Journal articles on the topic 'Schedule of work with orders'
Create a spot-on reference in APA, MLA, Chicago, Harvard, and other styles
Consult the top 50 journal articles for your research on the topic 'Schedule of work with orders.'
Next to every source in the list of references, there is an 'Add to bibliography' button. Press on it, and we will generate automatically the bibliographic reference to the chosen work in the citation style you need: APA, MLA, Harvard, Chicago, Vancouver, etc.
You can also download the full text of the academic publication as pdf and read online its abstract whenever available in the metadata.
Browse journal articles on a wide variety of disciplines and organise your bibliography correctly.
North, Frederick, Elissa M. Nelson, Rebecca J. Buss, Rebecca J. Majerus, Matthew C. Thompson, and Brian A. Crum. "The Effect of Automated Mammogram Orders Paired With Electronic Invitations to Self-schedule on Mammogram Scheduling Outcomes: Observational Cohort Comparison." JMIR Medical Informatics 9, no. 12 (2021): e27072. http://dx.doi.org/10.2196/27072.
Full textKaźmierczak, Piotr, Krzysztof Żywicki, and Paulina Rewers. "The Impact of Downtime on the Stability of the Production Schedule." Applied Sciences 15, no. 1 (2024): 150. https://doi.org/10.3390/app15010150.
Full textCheng, Audrey, Aaron Kabcenell, Jason Chan, et al. "Towards Optimal Transaction Scheduling." Proceedings of the VLDB Endowment 17, no. 11 (2024): 2694–707. http://dx.doi.org/10.14778/3681954.3681956.
Full textOnny, Sudarwanto, and Yudoko Gatot. "Managing Work Requests to Improve Level of Building Maintenance Services." International Journal of Current Science Research and Review 07, no. 07 (2024): 5132–47. https://doi.org/10.5281/zenodo.12758678.
Full textMeilanitasari, Prita, and Seung-Jun Shin. "Sequence learning-based schedule prediction for flexible manufacturing systems under uncertainties." Journal of Physics: Conference Series 1996, no. 1 (2021): 012010. http://dx.doi.org/10.1088/1742-6596/1996/1/012010.
Full textRamadaniah, Dedeh, and Muhammad Reza Romahdoni. "SISTEM INFORMASI PEMESANAN DAN PENJADWALAN SRI KADARSIH WEDDING ORGANIZER MENGGUNAKAN METODE AGILE SOFTWARE DEVELOPMENT." Jurnal SIMADA (Sistem Informasi dan Manajemen Basis Data) 7, no. 2 (2024): 117–27. https://doi.org/10.30873/simada.v7i2.586.
Full textIndra, Mahendra Sukardi, and W. Biantoro Agung. "Analysis of Contract Change Order (CCO) Factors, Cost and Time Factors Affecting Bore Pile Work (Case Study of Cisauk Fly over Construction Project): A Systematic Literature Review." Engineering and Technology Journal 10, no. 03 (2025): 4021–26. https://doi.org/10.5281/zenodo.14999548.
Full textGomes, Uiraquitan Tadeu, Plácido Rogério Pinheiro, and Rommel Dias Saraiva. "Dye Schedule Optimization: A Case Study in a Textile Industry." Applied Sciences 11, no. 14 (2021): 6467. http://dx.doi.org/10.3390/app11146467.
Full textWahyudi, Danu, and Sumarno Sumarno. "Web-Based Badminton Court Rental Information System." JICTE (Journal of Information and Computer Technology Education) 8, no. 1 (2024): 24–30. https://doi.org/10.21070/jicte.v8i1.1657.
Full textNywlt, Johannes, and Michael Grigutsch. "Order Penetration Point: Just a Stock within Production?" Advanced Materials Research 769 (September 2013): 367–73. http://dx.doi.org/10.4028/www.scientific.net/amr.769.367.
Full textAbdesselam, M., A. N. Mustafizul Karim, H. M. Emrul Kays, Mohamed Abdul Rahman, and R. A. Sarker. "Formulation of an IP-Based Model for Reactive Flow-Shop Scheduling Problem Subject to Arrival of New Orders." Advanced Materials Research 1115 (July 2015): 616–21. http://dx.doi.org/10.4028/www.scientific.net/amr.1115.616.
Full textMoselhi, Osama, Charles Leonard, and Paul Fazio. "Impact of change orders on construction productivity." Canadian Journal of Civil Engineering 18, no. 3 (1991): 484–92. http://dx.doi.org/10.1139/l91-059.
Full textSenderovich, Arik, Kyle E. C. Booth, and J. Christopher Beck. "Learning Scheduling Models from Event Data." Proceedings of the International Conference on Automated Planning and Scheduling 29 (May 25, 2021): 401–9. http://dx.doi.org/10.1609/icaps.v29i1.3504.
Full textKandel, Birendra. "Causes and Effects of Variation Orders in Water Supply Projects in Nepal." Prashasan: The Nepalese Journal of Public Administration 57, no. 1 (2025): 158–66. https://doi.org/10.3126/prashasan.v57i1.80664.
Full textDewi, I. Gusti Ayu Wulan Krisna, and I. Made Wahyu Pramana. "Pengaruh Negatif Change Order terhadap Biaya, Mutu dan Waktu pada Proyek Konstruksi di Kota Denpasar." Jurnal Talenta Sipil 8, no. 1 (2025): 26. https://doi.org/10.33087/talentasipil.v8i1.792.
Full textIn'am Maulana Fayrus Abadi and Siti Mundari. "Perencanaan Kapasitas Produksi Paving Guna Memenuhi Permintaan Pada Cv. Rejeki Beton Perkasa." Jurnal Ilmiah Teknik Informatika dan Komunikasi 3, no. 2 (2023): 102–14. http://dx.doi.org/10.55606/juitik.v3i2.502.
Full textM.karim, Karukh Hassan, Noori Ali, and Basira Majeed. "The Causes of Variation Orders and Their Effects on Cost and Time of Projects in Sulaimani Governorate." Kurdistan Journal of Applied Research 5, no. 1 (2020): 218–35. http://dx.doi.org/10.24017/science.2020.1.16.
Full textSuleiman, Abdulqadir Mohamad. "71 Exploring boundaries of work environment management using work domain analysis." Annals of Work Exposures and Health 68, Supplement_1 (2024): 1. http://dx.doi.org/10.1093/annweh/wxae035.027.
Full textGhimire, Shivahari, Niraj Bohra, and Keshab Datt Awasthi. "Causes and Impacts of Variation Order in Building Construction Projects: A Case Study of Three Projects at Bharatpur Metro." Journal of UTEC Engineering Management 1, no. 01 (2023): 105–14. http://dx.doi.org/10.36344/utecem.2023.v01i01.010.
Full textAfrianto, Muhammad Iqbal, Fauziah Fauziah, and Yunan Fauzi Wijaya. "Kombinasi Algoritma Priority Scheduling dan Earliest Due Date untuk Sistem Penjadwalan Slitting Produk Berbasis Web." TEKNOKOM 7, no. 1 (2024): 180–86. http://dx.doi.org/10.31943/teknokom.v7i1.176.
Full textN., Baggyalakshmi, Kavidharshini M., and Revathi R. "Departmental Store Management System." International Academic Journal of Innovative Research 10, no. 2 (2023): 18–26. http://dx.doi.org/10.9756/iajir/v10i2/iajir1006.
Full textGunduz, Murat, and Khaled Omar Mohammad. "ASSESSMENT OF CHANGE ORDER IMPACT FACTORS ON CONSTRUCTION PROJECT PERFORMANCE USING ANALYTIC HIERARCHY PROCESS (AHP)." Technological and Economic Development of Economy 26, no. 1 (2019): 71–85. http://dx.doi.org/10.3846/tede.2019.11262.
Full textWaty, Mega, and Hendrik Sulistio. "PERHITUNGAN CHANGE ORDER PROYEK JALAN DI BANTEN." Jurnal Muara Sains, Teknologi, Kedokteran dan Ilmu Kesehatan 4, no. 2 (2020): 211. http://dx.doi.org/10.24912/jmstkik.v4i2.6342.
Full textColeman, P., M. Ozbayrak, and R. Bell. "Tool Management and Job Allocation in Flexible Machining Cells Part 1: Work-Oriented Strategies." Proceedings of the Institution of Mechanical Engineers, Part B: Journal of Engineering Manufacture 210, no. 5 (1996): 405–15. http://dx.doi.org/10.1243/pime_proc_1996_210_138_02.
Full textBiruk, Sławomir. "A computer-based renewable resource management system for a construction company." Open Engineering 8, no. 1 (2018): 440–46. http://dx.doi.org/10.1515/eng-2018-0062.
Full textOke, S. A. "A linear regression approach in the determination of work standards for a manufacturing organisation." South Pacific Journal of Natural and Applied Sciences 25, no. 1 (2007): 30. http://dx.doi.org/10.1071/sp07005.
Full textAbdullah, Aizza Kirana, Idham Halid Lahay, and Hendra Uloli. "Penjadwalan Kapasitas Produksi Roti menggunakan Metode Rough Cut Capacity Planning di UMKM Cita Rasa Gorontalo." Jurnal Teknik Industri Terintegrasi 7, no. 1 (2024): 394–403. http://dx.doi.org/10.31004/jutin.v7i1.24933.
Full textThaufik Kurniawan, Febrina Agusti, and Ringgo Ismoyo Buwono. "Perancangan Sistem Ppic Guna Mengoptimalkan Proses Produksi Cetak Cover LKS (Lembar Kerja Siswa) Di CV Madyotomo." Jurnal Rekayasa Proses dan Industri Terapan 1, no. 3 (2023): 116–28. http://dx.doi.org/10.59061/repit.v1i3.358.
Full textDaripa, Jagannath. "Impacts of Delays in Project Completion in Terms of Time and Cost." International Journal for Research in Applied Science and Engineering Technology 10, no. 7 (2022): 3512–15. http://dx.doi.org/10.22214/ijraset.2022.45788.
Full textDr., Raju N. Panchal* Anant D. Awasare Dr. Jagruti R. Panchal. "5 S STRATEGIES FOR SHOP FLOOR IMPROVEMENT." Global Journal of Engineering Science and Research Management 4, no. 9 (2017): 121–24. https://doi.org/10.5281/zenodo.897770.
Full textSoeparyanto, Try Sugiyarto, Ridwan Syah Nuhun, Ismayana Ismayana, Meri Apriani, and Hado Hado. "Penggunaan Standar Metode Work Breakdown Structure (WBS) Pada Proyek Pembangunan Gudang BPBD dan Rumah Jabatan Dandim." Sultra Civil Engineering Journal 5, no. 2 (2024): 300–307. http://dx.doi.org/10.54297/sciej.v5i2.626.
Full textJunius, Alexander, and Mega Waty. "DAMPAK CHANGE ORDER PADA PROYEK PERKERASAN JALAN." JMTS: Jurnal Mitra Teknik Sipil 3, no. 1 (2020): 199. http://dx.doi.org/10.24912/jmts.v3i1.7023.
Full textKnapczyk, Adrian, Sławomir Francik, and Zbigniew Ślipek. "The concept of algorithm supporting the process of scheduling production tasks." BIO Web of Conferences 10 (2018): 02009. http://dx.doi.org/10.1051/bioconf/20181002009.
Full textPamisetty, Avinash. "Big Data Engineering for Real-Time Inventory Optimization in Wholesale Distribution Networks." International Journal of Engineering and Computer Science 8, no. 12 (2019): 24918–38. https://doi.org/10.18535/ijecs.v8i12.4422.
Full textVenu, Malagavelli, Krishna Chetlapally Bala, and Bollini Prasad. "Delay Analysis of Raw Water Reservoir and Pumping Station." International Journal of Engineering and Advanced Technology (IJEAT) 9, no. 3 (2020): 381–87. https://doi.org/10.35940/ijeat.C5225.029320.
Full textYounus, Muhammad, Yong Yu, Hu Lu, and Yu Qing Fan. "Study and Execution of Advanced Batch Production Planning System for an Aerospace Industry." Applied Mechanics and Materials 16-19 (October 2009): 748–52. http://dx.doi.org/10.4028/www.scientific.net/amm.16-19.748.
Full textToy, Pearl. "Guiding the Decision to Transfuse: Interventions That Do and Do Not Work." Archives of Pathology & Laboratory Medicine 123, no. 7 (1999): 592–94. http://dx.doi.org/10.5858/1999-123-0592-gtdtt.
Full textZainordin, Zainab Mohmad, Nurul Asra Abd Rahman, Shaza Rina Sahamir, and Zul Khafiz Mohd Khalid. "Methods of Valuing Construction Variation in Lump Sum Contract from the Public Client’s Perspective." MATEC Web of Conferences 266 (2019): 03023. http://dx.doi.org/10.1051/matecconf/201926603023.
Full textKusuma, Felia Indah, and ParwadiMoengin. "A Mathematical Model for Simultaneous Parallel Multiple Source Scheduling Problems." International Journal of Advanced Engineering and Management Research 08, no. 01 (2023): 38–48. http://dx.doi.org/10.51505/ijaemr.2023.8104.
Full textMahrum, Mohammad, Ismu Hadjar, and Nancy Yusnita. "THE EFFECT OF TRANSFORMATIONAL LEADERSHIP AND COMPENSATION ON PERFORMANCE (Empirical Study of Teachers at Mafazah Modern Boarding School)." JHSS (JOURNAL OF HUMANITIES AND SOCIAL STUDIES) 5, no. 2 (2021): 99–103. http://dx.doi.org/10.33751/jhss.v5i2.3708.
Full textHohor, Sorina. "Ways to improve the medical surveillance in shift workers." Romanian Journal of Occupational Medicine 75, no. 1 (2024): 48–55. https://doi.org/10.2478/rjom-2024-0006.
Full textPlotnikov, Andrei. "Impact of the COVID-19 Pandemic on The socioecnomic characteristcs of freelancers." Revista Gestão & Tecnologia 22, no. 3 (2022): 07–49. https://doi.org/10.20397/2177-6652/2022.v22i3.2385.
Full textNana Rahdiana and Ari Kusumawardani. "PENENTUAN JUMLAH TENAGA KERJA OPTIMAL BERDASARKAN WAKTU BAKU PADA PROSES PRODUKSI BATIK CAP DI WORKSHOP BATIK KARAWANG." Jurnal Teknik Mesin Mechanical Xplore 1, no. 1 (2021): 31–39. http://dx.doi.org/10.36805/jtmmx.v1i1.1282.
Full textFang, Karen, Noah Hoffman, Niklas Krumm, and Patrick Mathias. "An organization-wide analysis of laboratory test cost variables and costs as displayed in the electronic health record: first steps." American Journal of Clinical Pathology 160, Supplement_1 (2023): S134—S135. http://dx.doi.org/10.1093/ajcp/aqad150.291.
Full textLiang, Yi, Zan Sun, Tianheng Song, et al. "Lenovo Schedules Laptop Manufacturing Using Deep Reinforcement Learning." INFORMS Journal on Applied Analytics 52, no. 1 (2022): 56–68. http://dx.doi.org/10.1287/inte.2021.1109.
Full textRodrigues, Renato Pontes, Alexandre Ferreira de Pinho, and David Custódio Sena. "Application of Hybrid Simulation in production scheduling in job shop systems." SIMULATION 96, no. 3 (2019): 253–68. http://dx.doi.org/10.1177/0037549719861724.
Full textNugraha, Vian Aviantara Wahyu, M. Ruslin Anwar, and Eko Andi Suryo. "DISTRIBUTION SERVICE PERFORMANCE OPTIMIZATION OF PDAM TIRTA TAMAN BONTANG CITY EAST KALIMANTAN PROVINCE." Civil and Environmental Science 006, no. 01 (2023): 56–64. http://dx.doi.org/10.21776/ub.civense.2023.00601.7.
Full textMahamid, Ibrahim. "Effects of Design Quality on Delay in Residential Construction Projects." Journal of Sustainable Architecture and Civil Engineering 28, no. 1 (2021): 118–29. http://dx.doi.org/10.5755/j01.sace.28.1.20531.
Full textKusk, Kalle, and Claus Bossen. "Working with Wolt." Proceedings of the ACM on Human-Computer Interaction 6, GROUP (2022): 1–22. http://dx.doi.org/10.1145/3492823.
Full textPratama, Gelard Untirtha, Hasbi Ashidiqi, Asep Safaatulloh, and Rahadian Arief. "SISTEM INFORMASI PEMESANAN JASA LAYANAN INTERNET BERBASIS WEB PADA PT. FIRMAN HOTSPOT MEDIATAMA MENGGUNAKAN FRAMEWORK." Jurnal Ilmiah Sistem Informasi 4, no. 1 (2024): 202–13. http://dx.doi.org/10.46306/sm.v4i1.88.
Full text