra Factory Facilities in Small and Medium Industry Centers Using Systematic Layout Planning Method." Jurnal Riset Ilmu Teknik 1, no. 2 (2023): 115–27. http://dx.doi.org/10.59976/jurit.v1i2.13.

Full text
Abstract:
This research was conducted on the layout of copra processing facilities. Copra is one of the products to be produced by the Small and Medium Industry Center in the Meranti Islands. The purpose of designing the layout of this copra factory facility is to provide a proposal in the form of a copra processing facility layout with the shortest material handling distance. The methods used in this study are Systematic Layout Planning (SLP) and Arena Simulation. The result of the SLP method is in the form of alternative layout proposals, which will be checked with a simulation model. This Arena simul
APA, Harvard, Vancouver, ISO, and other styles
25

Silva, Ana Beatriz Locateli de Oliveira, Fernanda de Souza Linhares, and Marina Ribeiro Martins. "RESEARCH OF THE SLP METHOD TO IMPROVE THE LAYOUT OF AN ICE CREAM FACTORY." RINTERPAP - Revista Interdisciplinar de Pesquisas Aplicadas 1, no. 2 (2021): 31–57. http://dx.doi.org/10.47682/2675-6552.a2021v1n2p31-57.

Full text
Abstract:
The problems of physical arrangement for the organizations are relevant when have space and material movements limitations. Reviewing layouts is a way to improve the industrial production process. Therefore, the objective of this present academic work is to propose a layout for an ice cream factory's production, considering analysis of alternatives to increase productivity. The Systematic Layout Planning (SLP) Simplified method was used as the main tool for the construction of the layout proposal. A case study was carried out which investigates a phenomenon within a real context through an in-
APA, Harvard, Vancouver, ISO, and other styles
26

Yang, Ke. "Layout optimization of signal control box production line based on SLP." E3S Web of Conferences 253 (2021): 02090. http://dx.doi.org/10.1051/e3sconf/202125302090.

Full text
Abstract:
Taking the production process of the signal control box as the research object, aiming at the problem of the unreasonable layout of the production line, the Systematic Layout Planning (SLP) method is used to obtain the relationship and position relationship diagrams between the various operation units, and the optimal layout plan is given, combined with the factory building Conditions and funding constraints, determined and implemented the production layout improvement plan, reduced the material handling distance, shortened the delivery cycle, and realized the rapid delivery of products.
APA, Harvard, Vancouver, ISO, and other styles
27

Adiasa, Iksan, and Ismi Mashabai. "Perancangan Ulang Tata Letak Fasilitas Menggunakan Metode Systematic Layout Planning (SLP) Dengan Alogaritma Blocplan Di UD Wijaya Samawa." Industrika : Jurnal Ilmiah Teknik Industri 8, no. 1 (2024): 54–66. http://dx.doi.org/10.37090/indstrk.v8i1.1081.

Full text
Abstract:
Fish is the product of various types of natural resources and is widely consumed by most people. Based on data obtained from the Office of Maritime Affairs and Fisheries of West Nusa Tenggara, Sumbawa is ranked second in West Nusa Tenggara as an area with high potential in the world of fisheries and it is very likely that many people will be involved in the world of fisheries. One of the fish supply companies located in the city of Sumbawa is UD Wijaya Samawa. This company is engaged in catching, processing and selling fish. However, in the fish packaging production process, there are problems
APA, Harvard, Vancouver, ISO, and other styles
28

Matulja, Tin, Marko Hadjina, and Damir Kolić. "Shipyard Production Processes Re-Design Methodology Based on Expert Approach and Simulation Modeling." Journal of Maritime & Transportation Science 51, no. 1 (2016): 25–41. http://dx.doi.org/10.18048/2016.51.02.

Full text
Abstract:
The authors propose a synergy of expert approach methods through the Systematic layout planning (SLP) and Analytic Hierarchy Process (AHP) as tools for the shipyard production process design towards an optimal material flow, in combination with Simulation modeling (SM). Most production process designs are based on the conventional methodology of comparison initiating with benchmarking. Such approach can be misleading. For more reliable and efficient results, the approach suggested by the authors uses a combination of the mentioned three methods within the frame of an expert approach. Firstly,
APA, Harvard, Vancouver, ISO, and other styles
29

Aparecida dos Santos Mesquita, Elisângela, Gabrielle Batalini dos Santos, Thomas Henrique Alves da Cruz, and Rafael Medeiros Hespanhol. "LAYOUT EM NOVOS EMPREENDIMENTOS: ESTUDO DE CASO DE UMA PROCESSADORA DE CAFÉS ESPECIAIS." COLLOQUIUM EXACTARUM 10, Especial (2018): 120–26. http://dx.doi.org/10.5747/ce.2018.v10.nesp.000168.

Full text
Abstract:
The process of develop a production layout is one of the key aspects of creating a new company, regardless of its market segment. This study aims to develop a facility layout for arabica coffee processing. Quantitative and qualitative data were analyzed through the SLP (Systematic Layout Planning) method, for this purpose, a research of the necessary equipment was developed, regarding its dimensions and production capacity. Was also considered the six principles of layout optimization. The result was a layout proposal, with an array of equipment following the principle of arrangement by proces
APA, Harvard, Vancouver, ISO, and other styles
30

Kalim, Nur, and Lukmandono. "Minimizing Material Handling Costs with the SLP Method and Material Transport Equipment in Steel Pipe Companies." PROZIMA (Productivity, Optimization and Manufacturing System Engineering) 4, no. 2 (2021): 10–16. http://dx.doi.org/10.21070/prozima.v4i2.1310.

Full text
Abstract:
Factors that influence the amount of material handling costs are the distance of material movement, methods, and tools (equipment) used. The distance of material movement is strongly influenced by the layout of the production facility. The new layout design using the SLP method is expected to reduce the distance of material or product movement in PT. A B C. From the analysis results obtained the total distance of material transfer at the initial layout of the production process at PT. ABC of 1761 meters / month with material handling costs of Rp. 315,390,000.00 / month. Then an analysis of the
APA, Harvard, Vancouver, ISO, and other styles
31

Xu, Jun Hao, Hong Bing Yang, Zai Liang Chen, Fang Yan Mao, and Hong Tao Wang. "Layout Optimization for Welding Workshop of Vehicle Door Based on SLP." Applied Mechanics and Materials 459 (October 2013): 356–60. http://dx.doi.org/10.4028/www.scientific.net/amm.459.356.

Full text
Abstract:
Due to introduction of new vehicle models, an automobile manufacturing enterprise usually needs to make corresponding adjustments of the facility layout of the door welding workshop. On the basis of analyzing the production process and logistics characteristics of the welding line, the facility layout of the workshop is improved and the production logistics cost is reduced by using the SLP (Systematic Layout Planning) and internal logistics analysis method. Finally, a real production example is given to illustrate the effectiveness of the proposed method.
APA, Harvard, Vancouver, ISO, and other styles
32

Berlian, Devin Agni, and Putu Eka Dewi Karunia Wati. "Relayout Lantai Produksi Tenda Guna Meminimasi Jarak Perpindahan Material." Jurnal Teknik Industri Terintegrasi 8, no. 3 (2025): 2718–28. https://doi.org/10.31004/jutin.v8i3.46723.

Full text
Abstract:
CV. XYZ is a tent manufacturing company based in Surabaya facing issues with its production facility layout, which does not follow the actual production flow. This results in long material handling distances and inefficient workflow. This study aims to redesign the layout to minimize material movement distances and optimize space utilization. The methods used include observation, interviews, the creation of an Operation Process Chart, Multi Product Process Chart, From-To Chart, Systematic Layout Planning analysis, and simulation using FlexSim software. The research sample includes all workstat
APA, Harvard, Vancouver, ISO, and other styles
33

LI, K. H., S. F. LEE, C. K. LI, and DAWEI LU. "EVALUATION OF TOTAL THROUGHPUT TIME FOR AN ELECTRONICS PRODUCTION LINE BY SIMULATION AND FUZZY PERT NETWORK." Journal of Advanced Manufacturing Systems 04, no. 02 (2005): 195–208. http://dx.doi.org/10.1142/s0219686705000679.

Full text
Abstract:
Layout decision is an important issue in electronics manufacturing process. A good layout with better arrangement of assembly machines will increase overall efficiency and throughput. It is not uncommon that many industrial companies in Hong Kong do not use systematic layout planning methods for their layout decisions. This paper aims at developing a simulation model to analyze the best layout decision for an electronics manufacturing company. Finally, a simplified fuzzy PERT network framework is proposed to model a Surface Mount Technology (SMT) production line for calculating the fuzzy throu
APA, Harvard, Vancouver, ISO, and other styles
34

Fernandes, Ane Caroline, Dhebora Pinho Thomé, Ester Takashima Ferreira dos Santos, and Alysson Nunes Diógenes. "An analysis for the improvement in the productive process and physical arrangement of a donuts production establishment." Revista Gestão & Tecnologia 23, no. 3 (2023): 377–90. https://doi.org/10.20397/2177-6652/2023.v23i3.2387.

Full text
Abstract:
AbstractTheme: This research proposes a new facility layout for the kitchen of a donut company based on guidelines for Systematic Layout Planning (SLP) and Lean Manufacturing (LM).Objectives: This paper provides an original small company case study with valuable insights for practitioners interested in layout redesign. The main objective was to analyze the production process of a donut establishment and prepare a layout proposal, identifying points for time optimization and standardization.Research method: To showcase the application of LM on plant layout design, a donut company’s facility is
APA, Harvard, Vancouver, ISO, and other styles
35

Zhao, Lijie. "Layout design of new production shop based on SLP." E3S Web of Conferences 251 (2021): 03097. http://dx.doi.org/10.1051/e3sconf/202125103097.

Full text
Abstract:
It has become the main way for heavy industry enterprises to decrease the cost to excavate “logistics resources” according to the Systematic Layout Planning (SLP). Taking the new tool shaft machining workshop of Luoyang yituo zhongcheng machinery co., LTD. as an example, through the method of field investigation and visit, we get the data of the process flow, material handling, the relationship between each process and the general situation of the new workshop. The SLP method is used to divide the work units in the workshop, analyze the relationship between logistics and non-logistics among ea
APA, Harvard, Vancouver, ISO, and other styles
36

Hakim, Inaki Maulida, Durra Salsabila, and Keval Priapratama Prajadhiana. "Layout improvement design to reduce material handling cost by using the systematic layout planning method in the MSME industry." Jurnal Sistem dan Manajemen Industri 9, no. 1 (2025): 43–54. https://doi.org/10.30656/jsmi.v9i1.9212.

Full text
Abstract:
This research discusses layout improvements in MSMEs that produce skin crackers distributed in the Jabotabek area. Currently, the quantity of skin crackers produced is experiencing problems. One of the causes of problems is that material handling is still manual, poor layout settings, limited costs, unpredictable weather and lack of labor availability. Poor material handling causes long production duration, workers are less safe and comfortable, and material handling costs are high. Therefore, this research improved the layout by improving the material handling process. The research aims to an
APA, Harvard, Vancouver, ISO, and other styles
37

Ridwan, Muhamad, Arvita Emarilis Intani, and Rudy Effendi Listyanto. "Analisa Usulan Perbaikan Tata Letak Fasilitas untuk Mengoptimalkan Proses Produksi pada CV. XYZ dengan Metode Systematic Layout Planning." JiTEKH 13, no. 1 (2025): 15–23. https://doi.org/10.35447/jitekh.v13i1.1130.

Full text
Abstract:
An efficient facility layout is crucial for improving productivity and operational efficiency, especially for Small and Medium Enterprises like CV. XYZ, which face space limitations and inefficient material flow. This study aims to redesign the facility layout using the Systematic Layout Planning (SLP) method to optimize material flow, reduce internal transportation, and enhance the competitiveness of CV. XYZ in the screen printing industry. A quantitative descriptive approach was employed, with data collected through observations, interviews, documentation, and literature review. The SLP stag
APA, Harvard, Vancouver, ISO, and other styles
38

Stelle Chemim, Lucas, Nicolle Christine Sotsek, and Mariana Kleina. "Layout optimization methods and tools: A systematic literature review." Revista Gestão da Produção Operações e Sistemas 16, no. 04 (2021): 59–81. http://dx.doi.org/10.15675/gepros.v16i4.2806.

Full text
Abstract:
Purpose: This article aims to show the methods used to optimize layout and tools that have been applied since 2010 in the most diverse production environments. Theoretical Reference: Due to the intense competitiveness and uncertainties in the current market, improving processes and increasing production efficiency by managing the layout of a facility can be one of the methods to benefit organizations. In this context, knowledge of the main tools and methods is essential in defining the conduct of studies. Design/methodology/approach: Research was carried out through a systematic literature rev
APA, Harvard, Vancouver, ISO, and other styles
39

Moengin, Parwadi, Eka Rahma Saputri, and Sucipto Adisuwiryo. "Perbaikan Tata Letak Lantai Produksi dan Penggunaan Alat Material Handling untuk Meminimasi Waktu Produksi Menggunakan Pendekatan Simulasi (Studi Kasus: PT. Sharp Electronics Indonesia)." JURNAL TEKNIK INDUSTRI 10, no. 1 (2020): 8–21. http://dx.doi.org/10.25105/jti.v10i1.7722.

Full text
Abstract:
Intisari— Persaingan industri yang terus berkembang mendorong PT. Sharp Electronics Indonesia sebagai perusahan industri elektronik rumah tangga selalu berupaya untuk meningkatkan kualitas dan kecepatan produksinya. Permasalahan yang terjadi di lantai produksi PT. Sharp Electronics Indonesia adalah keterlambatan waktu proses produksi. Hal ini disebabkan oleh tata letak fasilitas di lantai produksi yang kurang beraturan yang ditunjukkan dengan jarak antar area kerja yang jauh dan juga penggunaan alat material handling yang tidak optimal yang dapat menyebabkan perpindahan material menjadi lebih
APA, Harvard, Vancouver, ISO, and other styles
40

Wilujeng Nugroho, Handi. "Perancangan Ulang Tata Letak Fasilitas Pabrik (Re-Layout) PT.XYZ." Journal of Engineering Science and Technology Management (JES-TM) 2, no. 2 (2022): 88–95. http://dx.doi.org/10.31004/jestm.v2i2.49.

Full text
Abstract:
The company is a medium scale company, although the medium scale company has used modern equipment. Such as lathes, milling machines, hydraulic press machines, iron cutting machines (benso), iron/steel plate press machines, steel/iron bending machines and others. Meanwhile, the arrangement of stations or existing production machines is still irregular and causes the production floor to be scattered and ineffective as well as inefficient spatial planning in the production process so that this affects the operator, maximizing output and time. The research method is carried out with systematic st
APA, Harvard, Vancouver, ISO, and other styles
41

Li, Qin, Guang Chun Yang, and Xin De Chen. "Study on Facility Layout of a Manufacturing Shop Based on SLP Method." Applied Mechanics and Materials 220-223 (November 2012): 127–31. http://dx.doi.org/10.4028/www.scientific.net/amm.220-223.127.

Full text
Abstract:
Aimed at the production technological process, analysis has been carried out on the current situation of workshop layout, and find out the existed problems; Systematic Layout Planning (SLP) method is exerted to analyze the workshop concerning relationship between logistics and non-logistics, draw out correlation diagram of location of working unit and correlation diagram of area of working unit. Two optimum proposals are determined according to the realistic of workshop, and weighting factor method is adopted for evaluation, thus obtain the optimal layout proposal. So that aims are achieved fo
APA, Harvard, Vancouver, ISO, and other styles
42

Amal, Muhammad Ikhlasul, and Nina Aini Mahbubah. "Integrating Lean Implementation and Relayout Design for Efficiency Improvement." Jurnal Ilmiah Teknik Industri 21, no. 2 (2022): 240–52. http://dx.doi.org/10.23917/jiti.v21i2.19748.

Full text
Abstract:
Eliminating non-value-added (NVA) activities is a comprehensive solution to achieve efficiency in manufacturing industry production processes. Inefficiency arises whether the production facility and equipment are recent or timeworn. Division. Soybean Production PT. YZ seeks to evaluate the inefficiencies in the relatively new soybean production and packaging plan. The incompatibility of the layout of the production floor facilities was identified as the leading cause of the inability of the Soybean Production Division to meet consumer demands. This study aims to make the production floor layou
APA, Harvard, Vancouver, ISO, and other styles
43

Choirun, A., A. Brilliantina, and D. Triardianto. "Facility layout design improvement in bottled drinking water at teaching factory." IOP Conference Series: Earth and Environmental Science 1338, no. 1 (2024): 012070. http://dx.doi.org/10.1088/1755-1315/1338/1/012070.

Full text
Abstract:
Abstract The Bottled Drinking Water Teaching Factory (Tefa) at State Polytechnic of Jember (Polije) produces mineral water packaged in several sizes of bottles, glasses, and gallons. The efficiency and effectiveness of the bottled drinking water production process is influenced by the layout of production facilities. The mismatch of machine layout arrangement and the number of unused equipment causes material flow to be longer. This study aims to redesign the layout of the Tefa Bottled Drinking Water facility to maximize area utilization and reduce empty space. This research provides recommend
APA, Harvard, Vancouver, ISO, and other styles
44

Kasemset, Chompoonoot, Takron Opassuwan, Thanakit Tangsittikhun, and Nititada Chaiyajina. "Application of Simulation Technique for Improving Plant Layout in Ceramic Factory." Production Engineering Archives 29, no. 2 (2023): 186–94. http://dx.doi.org/10.30657/pea.2023.29.22.

Full text
Abstract:
Abstract This study aims to design and improve the plant layout of a ceramic factory by adopting Systematic Layout Planning (SLP) and the simulation technique. A ceramic company in northern Thailand is selected as a case study. Three ceramic products including roof tiles, wall tiles and dishware are studied due to their highest production volume. Through the SLP approach, information regarding the number of departments and machines, the area of the plant, the frequency of movement and the distance between each department is collected for the analysis of the relationship between departments. Tw
APA, Harvard, Vancouver, ISO, and other styles
45

Amrina, Uly, Raden Adriyani Oktora, Dyah Lestari Widaningrum, and Ika Devi Mayangsari. "Analysis of production area layout design based on lean and green thinking in the micro, small and medium enterprises (MSME) industry." Jurnal Sistem dan Manajemen Industri 8, no. 2 (2024): 107–18. https://doi.org/10.30656/jsmi.v8i2.8981.

Full text
Abstract:
This research aims to analyze and design the layout of production areas based on Lean-Green (L&G) Thinking in Micro, Small and Medium Enterprises (MSMEs) Scale Companies. By focusing on operational efficiency and sustainable production processes, this research can help MSMEs increase their competitiveness in an increasingly competitive market. To support this goal, researchers used the Systematic Layout Planning (SLP) method combined with the Promodel 6.0 simulation tool. The SLP method helps in evaluating the current MSME layout system and identifying areas that can be made more efficient
APA, Harvard, Vancouver, ISO, and other styles
46

İnce, Melike Nur, and Çağatay Taşdemir. "“Facility location selection and layout planning through AHP, PROMETHEE, and CORELAP methods in the furniture industry." BioResources 19, no. 3 (2024): 6478–509. http://dx.doi.org/10.15376/biores.19.3.6478-6509.

Full text
Abstract:
Facility location selection and internal layout planning are critical strategic decisions for long-term sustainability. This study identified the most feasible location and optimal layout for a commercial bedroom furniture manufacturing facility through a seven-phase evaluation of Istanbul, Ankara, Izmir, and Bursa. The Analytical Hierarchy Process (AHP) and PROMETHEE were used for city and district selection, with AHP calculating criteria weights and PROMETHEE ranking alternatives. The Borda Count Method aggregated MCDM results, selecting Istanbul as the optimal city and Dudullu Organized Ind
APA, Harvard, Vancouver, ISO, and other styles
47

Tarigan, Ukurta, Erwin Sitorus, and Veronica Veronica. "Penerapan Metode Fuzzy Analytical Hierarchy Process dan SLP dalam Rangka Perancangan Ulang Tataletak Fasilitas Produksi Bata Ringan di Pt. PQR." Talenta Conference Series: Energy and Engineering (EE) 1, no. 1 (2018): 087–94. http://dx.doi.org/10.32734/ee.v1i1.116.

Full text
Abstract:
PT. PQR merupakan perusahaan yang bergerak dalam produksi bata ringan. Bata ringan diproduksi menggunakan sistem Autoclaved Aerated Concrete (AAC). Dari hasil pengamatan di perusahaan, produk bata ringan sering mengalami kerusakaan karena jatuh dari pallet saat dipindahkan menggunakan hand lift. Hal ini disebabkan oleh jauhnya jarak perpindahan antara lantai produksi dan gudang produk, sehingga operator kesulitan dalam proses pemindahan. Tujuan dari penelitian ini adalah untuk merancang ulang tata letak fasilitas dengan menggunakan pendekatan metode Fuzzy Analytical Hierarchy Process (Fuzzy AH
APA, Harvard, Vancouver, ISO, and other styles
48

Rao, Srikrishna B., Chandrababu D, and Sunil Satav. "Evaluating the Role of Supply Chain over the Molds and Dies in the Production Process through Systematic Layout Planning." International Journal of Mechanical Engineering 1, no. 5 (2014): 12–17. http://dx.doi.org/10.14445/23488360/ijme-v1i5p106.

Full text
APA, Harvard, Vancouver, ISO, and other styles
49

Soegianto, Dany, Aditya Tirta Pratama, Setijo Awibowo, and Steven Liang. "Improving Productivity at Standard Area of Airline Catering Company by Using Systematic Layout Planning." JURNAL TEKNIK INDUSTRI 10, no. 2 (2020): 123–29. http://dx.doi.org/10.25105/jti.v10i2.8396.

Full text
Abstract:
Intisari—Penelitian ini dilakukan di sebuah perusahaan katering maskapai yang berlokasi di Jakarta, Indonesia. Perusahaan menjual makanan dalam penerbangan dan produk komisaris seperti: makanan ringan, air, dan makanan kering lainnya untuk perusahaan penerbangan. Tujuan penelitian ini adalah untuk menyelesaikan masalah yang terjadi di perusahaan, terutama di daerah yang disebut "area standar", yang menangani produk komisaris. Berdasarkan data dari perusahaan, area standar sering tidak dapat memenuhi permintaan yang diperlukan di musim puncak, meskipun berdasarkan jumlah pekerja seharusnya dapa
APA, Harvard, Vancouver, ISO, and other styles
50

Scalvenzi, Laura, Estela Guardado Yordi, Edgar Wilfrido Santamaría Caño, et al. "The Design of an Intensified Process and Production Plant for Cosmetic Emulsions Using Amazonian Oils." Processes 13, no. 6 (2025): 1923. https://doi.org/10.3390/pr13061923.

Full text
Abstract:
The cosmetic industry in the Ecuadorian Amazon region faces the challenge of competitively integrating locally sourced plant-based raw materials into efficient and sustainable production processes. This study proposes the design of a pilot plant for the production of a cosmetic emulsion (CE), using oils extracted from Morete (Mauritia flexuosa) and Ungurahua (Oenocarpus bataua), with a focus on process intensification to reduce both capital investment and resource consumption. Process design methodologies and computational simulation (SuperPro Designer V10) were applied, along with Systematic
APA, Harvard, Vancouver, ISO, and other styles
We offer discounts on all premium plans for authors whose works are included in thematic literature selections. Contact us to get a unique promo code!