To see the other types of publications on this topic, follow the link: Timber formwork.

Dissertations / Theses on the topic 'Timber formwork'

Create a spot-on reference in APA, MLA, Chicago, Harvard, and other styles

Select a source type:

Consult the top 33 dissertations / theses for your research on the topic 'Timber formwork.'

Next to every source in the list of references, there is an 'Add to bibliography' button. Press on it, and we will generate automatically the bibliographic reference to the chosen work in the citation style you need: APA, MLA, Harvard, Chicago, Vancouver, etc.

You can also download the full text of the academic publication as pdf and read online its abstract whenever available in the metadata.

Browse dissertations / theses on a wide variety of disciplines and organise your bibliography correctly.

1

Persaud, Richard Yajuvendra. "The structural behaviour of a composite timber and concrete floor system incorporating steel decking as permanent formwork." Thesis, University of Cambridge, 2008. https://www.repository.cam.ac.uk/handle/1810/252081.

Full text
APA, Harvard, Vancouver, ISO, and other styles
2

Zuczek, Jan. "Stavba horského hotelu na bázi dřeva." Master's thesis, Vysoké učení technické v Brně. Fakulta stavební, 2016. http://www.nusl.cz/ntk/nusl-240306.

Full text
Abstract:
The subject of my thesis is the design of new mountain hotel based on wood, which is located at the top of Little Maple, cadastral area Trinec-Tyra, the city of Trinec, Frydek-Mistek level documentation for construction. The building has a partial basement, with three floors. The supporting system consists of three structural systems. The structural system consists of basement formwork, the first floor is made of ceramic blocks heluz, second and third floor is designed as a timber frame panel. Roof structure is made up of lattice wood trusses and gabled aisle. Proposal mountain hotel respects
APA, Harvard, Vancouver, ISO, and other styles
3

Štěpánová, Martina. "Restaurace a zázemí ČRS Lačnov." Master's thesis, Vysoké učení technické v Brně. Fakulta stavební, 2018. http://www.nusl.cz/ntk/nusl-372134.

Full text
Abstract:
The subject of this thesis is the process of building technical part of the design documentation for the realization of a newly-built restaurant and facilities for Czech fishing union in the village Lačnov. The building consists of two objects interconnected by a connecting neck. The ground floor of the building with a flat roof is used as a restaurant. The restaurant is wheelchair accessible. Public entrance is from the southern side. The entrance for the staff and the supply will be from the east side. Facilities for staff and technical facilities there is in the northern part of the buildin
APA, Harvard, Vancouver, ISO, and other styles
4

Štipčák, Martin. "Vinařství." Master's thesis, Vysoké učení technické v Brně. Fakulta stavební, 2018. http://www.nusl.cz/ntk/nusl-372207.

Full text
Abstract:
The objective of the thesis is newly built winery in the wine cellars alley situated inVlkoš u Kyjova in the South Moravia Region. Capacity for wine production is around 180,000 litres. In the building are the tasting rooms and pension with the capacity of 30 people. The building has three floors and a partial basement. The winery is located on sloping land. The building is designed as a brick construction, where underground vertical structures are made of blocks permanent formwork Best and part above ground is made of ceramics blocks Porotherm. The horizontal structures are made of prestresse
APA, Harvard, Vancouver, ISO, and other styles
5

Bednář, Jiří. "Bytový dům ve svahu." Master's thesis, Vysoké učení technické v Brně. Fakulta stavební, 2014. http://www.nusl.cz/ntk/nusl-226789.

Full text
Abstract:
The aim of my master's thesis is a project of a new apartment building on a sloped site at a level of the documentation for the structure realization. The building is partly basement with four above-ground floor. Individual floors up recede and are roofed with flat roofs. The structural system of the basement part is made up of permanent shuttering and the above-ground part is made up wall of cross laminated timber construction panels KLH. The project of the building is in accordance with the development plan of Kopřivnice and with the current street built. The work puts great emphasis on layo
APA, Harvard, Vancouver, ISO, and other styles
6

Landecký, Tomáš. "Horský penzion." Master's thesis, Vysoké učení technické v Brně. Fakulta stavební, 2015. http://www.nusl.cz/ntk/nusl-227563.

Full text
Abstract:
The objective of this thesis is to create the documentation for building construction. Designed building is a mountain guesthouse. Building plat is located in the cadastral Poteč. Project documentation has been prepared in accordance with applicable laws, regulations and standards. The object is designed as one floor building with basement and residential loft and is fitted in sloping terrain. The building is shaped in layout L with the longest plane dimensions 40,11 x 39,05 m. Foundations are designed as strips of plain concrete. The building is designed as a wall support system. Wall system
APA, Harvard, Vancouver, ISO, and other styles
7

Doležel, Ivo. "Nízkopodlažní bytový komplex." Master's thesis, Vysoké učení technické v Brně. Fakulta stavební, 2013. http://www.nusl.cz/ntk/nusl-226335.

Full text
Abstract:
My thesis deals with a project documentation processing of a new building “ Low Floor Apartment Complex – Horoměřice”. All requirements strictly follow effective legal regulations. The complex is comprised of three objects arranged as the U-shape. The two-floor object A is a combination of masonry from reinforced concrete and a wooden structure. The object B is a single-storey wooden structure and the object C is a two-floor wooden structure. All these objects are covered by a two-coating counter roof. My thesis is a construction technical arrangement, which contains a fire safety report, a he
APA, Harvard, Vancouver, ISO, and other styles
8

Recabarren, Jiménez Diego Sadaam, and Juárez Juan Manuel Tafur. "Optimización del uso de encofrado para losas y columnas f’c 210 kg/cm2 con aditivo retardante de fragua utilizando el método de madurez del concreto." Bachelor's thesis, Universidad Peruana de Ciencias Aplicadas (UPC), 2019. http://hdl.handle.net/10757/626578.

Full text
Abstract:
Esta investigación trata sobre la aplicación del método de madurez aplicado al concreto en las estructuras de un edificio multifamiliar de 8 pisos para evaluar la resistencia a compresión del concreto y optimizar el tiempo de encofrado de las estructuras. La práctica usual de monitorear el concreto in situ usando especímenes cilíndricos es considerada inapropiada debido a que los especímenes curados en obra no experimenten el mismo historial de curado que las estructuras a las que se supone deben de representar. Por otro lado, el tiempo de encofrado depende de la resistencia de la estructura,
APA, Harvard, Vancouver, ISO, and other styles
9

Dahlin, Tobias, and Magnus Yngvesson. "Construction Methodology of Tubed Mega Frame Structures in High­ Rise Buildings." Thesis, KTH, Betongbyggnad, 2014. http://urn.kb.se/resolve?urn=urn:nbn:se:kth:diva-147328.

Full text
Abstract:
As a response to the ever denser cities, skyscrapers have become yet more popular and are growing more and taller than ever. A new efficient structural system for skyscrapers has been proposed by Tyréns AB, called the Tubed Mega Frame. This structural system consists of hollow concrete tubes at the perimeter of the building. Since this structural system has not yet been used in any skyscraper several aspects have still not been studied or investigated. An important aspect having an impact on the system’s competitiveness compared to traditional structural systems is how a skyscraper using this
APA, Harvard, Vancouver, ISO, and other styles
10

Moohialdin, Ammar. "A real-time worker activity intensity identification system for construction workers under hot and humid weather conditions." Thesis, Queensland University of Technology, 2020. https://eprints.qut.edu.au/206448/1/Ammar_Moohialdin_Thesis.pdf.

Full text
Abstract:
This research examined a novel real-time, non-intrusive activity intensity identification system that approximate site activity intensity levels and their associated risks under hot and humid weather conditions. The research revealed that the activity intensity identification system provides real-time, non-intrusive measurements and early warning signs at the crew level. Physical work and site activities also contribute to high activity intensity levels, while the combined effects of activity intensity and hot and humid weather conditions have substantial direct and indirect heat-related risks
APA, Harvard, Vancouver, ISO, and other styles
11

Vondrák, Tomáš. "Komunitní centrum v Českých Budějovicích - stavebně technologický projekt." Master's thesis, Vysoké učení technické v Brně. Fakulta stavební, 2015. http://www.nusl.cz/ntk/nusl-227299.

Full text
Abstract:
The theme of the diploma thesis is the construction technology project construction of a community center in the Czech Budejovice. The work describes the study of the main stages of technological, financial and construction schedule, itemized budget and technological prescription for performance building envelope. A substantial part of the work is to perform a technological prescription ceiling cladding structure above 1.NP, which is supplemented by technical-economic balance for the implementation of this ceiling construction, along with formwork drawings describes the optimal design of monol
APA, Harvard, Vancouver, ISO, and other styles
12

Lebruška, Jakub. "Stavebně technologická příprava Penzionu Jánský Potok II." Master's thesis, Vysoké učení technické v Brně. Fakulta stavební, 2019. http://www.nusl.cz/ntk/nusl-392044.

Full text
Abstract:
The subject of this diploma thesis is technological preparation of realization guest – house Jánský potok II. in Jánské Lázně. The diploma thesis contains study of the main technological phases of the object, project of the site equipment, useful machines, time schedule, budget, technological prescription for reinforced concrete construction, project of the formwork for wall and floor slab, control plan, project of the acces road and parking. The basis for technological preparation in this diploma thesis is design documentation.
APA, Harvard, Vancouver, ISO, and other styles
13

Houha, Jan. "Stavebně technologický projekt přístavby Senior centrum Blansko." Master's thesis, Vysoké učení technické v Brně. Fakulta stavební, 2017. http://www.nusl.cz/ntk/nusl-265225.

Full text
Abstract:
Content of this master‘s thesis is construction technological project of the extension Senior Centrum Blansko. The main object is a three-storyed, designed as a monolithic skeleton construction. The masters’s thesis contains technical report of the construction technological project, suggested construction site installations, proposal of suitable machines and mechanisms required for construction, time schedule, budget, wider relations of transport lines to construction site, implementation of monolithic concrete structures and control and test plan.
APA, Harvard, Vancouver, ISO, and other styles
14

Krištof, Marek. "Stavebně technologický projekt Univerzity Tomáše Bati ve Zlíně." Master's thesis, Vysoké učení technické v Brně. Fakulta stavební, 2019. http://www.nusl.cz/ntk/nusl-392073.

Full text
Abstract:
The subject of my diploma thesis is selected parts of the construction technology project of Tomas Bata University in Zlín. The content of the work is mainly elaborated technological regulation for making the monolithic ceiling shell of the main aula of the building, processing of the control and test plan and drawings of the ceiling shell. Next, I worked on the design of suitable transport routes to the construction site, the processing of the studies of the implementation of the main technological stages, the design and the processing of the drawings of the construction site, which varies in
APA, Harvard, Vancouver, ISO, and other styles
15

Hromník, Lukáš. "Stavebně technologický projekt polyfunkčního bytového domu." Master's thesis, Vysoké učení technické v Brně. Fakulta stavební, 2014. http://www.nusl.cz/ntk/nusl-226979.

Full text
Abstract:
Construction technological project of polyfunctional flat house SO 107, solves the realization of reinforced concrete monolithic ceiling construction the financial and time schedule, technological instruction of concreting, proposal of mechanization, the technical report of technology construction project. The proposal formwork system Multiflex.
APA, Harvard, Vancouver, ISO, and other styles
16

Skřivánek, Jan. "Bytové domy v Pardubicích - příprava a organizace výstavby." Master's thesis, Vysoké učení technické v Brně. Fakulta stavební, 2015. http://www.nusl.cz/ntk/nusl-227452.

Full text
Abstract:
The final thesis contains selected parts of construction technological project, this project are defined by a apartment building complex in Pardubice, Dubinská. This thesis deals with first two buildings with four flours and a basement. Coordination site plan, time and financial schedule including machinery setting, a study of main technological phases, construction site facility project, main technological machinery design, technological standard and time schedule, technological regulation for basement monolithic constructions, inspection and trial schedule with drawing of facing to it are re
APA, Harvard, Vancouver, ISO, and other styles
17

Blažek, David. "Stavebně technologického řešení Vzdělávacího komplexu v Brně." Master's thesis, Vysoké učení technické v Brně. Fakulta stavební, 2012. http://www.nusl.cz/ntk/nusl-225564.

Full text
Abstract:
This master’s thesis deals with construction of the gross building of new building of learning complex FEKT VUT in Brno. It contains the design of earthworks, underground setting piles, monolithic structures and isolation of the building for further construction. Construction and technological project includes technical report, time and financial plan of construction, study of the implementation of major technological stages of site preparation, budget of facilities, technological regulation to solved stages, inspection and test plan of monolithic structures, health and safety plan and energy
APA, Harvard, Vancouver, ISO, and other styles
18

Bočková, Andrea. "Stavebně technologický projekt přípravy a realizace administrativní budovy firmy TREFAL, spol. s r.o." Master's thesis, Vysoké učení technické v Brně. Fakulta stavební, 2020. http://www.nusl.cz/ntk/nusl-409917.

Full text
Abstract:
The aim of this thesis is the development project of the firm TREFAL, Spol. s.r.o. The object SOO2 - Administrative building - that is a constituent of the area of TREFAL, Spol. s.r.o. is discussed topic of this thesis. The main focus is the construction development of the monolithic supporting construction objects. The thesis further depicts and investigates accompanying and overall technical report, an implementation study of the main technological stages, situational designs, a solution of the broader traffic relations including a proposal for the supplementation of the construction develop
APA, Harvard, Vancouver, ISO, and other styles
19

Kijonka, Jakub. "Výstavba školy Rajhrad – stavebně technologická příprava." Master's thesis, Vysoké učení technické v Brně. Fakulta stavební, 2012. http://www.nusl.cz/ntk/nusl-225521.

Full text
Abstract:
Subject of this master thesis is the structural and technological background for the construction of high school in Rajhrad. This consists of time and finanical plans, technological instructions for the reinforced concrete monolithic skeleton, time schedule, item budget, construction site layout, machinery configuration , audit and evaluation plans, work place safety protocols, environmental plan of the construction site.
APA, Harvard, Vancouver, ISO, and other styles
20

Kratochvíl, Tomáš. "D1 Rekonstrukce mostu D1-212 Ostrovačice, příprava realizace stavby." Master's thesis, Vysoké učení technické v Brně. Fakulta stavební, 2018. http://www.nusl.cz/ntk/nusl-372065.

Full text
Abstract:
The diploma thesis deals with preparation and realization of D1 reconstruction of D1-212 bridge in Ostrovačice. It is a motorway bridge that transfers traffic over road II / 386. The reconstruction will demolish the superstructure of bridge with bridge equipment and parts of the abutments and their new construction. The preparation of the project solves the engineering report, the block plan drawing, the financial and time schedule - by objects, the budget SO 201, the study of the implementation of the main construction technologys, the project of the site equipment, the design of the main bui
APA, Harvard, Vancouver, ISO, and other styles
21

Andres, Josef. "Bytový dům U Vojanky – stavebně technologická příprava." Master's thesis, Vysoké učení technické v Brně. Fakulta stavební, 2013. http://www.nusl.cz/ntk/nusl-226495.

Full text
Abstract:
The content of this thesis is the construction project of technological of residential building U Vojanky in Prag. The new residential building is comprised of two parts that are interconnected by connecting neck. Author deals with the most important technology stages of construction that are processed in following parts of this thesis.
APA, Harvard, Vancouver, ISO, and other styles
22

Novák, Martin. "Stavebně technologický projekt ZŠ Otevřená, Brno - Žebětín." Master's thesis, Vysoké učení technické v Brně. Fakulta stavební, 2014. http://www.nusl.cz/ntk/nusl-227003.

Full text
Abstract:
The constructive – technological project of elementary school in town district Brno – Žebětín, contains the technical report, the assessment of the wider transport relations, the time and financial plan of buildings, technological project of the site equipment, the main construction machines and mechanisms, the technological prescription for the underground construction, the inspection and test plan for the underground construction, the calculation of buildings for the objects, the safety report and the contract for work.
APA, Harvard, Vancouver, ISO, and other styles
23

Trhlík, Lukáš. "Prodejní a servisní centrum Praha – stavebně technologický projekt." Master's thesis, Vysoké učení technické v Brně. Fakulta stavební, 2012. http://www.nusl.cz/ntk/nusl-225401.

Full text
Abstract:
In this diploma thesis deals with execution of ground works, foundation constructions, steel and armored concrete monolithic framework of the sales and service center in Prague. Establishment of the building will be done on armored concrete basement feet, strips and basement plate. The building is desinged in part as a steel framework and in part as a armored concrete framework. The building technological project contains for the phases primarily time and financial plan of object, technology prescription, time schedule, budget, model of the building site accessories, model of the machines, che
APA, Harvard, Vancouver, ISO, and other styles
24

Vojtek, Ondřej. "Stavebně technologický projekt bytového domu v Brně - Slatině." Master's thesis, Vysoké učení technické v Brně. Fakulta stavební, 2018. http://www.nusl.cz/ntk/nusl-372271.

Full text
Abstract:
This diploma thesis deals with construction and technological project of apartment building in Brno – Slatina, Kigginsova street. Thesis focus on technological phase of monolithic rough superstructure and masonry work. For this phases were processed technogical specifications and controlling ad testing schedules. Within this thesis was also compiled technical report, solution of transport roads, technical report and drawings of site equipmet. For main object was compiled itemized budget, which was foundation for completing time schedule. In diploma thesis are further processed safety requireme
APA, Harvard, Vancouver, ISO, and other styles
25

Těžký, Filip. "Příprava realizace bytového domu v Brně - Slatině." Master's thesis, Vysoké učení technické v Brně. Fakulta stavební, 2019. http://www.nusl.cz/ntk/nusl-391973.

Full text
Abstract:
The diploma thesis deals with the building - technological project of the apartment house in Brno - Slatina, Lučiny. The purpose will be an optimal design of construction progress with regard to finance and time. For this phase were processed the site equipment with the design of the lifting strap, the transport routes and the machine assembly. In addition, an item budget, which was followed by a detailed schedule. Based on these documents was created a balance of machines and workers. For monolithic constructions were developed a technological regulation and a control and test plan. Furthermo
APA, Harvard, Vancouver, ISO, and other styles
26

Baštová, Veronika. "Stavebně technologický projekt terasového bytového domu v Brně." Master's thesis, Vysoké učení technické v Brně. Fakulta stavební, 2012. http://www.nusl.cz/ntk/nusl-225670.

Full text
Abstract:
The project deals with building technological study of the new building apartment house in Brno. Dimensions of the apartment building are 29.2 m x 57.2 m with shape of a rectangle. The apartment house is designed terraced in five floors as a brick structure of the ceramic blocks. Ceilings and construction in contact with the ground is reinforced concrete. In groundfloor are located garages, other floors are designed as residential. The project deals with technological processes of bottom building, time and financial demands of construction.
APA, Harvard, Vancouver, ISO, and other styles
27

Bartek, Petr. "Vybrané části stavebně technologického projektu mateřské školy v Brně." Master's thesis, Vysoké učení technické v Brně. Fakulta stavební, 2020. http://www.nusl.cz/ntk/nusl-409914.

Full text
Abstract:
This thesis deals with a construction-technology plan of two-story nursery school in Brno, district Bystrc. Thesis contains engineering report, financial and time schedule for structures, project of construction site, noise study, technological notes and inspection and test plans for cast-in-place reinforced concrete slabs and for prestressed concrete Spiroll floor slabs, formwork study, list of main machines used during construction, time schedule, needed quantity of workers and itemized budged for carcass, budged for whole building and comparison of cranes. Moreover, in appendices are drawin
APA, Harvard, Vancouver, ISO, and other styles
28

Cihelka, Karel. "Stavebně technologický projekt pavilonu laboratoří technologií Akademie věd v Brně." Master's thesis, Vysoké učení technické v Brně. Fakulta stavební, 2015. http://www.nusl.cz/ntk/nusl-227732.

Full text
Abstract:
The topic of this master thesis is dealing with selected parts of the constructional and technological project of laboratoty pavilion for technology of AS in Brno. Thesis is mainly focused for technological instructions of ground works, support of next building and solving of city center problems. Components of this thesis are evaluation plans and work place safety protocols. Next content of thesis are study of main technological phases, time and finanical plans, items budget, selected details, construction site equipment and design and verification of tower crain.
APA, Harvard, Vancouver, ISO, and other styles
29

Hladký, Dominik. "Obytný areál Ponavia park v Brně, příprava a organizace stavby." Master's thesis, Vysoké učení technické v Brně. Fakulta stavební, 2020. http://www.nusl.cz/ntk/nusl-409926.

Full text
Abstract:
This thesis deals with the construction process of the apartment house Ponavia Park located in Brno. The thesis solves the individual realization phases of the main building phase. Building site equipment is designed for the projected construction process in three different variations. A technical report is also included in the building site. Critical points within the transport of materials and machines are also verified. A financial plan for the whole building is made as an summarizing time schedule for the apartment building. The sources for the financial plan are the figures taken from the
APA, Harvard, Vancouver, ISO, and other styles
30

Šarlejová, Petra. "Bytové domy v Brně, Bystrci - příprava a organizace výstavby." Master's thesis, Vysoké učení technické v Brně. Fakulta stavební, 2014. http://www.nusl.cz/ntk/nusl-227010.

Full text
Abstract:
This thesis deals with the project planning and management of the construction of two houses of flats in Brno – Bystrc, Šemberova street. The houses of flats are designed as a newly built five floors above ground and one basement floor. The supporting system is made from brick ceramic blocks, underground floor is made of concrete blocks. This thesis processes technological project of building as preparation and building site equipment, use of machines necessary for implementation of the construction, monitoring and test plan, technological steps for basement walls of shuttering blocks. Finally
APA, Harvard, Vancouver, ISO, and other styles
31

Dvořáková, Michaela. "Kabeltechnik Mikulov - stavebně technologická příprava." Master's thesis, Vysoké učení technické v Brně. Fakulta stavební, 2013. http://www.nusl.cz/ntk/nusl-226504.

Full text
Abstract:
The subject of my diploma thesis is the technology of steel production hall and brick administrative building in the komplex of Kabeltechnik compalny in Mikulov. Thesis deals with design of construction site, construction and technological study of construction of steel manufacturing hall, items budget according to project documentation, financial and time planing, proposal of suitable mechanical assembly including lifting mechanisms, safety of work, environmental plan and monitoring and test planing.
APA, Harvard, Vancouver, ISO, and other styles
32

Komenda, Tomáš. "Komplex bytových domů, Praha - Jarov, stavebně technologická příprava stavby." Master's thesis, Vysoké učení technické v Brně. Fakulta stavební, 2016. http://www.nusl.cz/ntk/nusl-240225.

Full text
Abstract:
The goal of this diploma thesis is to create a building technology project for construction of 4 flat houses within stage 3a. of the building project „Green town of Prague – Jarov, phase II“. The flat houses are in two pairs interconnected by basement, each is a 7 floor high reinforced concrete building with flat roof and is functionally connected to others by a terrace garden system. This document focuses on organisation and preparation of the construction. It includes building site equipment, cost calculation for setting up and servicing of the building site with graphical illustrations for
APA, Harvard, Vancouver, ISO, and other styles
33

Malý, Filip. "Stavebně technologický projekt výstavby polyfunkčního domu lokalita Nová Nitra." Master's thesis, Vysoké učení technické v Brně. Fakulta stavební, 2012. http://www.nusl.cz/ntk/nusl-225445.

Full text
Abstract:
The content of this thesis is the construction project of technological multifunctional building new locality Nitra the Slovak Republic. Individual points outline the project, which are dealt with in this thesis can be divided into subcategories, depending on the type of information provided. The first category can include items such as a technical report to the STP, which describes the basic information about the objects constructed building including the construction situation, location of the site including links to transport and technical infrastructure and rough timetable for the construc
APA, Harvard, Vancouver, ISO, and other styles
We offer discounts on all premium plans for authors whose works are included in thematic literature selections. Contact us to get a unique promo code!