To see the other types of publications on this topic, follow the link: Schedule of work with orders.

Journal articles on the topic 'Schedule of work with orders'

Create a spot-on reference in APA, MLA, Chicago, Harvard, and other styles

Select a source type:

Consult the top 50 journal articles for your research on the topic 'Schedule of work with orders.'

Next to every source in the list of references, there is an 'Add to bibliography' button. Press on it, and we will generate automatically the bibliographic reference to the chosen work in the citation style you need: APA, MLA, Harvard, Chicago, Vancouver, etc.

You can also download the full text of the academic publication as pdf and read online its abstract whenever available in the metadata.

Browse journal articles on a wide variety of disciplines and organise your bibliography correctly.

1

North, Frederick, Elissa M. Nelson, Rebecca J. Buss, Rebecca J. Majerus, Matthew C. Thompson, and Brian A. Crum. "The Effect of Automated Mammogram Orders Paired With Electronic Invitations to Self-schedule on Mammogram Scheduling Outcomes: Observational Cohort Comparison." JMIR Medical Informatics 9, no. 12 (2021): e27072. http://dx.doi.org/10.2196/27072.

Full text
Abstract:
Background Screening mammography is recommended for the early detection of breast cancer. The processes for ordering screening mammography often rely on a health care provider order and a scheduler to arrange the time and location of breast imaging. Self-scheduling after automated ordering of screening mammograms may offer a more efficient and convenient way to schedule screening mammograms. Objective The aim of this study was to determine the use, outcomes, and efficiency of an automated mammogram ordering and invitation process paired with self-scheduling. Methods We examined appointment dat
APA, Harvard, Vancouver, ISO, and other styles
2

Kaźmierczak, Piotr, Krzysztof Żywicki, and Paulina Rewers. "The Impact of Downtime on the Stability of the Production Schedule." Applied Sciences 15, no. 1 (2024): 150. https://doi.org/10.3390/app15010150.

Full text
Abstract:
Production scheduling is a fundamental element for the efficient control of material flow in production processes. Research work concerns the approaches, methods and tools used to optimize the loading of production resources with production orders, taking into account various evaluation criteria. From a manufacturers’ point of view, one important objective is to ensure the timely fulfilment of customer orders. The emergence of disruptive factors causing downtime (e.g., machine breakdowns and adjustments) in the realization of production processes negatively affects the realization of this obje
APA, Harvard, Vancouver, ISO, and other styles
3

Cheng, Audrey, Aaron Kabcenell, Jason Chan, et al. "Towards Optimal Transaction Scheduling." Proceedings of the VLDB Endowment 17, no. 11 (2024): 2694–707. http://dx.doi.org/10.14778/3681954.3681956.

Full text
Abstract:
Maximizing transaction throughput is key to high-performance database systems, which focus on minimizing data access conflicts to improve performance. However, finding efficient schedules that reduce conflicts remains an open problem. For efficiency, previous scheduling techniques consider only a small subset of possible schedules. In this work, we propose systematically exploring the entire schedule space, proactively identifying efficient schedules, and executing them precisely during execution to improve throughput. We introduce a greedy scheduling policy, SMF, that efficiently finds fast s
APA, Harvard, Vancouver, ISO, and other styles
4

Onny, Sudarwanto, and Yudoko Gatot. "Managing Work Requests to Improve Level of Building Maintenance Services." International Journal of Current Science Research and Review 07, no. 07 (2024): 5132–47. https://doi.org/10.5281/zenodo.12758678.

Full text
Abstract:
Abstract : Building and Facilities Maintenance Section is one of the sections in Infrastructure Facilities Department in PT.ABC that deals with the maintenance and operation of building facilities in non-PIT areas. PT. Sumber Karya Utama is the contractor appointed to carry out the building maintenance contracts. In contrast to the KPI of 90% for Work Request completion, the total incoming WR addressed to the section has a completion rate of 65% every month. Delays in completing Work Request work are due to the fact that there has not been a structured work schedule made, the planner have diff
APA, Harvard, Vancouver, ISO, and other styles
5

Meilanitasari, Prita, and Seung-Jun Shin. "Sequence learning-based schedule prediction for flexible manufacturing systems under uncertainties." Journal of Physics: Conference Series 1996, no. 1 (2021): 012010. http://dx.doi.org/10.1088/1742-6596/1996/1/012010.

Full text
Abstract:
Abstract This study presents a method of production schedule prediction for flexible manufacturing systems with consideration of the uncertainty factors including limited machine capacity, diverse processing time and unplanned waiting time. The proposed method can predict product-level schedules using sequence learning, which derives data-learned models to predict production sequence proactively and granularly at the product-level. A decision tree technique is applied to derive such predictive models to pre-trace the locations of individual products allocated to each workstation. A determinist
APA, Harvard, Vancouver, ISO, and other styles
6

Ramadaniah, Dedeh, and Muhammad Reza Romahdoni. "SISTEM INFORMASI PEMESANAN DAN PENJADWALAN SRI KADARSIH WEDDING ORGANIZER MENGGUNAKAN METODE AGILE SOFTWARE DEVELOPMENT." Jurnal SIMADA (Sistem Informasi dan Manajemen Basis Data) 7, no. 2 (2024): 117–27. https://doi.org/10.30873/simada.v7i2.586.

Full text
Abstract:
The advancement of information technology is currently growing very rapidly. Various sectors have taken advantage of this technological advancement, including the wedding organizer business. This is indicated by changes in the management of work, which was previously done manually, now using technology. This research aims to overcome the problems of the semi-manual system used by Sri Kadarsih Wedding Organizer, where customers must come directly to obtain booking information and data is recorded in a book, so that data can be lost or damaged and can cause redundancy of schedule data. In this s
APA, Harvard, Vancouver, ISO, and other styles
7

Indra, Mahendra Sukardi, and W. Biantoro Agung. "Analysis of Contract Change Order (CCO) Factors, Cost and Time Factors Affecting Bore Pile Work (Case Study of Cisauk Fly over Construction Project): A Systematic Literature Review." Engineering and Technology Journal 10, no. 03 (2025): 4021–26. https://doi.org/10.5281/zenodo.14999548.

Full text
Abstract:
Almost all projects, whether government or private, experience change orders requested by either the contractor or the owner. In construction projects, change orders are regulated by contract provisions, which often result in project outcomes that deviate from the initial plans. This research aims to identify and analyze the factors that cause and influence Contract Change Orders (CCOs) on the cost and schedule of bore pile work for the Cisauk flyover construction project in Tangerang Regency. The study was conducted by distributing questionnaires to respondents involved in the Cisauk flyover
APA, Harvard, Vancouver, ISO, and other styles
8

Gomes, Uiraquitan Tadeu, Plácido Rogério Pinheiro, and Rommel Dias Saraiva. "Dye Schedule Optimization: A Case Study in a Textile Industry." Applied Sciences 11, no. 14 (2021): 6467. http://dx.doi.org/10.3390/app11146467.

Full text
Abstract:
In a demanding and globalized market, production management plays a fundamental role in the company’s reference. Proper management of the production area allows companies to obtain productivity gains, reducing operational costs and make contributions to face the competitiveness of their competitors. When defining its strategic objectives in a productive system, it is necessary to formulate plans to manage human resources and strategies based on requirements. In this context, planning, production, and control (PPC) is an excellent ally of the organizations. The adequate development of the activ
APA, Harvard, Vancouver, ISO, and other styles
9

Wahyudi, Danu, and Sumarno Sumarno. "Web-Based Badminton Court Rental Information System." JICTE (Journal of Information and Computer Technology Education) 8, no. 1 (2024): 24–30. https://doi.org/10.21070/jicte.v8i1.1657.

Full text
Abstract:
Badminton is a popular sport that is loved by many people in various circles of society. The Graha Sentosa meeting and sports hall is one of the many businesses that provides badminton court rentals. However, booking bookings and rental schedules still use conventional methods. This makes the manager work less effectively in recording and as a customer it is also difficult for him to see the available field schedule. The aim of creating this web-based information system is to make it easier for managers to record orders and assist customers in ordering and viewing field schedules. The research
APA, Harvard, Vancouver, ISO, and other styles
10

Nywlt, Johannes, and Michael Grigutsch. "Order Penetration Point: Just a Stock within Production?" Advanced Materials Research 769 (September 2013): 367–73. http://dx.doi.org/10.4028/www.scientific.net/amr.769.367.

Full text
Abstract:
Nowadays, for customers the logistical performance of industrial companies is as important as the price and quality when buying decisions have to be made. It can be observed that considering the KPIs of logistical performance as quality figures, similar to the product quality, becomes quite popular within national and international markets. Two logistical performance key figures that can be pointed out in that context are short lead times and high schedule reliability. The delivery times demanded by markets often are shorter than the realizable lead times of products or the replenishment time
APA, Harvard, Vancouver, ISO, and other styles
11

Abdesselam, M., A. N. Mustafizul Karim, H. M. Emrul Kays, Mohamed Abdul Rahman, and R. A. Sarker. "Formulation of an IP-Based Model for Reactive Flow-Shop Scheduling Problem Subject to Arrival of New Orders." Advanced Materials Research 1115 (July 2015): 616–21. http://dx.doi.org/10.4028/www.scientific.net/amr.1115.616.

Full text
Abstract:
In order to survive in a competitive environment, industries are required to adopt strategies that ensure their abilities to provide their customers with a product featured by good quality, low cost and short delivery time. Short term scheduling plays a pivotal role in this context by ensuring the operations to be executed and monitored in an optimal or sub-optimal manner which guarantees the product shipping within the customers’ due dates at lower cost and/or higher utilization of resources. However, the dynamic nature of the shop floor environment causes the predictive schedules to be no lo
APA, Harvard, Vancouver, ISO, and other styles
12

Moselhi, Osama, Charles Leonard, and Paul Fazio. "Impact of change orders on construction productivity." Canadian Journal of Civil Engineering 18, no. 3 (1991): 484–92. http://dx.doi.org/10.1139/l91-059.

Full text
Abstract:
In construction projects it is virtually certain that there will be changes made during the course of the work, and that the owner (or design professional) and the contractor will seldom agree on the cost and schedule impact of the changes. This is particularly so on fast track construction, where design and construction are overlapped to accelerate the delivery of projects. Without a doubt, the most contentious area of impact of change orders is their effect on the productivity of the contractor's labour force. This paper presents the quantitative results of a comprehensive field investigatio
APA, Harvard, Vancouver, ISO, and other styles
13

Senderovich, Arik, Kyle E. C. Booth, and J. Christopher Beck. "Learning Scheduling Models from Event Data." Proceedings of the International Conference on Automated Planning and Scheduling 29 (May 25, 2021): 401–9. http://dx.doi.org/10.1609/icaps.v29i1.3504.

Full text
Abstract:
A significant challenge in declarative approaches to scheduling is the creation of a model: the set of resources and their capacities and the types of activities and their temporal and resource requirements. In practice, such models are developed manually by skilled consultants and used repeatedly to solve different problem instances. For example, in a factory, the model may be used each day to schedule the current customer orders. In this work, we aim to automate the creation of such models by learning them from event data. We introduce a novel methodology that combines process mining, timed
APA, Harvard, Vancouver, ISO, and other styles
14

Kandel, Birendra. "Causes and Effects of Variation Orders in Water Supply Projects in Nepal." Prashasan: The Nepalese Journal of Public Administration 57, no. 1 (2025): 158–66. https://doi.org/10.3126/prashasan.v57i1.80664.

Full text
Abstract:
In Nepal's construction industry, variation orders remain a major concern. They are inevitable in nearly every construction project and carry significant implications for project outcomes. If not managed properly, variation orders can negatively impact cost, schedule, and quality. This study examines the causes and effects of variation orders in water supply projects in Nepal. The research is based on a review of variation order documents from 19 water supply projects and a questionnaire survey involving clients, consultants, and contractors. A total of 52 participants contributed to the study
APA, Harvard, Vancouver, ISO, and other styles
15

Dewi, I. Gusti Ayu Wulan Krisna, and I. Made Wahyu Pramana. "Pengaruh Negatif Change Order terhadap Biaya, Mutu dan Waktu pada Proyek Konstruksi di Kota Denpasar." Jurnal Talenta Sipil 8, no. 1 (2025): 26. https://doi.org/10.33087/talentasipil.v8i1.792.

Full text
Abstract:
Change orders often occur in constructionprojects, particularly in building projects, involvingadditions, changes, or reductions of work items during the implementation process. These changes significantly affect the project’s cost, quality, and schedule. The negative impact of changeorders is frequently felt across these three aspects, as observed inconstruction projectsin Denpasar. Therefore, ananalysis isneeded to determine the extent ofthe negativeimpact caused by change orders. This study aims to measure the impact of change orders on cost, quality, and time in constructionprojects in Den
APA, Harvard, Vancouver, ISO, and other styles
16

In'am Maulana Fayrus Abadi and Siti Mundari. "Perencanaan Kapasitas Produksi Paving Guna Memenuhi Permintaan Pada Cv. Rejeki Beton Perkasa." Jurnal Ilmiah Teknik Informatika dan Komunikasi 3, no. 2 (2023): 102–14. http://dx.doi.org/10.55606/juitik.v3i2.502.

Full text
Abstract:
CV. Rejeki Beton Perkasa is a company that produces paving. CV. Perkasa Beton Fortune has problems in fulfilling consumer requests. Given the large customer orders, the company must improve the production schedule to meet the company's production capacity, because it can be seen that the company still does not have long-term planning and production capacity that is mature, which results in uncontrolled production processes and delays in meeting consumer demand. The effort undertaken is planning production capacity requirements using the Rough Cut Capacity Planning (RCCP) approach to fulfill cu
APA, Harvard, Vancouver, ISO, and other styles
17

M.karim, Karukh Hassan, Noori Ali, and Basira Majeed. "The Causes of Variation Orders and Their Effects on Cost and Time of Projects in Sulaimani Governorate." Kurdistan Journal of Applied Research 5, no. 1 (2020): 218–35. http://dx.doi.org/10.24017/science.2020.1.16.

Full text
Abstract:
Variation orders are a permanent phenomenon in the construction of projects and industries around the world, and particularly in the province of Sulaymaniyah. Where construction industries suffer from variation orders. It includes an amendment of the initial scope of work as in the awarded contract. This study analyses the causes of variation orders and their effects on cost and time of projects in Sulaimani governorate. This study involves a questionnaire survey to selected 36 causes and 10 effects of variation orders from the perspective of owner, design consultant, and contractors. A total
APA, Harvard, Vancouver, ISO, and other styles
18

Suleiman, Abdulqadir Mohamad. "71 Exploring boundaries of work environment management using work domain analysis." Annals of Work Exposures and Health 68, Supplement_1 (2024): 1. http://dx.doi.org/10.1093/annweh/wxae035.027.

Full text
Abstract:
Abstract Background Work environment regulations identify specific objectives that employers must fulfil. Work environment is a multidimensional concept encompassing nature of tasks, physical and social conditions, workplace characteristics and organisation, work schedule, prospects to the workers, and the intrinsic rewards associated with the work. Through work domain analysis, the first of the five dimensions of cognitive work analysis, the study explored the boundaries of work environment management. Method Mixed method including looking at regulatory requirements, a limited literature revi
APA, Harvard, Vancouver, ISO, and other styles
19

Ghimire, Shivahari, Niraj Bohra, and Keshab Datt Awasthi. "Causes and Impacts of Variation Order in Building Construction Projects: A Case Study of Three Projects at Bharatpur Metro." Journal of UTEC Engineering Management 1, no. 01 (2023): 105–14. http://dx.doi.org/10.36344/utecem.2023.v01i01.010.

Full text
Abstract:
Variation orders are common in civil engineering construction projects and serve as significant measurement tools for project efficiency and success. This study focuses on identifying the causes and impacts of variation orders in building projects. Three hotel buildings under construction in Bharatpur were considered for the study. The study population included the client, consultant, and contractor, as they are the major stakeholders in any construction project. Data were collected using a five-point Likert scale and analyzed using the Relative Importance Index (RII) to rank the causes and im
APA, Harvard, Vancouver, ISO, and other styles
20

Afrianto, Muhammad Iqbal, Fauziah Fauziah, and Yunan Fauzi Wijaya. "Kombinasi Algoritma Priority Scheduling dan Earliest Due Date untuk Sistem Penjadwalan Slitting Produk Berbasis Web." TEKNOKOM 7, no. 1 (2024): 180–86. http://dx.doi.org/10.31943/teknokom.v7i1.176.

Full text
Abstract:
Production scheduling is one of the most critical components of production management that can impact efficiency and resource utilization. This research focuses on the development of a web-based production scheduling system that integrates two algorithms, Earliest Due Date (EDD) and Priority Scheduling. This research includes the analysis, design, implementation and testing of a those two algorithms in a web-based application for production management. The result of this research will be analyzed through the results of how both algorithms affects lateness and tardiness. The research findings i
APA, Harvard, Vancouver, ISO, and other styles
21

N., Baggyalakshmi, Kavidharshini M., and Revathi R. "Departmental Store Management System." International Academic Journal of Innovative Research 10, no. 2 (2023): 18–26. http://dx.doi.org/10.9756/iajir/v10i2/iajir1006.

Full text
Abstract:
A Departmental Store Management System (DSMS) is a software application that utilises a series of protocols to synchronise the activities of numerous processes on a network. This ensures that all components work together harmoniously to carry out a single or a few closely linked tasks. This approach is beneficial for individuals who already have an established shop and wish to attract attention to their stores. It is user-friendly. This system is specifically tailored to meet the company's unique requirements and facilitate efficient and seamless operations. The application is minimized to min
APA, Harvard, Vancouver, ISO, and other styles
22

Gunduz, Murat, and Khaled Omar Mohammad. "ASSESSMENT OF CHANGE ORDER IMPACT FACTORS ON CONSTRUCTION PROJECT PERFORMANCE USING ANALYTIC HIERARCHY PROCESS (AHP)." Technological and Economic Development of Economy 26, no. 1 (2019): 71–85. http://dx.doi.org/10.3846/tede.2019.11262.

Full text
Abstract:
Complexity is very high in construction project and constrained by money and time. Change orders are commonly required during the execution of construction projects. They may increase, omit or adjust tasks in the project. Change orders affect the performance of construction job because they disturb current jobs and affect their schedule. The motive behind this study is to outline a complete assessment on change orders impacts. A review on past studies was performed to capture change order factors that affect project performance. Literature review and interviews with the industry professionals
APA, Harvard, Vancouver, ISO, and other styles
23

Waty, Mega, and Hendrik Sulistio. "PERHITUNGAN CHANGE ORDER PROYEK JALAN DI BANTEN." Jurnal Muara Sains, Teknologi, Kedokteran dan Ilmu Kesehatan 4, no. 2 (2020): 211. http://dx.doi.org/10.24912/jmstkik.v4i2.6342.

Full text
Abstract:
ABSTRACTChange orders include a number of variants in the scope of work namely the amount of material, design errors, and price changes. This paper discusses change orders in a road construction project in Banten by investigating the causes, studying their effects on the project, and identifying the beneficiaries. The study used five road projects as actual case studies and the questionnaire used a six-point Likert Scale. To determine the ranking of factors that influence the causes of change orders, the effect of change orders and the factors that benefit from change orders are used the Relat
APA, Harvard, Vancouver, ISO, and other styles
24

Coleman, P., M. Ozbayrak, and R. Bell. "Tool Management and Job Allocation in Flexible Machining Cells Part 1: Work-Oriented Strategies." Proceedings of the Institution of Mechanical Engineers, Part B: Journal of Engineering Manufacture 210, no. 5 (1996): 405–15. http://dx.doi.org/10.1243/pime_proc_1996_210_138_02.

Full text
Abstract:
In many flexible machining cells, total priority is given to meeting a scheduled list of work orders. The management of the tooling resource required to process these work schedules is also important. This paper presents and investigates strategies for tool management and job allocation in such a demand-driven system, and are termed work oriented. These generic strategies are described, forecasting the required level of tool exchange activity at individual machines according to different sets of issue and return rules. A computational study using industrial data has been conducted to assess th
APA, Harvard, Vancouver, ISO, and other styles
25

Biruk, Sławomir. "A computer-based renewable resource management system for a construction company." Open Engineering 8, no. 1 (2018): 440–46. http://dx.doi.org/10.1515/eng-2018-0062.

Full text
Abstract:
Abstract The basic operation of a construction company involves the execution of tasks (building structures or building works) on sites. These projects are linked by the common resources of a building company used for the execution of different orders. The scheduling of a construction company programme is a continuous process with a dynamically changing look-ahead and scope of works. Decisions made on site by junior managers are based on their experience and intuition and are attempts at purposeful regulation – adaptation of the operative plan to the directive schedule, agreed with the investo
APA, Harvard, Vancouver, ISO, and other styles
26

Oke, S. A. "A linear regression approach in the determination of work standards for a manufacturing organisation." South Pacific Journal of Natural and Applied Sciences 25, no. 1 (2007): 30. http://dx.doi.org/10.1071/sp07005.

Full text
Abstract:
In semi-automated roofing sheets manufacturing plants, production managers receive large orders, which most often, are to be delivered within scheduled delivery dates; failure to deliver orders incurs penalty costs and litigation charges. The challenge therefore for the production manager is to be able to predict product completion period and map available labour man-hours to production of roofing sheet orders. This paper presents a linear regression model for setting up work standards for a roofing sheet manufacturing plant. Linear regression is a relatively established technique in scientifi
APA, Harvard, Vancouver, ISO, and other styles
27

Abdullah, Aizza Kirana, Idham Halid Lahay, and Hendra Uloli. "Penjadwalan Kapasitas Produksi Roti menggunakan Metode Rough Cut Capacity Planning di UMKM Cita Rasa Gorontalo." Jurnal Teknik Industri Terintegrasi 7, no. 1 (2024): 394–403. http://dx.doi.org/10.31004/jutin.v7i1.24933.

Full text
Abstract:
MSME Cita Rasa is a manufacturing industry in Gorontalo City. Fulfillment of consumer demand for the quantity and time of orders is closely related to the availability of raw materials, labor, machines, working time and other resources that support bread-making production. Therefore, it is necessary to calculate the scheduling of capacity requirements for bread products to see available capacity and actual capacity. The aim of this research is to create a bread production plan and determine the feasibility of bread production capacity at MSME Cita Rasa using the Rough Cut Capacity Planning met
APA, Harvard, Vancouver, ISO, and other styles
28

Thaufik Kurniawan, Febrina Agusti, and Ringgo Ismoyo Buwono. "Perancangan Sistem Ppic Guna Mengoptimalkan Proses Produksi Cetak Cover LKS (Lembar Kerja Siswa) Di CV Madyotomo." Jurnal Rekayasa Proses dan Industri Terapan 1, no. 3 (2023): 116–28. http://dx.doi.org/10.59061/repit.v1i3.358.

Full text
Abstract:
Printing is an industry that is constantly evolving and adapting to changing market demands, as well as an increasing focus on sustainability. CV Madyotomo is a company engaged in the printing sector. When excessive incoming orders cause a buildup of print orders of up to 110% of production capacity, this makes employees often have to do overtime. The purpose of this research is to design a PPIC system that is useful for planning and scheduling production so that the entire production process can run smoothly and employees don't have to work overtime too often. PPIC system design can be done u
APA, Harvard, Vancouver, ISO, and other styles
29

Daripa, Jagannath. "Impacts of Delays in Project Completion in Terms of Time and Cost." International Journal for Research in Applied Science and Engineering Technology 10, no. 7 (2022): 3512–15. http://dx.doi.org/10.22214/ijraset.2022.45788.

Full text
Abstract:
Abstract: Construction delays can be defined as the late completion of work compared to the planned schedule or contract schedule. Construction delays can be minimized only when their cause are identified. The objective of this study was to identify the major causes of construction delays, the effects of delays, and methods of minimizing construction delays. This study was carried out based on literature review and a questionnaire survey. A total of eight groups were contributed to the cause of construction delays, six factors that effects delays and fifteen methods of minimizing construction
APA, Harvard, Vancouver, ISO, and other styles
30

Dr., Raju N. Panchal* Anant D. Awasare Dr. Jagruti R. Panchal. "5 S STRATEGIES FOR SHOP FLOOR IMPROVEMENT." Global Journal of Engineering Science and Research Management 4, no. 9 (2017): 121–24. https://doi.org/10.5281/zenodo.897770.

Full text
Abstract:
Various housekeeping activities are often used first in adopting the continuous improvement way of life. Here adopted some practice at plant are: Sort out what is unneeded; Set-In-Order what must be kept; Shine everything that remains and establish a cleaning schedule; Standardize the system throughout the facility and provide employees with training Sustain the effort with self-discipline and resources and time to improve their workplace.TPM starts with 5S. It is a systematic process of housekeeping to achieve a serene environment in the work place involving the employees with a commitment to
APA, Harvard, Vancouver, ISO, and other styles
31

Soeparyanto, Try Sugiyarto, Ridwan Syah Nuhun, Ismayana Ismayana, Meri Apriani, and Hado Hado. "Penggunaan Standar Metode Work Breakdown Structure (WBS) Pada Proyek Pembangunan Gudang BPBD dan Rumah Jabatan Dandim." Sultra Civil Engineering Journal 5, no. 2 (2024): 300–307. http://dx.doi.org/10.54297/sciej.v5i2.626.

Full text
Abstract:
In today's modern era, the construction of buildings stands as a crucial element in the development of infrastructure. Among the various methods utilized for managing such construction projects, the Work Breakdown Structure (WBS) has emerged as an effective tool. WBS serves as a project management technique, breaking down complex tasks into smaller, manageable components, thereby facilitating efficient planning, execution, and monitoring throughout the project lifecycle.This research employs the Earned Value Method (EVM) approach, chosen for its adeptness in quantifying project cost and time p
APA, Harvard, Vancouver, ISO, and other styles
32

Junius, Alexander, and Mega Waty. "DAMPAK CHANGE ORDER PADA PROYEK PERKERASAN JALAN." JMTS: Jurnal Mitra Teknik Sipil 3, no. 1 (2020): 199. http://dx.doi.org/10.24912/jmts.v3i1.7023.

Full text
Abstract:
In a construction project, changes during the construction period are common. This change can be in the form of an increase or decrease in volume and type of work, changes in work specifications, or changes in the schedule for implementation. Changes in projects are often known as change orders. Change orders must be approved by all parties in a project namely, contractors, owners, and consultants. Change orders are caused by several factors such as changes in design, delays in procurement of goods, differences in field conditions, and others. The impact of this change order is felt by all par
APA, Harvard, Vancouver, ISO, and other styles
33

Knapczyk, Adrian, Sławomir Francik, and Zbigniew Ślipek. "The concept of algorithm supporting the process of scheduling production tasks." BIO Web of Conferences 10 (2018): 02009. http://dx.doi.org/10.1051/bioconf/20181002009.

Full text
Abstract:
The purpose of the work was to develop a concept of an algorithm which supports the process of scheduling production tasks. The designed algorithm performs a task queue creation process in six steps: selecting a schedule type, declaring a queue length, selecting orders for queue development, loading data, automatic job analysis, and queue and Gantt chart generation, taking a decision on the acceptance of the designed production program. The designed system will use single-attribute priority rules (defined by experts) and multi-attribute rules that can be created by combining single-attribute r
APA, Harvard, Vancouver, ISO, and other styles
34

Pamisetty, Avinash. "Big Data Engineering for Real-Time Inventory Optimization in Wholesale Distribution Networks." International Journal of Engineering and Computer Science 8, no. 12 (2019): 24918–38. https://doi.org/10.18535/ijecs.v8i12.4422.

Full text
Abstract:
Supply chains represent the next frontier in Big Data. In an increasingly competitive environment, the need for supply chain optimization and real-time supply chain management becomes evident. For proper design and evaluation of forecasts, orders, and other supply chain parameters, comprehensive and timely information is essential. Significant operational improvements can be made by ensuring the proper functioning of inventory flows across the supply chain. Our overarching goal is to address challenges in real-time inventory management in Supply Chain Networks using Data Engineering. A wholesa
APA, Harvard, Vancouver, ISO, and other styles
35

Venu, Malagavelli, Krishna Chetlapally Bala, and Bollini Prasad. "Delay Analysis of Raw Water Reservoir and Pumping Station." International Journal of Engineering and Advanced Technology (IJEAT) 9, no. 3 (2020): 381–87. https://doi.org/10.35940/ijeat.C5225.029320.

Full text
Abstract:
Inadequate or feeble preliminary work prior beginning of development of any structure may become the root for difficult issues during the development time span. Therefore, the expense of development increments digressively, the development length of the task expands and the standard of development is influenced unfavorably. This examination harps on the significance of development plans in accomplishing the point of creating great quality development work inside the predefined span. Checking constantly the interrelated connection regarding delays in development plans and contractor orders is a
APA, Harvard, Vancouver, ISO, and other styles
36

Younus, Muhammad, Yong Yu, Hu Lu, and Yu Qing Fan. "Study and Execution of Advanced Batch Production Planning System for an Aerospace Industry." Applied Mechanics and Materials 16-19 (October 2009): 748–52. http://dx.doi.org/10.4028/www.scientific.net/amm.16-19.748.

Full text
Abstract:
Modern manufacturing industries are increasingly faced with international competition and fluctuating market conditions in the age of globalization. In striving to remain competitive, manufacturing industries must deliver products to customer at the lowest cost, at the best quality and in the minimum lead time. As a result, it becomes mandatory to design and implement the advance production planning and scheduling system that supports shorter product cycles despite more complex and specialized manufacturing processes. The advance production planning and scheduling system provides the leaner pr
APA, Harvard, Vancouver, ISO, and other styles
37

Toy, Pearl. "Guiding the Decision to Transfuse: Interventions That Do and Do Not Work." Archives of Pathology & Laboratory Medicine 123, no. 7 (1999): 592–94. http://dx.doi.org/10.5858/1999-123-0592-gtdtt.

Full text
Abstract:
Abstract Guiding the decision to transfuse can improve transfusion practices. Effective processes must first identify problem(s) in transfusion practice and then include the attending physician as an educational target. Process improvements that have been shown to be effective include the following: (1) briefly meeting one-on-one with physicians, (2) teaching at scheduled conferences, (3) making daily clinical rounds of patients who receive transfusion, (4) concurrently reviewing orders for transfusion before issue of the blood product, and (5) installing algorithms and guidelines in the opera
APA, Harvard, Vancouver, ISO, and other styles
38

Zainordin, Zainab Mohmad, Nurul Asra Abd Rahman, Shaza Rina Sahamir, and Zul Khafiz Mohd Khalid. "Methods of Valuing Construction Variation in Lump Sum Contract from the Public Client’s Perspective." MATEC Web of Conferences 266 (2019): 03023. http://dx.doi.org/10.1051/matecconf/201926603023.

Full text
Abstract:
A valuation of variation orders has become a daily task on large construction contracts. It is a norm where one of the contracting parties disagrees about the valuation of work done. Therefore, the valuation of variation orders has become one of the main causes of conflicts and disputes in construction management. The aims of study to determine the best practicing method in valuing a variation order for lump sum contract and identify the main related causes of variation project. The mixed method (interview and case study) of research was adopted in the collection of necessary data. Interview w
APA, Harvard, Vancouver, ISO, and other styles
39

Kusuma, Felia Indah, and ParwadiMoengin. "A Mathematical Model for Simultaneous Parallel Multiple Source Scheduling Problems." International Journal of Advanced Engineering and Management Research 08, no. 01 (2023): 38–48. http://dx.doi.org/10.51505/ijaemr.2023.8104.

Full text
Abstract:
Manufacturing companies engaged in textile manufacturing engaged in the Job Order system with an extensive net work and market orientation require companies to pay attention to product quality and services that meet consumer requirements, one of which is by fulfilling orders at a pre-agreed time. The problem that is often found in companies like this is the frequent delays in completing orders. This is caused by the less optimal scheduling of job orders with different weights or penalties for each job which will ultimately result in a large total weighted delay originating from the accumulatio
APA, Harvard, Vancouver, ISO, and other styles
40

Mahrum, Mohammad, Ismu Hadjar, and Nancy Yusnita. "THE EFFECT OF TRANSFORMATIONAL LEADERSHIP AND COMPENSATION ON PERFORMANCE (Empirical Study of Teachers at Mafazah Modern Boarding School)." JHSS (JOURNAL OF HUMANITIES AND SOCIAL STUDIES) 5, no. 2 (2021): 99–103. http://dx.doi.org/10.33751/jhss.v5i2.3708.

Full text
Abstract:
This research is motivated by several interviews with the leadership of the Mafazah Modern Islamic Boarding School, several problems regarding the performance of teachers conveyed by the Head of the Pesantren as informants, including, there are still many teachers who are less disciplined with working hours that have been determined by the staffing department, sometimes in the schedule of admission. work is still late and when the time runs out, the teacher always waits for orders and lacks initiative in work, many teachers complain about the leadership of the head of the pesantren in paying a
APA, Harvard, Vancouver, ISO, and other styles
41

Hohor, Sorina. "Ways to improve the medical surveillance in shift workers." Romanian Journal of Occupational Medicine 75, no. 1 (2024): 48–55. https://doi.org/10.2478/rjom-2024-0006.

Full text
Abstract:
Abstract Metabolic syndrome is a common condition among shift workers (but not exclusively), as this type of work produces changes in the circadian rhythm associated with changes in glucose and lipid metabolism and an increased risk of cardiovascular disease. During the employment or periodic examinations, the occupational medicine doctor performs certain tests such as electrocardiogram, blood pressure measurement, orders blood tests (glycemia, alanine aminotransferase (ALT), aspartate aminotransferase (AST), gamma-glutamine transpeptidase (GGT), creatinine, depending on the type of exposure o
APA, Harvard, Vancouver, ISO, and other styles
42

Plotnikov, Andrei. "Impact of the COVID-19 Pandemic on The socioecnomic characteristcs of freelancers." Revista Gestão & Tecnologia 22, no. 3 (2022): 07–49. https://doi.org/10.20397/2177-6652/2022.v22i3.2385.

Full text
Abstract:
The study analyzes the impact of the COVID-19 pandemic on the work activities of freelancers and the self-employed. The study is based on a conducted survey. A total of 1,157 respondents participated in the survey. The sample subjected to statistical analysis is N=469 people. The employed research methods include correlation and one-factor analysis of variance, as well as text analysis. The textual analysis method is used in determining the reasons behind an unwillingness to register as self-employed. Correlation analysis is used in assessing the impact of the pandemic on income and customer d
APA, Harvard, Vancouver, ISO, and other styles
43

Nana Rahdiana and Ari Kusumawardani. "PENENTUAN JUMLAH TENAGA KERJA OPTIMAL BERDASARKAN WAKTU BAKU PADA PROSES PRODUKSI BATIK CAP DI WORKSHOP BATIK KARAWANG." Jurnal Teknik Mesin Mechanical Xplore 1, no. 1 (2021): 31–39. http://dx.doi.org/10.36805/jtmmx.v1i1.1282.

Full text
Abstract:
Workshop Batik Karawang merupakan salah satu UKM batik tradisional yang memproduksi batik cap dan batik tulis, dengan berbagai jenis motif khas Karawang. Strategi produksi yang dijalankan yakni make to order, belum ada pedoman waktu produksi untuk setiap stasiun kerjanya. Pada bulan Januari 2020 jumlah pesanan batik yang diterima sudah masuk antrian produksi bulan Juli 2020, dengan kata lain sudah terjadi penumpukan pesanan dengan antrian 7 bulan. Jika hal ini terus dibiarkan, dapat memiliki dampak buruk pada UKM tersebut. Tujuan dari penelitian ini adalah untuk menentukan waktu baku dan jumla
APA, Harvard, Vancouver, ISO, and other styles
44

Fang, Karen, Noah Hoffman, Niklas Krumm, and Patrick Mathias. "An organization-wide analysis of laboratory test cost variables and costs as displayed in the electronic health record: first steps." American Journal of Clinical Pathology 160, Supplement_1 (2023): S134—S135. http://dx.doi.org/10.1093/ajcp/aqad150.291.

Full text
Abstract:
Abstract Displaying the cost of laboratory tests and medications in the electronic health record (EHR) at the time of order may influence ordering practices. Our organization’s EHR was configured to display a semi-quantitative value adjacent to laboratory orders: “$” tests imply relatively little cost and “$$$$” tests imply resource intensive tests. Cost display is associated with charges from hospital or clinic fee schedules by default but can also be configured to reflect direct laboratory costs. To understand our system’s configuration and potentially improve the information being provided
APA, Harvard, Vancouver, ISO, and other styles
45

Liang, Yi, Zan Sun, Tianheng Song, et al. "Lenovo Schedules Laptop Manufacturing Using Deep Reinforcement Learning." INFORMS Journal on Applied Analytics 52, no. 1 (2022): 56–68. http://dx.doi.org/10.1287/inte.2021.1109.

Full text
Abstract:
Lenovo Research teamed with members of the factory operations group at Lenovo’s largest laptop manufacturing facility, LCFC, to replace a manual production scheduling system with a decision-making platform built on a deep reinforcement learning architecture. The system schedules production orders at all LCFC’s 43 assembly manufacturing lines, balancing the relative priorities of production volume, changeover cost, and order fulfillment. The multiobjective optimization scheduling problem is solved using a deep reinforcement learning model. The approach combines high computing efficiency with a
APA, Harvard, Vancouver, ISO, and other styles
46

Rodrigues, Renato Pontes, Alexandre Ferreira de Pinho, and David Custódio Sena. "Application of Hybrid Simulation in production scheduling in job shop systems." SIMULATION 96, no. 3 (2019): 253–68. http://dx.doi.org/10.1177/0037549719861724.

Full text
Abstract:
This work seeks to study one of the most complex and important issues in production scheduling research: flexible job shop systems. These systems are extremely important for industry, which uses the make-to-order strategy and seeks mix and volume flexibility. The model system will use agents within discrete-event simulation models, generating a Hybrid Simulation model. The agent will sequence the production orders at the beginning of the process and re-sequence them, when necessary, in order to achieve a multi-objective optimization. For this, the agent will bring together two different logics
APA, Harvard, Vancouver, ISO, and other styles
47

Nugraha, Vian Aviantara Wahyu, M. Ruslin Anwar, and Eko Andi Suryo. "DISTRIBUTION SERVICE PERFORMANCE OPTIMIZATION OF PDAM TIRTA TAMAN BONTANG CITY EAST KALIMANTAN PROVINCE." Civil and Environmental Science 006, no. 01 (2023): 56–64. http://dx.doi.org/10.21776/ub.civense.2023.00601.7.

Full text
Abstract:
To achieve the level of service performance from PDAM Tirta Taman Kota Bontang , obtained based on user perceptions of PDAM Taman Tirta obtained from the results of a questionnaire with a Likert scale using the Importance Performance Analysis (IPA) method. From the results of the IPA analysis, interviews were then conducted using the Strength Weakness Opportunities Threats (SWOT) method . The results of the IPA analysis were used in quadrant I, namely service to the registration process (x11), survey of prospective customer locations (x12), time of survey implementation (x13) , Payment orders
APA, Harvard, Vancouver, ISO, and other styles
48

Mahamid, Ibrahim. "Effects of Design Quality on Delay in Residential Construction Projects." Journal of Sustainable Architecture and Civil Engineering 28, no. 1 (2021): 118–29. http://dx.doi.org/10.5755/j01.sace.28.1.20531.

Full text
Abstract:
This study is conducted to establish the effect of design quality on project delay in building projects. It aims at: 1) investigating the major factors of design quality, 2) identifying the main delay factors in building projects, 2) establishing the relationship between design quality and delay in building projects. To achieve these objectives, a questionnaire survey is performed. Seventeen (17) factors that might affect design quality, and 15 delay factors are listed in a questionnaire form. Sixty (60) contractors and 40 consultants are asked to identify the severity of the identified factor
APA, Harvard, Vancouver, ISO, and other styles
49

Kusk, Kalle, and Claus Bossen. "Working with Wolt." Proceedings of the ACM on Human-Computer Interaction 6, GROUP (2022): 1–22. http://dx.doi.org/10.1145/3492823.

Full text
Abstract:
In this paper, we present the results of an ethnographic study focusing on food deliveries for the digital platform Wolt. The platform manages food transport ordered by customers to be delivered at home from restaurants, and subcontracts the transport to workers called 'couriers', who act as independent firms or entrepreneurs. The paper is based on six months of participant observation, during which time the first author worked as a courier, as well as on ad-hoc conversations and semi-structured interviews with other couriers. We describe couriers' work for the platform and discuss our finding
APA, Harvard, Vancouver, ISO, and other styles
50

Pratama, Gelard Untirtha, Hasbi Ashidiqi, Asep Safaatulloh, and Rahadian Arief. "SISTEM INFORMASI PEMESANAN JASA LAYANAN INTERNET BERBASIS WEB PADA PT. FIRMAN HOTSPOT MEDIATAMA MENGGUNAKAN FRAMEWORK." Jurnal Ilmiah Sistem Informasi 4, no. 1 (2024): 202–13. http://dx.doi.org/10.46306/sm.v4i1.88.

Full text
Abstract:
This study aims to develop an information system for ordering web-based internet services at PT. Word Hotspot Mediatama. This information system is designed to increase customer efficiency and convenience in submitting and ordering internet networks. The system analysis method used is SWOT to identify customer needs and the ordering process. Furthermore, system design is carried out using the SDLC method with the Waterfall type to describe the workflow and relationships between the entities involved. In the growing digital era, internet access has become a basic need. Therefore, it is importan
APA, Harvard, Vancouver, ISO, and other styles
We offer discounts on all premium plans for authors whose works are included in thematic literature selections. Contact us to get a unique promo code!