Academic literature on the topic 'Schedule of work with orders'

Create a spot-on reference in APA, MLA, Chicago, Harvard, and other styles

Select a source type:

Consult the lists of relevant articles, books, theses, conference reports, and other scholarly sources on the topic 'Schedule of work with orders.'

Next to every source in the list of references, there is an 'Add to bibliography' button. Press on it, and we will generate automatically the bibliographic reference to the chosen work in the citation style you need: APA, MLA, Harvard, Chicago, Vancouver, etc.

You can also download the full text of the academic publication as pdf and read online its abstract whenever available in the metadata.

Journal articles on the topic "Schedule of work with orders"

1

North, Frederick, Elissa M. Nelson, Rebecca J. Buss, Rebecca J. Majerus, Matthew C. Thompson, and Brian A. Crum. "The Effect of Automated Mammogram Orders Paired With Electronic Invitations to Self-schedule on Mammogram Scheduling Outcomes: Observational Cohort Comparison." JMIR Medical Informatics 9, no. 12 (2021): e27072. http://dx.doi.org/10.2196/27072.

Full text
Abstract:
Background Screening mammography is recommended for the early detection of breast cancer. The processes for ordering screening mammography often rely on a health care provider order and a scheduler to arrange the time and location of breast imaging. Self-scheduling after automated ordering of screening mammograms may offer a more efficient and convenient way to schedule screening mammograms. Objective The aim of this study was to determine the use, outcomes, and efficiency of an automated mammogram ordering and invitation process paired with self-scheduling. Methods We examined appointment dat
APA, Harvard, Vancouver, ISO, and other styles
2

Kaźmierczak, Piotr, Krzysztof Żywicki, and Paulina Rewers. "The Impact of Downtime on the Stability of the Production Schedule." Applied Sciences 15, no. 1 (2024): 150. https://doi.org/10.3390/app15010150.

Full text
Abstract:
Production scheduling is a fundamental element for the efficient control of material flow in production processes. Research work concerns the approaches, methods and tools used to optimize the loading of production resources with production orders, taking into account various evaluation criteria. From a manufacturers’ point of view, one important objective is to ensure the timely fulfilment of customer orders. The emergence of disruptive factors causing downtime (e.g., machine breakdowns and adjustments) in the realization of production processes negatively affects the realization of this obje
APA, Harvard, Vancouver, ISO, and other styles
3

Cheng, Audrey, Aaron Kabcenell, Jason Chan, et al. "Towards Optimal Transaction Scheduling." Proceedings of the VLDB Endowment 17, no. 11 (2024): 2694–707. http://dx.doi.org/10.14778/3681954.3681956.

Full text
Abstract:
Maximizing transaction throughput is key to high-performance database systems, which focus on minimizing data access conflicts to improve performance. However, finding efficient schedules that reduce conflicts remains an open problem. For efficiency, previous scheduling techniques consider only a small subset of possible schedules. In this work, we propose systematically exploring the entire schedule space, proactively identifying efficient schedules, and executing them precisely during execution to improve throughput. We introduce a greedy scheduling policy, SMF, that efficiently finds fast s
APA, Harvard, Vancouver, ISO, and other styles
4

Onny, Sudarwanto, and Yudoko Gatot. "Managing Work Requests to Improve Level of Building Maintenance Services." International Journal of Current Science Research and Review 07, no. 07 (2024): 5132–47. https://doi.org/10.5281/zenodo.12758678.

Full text
Abstract:
Abstract : Building and Facilities Maintenance Section is one of the sections in Infrastructure Facilities Department in PT.ABC that deals with the maintenance and operation of building facilities in non-PIT areas. PT. Sumber Karya Utama is the contractor appointed to carry out the building maintenance contracts. In contrast to the KPI of 90% for Work Request completion, the total incoming WR addressed to the section has a completion rate of 65% every month. Delays in completing Work Request work are due to the fact that there has not been a structured work schedule made, the planner have diff
APA, Harvard, Vancouver, ISO, and other styles
5

Meilanitasari, Prita, and Seung-Jun Shin. "Sequence learning-based schedule prediction for flexible manufacturing systems under uncertainties." Journal of Physics: Conference Series 1996, no. 1 (2021): 012010. http://dx.doi.org/10.1088/1742-6596/1996/1/012010.

Full text
Abstract:
Abstract This study presents a method of production schedule prediction for flexible manufacturing systems with consideration of the uncertainty factors including limited machine capacity, diverse processing time and unplanned waiting time. The proposed method can predict product-level schedules using sequence learning, which derives data-learned models to predict production sequence proactively and granularly at the product-level. A decision tree technique is applied to derive such predictive models to pre-trace the locations of individual products allocated to each workstation. A determinist
APA, Harvard, Vancouver, ISO, and other styles
6

Ramadaniah, Dedeh, and Muhammad Reza Romahdoni. "SISTEM INFORMASI PEMESANAN DAN PENJADWALAN SRI KADARSIH WEDDING ORGANIZER MENGGUNAKAN METODE AGILE SOFTWARE DEVELOPMENT." Jurnal SIMADA (Sistem Informasi dan Manajemen Basis Data) 7, no. 2 (2024): 117–27. https://doi.org/10.30873/simada.v7i2.586.

Full text
Abstract:
The advancement of information technology is currently growing very rapidly. Various sectors have taken advantage of this technological advancement, including the wedding organizer business. This is indicated by changes in the management of work, which was previously done manually, now using technology. This research aims to overcome the problems of the semi-manual system used by Sri Kadarsih Wedding Organizer, where customers must come directly to obtain booking information and data is recorded in a book, so that data can be lost or damaged and can cause redundancy of schedule data. In this s
APA, Harvard, Vancouver, ISO, and other styles
7

Indra, Mahendra Sukardi, and W. Biantoro Agung. "Analysis of Contract Change Order (CCO) Factors, Cost and Time Factors Affecting Bore Pile Work (Case Study of Cisauk Fly over Construction Project): A Systematic Literature Review." Engineering and Technology Journal 10, no. 03 (2025): 4021–26. https://doi.org/10.5281/zenodo.14999548.

Full text
Abstract:
Almost all projects, whether government or private, experience change orders requested by either the contractor or the owner. In construction projects, change orders are regulated by contract provisions, which often result in project outcomes that deviate from the initial plans. This research aims to identify and analyze the factors that cause and influence Contract Change Orders (CCOs) on the cost and schedule of bore pile work for the Cisauk flyover construction project in Tangerang Regency. The study was conducted by distributing questionnaires to respondents involved in the Cisauk flyover
APA, Harvard, Vancouver, ISO, and other styles
8

Gomes, Uiraquitan Tadeu, Plácido Rogério Pinheiro, and Rommel Dias Saraiva. "Dye Schedule Optimization: A Case Study in a Textile Industry." Applied Sciences 11, no. 14 (2021): 6467. http://dx.doi.org/10.3390/app11146467.

Full text
Abstract:
In a demanding and globalized market, production management plays a fundamental role in the company’s reference. Proper management of the production area allows companies to obtain productivity gains, reducing operational costs and make contributions to face the competitiveness of their competitors. When defining its strategic objectives in a productive system, it is necessary to formulate plans to manage human resources and strategies based on requirements. In this context, planning, production, and control (PPC) is an excellent ally of the organizations. The adequate development of the activ
APA, Harvard, Vancouver, ISO, and other styles
9

Wahyudi, Danu, and Sumarno Sumarno. "Web-Based Badminton Court Rental Information System." JICTE (Journal of Information and Computer Technology Education) 8, no. 1 (2024): 24–30. https://doi.org/10.21070/jicte.v8i1.1657.

Full text
Abstract:
Badminton is a popular sport that is loved by many people in various circles of society. The Graha Sentosa meeting and sports hall is one of the many businesses that provides badminton court rentals. However, booking bookings and rental schedules still use conventional methods. This makes the manager work less effectively in recording and as a customer it is also difficult for him to see the available field schedule. The aim of creating this web-based information system is to make it easier for managers to record orders and assist customers in ordering and viewing field schedules. The research
APA, Harvard, Vancouver, ISO, and other styles
10

Nywlt, Johannes, and Michael Grigutsch. "Order Penetration Point: Just a Stock within Production?" Advanced Materials Research 769 (September 2013): 367–73. http://dx.doi.org/10.4028/www.scientific.net/amr.769.367.

Full text
Abstract:
Nowadays, for customers the logistical performance of industrial companies is as important as the price and quality when buying decisions have to be made. It can be observed that considering the KPIs of logistical performance as quality figures, similar to the product quality, becomes quite popular within national and international markets. Two logistical performance key figures that can be pointed out in that context are short lead times and high schedule reliability. The delivery times demanded by markets often are shorter than the realizable lead times of products or the replenishment time
APA, Harvard, Vancouver, ISO, and other styles
More sources

Dissertations / Theses on the topic "Schedule of work with orders"

1

Зизяк, А. А. "Удосконалення технології прийняття управлінських рішень туристичного підприємства". Thesis, Одеський національний економічний університет, 2020. http://dspace.oneu.edu.ua/jspui/handle/123456789/12697.

Full text
Abstract:
У роботі розглядаються теоретичні аспекти технології прийняття управлінського рішення, зокрема встановлено сутність управлінського рішення, визначено основні методи та інструменти технології прийняття управлінських рішень. Проаналізовано ринок туристичних послуг України з використанням методу PEST-аналізу. Розроблено пропозиції щодо удосконалення технології прийняття управлінських рішень для туристичного підприємства та оцінено їх ефективність.<br>Diploma thesis deals with theoretical aspects of management decision-making technologies, in particular, the essence of the managerial decision is e
APA, Harvard, Vancouver, ISO, and other styles
2

Grigsby, Tenora Dianne. "The Effects of Perceived Work Schedule Flexibility, Number of Hours Worked, and Type of Work Schedule on Work-Family Conflict." PDXScholar, 1993. https://pdxscholar.library.pdx.edu/open_access_etds/4606.

Full text
Abstract:
The interaction effects of perceived work schedule flexibility (PWSF) and the number of hours worked on work-family conflict, and the interaction effects of PWSF and the type of work schedule on work-family conflict were investigated for employees of a regional bank headquartered in the Pacific Northwest. A 50% response rate was obtained from a survey questionnaire administered to 2,000 randomly selected employees. Hierarchial multiple regression analyses conducted on 526 subjects revealed no significant interaction effects for PWSF and type of work schedule. The interaction effect for PWSF an
APA, Harvard, Vancouver, ISO, and other styles
3

Leinweber, Hanzalová Petra. "Organizace stavební zakázky." Master's thesis, Vysoké učení technické v Brně. Fakulta stavební, 2018. http://www.nusl.cz/ntk/nusl-372289.

Full text
Abstract:
The topic of this diploma thesis si the Organization of construction contract. The thesis is divided into three parts. The first is about the theory of project management and construction organization, the second part analyzes the contracting authority and the contractor of the construction contract and solves the process of awarding and obtaining a public contract. The third part is about the documents needed for the management of the construction contract.
APA, Harvard, Vancouver, ISO, and other styles
4

Thombs, Daniel. "Determining the Value of Handwritten Comments within Work Orders." NSUWorks, 2010. http://nsuworks.nova.edu/gscis_etd/324.

Full text
Abstract:
In the workplace many work orders are handwritten on paper rather than recorded in a digital format. Despite being archived, these documents are neither referenced nor analyzed after their creation. Tacit knowledge gathered though employee documentation is generally considered beneficial, but only if it can be easily gathered and processed. This study attempted to determine if value exists within these handwritten documents; in this case from a public work organization possessing work orders. As employees make notes in the field, they generate work orders containing free-form handwritten comme
APA, Harvard, Vancouver, ISO, and other styles
5

Halliwell, M. "Some aspects of the economics of the work schedule." Thesis, University of Kent, 1985. http://ethos.bl.uk/OrderDetails.do?uin=uk.bl.ethos.352667.

Full text
APA, Harvard, Vancouver, ISO, and other styles
6

Whitman, Robert Leader. "Literacy, new capitalism, and new work orders: Case studies from school-to-work education." Diss., The University of Arizona, 2004. http://hdl.handle.net/10150/280663.

Full text
Abstract:
This dissertation examines literacy practices in settings that have been transformed by changes in capitalism of the last forty years. These settings are characterized by increased technologization, accrediting processes, team-building, and a requirement for independent critical thinking on the part of workers. The two school-to-work programs included in the dissertation are biotechnology and nursing. Both were sited in a two-year urban community college and both had the characteristics mentioned above. However they also provided a contrast it two ways. First, nursing is a traditional practice
APA, Harvard, Vancouver, ISO, and other styles
7

Li, Lok-man Jennifer, and 李諾文. "Schedule delay of work trips in Hong Kong: anempirical analysis." Thesis, The University of Hong Kong (Pokfulam, Hong Kong), 2008. http://hub.hku.hk/bib/B40988041.

Full text
APA, Harvard, Vancouver, ISO, and other styles
8

Porter, P. "Work schedule stress and wellness in female air cabin attendants." Master's thesis, University of Cape Town, 1988. http://hdl.handle.net/11427/17173.

Full text
Abstract:
Bibliography: pages 140-155.<br>The research investigated Work Schedule Stress experienced by female air cabin attendants (CAs) employed by South African Airways and its relationship to health variables in CAs. Specifically, it was hypothesised that Work Schedule Stress is an important stressor for CAs and is inversely related to health variables. Furthermore, the variables of Potency, Trait Anxiety, Trait Anger, and Social Support were proposed to moderate the relationship between Work Schedule Stress and the health variables. Data were collected from a sample of 108 domestic crew and 43 inte
APA, Harvard, Vancouver, ISO, and other styles
9

Campbell, Kelley Marie. "Flexible Work Schedules, Virtual Work Programs, and Employee Productivity." ScholarWorks, 2015. https://scholarworks.waldenu.edu/dissertations/509.

Full text
Abstract:
In a workplace marked by increasing change and competing commitments, business leaders require an increased understanding of alternative work programs. Utilizing spillover theory, motivator-hygiene theory, and adaptive structuration theory, this single case study was an exploration of the strategies that business leaders use for flexible work schedules and virtual work programs. The population consisted of 3 managerial business executives and 6 employees within a midwestern United States division of a global blood management solutions firm. The data collection process included a series of semi
APA, Harvard, Vancouver, ISO, and other styles
10

Li, Lok-man Jennifer. "Schedule delay of work trips in Hong Kong an empirical analysis /." Click to view the E-thesis via HKUTO, 2008. http://sunzi.lib.hku.hk/hkuto/record/B40988041.

Full text
APA, Harvard, Vancouver, ISO, and other styles
More sources

Books on the topic "Schedule of work with orders"

1

Firth, Violet M. Esoteric orders and their work. S. Weiser, 2000.

Find full text
APA, Harvard, Vancouver, ISO, and other styles
2

Schlesinger, Buzawa Eva, and Buzawa Carl G, eds. Do arrests and restraining orders work? Sage Publications, 1996.

Find full text
APA, Harvard, Vancouver, ISO, and other styles
3

Office for Standards in Education., ed. Inspecting youth work: A revised inspection schedule. OFSTED, 1997.

Find full text
APA, Harvard, Vancouver, ISO, and other styles
4

Services, Carillion, and PSA Specialist Services, eds. PSA schedule of rates for decoration work. 7th ed. TSO, 2003.

Find full text
APA, Harvard, Vancouver, ISO, and other styles
5

Ofsted. Inspecting youth work: A revised inspection schedule, March 1997. Ofsted, 1997.

Find full text
APA, Harvard, Vancouver, ISO, and other styles
6

Tsuchiya, Kenzaburō. Comfortable work in changing industrialization: Adaptation to labor, appropriate placement and systems applicable to an industrialized society. [University of Occupational and Environmental Health Japan], 1988.

Find full text
APA, Harvard, Vancouver, ISO, and other styles
7

Architects, Royal Institute ofBritish, ed. Historic buildings: Repairs and conservation work : alternative schedule of services. Royal Institute of British Architects, & others, 1992.

Find full text
APA, Harvard, Vancouver, ISO, and other styles
8

Judith, Harwin, ed. Making care orders work: A study of care plans and their implementation. Stationery Office, 2003.

Find full text
APA, Harvard, Vancouver, ISO, and other styles
9

Mellinger, Wayne Martin. Talk-as-work: The case of paramedic calls for emergency field orders. Department of Sociology, University of California, 1987.

Find full text
APA, Harvard, Vancouver, ISO, and other styles
10

Rinaldo, Peter M. The five-day weekend: A proposal for calendar and work-schedule change. DorPete Press, 1989.

Find full text
APA, Harvard, Vancouver, ISO, and other styles
More sources

Book chapters on the topic "Schedule of work with orders"

1

Oliskevych, Myroslav, Olexander Mel’nychenko, and Nazar Khomyn. "Сonstruction of Active Work Schedule of Trucks Drivers Based on Partially Ordered Mixed Graphs." In Lecture Notes in Networks and Systems. Springer Nature Switzerland, 2025. https://doi.org/10.1007/978-3-031-87379-9_14.

Full text
APA, Harvard, Vancouver, ISO, and other styles
2

Witte, Frank. "Schedule/Work Plan." In Strategy, Planning and Organization of Test Processes. Springer Fachmedien Wiesbaden, 2022. http://dx.doi.org/10.1007/978-3-658-36981-1_23.

Full text
APA, Harvard, Vancouver, ISO, and other styles
3

Yapa, Sanjaya, and Indika Abayarathne. "Processing Work Orders." In Dynamics 365 Field Service. Apress, 2020. http://dx.doi.org/10.1007/978-1-4842-6408-9_7.

Full text
APA, Harvard, Vancouver, ISO, and other styles
4

Bakopoulos, Emmanouil, Vasilis Siatras, Panagiotis Mavrothalassitis, Nikolaos Nikolakis, and Kosmas Alexopoulos. "Digital-Twin-Enabled Framework for Training and Deploying AI Agents for Production Scheduling." In Artificial Intelligence in Manufacturing. Springer Nature Switzerland, 2024. http://dx.doi.org/10.1007/978-3-031-46452-2_9.

Full text
Abstract:
AbstractDigital manufacturing tools aim to provide intelligent solutions that will help manufacturing industry adapt to the volatile work environment. Modern technologies such as artificial intelligence (AI) and digital twins (DT) are primarily exploited in a way to simulate and select efficient solutions from a broad range of alternative decisions. This work aims to couple DT and AI technologies in a framework where training, testing, and deployment of AI agents is made more efficient in production scheduling applications. A set of different AI agents were developed, utilizing key optimizatio
APA, Harvard, Vancouver, ISO, and other styles
5

Yapa, Sanjaya, and Indika Abayarathne. "Work Orders and Scheduling." In Dynamics 365 Field Service. Apress, 2020. http://dx.doi.org/10.1007/978-1-4842-6408-9_3.

Full text
APA, Harvard, Vancouver, ISO, and other styles
6

Moré, Paloma. "‘Here, we don’t only receive orders’." In Gender, Work and Migration. Routledge, 2018. http://dx.doi.org/10.4324/9781315225210-3.

Full text
APA, Harvard, Vancouver, ISO, and other styles
7

Murahata, Shogo, Masaki Ogura, and Atsuo Suzuki. "Implementation and Management of Surgical Schedule and Work Schedule Creation System." In Springer Series in Reliability Engineering. Springer Nature Switzerland, 2024. http://dx.doi.org/10.1007/978-3-031-64597-6_5.

Full text
APA, Harvard, Vancouver, ISO, and other styles
8

Mueller, Frederick Wm. "Common Descriptions of Work." In Integrated Cost and Schedule Control for Construction Projects. Springer US, 1986. http://dx.doi.org/10.1007/978-1-4615-9750-6_2.

Full text
APA, Harvard, Vancouver, ISO, and other styles
9

Emmerink, Richard H. M. "Empirical Analysis of the Work Schedule Flexibility." In Advances in Spatial Science. Springer Berlin Heidelberg, 1998. http://dx.doi.org/10.1007/978-3-642-72143-4_14.

Full text
APA, Harvard, Vancouver, ISO, and other styles
10

Kassirra, Ralf, and Herbert Rausch. "Analyzing Motivation-Enhancing Features in Work Orders." In Advances in Ergonomic Design of Systems, Products and Processes. Springer Berlin Heidelberg, 2016. http://dx.doi.org/10.1007/978-3-662-48661-0_8.

Full text
APA, Harvard, Vancouver, ISO, and other styles

Conference papers on the topic "Schedule of work with orders"

1

Farschon, Christopher, Michael Hewins, and Charles Moran. "Repainting Bridges During Rehabilitation Projects: Sequencing Options." In Paint and Coatings Expo (PACE) 2006. SSPC, 2006. https://doi.org/10.5006/s2006-00025.

Full text
Abstract:
Abstract Major bridge rehabilitation projects may include painting of the steel superstructure in addition to deck replacement, expansion joint improvements, bearing replacement, etc. This paper will review the scheduling of the coatings work during a bridge rehabilitation project and how the order of coatings work affects the project schedule, cost, and quality. Constructing and then painting a complex steel structure is no easy task. Designers and constructors face numerous challenges throughout the process, not the least of these is how to protect the steel from corrosion during the life of
APA, Harvard, Vancouver, ISO, and other styles
2

Brown, Cory. "Lining Concrete Ground Storage Tanks in Cold Weather." In Coatings+ 2020. SSPC, 2020. https://doi.org/10.5006/s2020-00008.

Full text
Abstract:
Abstract Concrete ground storage tanks for potable water can often times be large. This can make lining them a difficult task, especially when temperatures are cold. To minimize disruptions to water delivery to their customers, many municipalities like to schedule lining work in potable water storage tanks during low usage time, which coincide with colder temperatures. Because concrete is notorious for cracks, it is common for lining selection to include flexible materials such as aromatic polyurethanes for these ground storage tanks. These polyurethanes linings require epoxy primers to reduce
APA, Harvard, Vancouver, ISO, and other styles
3

Van Der Schijff, Ockert J., and Scott C. Bodemann. "Interim Results of Long Term Corrosion Testing under Compressed Air and Nitrogen Supervision." In CORROSION 2013. NACE International, 2013. https://doi.org/10.5006/c2013-02846.

Full text
Abstract:
Abstract Internal corrosion of dry and pre-action systems is an ongoing and ever growing problem for owners and operators of such systems. The use of nitrogen as a supervisory gas instead of compressed air is one of several techniques that have been put forth as a way to prevent or retard corrosion. In order to fully investigate and compile verifiable data about the efficacy of nitrogen as a supervisory gas, long-term exposure tests were set up in 2009. Sprinkler pipe sections were assembled to simulate in-service, dry sprinkler piping with residual water. The three different conditions curren
APA, Harvard, Vancouver, ISO, and other styles
4

Wu, Guoyao, Wei Kang, Fan Pan, Jingchai Chi, Jun Ma, and Yufeng Chen. "Intelligent Detection of Electrical Safety Service Work Orders Based on Image Recognition." In 2024 IEEE 2nd International Conference on Electrical, Automation and Computer Engineering (ICEACE). IEEE, 2024. https://doi.org/10.1109/iceace63551.2024.10898421.

Full text
APA, Harvard, Vancouver, ISO, and other styles
5

Samouilidou, Maria E., Nikolaos Passalis, Georgios P. Georgiadis, and Michael C. Georgiadis. "Enhancing Large-Scale Production Scheduling Using Machine-Learning Techniques." In The 35th European Symposium on Computer Aided Process Engineering. PSE Press, 2025. https://doi.org/10.69997/sct.168290.

Full text
Abstract:
This study focuses on optimizing production scheduling in multi-product plants with shared resources and costly changeover operations. Specifically, two main challenges are addressed, the unknown changeover behavior of new products and the need for rapid schedule generation after unforeseen events. An innovative framework integrating Machine Learning (ML) techniques with Mixed-Integer Linear Programming (MILP) is proposed for single-stage production processes. Initially, a regression model predicts unknown changeover times based on key product attributes. Then, a representation where distances
APA, Harvard, Vancouver, ISO, and other styles
6

Powers, Greg. "Managing Construction Risk through Aggressive Schedule Management." In SSPC 2011. SSPC, 2011. https://doi.org/10.5006/s2011-00057.

Full text
Abstract:
Abstract Contractors often agree to deliver a project on a certain schedule. Then, once the work begins, the project suffers significant impacts, oftentimes through no fault of either the General Contractor or the Subcontractors, and then they do not have the tools in place to properly communicate the impacts, recover the losses and manage success.
APA, Harvard, Vancouver, ISO, and other styles
7

Tang, Longbo, and Xiaorong Wang. "Intelligent Early Warning Algorithm for Abnormal Work Orders of Key Nodes Based on Frequent Itemsets." In 2024 4th International Symposium on Artificial Intelligence and Intelligent Manufacturing (AIIM). IEEE, 2024. https://doi.org/10.1109/aiim64537.2024.10934388.

Full text
APA, Harvard, Vancouver, ISO, and other styles
8

Si, Jinxin, Fuyong Sun, Shuaibing Song, et al. "SCDM:Integrating Semantic Learning and Multi-Task Optimization for Multi-Label Classification of Power Work Orders." In 2024 10th International Conference on Systems and Informatics (ICSAI). IEEE, 2024. https://doi.org/10.1109/icsai65059.2024.10893840.

Full text
APA, Harvard, Vancouver, ISO, and other styles
9

Chandola, Gaurav, Sanchit Singh, Manas Kundu, Kishankumar Jaysval, Mark U. Onwusoh, and Joseph A. Ukanah. "Preventive Maintenance Schedule Automation in Oil and Gas Facilities Using Constraint Programming." In SPE Annual Technical Conference and Exhibition. SPE, 2023. http://dx.doi.org/10.2118/215009-ms.

Full text
Abstract:
Abstract This paper presents details of an optimization tool which is developed to automate the week-wise preventive maintenance (PM) scheduling of equipment on oil and gas facilities for a 5-year scheduling horizon. The tool has been developed employing constraint programming (CP) paradigm and employs IBM ILOG CP Optimizer as the optimization engine. The tool takes the schedule auto generated by the computerized maintenance management systems (CMMS) as an input and efficiently load-levels the weekly-loads distribution by rescheduling maintenance activities from their scheduled dates while ens
APA, Harvard, Vancouver, ISO, and other styles
10

Gomes, Luciana de Q. Leal, Reinaldo C. M. Gomes, Cristine M. Gomes de Gusmão, and Hermano Perrelli de Moura. "Evaluating CPI and SPI Indicators in Project Management Maturity Evolution." In Simpósio Brasileiro de Sistemas de Informação. Sociedade Brasileira de Computação, 2013. http://dx.doi.org/10.5753/sbsi.2013.5744.

Full text
Abstract:
Project management has become a common subject in Software Engineering and an everyday task in software organizations. In this task, the effective use of technologies can determine the success of any business; affect quality and ability to provide products and services on time. According to some authors, success in project execution can be associated with organization maturity. Organizations search for project management maturity in order to improve their management process and increase client satisfaction. Maturity is related to cost, time and quality, and can determine the success of project
APA, Harvard, Vancouver, ISO, and other styles

Reports on the topic "Schedule of work with orders"

1

Grigsby, Tenora. The Effects of Perceived Work Schedule Flexibility, Number of Hours Worked, and Type of Work Schedule on Work-Family Conflict. Portland State University Library, 2000. http://dx.doi.org/10.15760/etd.6490.

Full text
APA, Harvard, Vancouver, ISO, and other styles
2

Padhye, Suyash, Aishwarya Sharma, Hesam Arefkhani, et al. INDOT Project Change Orders: Root Causes and Recommendations. Purdue University, 2024. https://doi.org/10.5703/1288284317747.

Full text
Abstract:
This study analyzed the historical trends in change orders (COs) associated with the Indiana Department of Transportation (INDOT) highway contracts. It also investigated correlations between COs and base factors (district, project type, contract type, award amount, geographical area (rural vs. urban)), and sought to understand the effect of the root causes but not to predict CO based on root causes. Unlike the base factors, the root causes are unknown prior to construction. The study developed models that forecasted CO characteristics—CO likelihood, CO frequency (count), and CO severity (magni
APA, Harvard, Vancouver, ISO, and other styles
3

Mohan, Varenya Kumar Duvvuru, Monica Prezzi, and Bob McCullouch. Analysis of Change Orders in Geotechnical Engineering Work at INDOT. Purdue University Press, 2011. http://dx.doi.org/10.5703/1288284314623.

Full text
APA, Harvard, Vancouver, ISO, and other styles
4

Adam, Stuart. Work incentives, redistribution and the tax/benefit rate schedule. The IFS, 2018. http://dx.doi.org/10.1920/ps.ifs.2024.0105.

Full text
APA, Harvard, Vancouver, ISO, and other styles
5

Adams-Prassl, Abi, Tom Waters, Maria Balgova, and Matthias Qian. Firm concentration & job design: the case of schedule flexible work arrangements. Institute for Fiscal Studies, 2023. http://dx.doi.org/10.1920/wp.ifs.2023.1423.

Full text
APA, Harvard, Vancouver, ISO, and other styles
6

LVOVICH, Ya, A. PREOBRAZHENSKIY, and Yu PREOBRAZHENSKIY. ANALYSIS OF TRANSPORT SYSTEM MANAGEMENT CAPABILITIES. Science and Innovation Center Publishing House, 2022. http://dx.doi.org/10.12731/2070-7568-2022-11-1-4-44-53.

Full text
Abstract:
The paper discusses the task related to the management of the transport system. The possibilities of securing orders are shown. An algorithm for evaluating work at the stages of marketing research is given.
APA, Harvard, Vancouver, ISO, and other styles
7

Mykyta, Laryssa. Work Conditions and Serious Psychological Distress Among Working Adults Aged 18–64: United States, 2021. National Center for Health Statistics (U.S.), 2023. http://dx.doi.org/10.15620/cdc:126566.

Full text
Abstract:
This report uses 2021 National Health Interview Survey data to examine differences in serious psychological distress in working adults in the past 30 days by working conditions, including shift work, monthly earnings variation, perceived job insecurity, and schedule flexibility.
APA, Harvard, Vancouver, ISO, and other styles
8

Želvytė, Julija, and Regina Narkiekė. Cargo Transportation using Modern Technologies at UAB "Kamida". Vilnius Business College, 2024. https://doi.org/10.57005/ab.2024.2.3.

Full text
Abstract:
This article presents the role of integrated technology systems in optimizing cargo transportation processes, focusing mainly on UAB "Kamida". Logistics, especially cargo transportation, is a complex operation involving various activities, during which the efficiency of transportation methods has a significant impact on costs and the quality of customer service. Modern technologies, such as cargo tracking systems, vehicle tracking systems, and order management systems, make it possible to simplify the transportation process and reduce costs. The obtained results showed that UAB "Kamida" uses s
APA, Harvard, Vancouver, ISO, and other styles
9

Deitelhoff, Nicole, Rainer Forst, Vinzenz Hediger, and Tobias Wille. Trust in conflict : notes on a research program. ConTrust - Trust in Conflict. Research Centre "Normative Orders" of Goethe University Frankfurt am Main, 2025. https://doi.org/10.21248/gups.90950.

Full text
Abstract:
The ConTrust research initiative challenges the conventional wisdom that trust is antithetical to conflict. Instead, ConTrust posits that under certain social and institutional conditions, trust can also emerge in and through conflict. To lay the groundwork for this agenda, this working paper develops a basic concept of trust that is the foundation for more specific conceptions of trust. Furthermore, it distinguishes between justified and unjustified trust, introduces a notion of social integration through conflict, highlights the role of uncertainty and crisis in contemporary trust dynamics,
APA, Harvard, Vancouver, ISO, and other styles
10

Busso, Matías, Juanita Camacho, Julián Messina, and Guadalupe Montenegro. Social Protection and Informality in Latin America during the COVID-19 Pandemic. Inter-American Development Bank, 2020. http://dx.doi.org/10.18235/0002865.

Full text
Abstract:
Latin American governments swiftly implemented income assistance programs to sustain families' livelihoods during COVID-19 stay-at-home orders. This paper analyzes the potential coverage and generosity of these measures and assesses the suitability of current safety nets to deal with unexpected negative income shocks in 10 Latin American countries. The expansion of pre-existing programs (most notably conditional cash transfers and non-contributory pensions) during the COVID-19 crisis was generally insufficient to compensate for the inability to work among the poorest segments of the population
APA, Harvard, Vancouver, ISO, and other styles
We offer discounts on all premium plans for authors whose works are included in thematic literature selections. Contact us to get a unique promo code!