To see the other types of publications on this topic, follow the link: Turnkey Project Management.

Dissertations / Theses on the topic 'Turnkey Project Management'

Create a spot-on reference in APA, MLA, Chicago, Harvard, and other styles

Select a source type:

Consult the top 16 dissertations / theses for your research on the topic 'Turnkey Project Management.'

Next to every source in the list of references, there is an 'Add to bibliography' button. Press on it, and we will generate automatically the bibliographic reference to the chosen work in the citation style you need: APA, MLA, Harvard, Chicago, Vancouver, etc.

You can also download the full text of the academic publication as pdf and read online its abstract whenever available in the metadata.

Browse dissertations / theses on a wide variety of disciplines and organise your bibliography correctly.

1

Chiang, Tung-Hsien, and 江東憲. "The Study of Project Management System for Turnkey Project." Thesis, 2006. http://ndltd.ncl.edu.tw/handle/2qdn5d.

Full text
Abstract:
碩士<br>國立臺灣科技大學<br>營建工程系<br>94<br>In Taiwan, turnkey projects are growing rapidly. However, in the current environment, it is very often that different business group jointly participating the bidding process. The members of bidding team with various cultural background and working process have to face a friction period before the working process finally settles down and smoothly into project execution stages. The scope of turnkey project should be included selection proposal, design, purchase, construction and equipment installation etc. The contractor will in charge of overall execution that
APA, Harvard, Vancouver, ISO, and other styles
2

Ying, Chen Mei, and 陳玫英. "Study on Project Management and Material Management of Process Plant Turnkey Project." Thesis, 2002. http://ndltd.ncl.edu.tw/handle/57691459411378689498.

Full text
Abstract:
碩士<br>國立臺灣科技大學<br>營建工程系<br>90<br>Process plants comprise any hardware as well as software of the process plant for producing chemical product, mechanical product, petroleum material, and gas material etc. Because of the requirements for process plant to launch commercial operation on time, the complexity, requirements of wide range of technical disciplines team work and strictly budget control, the whole plant engineering, procurement and construction (EPC) is generally contracted to big engineering companies locally and internationally. The scope of turnkey includes master planning, engineeri
APA, Harvard, Vancouver, ISO, and other styles
3

Hwang, Rong-Yuh, and 黃榮裕. "The Project Management Framework of a Large-scale Lump Sum Turnkey Project." Thesis, 2011. http://ndltd.ncl.edu.tw/handle/62194495451795782298.

Full text
Abstract:
碩士<br>國立中山大學<br>高階經營碩士班<br>99<br>The domestic construction project contracts have made a great development to large-scale lump sum turnkey project, which includes engineering, procurement and construction. The turnkey contractors are responsible for the interface integration among various projects to reduce the delays caused by poor interface coordination, and to shorten the project schedule, moreover to ensure project quality. However, there are huge discrepancies between lump sum turnkey construction projects and general construction projects. Lump sum turnkey projects require a wider field
APA, Harvard, Vancouver, ISO, and other styles
4

Liu, Chen —Yi, and 劉正義. "Project Management in Turnkey Contract─ A Case Study:Taipei Cultural Center Reconstruct." Thesis, 2003. http://ndltd.ncl.edu.tw/handle/26694403133737962906.

Full text
APA, Harvard, Vancouver, ISO, and other styles
5

CHIU, SHENG-KUAN, and 邱勝寬. "A Study of Critical Chain Project Management (CCPM) on Semiconductor Turnkey Services." Thesis, 2002. http://ndltd.ncl.edu.tw/handle/49197479218302565676.

Full text
Abstract:
碩士<br>國立交通大學<br>工業工程與管理系<br>90<br>Nowadays, the one-stop shopping turnkey service, which facilitates time to market and helps grab the market share, is more important to the IC design houses. Although it may provide better services to IC design houses, laboring tasks are therefore shifting to those FABs. On time delivery is one of the key performance indices of turnkey services. Therefore, a mechanism to control cycle time of turnkey service order to protect due-date performance is necessary. We present a semiconductor supply chain model constructed under the concept of Theory Of Co
APA, Harvard, Vancouver, ISO, and other styles
6

Hsu, Yun-chin, and 許雲欽. "The Research of the Performance of Collaborative Project Management in Power Industry –Disturbed Substation Turnkey Project." Thesis, 2008. http://ndltd.ncl.edu.tw/handle/30929838258938953842.

Full text
Abstract:
碩士<br>國立中央大學<br>工業管理研究所碩士在職專班<br>96<br>The turnkey project in substation is a business that it is derives from the planning of power distribution. The turnkey project is commissioned the substation of design and build by main contractor who is responsible to integrate the architecture design, electric machinery design, equipment procurement, building construction, equipment installation to the substation. Therefore, the turnkey project can fulfill the efficiency by commissioning subcontractors in reduction of working time and integration of related interface. The main contractor in the project
APA, Harvard, Vancouver, ISO, and other styles
7

Chen, Ching-lin, and 陳清林. "An Integrated Model of Construction Progress and Subcontracting Payment Management for Turnkey Project." Thesis, 2012. http://ndltd.ncl.edu.tw/handle/77395328114298235054.

Full text
Abstract:
碩士<br>國立中央大學<br>營建管理研究所碩士在職專班<br>100<br>"Payment" and "schedule" are two major areas of construction disputes. Mismanagement of schedule will also incur inaccurate measurement of pricing and payment. In the realm of turnkey contracting, complexity of the project further deteriorate the effectiveness of payment and schedule management. This work takes the experience of one of the biggest turnkey contracting firms in Taiwan, in analyzing how the quantity take-off, project schedule and subcontractors management can be integrated into one single strategy platform by rationalizing company organizat
APA, Harvard, Vancouver, ISO, and other styles
8

Hsu, Peng-Cheng, and 徐鵬程. "The Study of Dynamic Project Management Model for Turnkey Contracts in Power Industry." Thesis, 2007. http://ndltd.ncl.edu.tw/handle/ck724z.

Full text
Abstract:
碩士<br>國立臺北科技大學<br>商業自動化與管理研究所<br>95<br>With the admission of Taiwan into WTO, the competition between various regions became fiercer. In order to increase competition, the electrical owner try to become the turnkey contractor and provide owners total power solution services included machine manufacture, architectural design and construction. It is complex that the contractor integrated with engineers, architects and constructors. Furthermore, the electrical contractors do not have enough integrated experiences at present and there is no standardization operation of how to combine the architect
APA, Harvard, Vancouver, ISO, and other styles
9

王廣文. "Case study for project management for oil refinery and petrochemical turnkey project--base on a Lump Sum Turn Key Project in Thailand." Thesis, 2015. http://ndltd.ncl.edu.tw/handle/27xgcd.

Full text
APA, Harvard, Vancouver, ISO, and other styles
10

Chang, Chieh, and 張傑. "The Study of ISO 10006 Application in Turnkey Project Management-A Consulting Engineering Firm Case." Thesis, 2010. http://ndltd.ncl.edu.tw/handle/30510999028658145242.

Full text
Abstract:
碩士<br>國立臺灣科技大學<br>營建工程系<br>98<br>In recent years the domestic public works construction, the governmental agency have handled procurement by turnkey increasing day by day. Turnkey projects mainly organized by the company assigned to the joint implementation of projects, and the company engaged a technical advisory role by customers transformed into a turnkey team, this transformation of business pattern has taken the relatively high risk and changed management consultants to the original thought. If the lack of interface in the implementation phase of integration, communication and coordinatio
APA, Harvard, Vancouver, ISO, and other styles
11

Chen, Rebecca, and 陳姿伶. "A Contract Management Study for E/P/C Turnkey Project Management -Base on FIDIC Contract (Silver Book) and PMBOK." Thesis, 2013. http://ndltd.ncl.edu.tw/handle/31279812912487725037.

Full text
Abstract:
碩士<br>國立中央大學<br>營建管理研究所在職專班<br>101<br>In Taiwan, EPC Turnkey Project relevant to all citizen life. But controversial disputation is still over and over again happened. How to minimize controversial disputation happened through project execution management is an essential topic for both client and contractor parties. The study is integrated and analyzed from the general conditions of Contract FIDIC (Silver Edition) and the project management theory (PMBOK) in order to highlight the importance of project management knowledge during the execution of project. With well manage and integrate all pro
APA, Harvard, Vancouver, ISO, and other styles
12

LIU, JUN-RUI, and 劉俊瑞. "The study of Turnkey and commissioned Professional Construction Management of Engineering - Taking a new dormitory project as an example." Thesis, 2014. http://ndltd.ncl.edu.tw/handle/5m2kug.

Full text
Abstract:
碩士<br>中華科技大學<br>土木防災工程研究所在職專班<br>102<br>After the purchase law was promulgated by government, in order to promote the economic development of construction industries, both the turnkey and the greatest beneficial tender are adopted continuously for pushing public engineering. This thesis is to study the turnkey and professional construction management(PCM)of engineering. A new dormitory project was taken as a case study. According to the government's regulation associated with the existing law, collecting strategy is to take precaution for the turnkey and PCM. This case study is also compared
APA, Harvard, Vancouver, ISO, and other styles
13

Chen, Hu-Li, and 陳惠莉. "Labor safety attitudes and behavior with contractors construction management for occupation hazards : a case study of oil refinery turnkey project." Thesis, 2012. http://ndltd.ncl.edu.tw/handle/66750235230651191476.

Full text
Abstract:
碩士<br>國立高雄第一科技大學<br>環境與安全衛生工程研究所<br>100<br>This research is mainly to discuss laborer’s safe attitude, individual uses safe protective equipment attitude, management of construction of laborer’s behavior and contracting trader on the influence to the job calamity of the security, through collecting domestically and relevantly and gently? And consult other scholar&apos;&apos;s materials to gather together wholly, with the inference of this research, propose studying supposing and relevant analysis. Investigate laborer’s to safe attention degree through questionnaire, individual uses idea, unsaf
APA, Harvard, Vancouver, ISO, and other styles
14

HUANG, LI-WEN, and 黃瑮雯. "The Implementation of Turnkey Construction Project Management: Using the Taiwan High Speed Rail’s Public Works Construction of Miaoli Station as an Example." Thesis, 2013. http://ndltd.ncl.edu.tw/handle/56730056319195462677.

Full text
Abstract:
碩士<br>中華大學<br>營建管理學系碩士在職專班<br>101<br>The impact that establishing High Speed Rail (HSR) station on the western corridor of Taiwan has on the surrounding land use, traffic and transportation, and urban spatial structure has become an significant topic regarding the development of new cities in HSR-designated areas. This study used the HSR Miaoli Station designated area as an example to examine the application of a turnkey model for project implementation in an HRS-designated area. The study results are presented below. 1. Considering structural safety, landscape and ecology, drainage require
APA, Harvard, Vancouver, ISO, and other styles
15

Li-LingLiu and 劉麗玲. "Risk Management of Strategic Alliance In Construction Industry - the Example of Turnkey Projects." Thesis, 2015. http://ndltd.ncl.edu.tw/handle/9wtum4.

Full text
Abstract:
碩士<br>國立成功大學<br>高階管理碩士在職專班(EMBA)<br>103<br>In recent years, the projects for public constructions have gradually replaced the traditional contracts with turnkey contracts, and therefore many constructors have formed strategic alliances with different companies to bid for the public construction projects. While there are advantages in this strategy alliance, there is still a conservable level of risk. This study analyzes three laws suits the case company encountered in turnkey contracts. After summarizing the process and results of legal negotiations or judgments, this study identifies the caus
APA, Harvard, Vancouver, ISO, and other styles
16

Chen, Kuei-Lan, and 陳桂蘭. "Identifying Problems and Responsive Actions for Client on Contract Management of Turnkey Projects." Thesis, 2010. http://ndltd.ncl.edu.tw/handle/85682580860956504915.

Full text
Abstract:
碩士<br>中華大學<br>營建管理研究所<br>98<br>Project delivery method of turnkey has been promoted over ten years after the Government Procurement Law (GPL) launched in Taiwan. However, the number of the project employed the turnkey method as its project delivery method is limited compared to the situations in other countries. One of the essential causes is that the client encountered many contract management problems and resulted in numerous contract disputes. These circumstances make the clients being afraid of employing the turnkey method as their project delivery method. This study reviewed the literatur
APA, Harvard, Vancouver, ISO, and other styles
We offer discounts on all premium plans for authors whose works are included in thematic literature selections. Contact us to get a unique promo code!