To see the other types of publications on this topic, follow the link: Weekly Work Plan.

Journal articles on the topic 'Weekly Work Plan'

Create a spot-on reference in APA, MLA, Chicago, Harvard, and other styles

Select a source type:

Consult the top 50 journal articles for your research on the topic 'Weekly Work Plan.'

Next to every source in the list of references, there is an 'Add to bibliography' button. Press on it, and we will generate automatically the bibliographic reference to the chosen work in the citation style you need: APA, MLA, Harvard, Chicago, Vancouver, etc.

You can also download the full text of the academic publication as pdf and read online its abstract whenever available in the metadata.

Browse journal articles on a wide variety of disciplines and organise your bibliography correctly.

1

Br Ginting, Dewi Sartika, T. Henny Febriana Harumy, Niskarto Zendrato, et al. "E-Warta Android-Based System to Support Information Acceleration during the Pandemic in the GBKP Runggun Sememei Batu Community Group." ABDIMAS TALENTA: Jurnal Pengabdian Kepada Masyarakat 8, no. 2 (2023): 686–92. http://dx.doi.org/10.32734/abdimastalenta.v8i2.13928.

Full text
Abstract:
In the religious field, especially during this pandemic, the information that is routinely conveyed has problems. The work plan that has been planned by the religious management must also find a way to realize the work plan as well as possible. Efficiency in terms of information sharing was also discussed, especially considering the new normal era, that information sharing such as weekly information still has shortcomings, someone who is late cannot hear the weekly information anymore and members cannot re-read information when they want to come back wanting to know something from that informa
APA, Harvard, Vancouver, ISO, and other styles
2

Jakab, Z. "Successful transfer of Eurosurveillance to ECDC." Eurosurveillance 12, no. 3 (2007): 1–2. http://dx.doi.org/10.2807/esm.12.03.00695-en.

Full text
Abstract:
One of the first things the new European Centre for Disease Prevention and Control (ECDC) had to address in 2005 when the Centre was just being set up and operational was the requirement in its Work Plan 2005-2006 to issue a “weekly epidemiological report”.
APA, Harvard, Vancouver, ISO, and other styles
3

Tozahro, Ni'mah, and Afrizal Nursin. "LAST PLANNER SYSTEM (LPS) IMPLEMENTATION ON JAKARTA-CIKAMPEK II ELEVATED TOLL ROAD PROJECT." Applied Research on Civil Engineering and Environment (ARCEE) 2, no. 01 (2020): 17–22. http://dx.doi.org/10.32722/arcee.v2i01.2859.

Full text
Abstract:
In construction industry, its implementation of the construction has its own constraints. A good management or project management system is needed to minimize the risk of these constraints. The latest project management concept that has proven more effective and efficient is Last Planner System method. This study aims to investigate how the implementation of Last Planner System works on Jakarta-Cikampek II Elevated Toll Road Project. With the evaluation of weekly job evaluations using PPC (Percent Plan Completed) and Pareto Variance Constraint analysis, the constraint issues of this project wi
APA, Harvard, Vancouver, ISO, and other styles
4

Hadzhikolev, Emil, and Stanka Hadzhikoleva. "Application of the Simplex Method to Create A Weekly Menu Planner." Acta Universitatis Cibiniensis. Series E: Food Technology 22, no. 2 (2018): 77–84. http://dx.doi.org/10.2478/aucft-2018-0015.

Full text
Abstract:
Abstract Organized meals for different groups - students, servicemen, employees working in specific businesses and organization of work - is invariably care for people’s health. An important task in this process is the preparation of menu plans that correspond to the norms for full, balanced and healthy nutrition for the respective age group and working conditions. They must provide the energy and nutrients necessary for the organism - proteins, carbohydrates, vitamins, fats (of animal and plant origin), etc. In some cases, menu planning must be consistent with the use of available food produc
APA, Harvard, Vancouver, ISO, and other styles
5

Utomo, Gunaedy, Irna Hendriyani, and Siti Nor Aida. "Evaluasi Pelaksanaan Proyek Drainase Dengan Metode CPM Dan PERT." Media Ilmiah Teknik Sipil 9, no. 1 (2020): 44–52. http://dx.doi.org/10.33084/mits.v9i1.1884.

Full text
Abstract:
This research purposes to evaluate the implementation of the drainage project in Jl. Mulawarman, Gg. Arjuna, Sepinggan. This research uses the CPM (Critical Path Method) and the PERT (Project Evaluation and Review Technique). Based on the budget plan, time schedule, weekly report, documentation and interview found that the result of the CPM with two critical paths are work activities. The first critical path are: Activity A (Mobilization and Demobilization), Activity C (Landfilling activity), Activity F (Concrete works K-175, Ready Mix). The second critical path are: Activity A (Mobilization a
APA, Harvard, Vancouver, ISO, and other styles
6

Bar-Ad, Voichita, Kathleen W. Wilson, Susan Munro, et al. "Increasing on-treatment visit compliance for radiation therapy cancer patients." Journal of Clinical Oncology 31, no. 31_suppl (2013): 175. http://dx.doi.org/10.1200/jco.2013.31.31_suppl.175.

Full text
Abstract:
175 Background: Weekly on-treatment-visits (OTVs) represent standard care in radiation oncology and have significant impact on the quality of patient care. Ensuring that OTVs are completed might decrease the severity of acute treatment-related side effects by facilitating timely treatment of symptoms. This study evaluates factors contributing to missed OTVs and formulates a plan to mitigate this problem. Methods: A multidisciplinary team of radiation oncology staff members reviewed clinical work flow data to determine the number of patients missing their weekly OTVs. These numbers generated be
APA, Harvard, Vancouver, ISO, and other styles
7

J, Mingjing. "Five in One Risk Management and Control to Improve Enterprise Safety Management Level." Petroleum & Petrochemical Engineering Journal 5, no. 4 (2021): 1–4. http://dx.doi.org/10.23880/ppej-16000282.

Full text
Abstract:
The operation risk management and control system is to discuss the daily operation of petrochemical plant by five professionals, including Process Engineer, Safety Engineer, Operator Electrical Instrument Engineer and Equipment maintenance personnel, to arrange weekly plan, identify risks and discuss preventive measures. In this way, the daily total amount of work can be controlled, the risk can be controlled, the efficiency is higher, and the safety in the petrochemical production process can be guaranteed.
APA, Harvard, Vancouver, ISO, and other styles
8

McCarthy, Katherine M. "Empowering Online Undergraduate Social Work Students to Address Their Stress." Journal of Baccalaureate Social Work 25, no. 1 (2020): 231–43. http://dx.doi.org/10.18084/1084-7219.25.1.231.

Full text
Abstract:
Effective self-regulation is a critical aspect of social work. Unmanaged stress can impair a social worker’s effectiveness. BSW students must demonstrate the capacity for cognitive and affective self-regulation to graduate, yet they may be expected to develop these skills outside of their academic program. This article describes a pedagogical strategy for encouraging proactive stress management practices in BSW students during online theory and practice courses at a Midwest public university. Students completed weekly self-care quizzes, which required them to rate their stress, create a plan t
APA, Harvard, Vancouver, ISO, and other styles
9

Kussumardianadewi, Bernadette Detty, Albert Eddy Husin, and Anti Susianti. "Analysis of Key Factors for Successful Implementation of the Last Planner System to Improve Time Performance on Dam Projects." MEDIA KOMUNIKASI TEKNIK SIPIL 29, no. 2 (2024): 163–72. http://dx.doi.org/10.14710/mkts.v29i2.49098.

Full text
Abstract:
Infrastructure development is crucial to the development of a nation’s economy. Based on data from the 2021 World Competitiveness Yearbook, Indonesia's infrastructure is ranked 57th out of 64 countries and one of the assessment criteria is related to water resources. Water resource management in Indonesia is still faced with fundamental challenges, including the limited water storage capacity in Indonesia so alternative water resources development is needed, among which is through the construction of dams. In practice, dam projects are very vulnerable to time delays. One of the solutions to th
APA, Harvard, Vancouver, ISO, and other styles
10

Tello, Isabella, and Jose Alejandro Aguilar. "The Javeriana Cali’ Strategic Plan for the Sustainable Management: An Example of How to Implement, Disseminate and Evaluate Sustainability Policies." Journal of Sustainability Perspectives 4 (November 27, 2024): 303–16. http://dx.doi.org/10.14710/jsp.2024.25044.

Full text
Abstract:
In order to organize the multiple actions the Universidad Javeriana had been developing for the sustainable management of its campus, a strategic plan was structured. The plan is structured in five major programs: water resources, energy, biodiversity, recycling and reduction of CO2 emissions. For the definition of these five programs we were inspired by the contributions of the thematic structure of Green Metrics, the recommendations of the Encyclical Laudato Si and the SDGs. In turn, each program is broken down into sub-programs, projects and sub-projects. Each program also includes cross-cu
APA, Harvard, Vancouver, ISO, and other styles
11

Joseph Dedy Irawan, Munasih, Maria Christina Endarwati, Renaldi Primaswara Prasetya, and Cindia Rama Auliansyah. "Construction project management monitoring system using s-curve." World Journal of Advanced Research and Reviews 17, no. 2 (2023): 296–305. http://dx.doi.org/10.30574/wjarr.2023.17.2.0231.

Full text
Abstract:
Every construction project generally has a specific implementation plan and implementation schedule: when to start the implementation of the project, when to complete the project, how to do the project, and how to provide resources. Making a plan for a construction project always refers to the estimates that exist when the scheduled development plan is made. Therefore, problems can arise if there is a mismatch between the plan that has been made and its implementation. With the limited resources in the company, thorough and good planning is needed as a guide in carrying out the project to use
APA, Harvard, Vancouver, ISO, and other styles
12

Joseph, Dedy Irawan, Munasih, Christina Endarwati Maria, Primaswara Prasetya Renaldi, and Rama Auliansyah Cindia. "Construction project management monitoring system using s-curve." World Journal of Advanced Research and Reviews 17, no. 2 (2023): 296–305. https://doi.org/10.5281/zenodo.8107203.

Full text
Abstract:
Every construction project generally has a specific implementation plan and implementation schedule: when to start the implementation of the project, when to complete the project, how to do the project, and how to provide resources. Making a plan for a construction project always refers to the estimates that exist when the scheduled development plan is made. Therefore, problems can arise if there is a mismatch between the plan that has been made and its implementation. With the limited resources in the company, thorough and good planning is needed as a guide in carrying out the project to use
APA, Harvard, Vancouver, ISO, and other styles
13

McNamara, Deborah A., Paul Rafferty, and Fidelma Fitzpatrick. "An improvement model to optimise hospital interdisciplinary learning." International Journal of Health Care Quality Assurance 29, no. 5 (2016): 550–58. http://dx.doi.org/10.1108/ijhcqa-10-2015-0131.

Full text
Abstract:
Purpose – Interdisciplinary healthcare education and collaboration facilitates healthcare quality improvement (QI). Education challenges include cost, logistics and defining the optimum staff-engaging method. The purpose of this paper is to determine the optimum QI educational model and measure its impact using plan-do-study-act (PDSA) cycles. Design/methodology/approach – The authors established an on-site interdisciplinary QI learning collaborative: weekly 30-minute learning sessions close to the working environment; a learning materials Twitter repository; and junior doctor-led QI work stre
APA, Harvard, Vancouver, ISO, and other styles
14

Marbun, Sariana, and Dorlince Simatupang. "TEACHER GUIDANCE IN THE IMPLEMENTATION OF CURRICULUM 2013 (K-13) FOR EARLY CHILDHOOD EDUCATION IN THE LANGKAT REGENCY." Journal of Community Research and Service 2, no. 1 (2018): 143. http://dx.doi.org/10.24114/jcrs.v2i1.9855.

Full text
Abstract:
Abstract The background of the study comes from the low ability of teachers in designing scientific-based learning implementation plan (RPPH) for the Scientific and Local Culture subject and carrying out the authentic assessment for early childhood education (PAUD) students. These activities aim to assist teachers developing Weekly Implementation Plan (RPPM) and RPPH on the aforementioned subject as well as to help teachers developing the authentic assessment instruments in measuring early child development outcomes. The activities were conducted in the Ananda Kindergarten and Early Childhood
APA, Harvard, Vancouver, ISO, and other styles
15

Conde-López, Luis, Guillermo Gutiérrez-Alcaraz, and S. N. Singh. "Generating adequacy analysis of Mexico’s national interconnected power system." International Journal of Energy Sector Management 10, no. 4 (2016): 561–75. http://dx.doi.org/10.1108/ijesm-11-2014-0003.

Full text
Abstract:
Purpose Long-term reliability analysis of generation capacity based on the forecasted load demand helps to identify the optimal generation expansion plan of the system. This paper analyzes the generation adequacy of Mexico’s National Interconnected Power System (MNIPS) using loss of load expectation (LOLE) and loss of energy expectation (LOEE) indices. Design/methodology/approach These indices are calculated through an analytical (recursive) method and are then compared with values recommended by the North American Electric Reliability Council (NERC). Weekly indices are computed to analyze the
APA, Harvard, Vancouver, ISO, and other styles
16

Susanti, Ajeng Renita, and Suripto S. "Evaluasi Waste dan Implementasi Lean Construction Proyek Gedung Kampus X." JURNAL RIVET 1, no. 02 (2021): 65–72. http://dx.doi.org/10.47233/rivet.v1i02.331.

Full text
Abstract:
Pelaksanaan proyek pembangunan gedung akan menimbulkan waste yang bisa memberikan dampak untuk proyek yang sedang berjalan. Waste merupakan kegiatan yang tidak memberikan nilai tambah baik kepada customer maupun owner. Salah satu upaya untuk meminimalisir dampak dari waste waktu adalah perlu meminimalkan pemborosan dan meningkatkan value (nilai) seperti prinsip Lean Construction (konstruksi ramping). Analisis dilakukan untuk mengevaluasi variabel dan faktor penyebab waste paling berpengaruh dan implementasi dari Lean Construction tools. Teknik analisis data dilakukan menggunakan kuesioner sela
APA, Harvard, Vancouver, ISO, and other styles
17

Jin, Jun Yan. "Application of the Last Planner System in Schedule Management of Construction Projects." Applied Mechanics and Materials 438-439 (October 2013): 1777–81. http://dx.doi.org/10.4028/www.scientific.net/amm.438-439.1777.

Full text
Abstract:
Schedule control is one of the main tasks of engineering project management, and effective schedule management is an important means of realization of project objectives. The traditional project schedule management is lack of dynamic adjustment and update, and various drawbacks of the method have been appeared. Last planner system (LPS) is a kind of schedule management of project based TFV theory of lean thinking, which transfers the traditional "push" system into "pull" system for schedule management. Based on the master schedule, look-ahead schedule and weekly work plan, schedule management
APA, Harvard, Vancouver, ISO, and other styles
18

Werthman, Emily h. "809 Culture Change in the Burn Unit: A Comprehensive Pressure Injury Reduction Strategy." Journal of Burn Care & Research 41, Supplement_1 (2020): S243. http://dx.doi.org/10.1093/jbcr/iraa024.386.

Full text
Abstract:
Abstract Introduction In our regional burn center, which treats approximately 800 patients annually, the prevention of pressure injuries continues to challenge the burn team. The nursing team, in particular, was demoralized by a steady prevalence rate despite utilizing evidence based practice. A comprehensive pressure injury reduction plan was developed to provide new strategies to prevent pressure injuries and to provide real time data about the effectiveness of nursing interventions. Methods A team of physicians, nurses, nutritionists, pharmacists, physical and occupational therapists develo
APA, Harvard, Vancouver, ISO, and other styles
19

MELINA, V. KAHULUGAN. "UTILIZING THE MONITORING TOOL OF STUDENTS, PARENTS AND ADVISERS AS INTEGRATED IN THE UNIFIED WEEKLY HOME LEARNING PLAN TEMPLATE." International Journal of Thesis Projects and Dissertations (IJTPD) 12, no. 2 (2024): 1–8. https://doi.org/10.5281/zenodo.10972468.

Full text
Abstract:
<strong>Abstract:</strong> This action research sought to assist SHS students in monitoring their own learning tasks during the transition to the new normal education system. The study sought to ascertain the extent of output monitoring and to investigate the difficulties students encountered when submitting their weekly output. The study also sought to determine how the newly developed monitoring tool assisted students in overcoming these obstacles. To comprehend the difficulties students encountered in monitoring the learner&rsquo;s submitted outputs, this study used a qualitative research m
APA, Harvard, Vancouver, ISO, and other styles
20

I Gusti Agung Ananda Putra. "Analysis of Construction Project Cost and Time Using the Earned Value Method." Communications on Applied Nonlinear Analysis 32, no. 3 (2024): 322–27. http://dx.doi.org/10.52783/cana.v32.1963.

Full text
Abstract:
This study aims to analyze the cost and time performance of the renovation project of Arwana Restaurant The Laguna Resort and Spa Nusa Dua by applying the Earned Value method. The data used in this study include the Cost Budget Plan (RAB), project implementation schedule, weekly project progress reports, and project expenditure reports. The calculation is done by calculating the value of ACWP (Actual Cost of Work Performed), BCWS (Budgeted Cost of Work Schedule), BCWP ( Budgeted Cost of Work Performed ), CV ( Cost Variance ), SV ( Schedule Variance ), CPI (Cost Performance Index), SPI (Schedul
APA, Harvard, Vancouver, ISO, and other styles
21

Hartz, T. K., R. F. Smith, and K. F. Schulbach. "OPTIMIZING NITROGEN EFFICIENCY IN DRIP-IRRIGATED VEGETABLE PRODUCTION." HortScience 28, no. 5 (1993): 506e—506. http://dx.doi.org/10.21273/hortsci.28.5.506e.

Full text
Abstract:
Drip irrigation, by removing nitrogen application from other cultural restraints, allows efficient N management. In intensive work with commercial vegetable operations in California's central coastal valleys, we have formulated a nitrogen management plan for drip-irrigated vegetable production. The main elements of the plan are: a) estimation of net N mineralization potential of a field, b) suction lysimetry to monitor early-season soil N availability, c) weekly tissue sampling for conventional laboratory analysis or on-farm `quick test' analysis of petiole sap, and d) irrigation scheduling ba
APA, Harvard, Vancouver, ISO, and other styles
22

Rusdiana, Vena, Farrel Rayhan Ardra, Agung Bhakti Utama, and Eko Kusumo Friatmojo. "PENERAPAN LAST PLANNER SYSTEM PADA PROYEK PENATAAN KAWASAN MASJID DI KOTA SEMARANG." Jurnal Ilmiah Desain & Konstruksi 21, no. 2 (2022): 161–72. http://dx.doi.org/10.35760/dk.2022.v21i2.7166.

Full text
Abstract:
Dalam sebuah proyek konstruksi, ketidakefisienan penggunaan sumber daya akan menimbulkan pemborosan (waste). Waste tidak dapat dihilangkan, tetapi dapat diminimalisir dengan menerapkan konsep lean construction atau konstruksi ramping. Dalam konsep lean construction terdapat metode manajemen untuk mengurangi waste dengan menghasilkan perencanaan yang jelas dan sistematis yaitu dengan metode last planner system. Konsep last planner system digunakan untuk merencanakan dan mengendalikan proyek pada salah satu proyek penataan kawasan masjid di Kota Semarang. Artikel ini mendemonstrasikan penerapan
APA, Harvard, Vancouver, ISO, and other styles
23

Jacomini, Márcia, Thiago Alves, and Rubens Barbosa de Camargo. "Remuneração docente: Desafiospara o monitoramento da valorização dos professores brasileiros no contexto da meta 17 do Plano Nacional de Educação." education policy analysis archives 24 (July 11, 2016): 73. http://dx.doi.org/10.14507/epaa.24.2386.

Full text
Abstract:
This article aims to offer methodological strategies to verify and monitor the enforcement of goal 17 of the 2014/2021 National Education Plan (Brazilian Federal Law 13.005 from June 25, 2014), which determines that teachers from basic education public schools in Brazil must have average income equivalent to other professionals with similar education by 2020. We have used data from the National Household Sample Survey (PNAD) for the year 2013, which was the source recommended by the legislator. In the suggested calculation formula, we have indicated selection and treatment parameters for remun
APA, Harvard, Vancouver, ISO, and other styles
24

Nugroho, Pasadhena Arief Cahya, Albert Wiweko, and Muhammad Sapril Siregar. "Main Switch Board Plan Maintenance System on MV. Kirana III." ATRIA : Jurnal Multidisiplin Riset Ilmiah 1, no. 1 (2024): 7–14. http://dx.doi.org/10.62554/r6axsk18.

Full text
Abstract:
The Plan Maintenance System (PMS) is a continuous and scheduled maintenance system for equipment and supplies on a ship. Its purpose is to ensure that the ship is always in a seaworthy condition and ready to operate. In order to achieve smooth operation of the ship, it is essential to have a good, efficient, and effective work and maintenance system for the ship's electricity and systems. One way to do this is by formulating and implementing maintenance system plans by shipping companies in Indonesia. During research carried out on the KM Ship, KIRANA, it was found that there was a lack of mai
APA, Harvard, Vancouver, ISO, and other styles
25

Berninger, Nathalie M., Gill A. ten Hoor, Guy Plasqui, Gerjo Kok, Gjalt-Jorn Ygram Peters, and Robert A. C. Ruiter. "Sedentary Work in Desk-Dominated Environments: A Data-Driven Intervention Using Intervention Mapping." JMIR Formative Research 4, no. 7 (2020): e14951. http://dx.doi.org/10.2196/14951.

Full text
Abstract:
Background Since desk-dominated work environments facilitate sedentary behavior, office workers sit for 66% of their working days and only 8% succeed in interrupting their prolonged periods of sitting within the first 55 minutes. Yet stretches of long and uninterrupted sitting increase the likelihood of several chronic metabolic and cardiovascular diseases. Objective We therefore developed a computer-based app designed to interrupt periods of prolonged sitting among office employees. Methods When developing the intervention, we applied the intervention mapping protocol. This approach for the s
APA, Harvard, Vancouver, ISO, and other styles
26

Firdausi, Ahmad Kahfi, M. Ruslin Anwar, and Arief Rachmansyah. "A Fuzzy Approach on Earned Value Method to Evaluate Project Performance in Solojebres Commuter Depot." Rekayasa Sipil 18, no. 3 (2024): 186–94. http://dx.doi.org/10.21776/ub.rekayasasipil.2024.018.03.3.

Full text
Abstract:
The high level of public interest in using the Solo-Jogja commuter needs to be accompanied by an effort to improve the services and reliability of facilities, one of which is the establishment of a Commuter Depot located at Solojebres Station. In the 18th month of work, the construction of the Commuter Depot experienced delays in work performance with a deviation between plan progress and actual progress of -3.5415%. This research aims to evaluate project performance, including the project's cost and schedule performances, and estimate the cost and schedule of the project at completion due to
APA, Harvard, Vancouver, ISO, and other styles
27

Cubillos-Mesías, Macarena, Esther G. C. Troost, Fabian Lohaus, et al. "Quantification of plan robustness against different uncertainty sources for classical and anatomical robust optimized treatment plans in head and neck cancer proton therapy." British Journal of Radiology 93, no. 1107 (2020): 20190573. http://dx.doi.org/10.1259/bjr.20190573.

Full text
Abstract:
Objective: Classical robust optimization (cRO) in intensity-modulated proton therapy (IMPT) considers isocenter position and particle range uncertainties; anatomical robust optimization (aRO) aims to consider additional non-rigid positioning variations. This work compares the influence of different uncertainty sources on the robustness of cRO and aRO IMPT plans for head and neck squamous cell carcinoma (HNSCC). Methods: Two IMPT plans were optimized for 20 HNSCC patients who received weekly control CTs (cCT): cRO, using solely the planning CT, and aRO, including 2 additional cCTs. The robustne
APA, Harvard, Vancouver, ISO, and other styles
28

De Souza Silva, Antonio, Thiago Alexandre Mota, Marcos Gino Fernandes, and Samir Oliveira Kassab. "Spatial distribution of Bemisia tuberculata (Hemiptera: Aleyrodidae) on cassava crop in Brazil." Revista Colombiana de Entomología 39, no. 2 (2013): 193–95. http://dx.doi.org/10.25100/socolen.v39i2.8233.

Full text
Abstract:
To determine an adequate sampling plan, according to the guidelines of Integrated Pest Management (IPM), it is important to understand the spatial distribution of the pest in question. The objective of this work was to develop a distribution model for Bemisia tuberculata adults on cassava crops. Sampling was performed in a commercial field of 2,500 m2, divided into 100 plots, where the numbers of individuals on the apical leaves were counted. No insecticides were applied during the study. Fifteen samples were taken weekly from January to April 2012. In general, the aggregation indices (varianc
APA, Harvard, Vancouver, ISO, and other styles
29

HERMAWAN, I. PUTU YANA, I. GEDE NGURAH SUNATHA, ANAK AGUNG RATU RITAKA WANGSA, and KADEK ANDY SADEWA. "ANALISIS PERCEPATAN WAKTU PELAKSANAAN PROYEK DENGAN PENAMBAHAN JAM KERJA (STUDI KASUS PEMBANGUNAN LAHAN PARKIR RUMAH SAKIT BANGLI MEDIKA CANTI)." GANEC SWARA 17, no. 2 (2023): 638. http://dx.doi.org/10.35327/gara.v17i2.467.

Full text
Abstract:
Implementation of a construction project has a series of activities or jobs that are complex and interdependent on one another. Construction project development is carried out in several stages of work, one of which is making a work schedule. Work schedules are made to make it easier for each activity to be carried out sequentially and on time. In the implementation of the Parking Lot Construction Project at Bangli Medika Canti Hospital, there was a delay in weekly progress. To anticipate changes in implementation time, an acceleration of implementation time is carried out using the method of
APA, Harvard, Vancouver, ISO, and other styles
30

Rahmadani, Laila Putri, Junita Eka Susanti, and Putri Ayu Dwiyana. "Cost and Time Performance Evaluation Based on Earned Value Analysis Method." Journal of Civil Engineering and Planning 6, no. 1 (2025): 140–48. https://doi.org/10.37253/jcep.v6i1.10691.

Full text
Abstract:
The execution of construction projects frequently encounters a range of challenges in the field, leading to deviations between the initial project plan and actual implementation, particularly in terms of time and cost performance. Such deviations may significantly affect the overall efficiency and effectiveness in achieving the intended project objectives. Consequently, there is a critical need for an evaluation method capable of providing a comprehensive and real-time assessment of project performance. This study aims to evaluate the performance of an infrastructure development initiative, na
APA, Harvard, Vancouver, ISO, and other styles
31

Auliawan, Kevin Duta, and Hanna Prillysca Chernovita. "Strategic Planning Information Systems Industrial Work Lecture Program (Case Study: CV. Laksana Karoseri)." Journal of Information Systems and Informatics 4, no. 3 (2022): 737–52. http://dx.doi.org/10.51519/journalisi.v4i3.275.

Full text
Abstract:
CV. Laksana Karoseri is a bus carousel company from Ungaran that assembles various bus bodies. In an effort to help the development of good human resources, every year CV. Laksana Karoseri has an industrial work lecture program that accepts hundreds of internship students every year. However, the program has not been running and is well organized because some activity processes have not run optimally, for example, the acceptance of internships, attendance and scheduling of internships that are not managed properly. Therefore, it is necessary to have SI / IT strategic planning to improve manage
APA, Harvard, Vancouver, ISO, and other styles
32

Soegaard Ballester, Jacqueline M., Geoffrey D. Bass, Richard Urbani, et al. "A Mobile, Electronic Health Record-Connected Application for Managing Team Workflows in Inpatient Care." Applied Clinical Informatics 12, no. 05 (2021): 1120–34. http://dx.doi.org/10.1055/s-0041-1740256.

Full text
Abstract:
Abstract Background Clinical workflows require the ability to synthesize and act on existing and emerging patient information. While offering multiple benefits, in many circumstances electronic health records (EHRs) do not adequately support these needs. Objectives We sought to design, build, and implement an EHR-connected rounding and handoff tool with real-time data that supports care plan organization and team-based care. This article first describes our process, from ideation and development through implementation; and second, the research findings of objective use, efficacy, and efficienc
APA, Harvard, Vancouver, ISO, and other styles
33

Utomo Dwi Hatmoko, Jati, Human Adi Darmawan, Zuldi Sabrian, and Mochamad Agung Wibowo. "Are Indonesia contractors ready to implement last planner system? – an early investigation." MATEC Web of Conferences 195 (2018): 06012. http://dx.doi.org/10.1051/matecconf/201819506012.

Full text
Abstract:
Last Planner System (LPS) is one of Lean Construction’s tools for scheduling to enhance project’s reliability, productivity, and performance. It has already been widely adopted in many developed countries and shown benefits, such as shorter duration, less rework, and better communication. Despite its benefits, the use of LPS is almost unheard of in Indonesian. The aim of this exploratory research is to investigate the readiness of LPS implementation for Indonesia’s projects. The assessment is based on five principles of LPS, i.e. Master Schedule, Pull Planning, Making Work Ready, Weekly Work P
APA, Harvard, Vancouver, ISO, and other styles
34

Ahmed, Ahmed M., Kushal Kadakia, Alwiya Ahmed, Blake Shultz, and Xiaojuan Li. "Trends in Labor Unionization Among US Health Care Workers, 2009-2021." JAMA 328, no. 24 (2022): 2404. http://dx.doi.org/10.1001/jama.2022.22790.

Full text
Abstract:
ImportanceLabor unionization efforts have resurged in the US, and union membership has been shown to improve worker conditions in some industries. However, little is known about labor unionization membership and its economic effects across the health care workforce.ObjectivesTo examine the prevalence of labor unionization among health care workers and its associations with pay, noncash benefits, and work hours.Design, Setting, and ParticipantsThis cross-sectional study was conducted using data from the Current Population Survey and Annual Social and Economic Supplement from 2009 through 2021.
APA, Harvard, Vancouver, ISO, and other styles
35

Fernandez-Olivares, Juan, and Raul Perez. "Driver Activity Recognition by Means of Temporal HTN Planning." Proceedings of the International Conference on Automated Planning and Scheduling 30 (June 1, 2020): 375–83. http://dx.doi.org/10.1609/icaps.v30i1.6683.

Full text
Abstract:
When delivering a transport service, scheduled driver workplans have to be aligned with world wide complex hours of service (HoS) regulations which constraint the amount of working and driving time without resting. The activities of such workplans are recorded by onboard sensors in large temporal event logs. Transport companies are interested on recognizing what a driver is doing, based on the temporal observations from event logs, considering the terms defined by HoS regulations. This work presents an application of temporal HTN planning to plan and goal recognition that, starting from a real
APA, Harvard, Vancouver, ISO, and other styles
36

Rodríguez-Padial, Néstor, Marta M. Marín, and Rosario Domingo. "Assisted-Driven Design of Customized Maintenance Plans for Industrial Plants." Applied Sciences 12, no. 14 (2022): 7144. http://dx.doi.org/10.3390/app12147144.

Full text
Abstract:
Current production systems that respond to market demands with high rates of production change and customization use complex systems. These systems are machines with a high capacity for communication, sensing and self-diagnosis, although they are susceptible to failures, breakdowns and a loss of reliability. The amount of data they provide as a productive system and, individually, as a machine can be treated to improve customized maintenance plans. The objective of this work, with an operational scope, is to collect and exploit the knowledge acquired in the industrial plant on failures and bre
APA, Harvard, Vancouver, ISO, and other styles
37

Kim, Ji-Young, Bouchra Tawk, Maximilian Knoll, et al. "Clinical Workflow of Cone Beam Computer Tomography-Based Daily Online Adaptive Radiotherapy with Offline Magnetic Resonance Guidance: The Modular Adaptive Radiotherapy System (MARS)." Cancers 16, no. 6 (2024): 1210. http://dx.doi.org/10.3390/cancers16061210.

Full text
Abstract:
Purpose: The Ethos (Varian Medical Systems) radiotherapy device combines semi-automated anatomy detection and plan generation for cone beam computer tomography (CBCT)-based daily online adaptive radiotherapy (oART). However, CBCT offers less soft tissue contrast than magnetic resonance imaging (MRI). This work aims to present the clinical workflow of CBCT-based oART with shuttle-based offline MR guidance. Methods: From February to November 2023, 31 patients underwent radiotherapy on the Ethos (Varian, Palo Alto, CA, USA) system with machine learning (ML)-supported daily oART. Moreover, patient
APA, Harvard, Vancouver, ISO, and other styles
38

Lastrucci, Andrea, Yannick Wandael, Giovanni Orlandi, et al. "Precision Workforce Management for Radiographers: Monitoring and Managing Competences with an Automatic Tool." Journal of Personalized Medicine 14, no. 7 (2024): 669. http://dx.doi.org/10.3390/jpm14070669.

Full text
Abstract:
Optimizing work shifts in healthcare is crucial for maintaining high standards of service delivery and fostering professional development. This study delves into the emerging field of skill-oriented work shift optimization, focusing specifically on radiographers within the healthcare sector. Through the development of Skills Retention Monitoring (SRH), this research aims to enhance skill monitoring, workload management, and organizational performance. In this study, several key highlights emerged: (a) Introduction of the SRH tool: The SRH tool represents a resource-efficient solution that harn
APA, Harvard, Vancouver, ISO, and other styles
39

Mohammed, Ismail. "IoT based Employee Wellness Program." International Journal for Research in Applied Science and Engineering Technology 9, no. 9 (2021): 392–99. http://dx.doi.org/10.22214/ijraset.2021.37979.

Full text
Abstract:
Abstract: Owing to globalization, employees spend 60-70% of their time in their offices hence they offer an important venue for influencing dietary behaviour of employees [1, 3]. With the increased technology and usage of sensors, the application of Internet based smart health monitoring has emerged at a greater pace. Internet of Things (IoT) is the new revolution which is the growing research area especially in the health care domain [7]. The current work presents a methodology that links the employee health to risk factors such as diet and physical activity and provides an exclusive diet pla
APA, Harvard, Vancouver, ISO, and other styles
40

Verma, S., L. Horn, J. Chung, S. Vijayaratnam, and S. Berry. "A survey of Canadian medical oncologists on internet use for medical information and a needs assessment for an oncology education website." Journal of Clinical Oncology 25, no. 18_suppl (2007): 17072. http://dx.doi.org/10.1200/jco.2007.25.18_suppl.17072.

Full text
Abstract:
17072 Background: The internet offers an innovative resource for medical oncologists to share and discuss important medical information and advances. Despite the existence of many websites with oncology related information, there has not been a comprehensive assessment of how Canadian medical oncologists use the internet to access this information. Purpose: In the first phase of developing a new educational website (OncologyEducation.com), we surveyed Canadian medical oncologists to determine how they used the internet to access information and to assess their needs for a web based educational
APA, Harvard, Vancouver, ISO, and other styles
41

Cruz, Lisanne Catherine, Jeffrey S. Fine, and Subhadra Nori. "Barriers to discharge from inpatient rehabilitation: a teamwork approach." International Journal of Health Care Quality Assurance 30, no. 2 (2017): 137–47. http://dx.doi.org/10.1108/ijhcqa-07-2016-0102.

Full text
Abstract:
Purpose In order to prevent adverse events during the discharge process, coordinating appropriate community resources, medication reconciliation, and patient education needs to be implemented before the patient leaves the hospital. This coordination requires communication and effective teamwork amongst staff members. In order to address these concerns, the purpose of this paper is to incorporate the TeamSTEPPS principles to develop a discharge plan that would best meet the needs of the patients as they return to the community. Design/methodology/approach Through a gap analysis, barriers to dis
APA, Harvard, Vancouver, ISO, and other styles
42

Faul, Anna, Mona Huff, Samantha G. Cotton, Pamela Yankeelov, Joe D’Ambrosio, and Megan Austin. "THE IMPACT OF PARTICIPATION IN SOCIAL HEALTH NETWORKS." Innovation in Aging 3, Supplement_1 (2019): S661. http://dx.doi.org/10.1093/geroni/igz038.2449.

Full text
Abstract:
Abstract Stress and compassionate fatigue are common among graduate level students working in healthcare professions, however, few studies focus on preventative self-care and its’ impact on these learners. As part the University of Louisville’s Behavioral Health Workforce Enhancement Training Program (BHWET), graduate students are trained to work with older adults in rural communities. The focus of our BHWET program is to provide holistic, behavioral health care through our FlourishCare Network. As part of the student’s weekly curriculum, an interdisciplinary group of learners from counseling
APA, Harvard, Vancouver, ISO, and other styles
43

Raju, Suguna, Luke Li, Lyncean Ung, et al. "Improving Effectiveness of Thrombophilia Work-up." Blood 144, Supplement 1 (2024): 7558. https://doi.org/10.1182/blood-2024-202197.

Full text
Abstract:
Background: Thrombophilia testing is often performed in both the inpatient and outpatient settings. However, inappropriate ordering of laboratory tests may increase costs, patient burden, and unnecessary referrals. Providers may order tests not generally recommended by guidelines due to a lack of standardized testing and uncertainty of clinical significance. Such testing results in minimal clinical utility. We hypothesized that revising existing Cerner order sets in the electronic health record (EHR) and adding clinical decision-making support could improve the effectiveness of thrombophilia w
APA, Harvard, Vancouver, ISO, and other styles
44

A, Sadhu Adwitya, M. Agung Wibowo, and Syafrudin Syafrudin. "ANALISA PERBEDAAN LPS (LAST PLANNER SYSTEM) DENGAN SISTEM KONVENSIONAL SERTA PENGARUH CPM DAN BAR CHART PADA LPS." Wahana Teknik Sipil: Jurnal Pengembangan Teknik Sipil 25, no. 1 (2020): 66. http://dx.doi.org/10.32497/wahanats.v25i1.1919.

Full text
Abstract:
Two generally method / tools which used in project construction management system in Indonesia and the name are CPM (critical part method) or network planning and Bar Chart. The system used general method called conventional management system. Nowadays, was appeared one of a new system which seldom to applied in Indonesia, it is called LPS (last planner system). This research, researcher doing analyzed the differences between LPS and conventional management system. The result which obtained in this research are LPS dominated to accentuates team collaborative in the scheduling planning, resourc
APA, Harvard, Vancouver, ISO, and other styles
45

Ros-McDonnell, Lorenzo, Norina Szander, María Victoria de-la-Fuente-Aragón, and Robert Vodopivec. "Scheduling Sustainable Homecare with Urban Transport and Different Skilled Nurses Using an Approximate Algorithm." Sustainability 11, no. 22 (2019): 6210. http://dx.doi.org/10.3390/su11226210.

Full text
Abstract:
The essential characteristics that distinguish homecare services from other routing and scheduling problems are relatively few patients being spread out over a large urban area, long transport times and several different services being provided. The approach that the authors present herein was developed to solve planning homecare services according to the criterion of increasing social sustainability and incorporating environmentally sustainable transport systems. The objective of this paper is to present a tool to plan the daily work carried out by a homecare service with assigned patients wi
APA, Harvard, Vancouver, ISO, and other styles
46

Selian, Nurhaida. "THE MANAGEMENT OF PRE SCHOOL TOWARDS ACCREDITATION STANDARDS." AL-ISHLAH: Jurnal Pendidikan 11, no. 2 (2019): 197. http://dx.doi.org/10.35445/alishlah.v11i2.150.

Full text
Abstract:
The research is conducted by the rampant growth of PAUD institutions in the regions but has not been accompanied by efforts to fulfill quality according to national quality standards so that they do not meet accreditation assessments. The objective of this research is to determine PAUD management system in national standards in Bengkalis District and to find out the dominant factors that do not meet national standards in PAUD management systems towards accreditation in Bengkalis District. The method of this reaearch is descriptive with using simple random technique. The data collection method
APA, Harvard, Vancouver, ISO, and other styles
47

Kahfi, Ashabul, Dwi P. Fransiskus, Wijanarko K. Adi, Ahmad Prayogi, and Luqman S. Purwosasongko. "THE HARMONIZING MINE PLANNING IN THE EAST KALIMANTAN COKING COAL MINE: THE CHALLENGES AND IMPROVEMENTS." Indonesian Mining Professionals Journal 5, no. 2 (2024): 93–104. http://dx.doi.org/10.36986/impj.v5i2.121.

Full text
Abstract:
The coking coal mine at the research site is in the Pamaluan formation East Kalimantan. The condition of the mine has many complexities and challenges, such as natural slope condition (30º-35º), narrow pit area and low out pit dump capacity limited by land compensation issue, overburden material, geological structure, coal with very thin layers (&amp;#60;1 m) and consist multiple products in a layer, small number of strips and large number of blocks and high SR pit and SR balance in short range. In mine planning at the research location, many improvements need to be made so that all aspects, s
APA, Harvard, Vancouver, ISO, and other styles
48

Spanos, Athanasios C., Sotiris P. Gayialis, Evripidis P. Kechagias, and Georgios A. Papadopoulos. "An Application of a Decision Support System Enabled by a Hybrid Algorithmic Framework for Production Scheduling in an SME Manufacturer." Algorithms 15, no. 10 (2022): 372. http://dx.doi.org/10.3390/a15100372.

Full text
Abstract:
In this research, we present a hybrid algorithmic framework and its integration into the precise production scheduling system of a Greek metal forming factory. The system was created as a decision support tool to assist production planners in arranging weekly production orders to work centers and other manufacturing cells. The functionality offered includes dispatching priority rules, bottleneck identification for capacity planning, production order reallocation to alternate work centers and planning periods, interchangeable scheduling scenarios, and work-in-process availability checks based o
APA, Harvard, Vancouver, ISO, and other styles
49

Albuainain, Noora, Ghaleb Sweis, Wassim AlBalkhy, Rateb Sweis, and Zoubeir Lafhaj. "Factors Affecting Occupants’ Satisfaction in Governmental Buildings: The Case of the Kingdom of Bahrain." Buildings 11, no. 6 (2021): 231. http://dx.doi.org/10.3390/buildings11060231.

Full text
Abstract:
Satisfaction is a very important factor in improving productivity and performance in the work environment. This study aims to investigate the levels of occupants’ satisfaction with the indoor environmental quality (IEQ) in the governmental buildings in the Kingdom of Bahrain and to investigate the impact of occupants’ demographics and building attributes (non-IEQ factors) on these levels. For these purposes, the study used a questionnaire that has 17 indoor environmental quality (IEQ) factors in addition to a group of non-IEQ factors. The questionnaire was distributed by hand or using email to
APA, Harvard, Vancouver, ISO, and other styles
50

Abreu e Lima, Daniele. "Max Rosenfeld, The Home Architect." Architectural History Aotearoa 5 (October 31, 2008): 13–22. http://dx.doi.org/10.26686/aha.v5i0.6761.

Full text
Abstract:
1949 marks the beginning of a radical change in the relation between New Zealanders and their homes. The new government at that time began encouraging home ownership in opposition to the existing policy of renting state houses. In those days, one of the most influential architects in the country was Max Rosenfeld, a Czech immigrant who became known mainly through the Auckland magazine The Weekly News. Rosenfeld hadn't produced any iconic building or brought any revolutionary aesthetic style. Nevertheless his contribution to New Zealand domestic architecture was tremendous, though today he is h
APA, Harvard, Vancouver, ISO, and other styles
We offer discounts on all premium plans for authors whose works are included in thematic literature selections. Contact us to get a unique promo code!